DE102019211641A1 - Route facility and method for operating a route facility - Google Patents

Route facility and method for operating a route facility Download PDF

Info

Publication number
DE102019211641A1
DE102019211641A1 DE102019211641.8A DE102019211641A DE102019211641A1 DE 102019211641 A1 DE102019211641 A1 DE 102019211641A1 DE 102019211641 A DE102019211641 A DE 102019211641A DE 102019211641 A1 DE102019211641 A1 DE 102019211641A1
Authority
DE
Germany
Prior art keywords
rbc1
facility
route
lok
assigned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102019211641.8A
Other languages
German (de)
Inventor
Mete Bulut
Daniel Dettmer
Bernd Henkel
Jens Möller
Wolfgang Opp
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Mobility GmbH
Original Assignee
Siemens Mobility GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Mobility GmbH filed Critical Siemens Mobility GmbH
Priority to DE102019211641.8A priority Critical patent/DE102019211641A1/en
Priority to EP20183587.3A priority patent/EP3771612B1/en
Publication of DE102019211641A1 publication Critical patent/DE102019211641A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or vehicle train for signalling purposes ; On-board control or communication systems
    • B61L15/0018Communication with or on the vehicle or vehicle train
    • B61L15/0027Radio-based, e.g. using GSM-R
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L15/00Indicators provided on the vehicle or vehicle train for signalling purposes ; On-board control or communication systems
    • B61L15/0072On-board train data handling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/40Handling position reports or trackside vehicle data
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/70Details of trackside communication
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/202Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using European Train Control System [ETCS]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L2205/00Communication or navigation systems for railway traffic
    • B61L2205/02Global system for mobile communication - railways (GSM-R)

Abstract

Die Erfindung bezieht sich auf ein Verfahren zum Betreiben einer ein Mobilfunknetz (MNET) nutzenden Streckeneinrichtung (RBC1), die einem Anlagenabschnitt (SA1) einer Streckenanlage, insbesondere einem Anlagenabschnitt (SA1) einer Eisenbahngleisanlage (EGA), zugeordnet ist und mit Fahrzeugen (LOK) über das Mobilfunknetz (MNET) kommunizieren kann. Erfindungsgemäß ist vorgesehen, dass nach Eingang eines Mobilfunkanrufs eines Fahrzeugs (LOK) geprüft wird, aus welcher Funkzelle (FZ0-FZ9) des Mobilfunknetzes (MNET) der Anruf stammt, anschließend geprüft wird, ob die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) zugeordnet ist oder nicht und im Falle, dass die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) nicht zugeordnet ist, zumindest eine andere Streckeneinrichtung (RBC2/RBC3) ermittelt wird, die der Funkzelle (FZ0-FZ9) zugeordnet ist, dem Fahrzeug (LOK) die Mobilfunknummer dieser zumindest einen anderen Streckeneinrichtung (RBC2/RBC3) mitgeteilt wird und anschließend die Kommunikationsverbindung beendet wird.The invention relates to a method for operating a line facility (RBC1) using a mobile radio network (MNET), which is assigned to a system section (SA1) of a line system, in particular a system section (SA1) of a railway track system (EGA), and which is assigned to vehicles (LOK) can communicate via the cellular network (MNET). According to the invention it is provided that after receiving a mobile phone call from a vehicle (LOK) it is checked from which radio cell (FZ0-FZ9) of the mobile radio network (MNET) the call originates, and then it is checked whether the radio cell (FZ0-FZ9) of the route facility (RBC1 ) is assigned or not and in the event that the radio cell (FZ0-FZ9) is not assigned to the link facility (RBC1), at least one other link facility (RBC2 / RBC3) is determined that is allocated to the radio cell (FZ0-FZ9) to which Vehicle (LOK) the mobile number of this at least one other route facility (RBC2 / RBC3) is communicated and then the communication connection is terminated.

Description

Die Erfindung bezieht sich auf ein Verfahren zum Betreiben einer ein Mobilfunknetz nutzenden Streckeneinrichtung, die einem Anlagenabschnitt, insbesondere einem Anlagenabschnitt einer Eisenbahngleisanlage, zugeordnet ist und mit Fahrzeugen, insbesondere Schienenfahrzeugen, über das Mobilfunknetz kommunizieren kann.The invention relates to a method for operating a route facility using a mobile radio network, which is assigned to a system section, in particular a system section of a railway track system, and can communicate with vehicles, in particular rail vehicles, via the mobile radio network.

Bekanntermaßen können Eisenbahngleisanlagen auf der Basis des ETCS-Standards betrieben werden. Streckeneinrichtungen in Form von Radio-Block-Centern benutzen beim ETCS-Standard das GSM-R-Netz zur Kommunikation mit und Steuerung von Schienenfahrzeugen, die auf der Eisenbahngleisanlage fahren.As is known, railroad tracks can be operated on the basis of the ETCS standard. In the ETCS standard, track facilities in the form of radio block centers use the GSM-R network to communicate with and control rail vehicles that run on the railway track system.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zum Betreiben von Streckeneinrichtungen anzugeben, bei der unnötige Kommunikationsverbindungen möglichst kurz gehalten werden.The invention is based on the object of specifying a method for operating route facilities in which unnecessary communication connections are kept as short as possible.

Diese Aufgabe wird erfindungsgemäß durch ein Verfahren mit den Merkmalen gemäß Patentanspruch 1 gelöst. Vorteilhafte Ausgestaltungen des erfindungsgemäßen Verfahrens sind in Unteransprüchen angegeben.According to the invention, this object is achieved by a method having the features according to patent claim 1. Advantageous embodiments of the method according to the invention are specified in the subclaims.

Danach ist erfindungsgemäß vorgesehen, dass nach Eingang eines Mobilfunkanrufs eines Fahrzeugs geprüft wird, aus welcher Funkzelle des Mobilfunknetzes der Anruf stammt, anschließend geprüft wird, ob die Funkzelle der Streckeneinrichtung zugeordnet ist oder nicht und im Falle, dass die Funkzelle der Streckeneinrichtung nicht zugeordnet ist, zumindest eine andere Streckeneinrichtung ermittelt wird, die der Funkzelle zugeordnet ist, dem Fahrzeug die Mobilfunknummer dieser zumindest einen anderen Streckeneinrichtung mitgeteilt wird und anschließend die Kommunikationsverbindung beendet wird.According to this, the invention provides that after receiving a cell phone call from a vehicle, it is checked from which cell of the cell phone network the call originates, then a check is made as to whether the cell is assigned to the link facility or not and in the event that the radio cell is not assigned to the link facility, at least one other link facility is determined which is assigned to the radio cell, the vehicle is informed of the mobile radio number of this at least one other link facility and the communication connection is then terminated.

Ein wesentlicher Vorteil des erfindungsgemäßen Verfahrens besteht darin, dass Fahrzeuge, die eine Kommunikationsverbindung mit nicht zuständigen Streckeneinrichtungen aufbauen, sehr schnell über diesen Umstand informiert werden sowie darüber hinaus bezüglich der zuständigen oder womöglich zuständigen Streckeneinrichtung und deren Mobilfunknummer in Kenntnis gesetzt werden. Nicht zielführende Kommunikationsverbindungen können somit schnell beendet werden, so dass damit einhergehend in vorteilhafter Weise sowohl das Kommunikationsnetz als auch die falsch angerufene Streckeneinrichtung von unnötiger Kommunikation entlastet werden.A major advantage of the method according to the invention is that vehicles that set up a communication link with non-responsible route facilities are informed of this fact very quickly and are also informed of the responsible or possibly responsible route facility and their mobile phone number. Communication connections that are not targeted can thus be terminated quickly, so that, as a result, both the communication network and the incorrectly called route facility are advantageously relieved of unnecessary communication.

