DE10240432B4 - Guide roller for contact wire pull on the side holder - Google Patents

Guide roller for contact wire pull on the side holder Download PDF

Info

Publication number
DE10240432B4
DE10240432B4 DE2002140432 DE10240432A DE10240432B4 DE 10240432 B4 DE10240432 B4 DE 10240432B4 DE 2002140432 DE2002140432 DE 2002140432 DE 10240432 A DE10240432 A DE 10240432A DE 10240432 B4 DE10240432 B4 DE 10240432B4
Authority
DE
Germany
Prior art keywords
contact wire
guide roller
der
die
side holder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE2002140432
Other languages
German (de)
Other versions
DE10240432A1 (en
Inventor
Thomas Kosel
Thomas Nittel
Norbert Rode
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DB Netz AG
Original Assignee
DB Netz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DB Netz AG filed Critical DB Netz AG
Priority to DE2002140432 priority Critical patent/DE10240432B4/en
Publication of DE10240432A1 publication Critical patent/DE10240432A1/en
Application granted granted Critical
Publication of DE10240432B4 publication Critical patent/DE10240432B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/20Arrangements for supporting or suspending trolley wires, e.g. from buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/28Manufacturing or repairing trolley lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Current-Collector Devices For Electrically Propelled Vehicles (AREA)
  • Electric Cable Installation (AREA)

Abstract

Vorrichtung zur Befestigung eines Fahrdrahtes einer Oberleitung an einem Seitenhalter eines Auslegers eines Oberleitungsmasten während eines Ziehens und Abspannens des Fahrdrahtes (3), dadurch gekennzeichnet, dass der Fahrdraht im Bereich der Spitze des Seitenhalters (8)
– über mindestens eine in Zieh- und Abspannrichtung drehbare Führungsrolle (1) geführt ist,
– die Führungsrolle (1) mit Hilfe einer Bügelkonstruktion (2) an der Spitze des Seitenhalters (8) eingehängt ist
– der über die Führungsrolle (1) laufende Fahrdraht (3) mit Hilfe einer Verriegelung (4), die höhenverstellbar an der Bügelkonstruktion (2) befestigt ist und mit einer Klemmvorrichtung (5) arretiert werden kann, gegen ein mögliches Herausfallen gesichert ist.
Device for fixing a contact wire of a catenary to a side support of a boom of a catenary mast during pulling and guying of the contact wire (3), characterized in that the contact wire in the region of the tip of the side support (8)
- Is guided over at least one in the drawing and guying direction rotatable guide roller (1),
- The guide roller (1) by means of a bracket construction (2) at the top of the side holder (8) is mounted
- The above the guide roller (1) running contact wire (3) by means of a lock (4) which is fixed in height adjustable on the bracket construction (2) and can be locked with a clamping device (5) is secured against possible falling out.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Vorrichtung zur Befestigung eines Fahrdrahtes einer Oberleitung an einem Seitenhalter eines Auslegers insbesondere eines Oberleitungsmasten während eines Ziehens und Abspannens des Fahrdrahtes. Dieses Ziehen und Abspannen des Fahrdrahtes erfolgt bei Neueinrichtung oder Austausch des Fahrdrahtes der Oberleitung. Oberleitungen, auf die sich die Erfindung bezieht, finden ihre Anwendung insbesondere bei Schienenbahnen und Oberleitungsbussen, sog. O-Bussen.The The invention relates to a device for fastening a contact wire a catenary on a side bracket of a boom in particular a trolley pole during pulling and guying the contact wire. This pulling and unclamping of the contact wire takes place when new equipment or replacement of the contact wire the overhead line. Overhead lines to which the invention relates find their application especially in railways and trolleybuses, so-called O-buses.

Der Fahrdraht einer Oberleitung ist während seines Betriebes unter einer mechanischen Spannung in Längsrichtung verlegt. Diese mechanische Spannung wird an den beiden Enden des Fahrdrahtes durch Abspannwerke erzeugt, an denen der Fahrdraht mit Gewichten, insbesondere Betongewichte, gespannt wird. Zwischen den Abspannwerken wird der Fahrdraht an Fahrleitungsstützpunkten an Oberleitungsmasten mit Seitenhaltern in einer bestimmten Höhe über der Fahrbahnoberkante gehalten. Zusätzlich wird der Fahrdraht durch die Seitenhalter in einem sog. Zick-Zack-Verlauf gehalten, um einen gleichmäßigen Abrieb von Stromabnehmern von Fahrzeugen zu gewährleisten. Aufgabe der mechanischen Abspannung des Fahrdrahtes ist, dass sich der Fahrdraht möglichst wenig zwischen den einzelnen Seitenhaltern nach unten durchbiegt.Of the Catenary of a catenary is under during its operation under a mechanical tension in the longitudinal direction laid. This mechanical tension is applied to the two ends of the Contact wire generated by tie bars, where the contact wire with Weights, especially concrete weights, is stretched. Between Abspannwerken is the contact wire at catenary bases on overhead pylons with side supports at a certain height above the Roadway edge held. additionally is the contact wire through the side holder in a so-called zig-zag course held to a uniform abrasion of pantographs of vehicles. Task of mechanical Tensioning the contact wire is that the contact wire as possible little bends down between the individual side brackets.

Bei Neueinrichtung oder Austausch des Fahrdrahtes der Oberleitung einer Strecke wird der Fahrdraht zunächst beweglich an dem jeweiligen Seitenhalter des Auslegers befestigt. Daraufhin wird der Fahrdraht mit etwas mehr Länge als erforderlich bis zu dem Seitenhalter des Auslegers des nächsten, folgenden Oberleitungsmasten verlegt. Ist der Fahrdraht zwischen zwei Abspannwerken vollständig verlegt, wird er mechanisch an seinen beiden Enden auf die endgültige, von der Oberbauart abhängigen Betriebszugkraft abgespannt. Hierbei bewegt sich der Fahrdraht in der beweglichen Lagerung an den Seitenhaltern zwischen 30 cm und 90 cm und wird bei erreichen der endgültigen Zugkraft und damit seiner endgültigen Lage am Seitenhalter in einer Seitenhalterklemme eingeklemmt.at New installation or replacement of the contact wire of the catenary of a Route will be the contact wire first movably attached to the respective side bracket of the boom. Thereupon, the contact wire with a little more length than required up to the side bracket of the boom of the next, following trolley masts laid. Is the contact wire completely laid between two guy stations, he is mechanically at its two ends to the final, from dependent on the superstructure type Operating tractive force tautened. Here, the contact wire moves in the mobile storage on the side supports between 30 cm and 90 cm and will reach the final traction and thus its final position clamped on the side holder in a side holder clamp.

Stand der Technik ist, dass der neue Fahrdraht während des Ziehens und Abspannens am Seitenhalter des Auslegers mit Kupferdraht oder mit einem S-förmig gebogenem Haken, sog. S-Haken, in Zug- und Abspannrichtung beweglich befestigt wird. Die Befestigung mit Kupferdraht oder S-Haken ist sehr kos tengünstig. Vor allem die Kupferdrahtbefestigung wird bevorzugt verwendet, da der entsprechende Kupferdraht bei der Montage der Oberleitung ohnehin in großen Mengen zur Verfügung steht, Kupferdraht leicht zu handhaben ist und keinen oder nur einen sehr geringen Aufwand bei der Einweisung des Montagepersonals erfordert.was standing The technique is that the new contact wire during pulling and guying on the side bracket of the boom with copper wire or with an S-shaped curved hook, so-called. S-hook, is mounted movable in tension and guying. The Fixing with copper wire or S-hook is very cost-effective. In front In particular, the copper wire attachment is preferably used because of corresponding copper wire during assembly of the overhead line anyway in big Quantities available stands, copper wire is easy to handle and no or only one requires very little effort in instructing the assembly personnel.

Diesen Vorteilen des Standes der Technik stehen jedoch einige Nachteile entgegen:

  • – Der Fahrdraht wird bei dem Ziehen durch die Kupferdrahtbefestigung bzw. den S-Haken sehr häufig mechanisch beschädigt. Hierdurch treten Unebenheiten an der Kontaktfläche Fahrdraht-Stromabnehmer auf, die sich im Laufe der Betriebszeit vergrößern, zu einem Lichtbogen und Abbrand zwischen Fahrdraht und Stromabnehmer führen und damit die Liegezeit des Fahrdrahtes verkürzen.
  • – Der Fahrdraht kann sich während der Montage – zum Teil mehrfach – um seine Längsachse verdrehen, so dass er in einem nachfolgenden Kontrollgang wieder zurück gedreht werden muss.
  • – Der Fahrdraht kann sich in der Kupferdrahtbefestigung bzw. dem S-Haken verklemmen, so dass sich beim Ziehen und Abspannen häufig der Seitenhalter schräg stellt. Dies tritt vor allem in Kurven der Strecke auf, in denen die Zug- und Abspannrichtung des Fahrdrahtes leicht schräg gegenüber der Zug- und Abspannrichtung in der Geraden ausgerichtet ist. Folge ist ein Kontrollaufwand, um die Lage der Seitenhalter zu überprüfen und gegebenenfalls wieder in ihre erforderlichen Lage zu bringen. Erst dann ist eine Übernahme des Fahrdrahtes auf das Abspannwerk möglich.
  • – Durch das Verklemmen des Fahrdrahtes in der Kupferdrahtbefestigung bzw. dem S-Haken stellt sich zudem der Seitenhalter zum Teil in einem solchen Maße quer, dass der Seitenhalter beschädigt wird. Insbesondere brechen die Isolatoren des Seitenhalters.
  • – Durch das Verklemmen des Fahrdrahtes in der Kupferdrahtbefestigung bzw. dem S-Haken kommt es bei weiterem Ziehen und Abspannen des Fahrdrahtes zu einem nachfolgenden pötzlichen Lösen der Verklemmung. Hierdurch entstehen ruckartige Bewegungen im Fahrdraht, die ein definiertes, kontinuierliches Abspannen des Fahrdrahtes verhindern.
  • – Durch das Verklemmen des Fahrdrahtes in der Kupferdrahtbefestigung kommt es vor, dass bereits während der Montage des Fahrdrahtes, aufgrund von Zugkräften während der Montage der Kupferdraht reißt. Dieses Reißen geschieht üblicherweise dann, wenn sich das Bedienungspersonal, das den Fahrdraht zumeist nachts montiert, bereits mehere hundert Meter von der Rissstelle weiterbewegt hat. Es geschieht somit unbemerkt. Desweiteren kann das Reißen einer einzelnen Kupferdrahtbefestigung zu einem kettenreaktionsartigen Reißen weiterer Kupferdrahtbefestigungen führen, wodurch zum Teil mehrere hundert Meter Fahhdraht herunter gerissen werden.
  • – Vor allem in Kurven besteht – aufgrund erhöhter Querzugkräfte – die Gefahr des Reißens der Kupferdrahtbefestigung, so dass in diesem Bereich weitere Maßnahmen zur Sicherung des Fahrdrahtes getroffen werden müssen.
  • – Das Einklemmen des Fahrdrahtes in die Seitenhalterklemme wird durch die verwendeten Kupferdrähte bzw. die S-Haken erschwert, da die Schrauben der Seitenhalterklemme durch den Kupferdraht bzw. den S-Haken verdeckt werden.
  • – Die Befestigung mit S-Haken ist unfallgefährlich, da der Fahrdraht aus dem offenen S-Haken wieder herausfallen kann.
However, these advantages of the prior art are counteracted by some disadvantages:
  • - The contact wire is very often mechanically damaged when pulled by the copper wire attachment or the S-hook. As a result, bumps occur at the contact surface contact wire pantograph, which increase in the course of the operating time, lead to an arc and burnup between the contact wire and pantograph and thus shorten the waiting time of the contact wire.
  • - The contact wire may twist during assembly - sometimes several times - about its longitudinal axis, so that it must be turned back in a subsequent inspection.
  • - The contact wire may jam in the copper wire attachment or the S-hook, so that when pulling and clamping often the side holder is inclined. This occurs especially in curves of the route, in which the tension and guying direction of the contact wire is slightly obliquely aligned with respect to the tensile and guying direction in the straight line. Result is a control effort to check the position of the side holder and, if necessary, to bring back to their required position. Only then is a takeover of the contact wire on the substation possible.
  • - Due to the jamming of the contact wire in the copper wire attachment or the S-hook, in addition, the side holder is partly transverse to such an extent that the side holder is damaged. In particular, break the insulators of the side holder.
  • - Due to the jamming of the contact wire in the copper wire attachment or the S-hook occurs when further pulling and clamping the contact wire to a subsequent sudden release of the jamming. This results in jerky movements in the contact wire, which prevent a defined, continuous tensioning of the contact wire.
  • - Due to the jamming of the contact wire in the copper wire fastening, it happens that already breaks during the installation of the contact wire, due to tensile forces during assembly of the copper wire. This tearing usually occurs when the operator, who usually mounts the contact wire at night, has already moved several hundred meters from the crack site. It happens thus unnoticed. Furthermore, the rupture of a single copper wire fixture can result in a chain reaction-like cracking of further copper wire fixtures, sometimes tearing down several hundred meters of wire.
  • - Especially in curves - due to increased transverse tensile forces - the risk of tearing the Kup Ferdrahtbefestigung, so that in this area further measures to secure the contact wire must be made.
  • - The jamming of the contact wire in the side holder clamp is made difficult by the copper wires or the S-hooks used, since the screws of the side holder clamp are covered by the copper wire or the S-hook.
  • - Attachment with S-hooks is dangerous for accidents, since the contact wire can fall out of the open S-hook again.