Vorteilhaft ist es, wenn die Streckeneinrichtung die Kommunikationsverbindung selbst beendet. Alternativ kann in ebenfalls vorteilhafter Weise vorgesehen werden, dass die Streckeneinrichtung das Fahrzeug auffordert, die Kommunikationsverbindung zu beenden.It is advantageous if the link facility terminates the communication link itself. Alternatively, it can also advantageously be provided that the route facility requests the vehicle to terminate the communication connection.

Bei einer bevorzugten Ausgestaltung des Verfahrens ist vorgesehen, dass im Falle, dass die Funkzelle der Streckeneinrichtung zugeordnet ist, die Kommunikationsverbindung weiter bestehen bleibt und das Überfahren einer Baliseneinrichtung abgewartet wird, nach dem Eingang einer über die Kommunikationsverbindung übermittelten Nachricht des Fahrzeugs über das Überfahren der Baliseneinrichtung die in der Nachricht übermittelte Balisenkennung dahingehend überprüft wird, ob die Baliseneinrichtung in dem Anlagenabschnitt der Streckeneinrichtung angeordnet ist und im Falle, dass die Baliseneinrichtung nicht in dem Anlagenabschnitt der Streckeneinrichtung angeordnet ist, die zuständige Streckeneinrichtung ermittelt wird, also diejenige Streckeneinrichtung, die den die Baliseneinrichtung enthaltenden Anlagenabschnitt verwaltet, dem Fahrzeug die Mobilfunknummer dieser zuständigen Streckeneinrichtung mitgeteilt wird und anschließend die Kommunikationsverbindung beendet wird, und andernfalls die Kommunikationsverbindung weitergeführt wird.In a preferred embodiment of the method it is provided that in the event that the radio cell is assigned to the link facility, the communication link remains and the crossing of a balise facility is awaited after receipt of a message from the vehicle transmitted via the communication link about the crossing of the balise facility the balise identifier transmitted in the message is checked to determine whether the balise device is located in the system section of the line facility and, in the event that the balise device is not located in the system section of the line facility, the responsible line facility is determined, i.e. the line facility which the balise facility containing system section managed, the vehicle is informed of the mobile number of this responsible route facility and then the communication connection is terminated, and otherwise the comm communication connection is continued.

Das Mobilfunknetz ist vorzugsweise das GSM-R-Netz. Die Verbindung zwischen einer Netzvermittlungseinrichtung des Mobilfunknetzes, von der die Funkzelle abgefragt werden kann, ist vozugsweise leitungsgeschaltet (fachsprachlich „circuit-switched“) oder paketbasiert (fachsprachlich „packet-switched“).The cellular network is preferably the GSM-R network. The connection between a network switching device of the mobile radio network, from which the radio cell can be queried, is preferably line-switched (in technical terms "circuit-switched") or packet-based (in technical language "packet-switched").

Die Streckeneinrichtung ist vorzugsweise eine ETCS-kompatible Streckeneinrichtung, insbesondere ein ETCS-kompatibles Radio-Block-Centre.The link facility is preferably an ETCS-compatible link facility, in particular an ETCS-compatible radio block center.

Der Anlagenabschnitt ist vorzugsweise ein Eisenbahngleisanlagenabschnitt und das Fahrzeug ein Schienenfahrzeug.The system section is preferably a railway track system section and the vehicle is a rail vehicle.

Der Eisenbahngleisanlagenabschnitt wird vorzugsweise gemäß ETCS-Standard, insbesondere gemäß Level 2 oder Level 3, betrieben.The railway track section is preferably operated according to the ETCS standard, in particular according to level 2 or level 3.

Die Erfindung bezieht sich darüber hinaus auf eine Streckeneinrichtung, die ein Mobilfunknetz nutzen kann und einem Anlagenabschnitt, insbesondere einem Anlagenabschnitt einer Eisenbahngleisanlage, zugeordnet werden kann und mit Fahrzeugen über das Mobilfunknetz kommunizieren kann.The invention also relates to a route facility that can use a mobile radio network and can be assigned to a system section, in particular a system section of a railway track system, and can communicate with vehicles via the mobile radio network.

Erfindungsgemäß ist vorgesehen, dass die Streckeneinrichtung dazu ausgebildet ist, nach Eingang eines Mobilfunkanrufs eines Fahrzeugs von einer Netzvermittlungseinrichtung des Mobilfunknetzes abzufragen, aus welcher Funkzelle des Mobilfunknetzes der Anruf stammt, anschließend zu prüfen, ob die Funkzelle der Streckeneinrichtung zugeordnet ist oder nicht, und im Falle, dass die Funkzelle der Streckeneinrichtung nicht zugeordnet ist, zumindest eine andere Streckeneinrichtung zu ermitteln, die der Funkzelle zugeordnet ist, und dem Fahrzeug die Mobilfunknummer dieser zumindest einen anderen Streckeneinrichtung mitzuteilen.According to the invention, it is provided that the route device is designed to query a network switching device of the mobile network from which radio cell of the cellular network the call originates after receiving a mobile radio call from a vehicle, and then to check whether the radio cell is assigned to the route device or not, and in the event that the radio cell is not assigned to the link facility, to determine at least one other link facility that is allocated to the radio cell and to inform the vehicle of the mobile phone number of this at least one other link facility.

Bezüglich der Vorteile der erfindungsgemäßen Streckeneinrichtung sowie bezüglich vorteilhafter Ausgestaltungen der erfindungsgemäßen Streckeneinrichtung sei auf die obigen Ausführungen im Zusammenhang mit dem erfindungsgemäßen Verfahren und dessen vorteilhafter Ausgestaltungen verwiesen.With regard to the advantages of the route device according to the invention and with regard to advantageous configurations of the route device according to the invention, reference is made to the above statements in connection with the method according to the invention and its advantageous configurations.

Die Streckeneinrichtung ist vorzugsweise dazu ausgebildet, nach Übermittlung der Mobilfunknummer der zumindest einen anderen Streckeneinrichtung das Fahrzeug aufzufordern die Kommunikationsverbindung zu beenden oder selbst die Kommunikationsverbindung zu beenden.The link facility is preferably designed to request the vehicle to terminate the communication connection or to terminate the communication link itself after the cell phone number of the at least one other link facility has been transmitted.

Die Streckeneinrichtung weist vorzugsweise eine Datenbankschnittstelle zum Anschluss an eine externe Datenbank auf, in der abgespeichert ist, welche Funkzellen welchen Streckeneinrichtungen zugeordnet sind.The link facility preferably has a database interface for connection to an external database in which it is stored which radio cells are assigned to which link facilities.

Alternativ oder zusätzlich kann in vorteilhafter Weise vorgesehen sein, dass die Streckeneinrichtung eine interne Datenbank aufweist, in der abgespeichert ist, welche Funkzellen welchen Streckeneinrichtungen zugeordnet sind.Alternatively or in addition, it can advantageously be provided that the link facility has an internal database in which it is stored which radio cells are assigned to which link facilities.

Die Streckeneinrichtung ist bevorzugt dazu ausgebildet, dass sie im Falle, dass die von der Netzvermittlungseinrichtung identifizierte Funkzelle der Streckeneinrichtung zugeordnet ist, die Kommunikationsverbindung weiter betreibt und das Überfahren einer Baliseneinrichtung abwartet, nach dem Eingang einer vom Fahrzeug über die Kommunikationsverbindung übermittelten Nachricht über das Überfahren der Baliseneinrichtung die in der Nachricht übermittelte Balisenkennung dahingehend überprüft, ob die Baliseneinrichtung in dem Anlagenabschnitt der Streckeneinrichtung angeordnet ist, und im Falle, dass die Baliseneinrichtung nicht in dem Anlagenabschnitt der Streckeneinrichtung angeordnet ist, die zuständige Streckeneinrichtung ermittelt, die der Baliseneinrichtung zugeordnet ist, dem Fahrzeug die Mobilfunknummer dieser zuständigen Streckeneinrichtung mitteilt und anschließend die Kommunikationsverbindung selbst beendet oder vom Fahrzeug beenden lässt, und andernfalls die Kommunikationsverbindung weiterführt.The link facility is preferably designed so that, in the event that the radio cell identified by the network switching facility is assigned to the link facility, it continues to operate the communication link and waits for the crossing of a balise facility after receipt of a message about the crossing of the vehicle transmitted via the communication link Balise device checks the balise identifier transmitted in the message to determine whether the balise device is arranged in the system section of the route installation and, in the event that the balise installation is not arranged in the installation section of the route installation, determines the relevant route installation assigned to the balise installation, the vehicle notifies the mobile phone number of this responsible route facility and then terminates the communication connection itself or lets the vehicle terminate it, and otherwise the communication connection ung continues.

Die Streckeneinrichtung weist vorzugsweise eine Recheneinrichtung und einen Speicher auf, in dem ein Steuerprogramm abgespeichert ist, das bei Ausführung durch die Recheneinrichtung diese veranlasst, ein Verfahren wie oben beschrieben auszuführen.The route device preferably has a computing device and a memory in which a control program is stored which, when executed by the computing device, causes the computing device to carry out a method as described above.

Die Erfindung bezieht sich darüber hinaus auf eine Streckenanlage, die eine Mehrzahl an Anlagenabschnitten aufweist, denen jeweils eine Streckeneinrichtung wie oben beschrieben zugeordnet ist.The invention also relates to a route system which has a plurality of system sections, each of which is assigned a route facility as described above.

Die Erfindung wird nachfolgend anhand von Ausführungsbeispielen näher erläutert; dabei zeigen beispielhaft

  • 1-6 eine Eisenbahngleisanlage mit unterschiedlichen Positionen eines Schienenfahrzeugs auf der Eisenbahngleisanlage, wobei anhand der Eisenbahngleisanlage gemäß den 1 bis 6 Ausführungsbeispiele für das erfindungsgemäße Verfahren sowie Ausführungsbeispiele für erfindungsgemäße Streckeneinrichtungen erläutert werden,
  • 7 ein Flussdiagramm zur Erläuterung der Arbeitsweise der Streckeneinrichtungen der Eisenbahngleisanlage gemäß den 1 bis 6,
  • 8 ein Ausführungsbeispiel für eine Streckeneinrichtung, die bei der Eisenbahngleisanlage gemäß den 1 bis 6 eingesetzt werden kann, und
  • 9 ein weiteres Ausführungsbeispiel für eine Streckeneinrichtung, die für den Einsatz bei der Eisenbahngleisanlage gemäß den 1 bis 6 geeignet ist.
The invention is explained in more detail below on the basis of exemplary embodiments; show by way of example
  • 1-6 a railroad track system with different positions of a rail vehicle on the railroad track system, based on the railway track system according to the 1 to 6 Exemplary embodiments for the method according to the invention and exemplary embodiments for route equipment according to the invention are explained,
  • 7th a flow chart to explain the operation of the track facilities of the railway track system according to the 1 to 6 ,
  • 8th an embodiment of a track facility that is used in the railroad track system according to 1 to 6 can be used, and
  • 9 a further embodiment of a track facility that is suitable for use in the railway track system according to the 1 to 6 suitable is.

In den Figuren werden der Übersicht halber für identische oder vergleichbare Komponenten stets dieselben Bezugszeichen verwendet.For the sake of clarity, the same reference symbols are always used in the figures for identical or comparable components.

Die 1 zeigt ein Ausführungsbeispiel für eine Eisenbahngleisanlage EGA, bei der Anlagenabschnitte bzw. Streckenabschnitte SA1, SA2 und SA3 von zugeordneten Streckeneinrichtungen RBC1, RBC2 und RBC3 gesteuert werden. Bei den Streckeneinrichtungen handelt es sich vorzugsweise um ETCS-Streckeneinrichtungen, insbesondere um sogenannte Radio-Block-Center.The 1 shows an embodiment for a railroad track system EGA , at the plant sections or route sections SA1 , SA2 and SA3 be controlled by assigned track facilities RBC1, RBC2 and RBC3. The track facilities are preferably ETCS track facilities, in particular so-called radio block centers.

Im Bereich der Eisenbahngleisanlage EGA wird ein Mobilfunknetz MNET betrieben und von einer Netzvermittlungseinrichtung MSC verwaltet bzw. gesteuert.In the area of the railway track system EGA becomes a cellular network MNET operated and managed or controlled by a network switching center MSC.

Das Mobilfunknetz MNET ermöglicht Mobilfunkverbindungen zwischen den Streckeneinrichtungen RBC1, RBC2 und RBC3 und den in den Streckenabschnitten SA1, SA2 und SA3 befindlichen bzw. fahrenden Schienenfahrzeugen. Im Rahmen der Mobilfunkverbindungen können fahrzeugseitige Informationen (z. B. Balisenkennungen von überfahrenen Baliseneinrichtungen als fahrzeugseitige Ortungsinformationen) und/oder streckenseitige Steuerungsbefehle (z. B. Streckenfreigaben oder Einfahr- bzw. Weiterfahrverbote) zur Überwachung des Schienenverkehrs in den jeweiligen Streckenabschnitten SA1, SA2 und SA3 übermittelt werden.The cellular network MNET enables cellular connections between the route facilities RBC1, RBC2 and RBC3 and those in the route sections SA1 , SA2 and SA3 existing or moving rail vehicles. In the context of the mobile radio connections, information on the vehicle (e.g. balise identifiers of overrun balise devices as vehicle-side location information) and / or track-side control commands (e.g. route releases or entry or further travel bans) for monitoring rail traffic in the respective route sections SA1 , SA2 and SA3 be transmitted.

Eine entsprechende mobilfunkbasierte Zugsteuerung ist als „Europäisches Zugbeeinflussungssystem“ (ETCS) bekannt und kann - abgesehen von den nachfolgend beschriebenen Modifikationen - als Basissystem für den Betrieb der Eisenbahngleisanlage EGA gemäß den 1 bis 6 dienen. Bezüglich des Europäischen Zugbeeinflussungssystems ETCS sei auf die einschlägige Literatur sowie auf die Erläuterungen im Wikipedia-Eintrag „Europäisches Zugbeeinflussungssystem“ verwiesen.A corresponding mobile radio-based train control system is known as the "European Train Control System" (ETCS) and - apart from the modifications described below - can be used as the basic system for operating the railway track system EGA according to the 1 to 6 to serve. With regard to the European train control system ETCS, reference is made to the relevant literature and the explanations in the Wikipedia entry "European train control system".