Bisher wurden diese genannten Nachteile des Standes der Technik durch den Betreiber der Strecke und Auftraggeber der Bau- bzw. Instandhaltungsmaßnahme an der Oberleitung aufgrund der finanziellen Einsparungen während der Bauphase toleriert – die Befestigung des Fahrdrahtes an dem Seitenhalter mit Kupferdraht oder S-Haken ist billig. Zunehmend berücksichtigen die Betreiber der Strecke und Auftraggeber der Bau- bzw. Instandhaltungsmaßnahme an der Oberleitung jedoch nicht nur die Kosten während der Bauphase sondern auch die Betriebskosten der Strecke sowie die folgenden Kosten für die Instandhaltung der Oberleitung, die sog. Life-Cycle-Costs LCC. Maßnahmen und Vorrichtungen, die zwar die Baukosten senken, in der Folge jedoch die Betriebskosten und die Kosten für die Instandhaltung unzulässig erhöhen, können zukünftig nicht mehr akzeptiert werden.So far These disadvantages of the prior art mentioned by the Operator of the line and client of the construction or maintenance measure the overhead line due to the financial savings during the Construction phase tolerated - the Fix the contact wire to the side support with copper wire or S-hook is cheap. Increasingly, the operators of the Route and client of the construction or maintenance measure the overhead line not only the costs during the construction phase but also the operating costs of the route as well as the following costs for the maintenance the overhead line, the so-called life cycle costs LCC. activities and devices that reduce construction costs but subsequently Increase the operating costs and costs of maintenance inadmissible, can not in the future more to be accepted.

Aus DE 526 889 C ist eine Methode der Fahrdrahtverlegung bekannt, bei der der Fahrdraht durch ein Verlegefahrzeug nicht provisorisch an den Seitenhaltern befestigt, sondern bereits unter Vorspannung verlegt und sofort endgültig an in den Klemmen der Seitenhalter befestigt wird. Demzufolge sind provisorische Befestigungsmittel an den Seitenhaltern nicht erforderlich. Nachteil dieser Methoder ist jedoch, dass bei einem eventuellen erforderlichen Nachspannen des Fahrdrahtes nach Beendigung des Verlegens alle Klemmen der Seitenhalter einzeln wieder geöffnet und alle Seitenhalter nachjustiert werden müssen. Hierdurch entsteht ein erheblicher Aufwand für die Nacharbeitung.Out DE 526 889 C a method of trolley installation is known in which the contact wire is not temporarily attached by a laying vehicle to the side brackets, but already laid under bias and immediately finally attached to the terminals of the side bracket. As a result, temporary fasteners on the side brackets are not required. Disadvantage of this method, however, is that in case of any necessary retightening of the contact wire after completion of laying all terminals of the side holder individually opened again and all side holder must be readjusted. This creates a considerable effort for reworking.

Aus US 3 199 840 ist eine Methode zur Verlegung von Freileitungen einer Hochspannungsleitung bekannt, bei der die Verlegung von Freileitungen mittels eines Vorseils geschieht. Hierbei werden zunächst an allen Tragmasten der Freileitung Rollen befestigt und über diese das Vorseil geführt. Daraufhin wird am Vorseil ein oder mehrere Leiter der Freileitung befestigt und durch die Rollen gezogen. Die Leiter der Freileitung sind hierbei auf Kabeltrommeln aufgewickelt, die sich vor dem ersten Tragmast befinden und während des gesamten Verlegevorganges nicht bewegt werden. Nachteile dieser Methode sind:

  • – Der Leiter der Freileitung muss mit seiner gesamten Länge von mehreren hundert Metern bis mehreren Kilometern durch die Befestigungen an den Tragmasten gezogen werden. Dies erfordert präzise gefertigte Rollen mit einer sehr geringen Rollreibung, die für hohe Traglasten dimensioniert sind. Die verwendeten Rollen sind demzufolge teuer sowie aufwendig in ihrer Herstellung und Wartung.
  • – Durch die unterschiedlichen Orte einer Trommel auf die das Vorseil aufgewickelt wird und der Trommel von der der Leiter der Freileitung abgewickelt wird ist ein erhöhter Aufwand von Personal sowie eine exakte Abstimmung der Auf- bzw. Abwickelgeschwindigkeit zwischen den beiden Trommeln erforderlich.
Out US 3,199,840 is a method for laying overhead lines of a high voltage line known in which the laying of overhead lines done by means of a pre-cable. Here are first attached to all poles of the overhead line rollers and passed over this the Vorseil. Then one or more conductors of the overhead line is attached to the cable and pulled through the rollers. The conductors of the overhead line are here wound on cable drums, which are located in front of the first support pole and are not moved during the entire installation process. Disadvantages of this method are:
  • - The conductor of the overhead line must be pulled with its entire length of several hundred meters to several kilometers through the attachments to the support poles. This requires precisely manufactured rollers with a very low rolling friction, which are dimensioned for high load capacities. The roles used are therefore expensive and expensive in their production and maintenance.
  • - Due to the different locations of a drum on which the Vorseil is wound and the drum is unwound from the head of the overhead line an increased effort of personnel and an exact vote of up or unwinding speed between the two drums is required.