Die 1 zeigt beispielhaft zehn Funkzellen des Mobilfunknetzes MNET, die mit den Bezugszeichen FZ0 bis FZ9 gekennzeichnet sind. Die Verwaltung und der Betrieb der zehn Funkzellen FZ0 bis FZ9 erfolgt durch die Netzvermittlungseinrichtung MSC.The 1 shows an example of ten radio cells in the cellular network MNET , which are identified with the reference symbols FZ0 to FZ9. The management and operation of the ten radio cells FZ0 to FZ9 is carried out by the network switching center MSC.

Die Arbeitsweise der Streckeneinrichtungen RBC1 bis RBC3 wird nachfolgend beispielhaft anhand der Streckeneinrichtung RBC1 näher erläutert; diese Erläuterungen können für die Arbeitsweise der anderen beiden Streckeneinrichtungen RBC2 und RBC3 entsprechend gelten.The mode of operation of the route devices RBC1 to RBC3 is explained in more detail below using the route device RBC1 as an example; these explanations can apply accordingly to the mode of operation of the other two route facilities RBC2 and RBC3.

Nachfolgend wird beispielhaft davon ausgegangen, dass ein Schienenfahrzeug LOK im Bereich des ersten Streckenabschnittes SA1 außer Betrieb genommen wurde und - beispielsweise im Rahmen eines Abschleppvorgangs - in den zweiten Streckenabschnitt SA2, in dem sich beispielsweise eine Werkstatt befindet, überführt worden ist. Wird das Schienenfahrzeug LOK anschließend, beispielsweise nach einer Reparatur, neu in Betrieb genommen, so ist dem Schienenfahrzeug LOK bzw. dessen Fahrzeugsteuerungseinrichtung noch nicht bekannt, dass sich das Schienenfahrzeug LOK nun im zweiten Streckenabschnitt SA2 und nicht mehr im ersten Streckenabschnitt SA1 befindet, in dem es zuvor außer Betrieb genommen wurde.In the following, it is assumed by way of example that a rail vehicle LOK in the area of the first route section SA1 was taken out of service and - for example as part of a towing operation - in the second route section SA2 , in which there is a workshop, for example, has been transferred. If the rail vehicle LOK is then restarted, for example after a repair, the rail vehicle LOK or its vehicle control device is not yet aware that the rail vehicle LOK is now in the second route section SA2 and no longer in the first section SA1 in which it was previously taken out of service.

Das Schienenfahrzeug LOK bzw. dessen Fahrzeugsteuerungseinrichtung wird demgemäß bei dem Versuch, eine Mobilfunkverbindung mit der zuständigen Streckeneinrichtung aufzubauen, zunächst die Mobilfunknummer der ersten Streckeneinrichtung RBC1 wählen, da das Schienenfahrzeug im ersten Streckenabschnitt SA1 außer Betrieb genommen wurde.The rail vehicle LOK or its vehicle control device will accordingly first dial the mobile radio number of the first route device RBC1 when attempting to set up a mobile radio connection with the responsible route facility, since the rail vehicle is in the first route section SA1 has been taken out of service.

Geht der Mobilfunkanruf bei der ersten Streckeneinrichtung RBC1 ein und ist die Kommunikationsverbindung zwischen der ersten Streckeneinrichtung RBC1 und dem Schienenfahrzeug LOK aufgebaut, so wird die erste Streckeneinrichtung RBC1 zunächst eine Anfrage A (siehe 1) an die Netzvermittlungseinrichtung MSC richten und fragen, aus welcher Funkzelle der Mobilfunkanruf des Schienenfahrzeugs LOK stammt. Die Netzvermittlungseinrichtung MSC wird eine Rückmeldung R (siehe 2) mit einer Funkzellenangabe der Funkzelle FZ8 übermitteln, da der zweite Streckenabschnitt SA2 bei dem Beispiel gemäß 1 ausschließlich innerhalb der Funkzelle FZ8 liegt.If the mobile radio call is received by the first route facility RBC1 and the communication connection is established between the first route facility RBC1 and the rail vehicle LOK, the first route facility RBC1 will first send an inquiry A (see FIG 1 ) to the network switching center MSC and ask from which radio cell the mobile radio call of the rail vehicle LOK originates. The network switching center MSC will receive a response R (see 2 ) with a radio cell specification of radio cell FZ8, since the second route section SA2 in the example according to 1 is exclusively within the radio cell FZ8.

Die Verbindungsleitung L zwischen der Netzvermittlungseinrichtung MSC der Streckeneinrichtung RBC1 wird vorzugsweise leitungsgeschaltet (fachsprachlich „circuit-switched“) und/oder paketbasiert (fachsprachlich „packet-switched“) betrieben.The connecting line L between the network switching facility MSC of the route facility RBC1 is preferably line-switched (in technical terms “circuit-switched”) and / or operated in a packet-based manner (technical language “packet-switched”).

Nach Erhalt der Rückmeldung R und der Funkzellenangabe der Funkzelle FZ8 wird die erste Streckeneinrichtung RBC1 eine interne Datenbank DBi und/oder eine externe Datenbank DBe (vgl. 8 und 9) abfragen und ermitteln, ob der erste Streckenabschnitt SA1 im Bereich der Funkzelle FZ8 liegt.After receiving the feedback R and the radio cell information from the radio cell FZ8, the first link facility RBC1 will be an internal database DBi and / or an external database DBe (cf. 8th and 9 ) and determine whether the first route section SA1 is in the area of the radio cell FZ8.

Bei dem Ausführungsbeispiel gemäß 1 und 2 ist ersichtlich, dass die Funkzelle FZ8 außerhalb des ersten Streckenabschnitts SA1 liegt, woraus die erste Streckeneinrichtung RBC1 schließen kann, dass sich das Schienenfahrzeug LOK außerhalb des eigenen Streckenabschnitts SA1 befindet.In the embodiment according to 1 and 2 it can be seen that the radio cell FZ8 is outside the first route section SA1 lies, from which the first route facility RBC1 can conclude that the rail vehicle LOK is outside its own route section SA1 is located.

Nachfolgend wird die erste Streckeneinrichtung RBC1 aus der internen oder externen Datenbank DBi bzw. DBe erfragen, welche anderen Streckeneinrichtungen die Funkzelle FZ8 nutzen und somit womöglich für das Schienenfahrzeug LOK zuständig sein könnten.The first route facility RBC1 will then inquire from the internal or external database DBi or DBe which other route facilities use the radio cell FZ8 and thus possibly be responsible for the rail vehicle LOK.

Bei dem Ausführungsbeispiel gemäß 1 und 2 befindet sich in der Funkzelle FZ8 ausschließlich der zweite Streckenabschnitt SA2, der von der zweiten Streckeneinrichtung RBC2 betrieben wird. Die erste Streckeneinrichtung RBC1 wird nun durch Abfrage der internen oder externen Datenbank DBi bzw. DBe die Mobilfunknummer der zweiten Streckeneinrichtung RBC2 ermitteln und diese im Rahmen der bestehenden Kommunikationsverbindung zu dem Schienenfahrzeug LOK übermitteln. In the embodiment according to 1 and 2 only the second route section is located in radio cell FZ8 SA2 operated by the second route facility RBC2. The first route facility RBC1 will now determine the mobile radio number of the second route facility RBC2 by querying the internal or external database DBi or DBe and transmit this to the rail vehicle LOK within the framework of the existing communication link.