Es ist somit Aufgabe der Erfindung, eine einfache Vorrichtung anzugeben, die, bei geringem Arbeitsaufwand, den Fahrdraht beim Ziehen und Abspannen am Seitenhalter eines Auslegers in Zug- und Abspannrichtung beweglich befestigt ohne ihn sowie andere Teile der Oberleitung zu beschädigen und ohne die Sicherheit des Arbeitspersonals zu gefährden.It It is therefore an object of the invention to provide a simple device, which, with little effort, the contact wire when pulling and Clamping on the side bracket of a boom in tensile and guying direction movably fastened without him as well as other parts of the overhead line to damage and without compromising the safety of the workforce.

Diese Aufgabe wird in Verbindung mit dem Oberbegriff des Hauptanspruches erfindungsgemäß durch die in Anspruch 1 angegebenen Merkmale gelöst. Vorteile der Erfindung gegenüber dem Stand der Technik sind:

  • – Durch das Abrollen des Fahrdrahtes auf mindestens einer Führungsrolle wird der Fahrdraht nicht beschädigt und somit schonend verlegt. Hierdurch erhöht sich die Liegedauer des Fahrdrahtes, verringern sich die Kosten für Instandhaltung und verlängern sich die Wartungsintervalle des Fahrdrahtes.
  • – Durch die kontinuierlich rollende Bewegung des Fahrdrahtes auf mindestens einer Führungsrolle kann sich der Fahrdraht nicht in der Vorrichtung verklemmen, so dass die Seitenhalter immer von selbst in ihrer erforderlichen und endgültigen Lage positioniert bleiben. Ein Kontrollaufwand nach dem Ziehen und Abspannen des Fahrdrahtes, um die Seitenhalter wieder in ihrer erforderlichen Lage zu positionieren, ist nicht erforderlich.
  • – Weiterhin wird durch die kontinuierliche Bewegung des Fahrdrahtes auf mindestens einer Führungsrolle ein definiertes Abspannen ermöglicht.
  • – Durch eine höhenverstellbare Verriegelung der Bügelkonstruktion wird ein mögliches Herausfallen des Fahrdrahtes aus der Bügelkonstruktion sicher verhindert. Die Verriegelung ist zusätzlich drehbar um die Bügelkonstruktion angebracht, um ein Herausnehmen des Fahrdrahtes aus der Bügelkonstruktion zum Einspannen in die Seitenhalterklemme zu ermöglichen.
  • – Durch die Bügelkonstruktion wird die Seitenhalterklemme nicht verdeckt, so dass ein einfaches Einlegen in die Seitenhalterklemme ermöglicht wird.
This object is achieved in connection with the preamble of the main claim according to the invention by the features specified in claim 1. Advantages of the invention over the prior art are:
  • - By rolling the contact wire on at least one guide roller of the contact wire is not damaged and thus laid gently. This increases the service life of the contact wire, reduces the cost of maintenance and extend the service intervals of the contact wire.
  • - Due to the continuous rolling movement of the contact wire on at least one guide roller, the contact wire can not jam in the device, so that the side holder always remain positioned by itself in its required and final position. A control effort after pulling and unclamping the contact wire to position the side holder in its required position is not required.
  • - Furthermore, a defined clamping is made possible by the continuous movement of the contact wire on at least one guide roller.
  • - By a height-adjustable locking the bracket construction a possible falling out of the contact wire from the bracket construction is reliably prevented. The lock is additionally rotatably mounted around the stirrup structure to allow removal of the trolley wire from the stirrup structure for clamping in the side holder clamp.
  • - The bracket construction does not obstruct the side bracket clamp, allowing easy insertion into the side bracket clamp.