Anschließend wird die erste Streckeneinrichtung RBC1 entweder selbst die Kommunikationsverbindung mit dem Schienenfahrzeug LOK beenden oder aber alternativ das Schienenfahrzeug LOK auffordern, die Kommunikationsverbindung zu beenden. Das Schienenfahrzeug LOK hat anschließend die Möglichkeit, in Kenntnis der Mobilfunknummer der zuständigen zweiten Streckeneinrichtung RBC2 diese anzurufen und eine Kommunikationsverbindung mit der zweiten Streckeneinrichtung RBC2 herzustellen, sodass die weitere Steuerung des Schienenfahrzeugs LOK im zweiten Streckenabschnitt SA2 von der zweiten Streckeneinrichtung RBC2, vorzugsweise gemäß dem ETCS-Standard, übernommen werden kann.The first route facility RBC1 will then either itself terminate the communication link with the rail vehicle LOK or alternatively request the rail vehicle LOK to terminate the communication link. The rail vehicle LOK then has the option of calling the responsible second route facility RBC2 knowing the mobile phone number and establishing a communication link with the second route facility RBC2 produce so that the further control of the rail vehicle LOK in the second route section SA2 can be taken over by the second route facility RBC2, preferably according to the ETCS standard.

Die 3 zeigt eine andere Position des Schienenfahrzeugs LOK bei einer Neuinbetriebnahme, nachdem das Schienenfahrzeug LOK im ersten Streckenabschnitt SA1 außer Betrieb genommen war. Es lässt sich erkennen, dass sich das Schienenfahrzeug LOK bei der Darstellung gemäß 3 im dritten Streckenabschnitt SA3 befindet und der Mobilfunkanruf des Schienenfahrzeugs LOK von der Funkzelle FZ3 erfolgen muss.The 3 shows a different position of the rail vehicle LOK when it is restarted after the rail vehicle LOK in the first route section SA1 was decommissioned. It can be seen that the rail vehicle LOK in the representation according to 3 in the third section SA3 and the mobile phone call of the rail vehicle LOK must be made by the radio cell FZ3.

Die erste Streckeneinrichtung SA1 wird nach dem Eingang des Mobilfunkanrufs des Schienenfahrzeugs LOK wiederum eine Anfrage A an die Netzvermittlungseinrichtung MSC richten und von dieser im Rahmen der Rückmeldung R erfahren, dass der Mobilfunkanruf von der Funkzelle FZ3 erfolgt ist. Da sich die Funkzelle FZ3 in den Bereich des ersten Streckenabschnitts SA1 erstreckt, ist es durchaus denkbar, dass sich das Schienenfahrzeug LOK im Bereich des ersten Streckenabschnitts SA1 befinden könnte. Genauso ist es möglich, dass das Schienenfahrzeug LOK im Bereich des dritten Streckenabschnitts SA3 betrieben wird, da die Funkzelle FZ3 auch den Bereich des dritten Streckenabschnitts SA3 erfasst.The first line facility SA1 After receiving the mobile radio call from the rail vehicle LOK, a request A will be sent to the network switching device MSC and, as part of the response R, it will learn that the mobile radio call has been made from the radio cell FZ3. Since the radio cell FZ3 is in the area of the first route section SA1 extends, it is quite conceivable that the rail vehicle LOK is in the area of the first route section SA1 could be located. It is also possible that the rail vehicle LOK in the area of the third route section SA3 is operated, as the radio cell FZ3 also covers the area of the third route section SA3 detected.

Die erste Streckeneinrichtung SA1 wird aus diesem Grund die bestehende Kommunikationsverbindung mit dem Schienenfahrzeug LOK zunächst fortsetzen und davon ausgehen, dass sich das Schienenfahrzeug LOK im Bereich des ersten Streckenabschnitts SA1 befindet. Die Kommunikationsverbindung wird aufrechterhalten, bis das Schienenfahrzeug LOK eine der Baliseneinrichtungen, die in der Eisenbahngleisanlage EGA installiert sind, überfährt.The first line facility SA1 For this reason, the existing communication connection with the rail vehicle LOK will initially continue and it will be assumed that the rail vehicle LOK is in the area of the first route section SA1 is located. The communication link is maintained until the rail vehicle LOK one of the balise devices in the railroad track system EGA are installed, run over.

Überfährt das Schienenfahrzeug LOK im Rahmen des weiteren Fahrbetriebs beispielsweise die Baliseneinrichtung BL9 (siehe 4), die zum dritten Streckenabschnitt SA3 gehört, und übermittelt das Schienenfahrzeug LOK die Balisenkennung der Baliseneinrichtung BL9 zu der ersten Streckeneinrichtung RBC1, so wird die erste Streckeneinrichtung RBC1 aus der internen Datenbank DBi oder der externen Datenbank DBe abfragen, ob die Baliseneinrichtung BL9 zum ersten Streckenabschnitt SA1 bzw. zum eigenen Streckenabschnitt SA1 gehört oder nicht.If the rail vehicle LOK drives over, for example, the balise device BL9 (see FIG 4th ) leading to the third section of the route SA3 belongs, and the rail vehicle LOK transmits the balise identifier of the balise device BL9 to the first route device RBC1, then the first route device RBC1 will query from the internal database DBi or the external database DBe whether the balise device BL9 to the first route section SA1 or to your own route section SA1 heard or not.

Diese Abfrage wird ergeben, dass die Baliseneinrichtung BL9 nicht zum ersten Streckenabschnitt SA1 gehört und sich das Schienenfahrzeug LOK somit außerhalb des ersten Streckenabschnitts SA1 befindet. Gleichzeitig ergibt die Datenbankabfrage, dass sich das Schienenfahrzeug LOK im Bereich des dritten Streckenabschnitts SA3, also im Zuständigkeitsbereich der dritten Streckeneinrichtung RBC3 befindet.This query will show that the balise device BL9 is not going to the first route section SA1 belongs and the rail vehicle LOK is therefore outside the first route section SA1 is located. At the same time, the database query shows that the rail vehicle LOK is in the area of the third route section SA3 , i.e. in the area of responsibility of the third route facility RBC3.

Die erste Streckeneinrichtung RBC1 wird demgemäß die Mobilfunknummer der dritten Streckeneinrichtung RBC3 aus der Datenbank DBi bzw. DBe erfragen und diese im Rahmen der bestehenden Kommunikationsverbindung zu dem Schienenfahrzeug LOK übermitteln. Anschließend wird es das Schienenfahrzeug LOK auffordern, die Kommunikationsverbindung zu beenden; alternativ kann die erste Streckeneinrichtung RBC1 auch selbsttätig die Kommunikationsverbindung beenden.The first route facility RBC1 will accordingly request the mobile radio number of the third route facility RBC3 from the database DBi or DBe and transmit this to the rail vehicle LOK within the framework of the existing communication connection. It will then request the rail vehicle LOK to terminate the communication link; alternatively, the first route facility RBC1 can also automatically terminate the communication link.

Die 5 zeigt die Eisenbahnanlage EGA, nachdem das Schienenfahrzeug LOK ausgehend von der Position gemäß 3 nicht die Baliseneinrichtung BL9, sondern die Baliseneinrichtung BL7 passiert hat und die Balisenkennung der Baliseneinrichtung BL7 an die erste Streckeneinrichtung RBC1 übertragen hat. Die Datenbankabfrage der ersten Streckeneinrichtung RBC1 bezüglich der Balisenkennung BL7 wird ergeben, dass die Baliseneinrichtung BL7 zum ersten Streckenabschnitt SA1 gehört und somit die erste Streckeneinrichtung RBC1 für das Schienenfahrzeug LOK zuständig ist, weil sich das Schienenfahrzeug LOK tatsächlich im ersten Streckenabschnitt SA1 befindet. Die Kommunikationsverbindung zwischen der ersten Streckeneinrichtung SA1 und dem Schienenfahrzeug LOK bleibt somit erhalten und die weitere Steuerung des Schienenfahrzeugs LOK erfolgt durch die erste Streckeneinrichtung RBC1, vorzugsweise gemäß dem oben erwähnten ETCS-Standard.The 5 shows the railway system EGA after the rail vehicle LOK based on the position according to 3 has not passed the balise device BL9 but rather the balise device BL7 and has transmitted the balise identifier of the balise device BL7 to the first route device RBC1. The database query of the first route facility RBC1 with respect to the balise identifier BL7 will result in that the balise facility BL7 is on the first route section SA1 belongs and thus the first route facility RBC1 is responsible for the rail vehicle LOK, because the rail vehicle LOK is actually in the first route section SA1 is located. The communication link between the first link facility SA1 and the rail vehicle LOK is thus retained and the further control of the rail vehicle LOK is carried out by the first route device RBC1, preferably in accordance with the above-mentioned ETCS standard.

Die 6 zeigt die Eisenbahngleisanlage EGA für den Fall, dass das Schienenfahrzeug LOK im Bereich des ersten Streckenabschnitts SA1 außer Betrieb genommen wurde und im Bereich der Funkzelle FZ1 wieder neu in Betrieb genommen wird. Nach Aufbau der Kommunikationsverbindung mit der ersten Streckeneinrichtung RBC1 wird diese nach Erhalt der Rückmeldung R von der Netzvermittlungseinrichtung MSC und nach Abfrage der internen und/oder externen Datenbank DBi bzw. DBe feststellen, dass sich das Schienenfahrzeug LOK im Bereich des ersten Streckenabschnitts SA1 befinden muss, da nämlich die Funkzelle FZ1 ausschließlich im Bereich des ersten Streckenabschnitts SA1 und damit ausschließlich im Zuständigkeitsbereich der ersten Streckeneinrichtung RBC1 liegt. Die Kommunikationsverbindung mit dem Schienenfahrzeug LOK bleibt somit erhalten und die weitere Steuerung des Schienenfahrzeugs LOK erfolgt durch die erste Streckeneinrichtung RBC1, vorzugsweise gemäß dem oben erwähnten ETCS-Standard.The 6 shows the railway track system EGA in the event that the rail vehicle LOK is in the area of the first route section SA1 has been taken out of operation and is being put back into operation again in the area of the radio cell FZ1. After establishing the communication connection with the first route facility RBC1, it will determine after receiving the feedback R from the network switching facility MSC and after querying the internal and / or external database DBi or DBe that the rail vehicle LOC is in the area of the first route section SA1 must be located, because namely the radio cell FZ1 exclusively in the area of the first route section SA1 and thus lies exclusively in the area of responsibility of the first route facility RBC1. The communication connection with the rail vehicle LOK is thus maintained and the further control of the rail vehicle LOK is carried out by the first route device RBC1, preferably in accordance with the above-mentioned ETCS standard.

Die Arbeitsweise der ersten Streckeneinrichtung RBC1 ist beispielhaft in einem Flussdiagramm in 7 näher dargestellt.The mode of operation of the first route facility RBC1 is exemplified in a flowchart in FIG 7th shown in more detail.

Nach Eingang eines Mobilfunkanrufs eines Schienenfahrzeugs und nach Aufbau der Kommunikationsverbindung wird im Rahmen eines Verfahrensschritts 110 die erste Streckeneinrichtung RBC1 von der Netzvermittlungseinrichtung MSC mittels einer Abfrage A unter Angabe der Rufnummer NUM des anrufenden Schienenfahrzeugs die Funkzelle erfragen, von der der Mobilfunkanruf kommt.After receiving a mobile phone call from a rail vehicle and after setting up the communication connection, as part of a method step 110 the first route facility RBC1 query the radio cell from which the mobile radio call comes from the network switching facility MSC by means of an inquiry A, specifying the call number NUM of the calling rail vehicle.

Nach Erhalt der Rückmeldung R mit der Funkzellenangabe FZ von der Netzvermittlungseinrichtung MSC (Verfahrensschritt 120) wird in einem Verfahrensschritt 130 durch Abfrage einer internen Datenbank DBi und/oder einer externen Datenbank DBe ermittelt, welche Streckenabschnitte SA bzw. Streckeneinrichtungen RBC der zurückgemeldeten Funkzellenangabe FZ zugeordnet werden können.After receiving the feedback R with the radio cell information FZ from the network switching center MSC (procedural step 120 ) is in one process step 130 by querying an internal database DBi and / or an external database DBe, it is determined which route sections SA or route facilities RBC can be assigned to the reported radio cell information FZ.

Anschließend wird in einem Verfahrensschritt 140 das Rückmeldeergebnis des Verfahrensschritts 130 ausgewertet:

  • Bezeichnet die zurückgemeldete Funkzellenangabe FZ ausschließlich eine oder mehrere „fremde“ Funkzellen FZf, also solche Funkzellen, die außerhalb des ersten Streckenabschnitts SA1 liegen (siehe 1 und 2), so wird in einem Verfahrensschritt 150 die jeweils zuständige Streckeneinrichtung oder eine beliebige der womöglich zuständigen Streckeneinrichtungen ermittelt. Die Mobilfunknummer der als zuständig ermittelten Streckeneinrichtung wird dem Schienenfahrzeug LOK übermittelt und anschließend wird die Kommunikationsverbindung beendet. Nach einem Kommunikationsaufbau zwischen dem Schienenfahrzeug LOK und der zuständigen Streckeneinrichtung kann eine Zugsteuerung gemäß dem oben erwähnten ETCS-Standard erfolgen.
Then in one process step 140 the feedback result of the procedural step 130 evaluated:
  • The reported radio cell information FZ exclusively designates one or more "foreign" radio cells FZf, that is, those radio cells that are outside the first route section SA1 lie (see 1 and 2 ), then in one process step 150 determines the relevant route facility or any of the possibly responsible route facilities. The mobile phone number of the route facility determined as responsible is transmitted to the rail vehicle LOK and the communication link is then terminated. After communication has been established between the rail vehicle LOK and the responsible track facility, train control can take place in accordance with the above-mentioned ETCS standard.

Handelt es sich um eine „eigene“ Funkzelle FZe, also eine solche, die im Bereich des ersten Streckenabschnitts SA1 liegt, so wird in dem Verfahrensschritt 140 geprüft, ob die zurückgemeldete Funkzelle ausschließlich von dem eigenen bzw. ersten Streckenabschnitt SA1 genutzt wird oder auch von zumindest einem anderen Streckenabschnitt.Is it a "dedicated" radio cell FZe, ie one that is in the area of the first route section SA1 is in the process step 140 checked whether the radio cell reported back exclusively from its own or first route section SA1 is used or by at least one other route section.