Nach Anspruch 2 ist mindestens eine der Führungsrollen aus einem weicheren Material als dem Material des Fahrdrahtes gefertigt. Vorteil ist hierbei eine zusätzliche Schonung des Fahrdrahtes, da sich während des Ziehens und Abspannens das Material der Führungsrolle und nicht des Fahrdrahtes abnutzt.To Claim 2 is at least one of the guide rollers made of a softer Material manufactured as the material of the contact wire. Advantage is here an additional Protection of the contact wire, since during pulling and guying the material of the leadership and not the contact wire wears off.

Anspruch 3 beinhaltet ein vorteilhaftes Ausführungsbeispiel für Anspruch 2. Als Material für den Fahrdraht wird, aufgrund seiner Leitfähigkeit, üblicherweise Kupfer verwendet. Das in Anspruch 3 angegebene Metall Messing für mindestens eine der Führungsrollen ist ein weicheres Material als Kupfer und führt somit zu den Vorteilen des Anspruchs 2.claim 3 includes an advantageous embodiment for claim 2. As material for The contact wire is usually used copper because of its conductivity. The specified in claim 3 metal brass for at least one of the guide rollers is a softer material than copper and thus leads to the benefits of claim 2.

Ansprüche 4 bis 6 beinhalten vorteilhafte Ausführungsbeispiele für die Form einer Führungsrolle. Insbesondere wird durch eine Vertiefung in Umlaufrichtung mindestens einer der Führungsrollen und/oder durch eine in hyperboloider oder paraboloider Form ausgebildete Führungsrolle gewährleistet, dass der Fahrdraht vor allem in der Mitte der Führungsrolle geführt wird. Vorteil dieser Ausführungsform ist eine verbesserte Führung des Fahrdrahtes ohne Berührung der Seitenteile der Bügelkonstruktion.Claims 4 to 6 contain advantageous embodiments for the Form of a leadership role. In particular, by a recess in the direction of rotation at least one of the leadership roles and / or by a trained in hyperboloider or paraboloidal form leadership ensures that the contact wire is guided especially in the middle of the leadership role. Advantage of this embodiment is an improved leadership of the contact wire without contact the side parts of the stirrup construction.

Anspruch 7 beinhaltet ein vorteilhaftes Ausführungsbeispiel der Bügelkonstruktion.claim 7 includes an advantageous embodiment of the bracket construction.

Die Erfindung wird nachstehend anhand der Ausführungsbeispiele der 1 bis 3 näher erläutert. Die Figuren zeigen inThe invention will be described below with reference to the embodiments of 1 to 3 explained in more detail. The figures show in

1 eine Führungsrolle mit der Bügelkonstruktion und der höhenverstellbaren Verriegelung in Draufsicht, 1 a guide roller with the bracket construction and the height-adjustable lock in plan view,

2 die Führungsrolle mit der Bügelkonstruktion und der höhenverstellbaren Verriegelung in Seitenansicht, 2 the guide roller with the bracket construction and the height-adjustable lock in side view,

3 die Führungsrolle mit der Bügelkonstruktion, die an einer Bohrung an der Spitze des Seitenhalters befestigt ist. 3 the guide roller with the bracket construction, which is attached to a bore at the top of the side holder.

In 1 ist die Führungsrolle (1) mit der Bügelkonstruktion (2), der höhenverstellbaren Verriegelung (4) und der Klemmvorrichtung (5) in Draufsicht sowie in 2 in Seitenansicht dargestellt. Auf der Führungsrolle, die frei drehbar um die Achse (6) angeordnet ist, bewegt sich der Fahrdraht (3) senkrecht zur ( 1) bzw. in Richtung der (2) Zeichnungsebene. Die Montage des Fahrdrahtes der Oberleitung mit Hilfe der in 1 dargestellten erfindungsgemäßen Vorrichtung erfolgt folgendermaßen:

  • 1. Die Bügelkonstruktion (2) wird, wie in 3 dargestellt, mit einem Haken (6) der Bügelkonstruktion incl. Führungsrolle und Verriegelung in eine Bohrung (10) des Seitenhalters (8) eingehängt.
  • 2. Daraufhin wird der Fahrdraht (3) in die Bügelkonstruktion (2) auf die Führungsrolle (1) gelegt und die Verriegelung (4) geschlossen.
  • 3. Nachdem der Fahrdraht in alle relevanten Seitenhalter eingelegt worden ist, wird der Fahrdraht an seinen beiden Enden abgespannt.
  • 4. Hat der Fahrdraht seine, von der Oberbauart abhängige Betriebszugkraft erreicht, wird die Verriegelung an der Bügelkonstruktion geöffnet, der Fahrdraht aus der Bügelkonstruktion gehoben und in die Seitenhalterklemme (9) eingeklemmt.
  • 5. Die Bügelkonstruktion wird wieder aus dem Seitenhalter entfernt, die Montage des Fahrdrahtes ist abgeschlossen.
In 1 is the leading role ( 1 ) with the bracket construction ( 2 ), the height-adjustable lock ( 4 ) and the clamping device ( 5 ) in plan view as well as in 2 shown in side view. On the guide roller, freely rotatable about the axis ( 6 ), the contact wire ( 3 ) perpendicular to ( 1 ) or in the direction of ( 2 ) Drawing plane. The installation of the contact wire of the catenary using the in 1 illustrated device according to the invention is carried out as follows:
  • 1. The bracket construction ( 2 ), as in 3 shown with a hook ( 6 ) of the bracket construction incl. Guide roller and locking in a hole ( 10 ) of the side holder ( 8th ).
  • 2. Then the contact wire ( 3 ) in the bracket construction ( 2 ) on the leadership role ( 1 ) and the lock ( 4 ) closed.
  • 3. After the contact wire has been inserted into all relevant side brackets, the contact wire is guyed at both ends.
  • 4. If the trolley wire has reached its superstructure-dependent operational traction, the interlock on the stirrup construction is opened, the trolley wire is lifted out of the stirrup construction and into the side holder clamp ( 9 ) trapped.
  • 5. The bracket construction is removed again from the side holder, the installation of the contact wire is completed.

11
Führungsrolleleadership
22
BügelkonstruktionIroning construction
33
Fahrdrahtcontact wire
44
Verriegelunglock
55
Klemmvorrichtungclamping device
66
Drehachse für die Führungsrolleaxis of rotation for the leadership
77
Hakenhook
88th
SeitenhalterTailpiece
99
SeitenhalterklemmeTailpiece terminal
1010
Bohrungdrilling

Claims (7)

Vorrichtung zur Befestigung eines Fahrdrahtes einer Oberleitung an einem Seitenhalter eines Auslegers eines Oberleitungsmasten während eines Ziehens und Abspannens des Fahrdrahtes (3), dadurch gekennzeichnet, dass der Fahrdraht im Bereich der Spitze des Seitenhalters (8) – über mindestens eine in Zieh- und Abspannrichtung drehbare Führungsrolle (1) geführt ist, – die Führungsrolle (1) mit Hilfe einer Bügelkonstruktion (2) an der Spitze des Seitenhalters (8) eingehängt ist – der über die Führungsrolle (1) laufende Fahrdraht (3) mit Hilfe einer Verriegelung (4), die höhenverstellbar an der Bügelkonstruktion (2) befestigt ist und mit einer Klemmvorrichtung (5) arretiert werden kann, gegen ein mögliches Herausfallen gesichert ist.Device for attaching a contact wire of a catenary to a side support of a cantilever of a catenary mast during pulling and unclamping of the contact wire ( 3 ), characterized in that the contact wire in the region of the tip of the side holder ( 8th ) - at least one in the drawing and guying direction rotatable guide roller ( 1 ), - the leadership role ( 1 ) by means of a stirrup construction ( 2 ) at the top of the side holder ( 8th ) - the one about leadership ( 1 ) running contact wire ( 3 ) by means of a lock ( 4 ), which are adjustable in height on the bracket construction ( 2 ) and with a clamping device ( 5 ) can be locked against a possible falling out is secured. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die mindestens eine Führungsrolle (1) aus einem weicheren Material als dem Material des Fahrdrahtes gefertigt ist.Apparatus according to claim 1, characterized in that the at least one guide roller ( 1 ) is made of a softer material than the material of the contact wire. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, dass die mindestens eine Führungsrolle (1) aus Messing gefertigt ist.Apparatus according to claim 2, characterized in that the at least one guide roller ( 1 ) is made of brass. Vorrichtung nach einem oder mehreren der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die mindestens eine Führungsrolle (1) zylindrisch geformt ist.Device according to one or more of claims 1 to 3, characterized in that the at least one guide roller ( 1 ) is cylindrically shaped. Vorrichtung nach einem oder mehrerer, Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die mindestens eine Führungsrolle (1) zylindrisch geformt ist und eine Vertiefung in Umlaufrichtung der Führungsrolle (1) zur Führung des Fahrdrahtes (3) in Querrichtung der Führungsrolle (1) aufweist.Device according to one or more of claims 1 to 4, characterized in that the at least one guide roller ( 1 ) is cylindrically shaped and a recess in the direction of rotation of the guide roller ( 1 ) for guiding the contact wire ( 3 ) in the transverse direction of the guide roller ( 1 ) having. Vorrichtung nach einem oder mehreren der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Führungsrolle (1) in hyperboloider oder paraboloider ausgebildet ist. Device according to one or more of claims 1 to 5, characterized in that the guide roller ( 1 ) is formed in hyperboloid or paraboloid. Vorrichtung nach einem oder mehreren der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Bügelkonstruktion (2) aus Rundstahl gefertigt ist.Device according to one or more of claims 1 to 6, characterized in that the bracket construction ( 2 ) is made of round steel.
DE2002140432 2002-09-02 2002-09-02 Guide roller for contact wire pull on the side holder Expired - Fee Related DE10240432B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2002140432 DE10240432B4 (en) 2002-09-02 2002-09-02 Guide roller for contact wire pull on the side holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2002140432 DE10240432B4 (en) 2002-09-02 2002-09-02 Guide roller for contact wire pull on the side holder