Ergibt der Verfahrensschritt 140, dass auch ein anderer Streckenabschnitt und eine andere Streckeneinrichtung die zurückgemeldete Funkzelle nutzt (siehe 3 bis 5), so wird im Rahmen eines Verfahrensschritts 160 zunächst abgewartet, dass das Schienenfahrzeug eine Balisenkennung einer Baliseneinrichtung zurückmeldet.Results in the process step 140 that another route section and another route facility also use the reported radio cell (see 3 to 5 ), then as part of a procedural step 160 first waited for the rail vehicle to report a balise identification of a balise device.

In dem Verfahrensschritt 160 wird nach Erhalt einer Balisenkennung durch Abfrage der internen oder externen Datenbank DBi und/oder DBe geprüft, ob die Balisenkennung eine „eigene“ Baliseneinrichtung BLe, also eine Baliseneinrichtung im ersten Streckenabschnitt SA1, oder eine „fremde“ Baliseneinrichtung BLf bezeichnet.In the process step 160 after receiving a balise identifier by querying the internal or external database DBi and / or DBe, it is checked whether the balise identifier is an “own” balise device BLe, ie a balise device in the first route section SA1 , or a "foreign" balise device BLf.

Bezeichnet die Balisenkennung eine „fremde“ Baliseneinrichtung BLf, also eine solche, die außerhalb des ersten Streckenabschnitts SA1 liegt (siehe 4), so wird in einem Verfahrensschritt 170 die jeweils zuständige Streckeneinrichtung ermittelt und es wird die Mobilfunknummer der als zuständig ermittelten Streckeneinrichtung zu dem Schienenfahrzeug LOK übermittelt; anschließend wird die Kommunikationsverbindung beendet. Nach einem Kommunikationsaufbau zwischen dem Schienenfahrzeug LOK und der zuständigen Streckeneinrichtung kann eine Zugsteuerung gemäß dem oben erwähnten ETCS-Standard erfolgen.The balise identifier denotes a "foreign" balise facility BLf, i.e. one that is outside the first route section SA1 lies (see 4th ), then in one process step 170 the responsible route facility is determined and the mobile phone number of the route facility determined as responsible is transmitted to the rail vehicle LOK; then the communication connection is terminated. After communication has been established between the rail vehicle LOK and the responsible track facility, train control can take place in accordance with the above-mentioned ETCS standard.

Ergibt der Verfahrensschritt 160, dass es sich um eine „eigene“ Baliseneinrichtung BLe handelt (siehe 5), so bleibt die Kommunikationsverbindung erhalten und die Steuerung des Schienenfahrzeugs erfolgt unter der Aufsicht der Streckeneinrichtung RBC1 (Verfahrensschritt 180), vorzugsweise gemäß dem oben erwähnten ETCS-Standard.Results in the process step 160 that it is a "separate" balise device BLe (see 5 ), the communication link is maintained and the rail vehicle is controlled under the supervision of the route facility RBC1 (process step 180 ), preferably in accordance with the ETCS standard mentioned above.

Auch wird ausgehend von dem Verfahrensschritt 140 mit dem Verfahrensschritt 180 (Beibehaltung der Kommunikationsverbindung und Steuerung des Schienenfahrzeugs unter der Aufsicht der Streckeneinrichtung RBC1) fortgefahren, wenn bereits im Verfahrensschritt 140 festgestellt wurde (siehe 6), dass die zurückgemeldete Funkzelle ausschließlich von dem eigenen bzw. ersten Streckenabschnitt SA1 genutzt wird und keine andere Streckeneinrichtung als die Streckeneinrichtung RBC1 zuständig sein kann.Also starting from the process step 140 with the process step 180 (Maintaining the communication link and controlling the rail vehicle under the supervision of the route facility RBC1) continued if already in the method step 140 was established (see 6 ) that the radio cell reported back exclusively from its own or first route section SA1 is used and no other route facility than the route facility RBC1 can be responsible.

Die 8 zeigt ein Ausführungsbeispiel für eine Streckeneinrichtung 200, die bei der Eisenbahngleisanlage EGA als eine der Streckeneinrichtungen RBC1-RBC3 gemäß den 1 bis 7 eingesetzt werden kann. Die Streckeneinrichtung 200 umfasst eine Recheneinrichtung 210 und einen Speicher 220. In dem Speicher 220 ist ein Steuerprogrammmodul SPM abgespeichert, das bei Ausführung durch die Recheneinrichtung 210 Arbeitsschritte gemäß dem Flussdiagramm 7 bzw. gemäß der in den 1 bis 6 beschriebenen Vorgehensweise durchführt.The 8th shows an embodiment for a route device 200 that at the railway track system EGA as one of the route facilities RBC1-RBC3 according to FIGS 1 to 7th can be used. The route facility 200 comprises a computing device 210 and a memory 220 . In the memory 220 a control program module SPM is stored, which when executed by the computing device 210 Work steps according to the flowchart 7th or according to the 1 to 6 described procedure.

In dem Speicher 220 ist darüber hinaus eine interne Datenbank DBi abgespeichert, in der Balisenkennungen der in der Eisenbahngleisanlage EGA angebrachten Baliseneinrichtungen sowie die Zuordnung von Funkzellen zu Streckeneinrichtungen abgespeichert sind, sodass die Recheneinrichtung 210 bei Durchführung des Steuerprogrammmoduls SPM ermitteln kann, welche Streckeneinrichtung jeweils zuständig ist.In the memory 220 In addition, an internal database DBi is stored in the balise ID of the railroad track system EGA attached balise devices and the assignment of radio cells to route devices are stored so that the computing device 210 when the control program module SPM is carried out, it can determine which route facility is responsible in each case.

Die 9 zeigt ein weiteres Ausführungsbeispiel für eine Streckeneinrichtung 300, die bei der Eisenbahngleisanlage EGA als eine der Streckeneinrichtungen RBC1-RBC3 gemäß den 1 bis 7 eingesetzt werden kann. Die Streckeneinrichtung 300 umfasst eine Recheneinrichtung 310 und einen Speicher 320. In dem Speicher 320 ist ein Steuerprogrammmodul SPM abgespeichert, das bei Ausführung durch die Recheneinrichtung 310 Arbeitsschritte gemäß dem Flussdiagramm 7 bzw. gemäß der in den 1 bis 6 beschriebenen Vorgehensweise durchführt. Die Streckeneinrichtung weist einen Anschluss A300 auf, der eine Verbindung mit einer externen Datenbank DBe ermöglicht, in der Balisenkennungen der in der Eisenbahngleisanlage EGA angebrachten Baliseneinrichtungen sowie die Zuordnung von Funkzellen zu Streckeneinrichtungen abgespeichert sind, sodass die Recheneinrichtung 310 bei Durchführung des Steuerprogrammmoduls SPM ermitteln kann, welche Streckeneinrichtung jeweils zuständig ist.The 9 shows a further embodiment for a route device 300 that at the railway track system EGA as one of the route facilities RBC1-RBC3 according to FIGS 1 to 7th can be used. The route facility 300 comprises a computing device 310 and a memory 320 . In the memory 320 a control program module SPM is stored, which when executed by the computing device 310 Work steps according to the flowchart 7th or according to the 1 to 6 described procedure. The route device has a connection A300 which enables a connection to an external database DBe, in the balise identifiers in the railroad track system EGA attached balise devices and the assignment of radio cells to route devices are stored so that the computing device 310 when the control program module SPM is carried out, it can determine which route facility is responsible in each case.

Obwohl die Erfindung im Detail durch bevorzugte Ausführungsbeispiele näher illustriert und beschrieben wurde, so ist die Erfindung nicht durch die offenbarten Beispiele eingeschränkt und andere Variationen können vom Fachmann hieraus abgeleitet werden, ohne den Schutzumfang der Erfindung zu verlassen.Although the invention has been illustrated and described in more detail by means of preferred exemplary embodiments, the invention is not restricted by the disclosed examples and other variations can be derived therefrom by the person skilled in the art without departing from the scope of protection of the invention.

Claims (15)

Verfahren zum Betreiben einer ein Mobilfunknetz (MNET) nutzenden Streckeneinrichtung (RBC1), die einem Anlagenabschnitt (SA1) einer Streckenanlage, insbesondere einem Anlagenabschnitt (SA1) einer Eisenbahngleisanlage (EGA), zugeordnet ist und mit Fahrzeugen (LOK) über das Mobilfunknetz (MNET) kommunizieren kann, dadurch gekennzeichnet, dass - nach Eingang eines Mobilfunkanrufs eines Fahrzeugs (LOK) geprüft wird, aus welcher Funkzelle (FZ0-FZ9) des Mobilfunknetzes (MNET) der Anruf stammt, - anschließend geprüft wird, ob die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) zugeordnet ist oder nicht und - im Falle, dass die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) nicht zugeordnet ist, zumindest eine andere Streckeneinrichtung (RBC2/RBC3) ermittelt wird, die der Funkzelle (FZ0-FZ9) zugeordnet ist, dem Fahrzeug (LOK) die Mobilfunknummer dieser zumindest einen anderen Streckeneinrichtung (RBC2/RBC3) mitgeteilt wird und anschließend die Kommunikationsverbindung beendet wird.Method for operating a route facility (RBC1) using a mobile radio network (MNET), which is assigned to a system section (SA1) of a route system, in particular a system section (SA1) of a railway track system (EGA), and with vehicles (LOK) via the mobile radio network (MNET) can communicate, characterized in that - after receiving a mobile phone call from a vehicle (LOK) it is checked from which radio cell (FZ0-FZ9) of the mobile network (MNET) the call originates, - it is then checked whether the radio cell (FZ0-FZ9) is or is not assigned to the link facility (RBC1) and - in the event that the radio cell (FZ0-FZ9) is not assigned to the link facility (RBC1), at least one other link facility (RBC2 / RBC3) is determined which is associated with the radio cell (FZ0-FZ9 ) is assigned, the vehicle (LOK) is informed of the mobile number of this at least one other route facility (RBC2 / RBC3) and then the communication link is terminated. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) die Kommunikationsverbindung selbst beendet.Procedure according to Claim 1 , characterized in that the route device (RBC1) terminates the communication link itself. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) das Fahrzeug (LOK) auffordert, die Kommunikationsverbindung zu beenden.Procedure according to Claim 1 , characterized in that the route facility (RBC1) requests the vehicle (LOK) to terminate the communication link. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass - im Falle, dass die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) zugeordnet ist, die Kommunikationsverbindung weiter bestehen bleibt und das Überfahren einer Baliseneinrichtung (BL1-BL13) abgewartet wird, - nach dem Eingang einer über die Kommunikationsverbindung übermittelten Nachricht des Fahrzeugs (LOK) über das Überfahren der Baliseneinrichtung (BL1-BL13) die in der Nachricht übermittelte Balisenkennung dahingehend überprüft wird, ob die Baliseneinrichtung (BL1-BL13) in dem Anlagenabschnitt (SA1) der Streckeneinrichtung (RBC1) angeordnet ist und - im Falle, dass die Baliseneinrichtung (BL1-BL13) nicht in dem Anlagenabschnitt (SA1) der Streckeneinrichtung (RBC1) angeordnet ist, die zuständige Streckeneinrichtung (RBC2/RBC3) ermittelt wird, also diejenige Streckeneinrichtung (RBC2/RBC3), die den die Baliseneinrichtung (BL1-BL13) enthaltenden Anlagenabschnitt (SA2/SA3) verwaltet, dem Fahrzeug (LOK) die Mobilfunknummer dieser zuständigen Streckeneinrichtung (RBC2/RBC3) mitgeteilt wird und anschließend die Kommunikationsverbindung beendet wird, und - andernfalls die Kommunikationsverbindung weitergeführt wird.Method according to one of the preceding claims, characterized in that - in the event that the radio cell (FZ0-FZ9) is assigned to the route facility (RBC1), the communication connection continues and the crossing of a balise facility (BL1-BL13) is awaited, - after receipt of a message from the vehicle (LOK) transmitted via the communication link about the crossing of the balise device (BL1-BL13), the balise identifier transmitted in the message is checked to determine whether the balise device (BL1-BL13) in the system section (SA1) of the route facility (RBC1) and - in the event that the balise facility (BL1-BL13) is not located in the system section (SA1) of the line facility (RBC1), the responsible line facility (RBC2 / RBC3) is determined, i.e. that line facility (RBC2 / RBC3), which manages the system section (SA2 / SA3) containing the balise device (BL1-BL13), the vehicle (LOK) the mobile phone number of this responsible link facility (RBC2 / RBC3) is communicated and then the communication connection is terminated, and - otherwise the communication connection is continued. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass das Mobilfunknetz (MNET) das GSM-R-Netz ist.Method according to one of the preceding claims, characterized in that the mobile radio network (MNET) is the GSM-R network. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) eine ETCS-kompatible Streckeneinrichtung (RBC1), insbesondere ein ETCS-kompatibles Radio-Block-Centre gemäß ETCS-Standard, ist.Method according to one of the preceding claims, characterized in that the route device (RBC1) is an ETCS-compatible route device (RBC1), in particular an ETCS-compatible radio block center according to the ETCS standard. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass der Anlagenabschnitt (SA1) ein Eisenbahngleisanlagenabschnitt ist,Method according to one of the preceding claims, characterized in that the system section (SA1) is a railway track system section, Verfahren nach Anspruch 7, dadurch gekennzeichnet, dass der Eisenbahngleisanlagenabschnitt gemäß ETCS-Standard, insbesondere gemäß Level 2 oder Level 3, betrieben wird.Procedure according to Claim 7 , characterized in that the railway track section is operated in accordance with the ETCS standard, in particular in accordance with Level 2 or Level 3. Streckeneinrichtung (RBC1), die ein Mobilfunknetz (MNET) nutzen kann und einem Anlagenabschnitt (SA1), insbesondere einem Anlagenabschnitt (SA1) einer Eisenbahngleisanlage (EGA), zugeordnet werden kann und mit Fahrzeugen (LOK) über das Mobilfunknetz (MNET) kommunizieren kann, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) dazu ausgebildet ist, - nach Eingang eines Mobilfunkanrufs eines Fahrzeugs (LOK) von einer Netzvermittlungseinrichtung (MSC) des Mobilfunknetzes (MNET) abzufragen, aus welcher Funkzelle (FZ0-FZ9) des Mobilfunknetzes (MNET) der Anruf stammt, - anschließend zu prüfen, ob die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) zugeordnet ist oder nicht, und - im Falle, dass die Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) nicht zugeordnet ist, zumindest eine andere Streckeneinrichtung (RBC2/RBC3) zu ermitteln