Publications (2)

Publication Number Publication Date
DE10240432A1 DE10240432A1 (en) 2004-03-11
DE10240432B4 true DE10240432B4 (en) 2005-12-08

Family

ID=31502261

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2002140432 Expired - Fee Related DE10240432B4 (en) 2002-09-02 2002-09-02 Guide roller for contact wire pull on the side holder

Country Status (1)

Country Link
DE (1) DE10240432B4 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT512493B1 (en) * 2012-01-25 2015-06-15 Karl U Albert Kruch Ges M B H & Co Kg Ing HOLDER FOR THE DRIVING WIRE OF SIMPLE DRIVING LINES

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE526889C (en) * 1928-12-31 1931-06-11 Anonima Elettrificazione Soc Device for laying electrical lines
US3199840A (en) * 1963-06-25 1965-08-10 L E Lindsey Convertible stringing block assembly

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE526889C (en) * 1928-12-31 1931-06-11 Anonima Elettrificazione Soc Device for laying electrical lines
US3199840A (en) * 1963-06-25 1965-08-10 L E Lindsey Convertible stringing block assembly

Also Published As

Publication number Publication date
DE10240432A1 (en) 2004-03-11

Similar Documents

Publication Publication Date Title
EP0459538A2 (en) Railroad machine to lay the power and/or supporting wire of track overhead line
WO2011107207A2 (en) Device for coupling elastic and rigid overhead line systems
EP2072322B1 (en) Conductor rail mounting device
DE102007041762B4 (en) Securing element, device and method for securing overhead lines
DE10240432B4 (en) Guide roller for contact wire pull on the side holder
EP2631107B1 (en) Tension adjustment device for catenaries of electrical railways
EP1418084B1 (en) Tensioning pulley
DE10240434B4 (en) Guide roller for carrying cable on the boom head
DE10240435B4 (en) Device for holding and adjusting the height of the contact wire during the trolley train
EP2410623A2 (en) Deflector module and system for tensioning a conductor strand on high voltage masts
DE1059523B (en) Procedure for pulling out overhead lines
EP2159325A1 (en) Lifting and assembly device for tension members of structures, use of a support element and use of a device and method for attaching and tensioning a tension member
DE519553C (en) Tensioning device for contact wires or other line parts of electric railways
EP1698030B1 (en) Method for splicing suspended high voltage cables
DE435746C (en) Device built into a catenary system for the separation of the route or the tensioning of the contact wire with an additional wire branched off from the contact wire and led upwards
DE3129973C2 (en) Automatic rope clamp with a clamping wedge and clamping surfaces
DE19937003B4 (en) Method and device for dismantling overhead cables
WO2023241848A1 (en) Connecting arrangement between longitudinal-connection elements of a catenary system, and catenary system having such a connecting arrangement
DE10164514C1 (en) Overhead cable mast lifting device has coaxial guide bearer tubes movable relative to each other by lifting arrangement; bearer tube can be connected to upper mast part at two or more levels
DE3028037A1 (en) SUSPENSION FOR A AIR CABLE ON AN OPERATION CABLE
DE624886C (en) Tensioning device for contact wires or other line parts of electric railways
DE2461318A1 (en) Roll suspension for overhead lines laying and dismounting - uses two suspender support elements one with rolls and suspension rope
DE10039871A1 (en) Single-arm jib for operating with a chain mechanism for a railway overhead line has a feeder arm on a holder device, a bearer cable mount for bearer cables and pressure registration arms to swivel and link to the feeder arm.
DE684022C (en) Device for attaching contact wires or other parts of electric railways to tensioning devices
DE4415899C2 (en) Drag line device

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: DB NETZ AG, 60486 FRANKFURT, DE

8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee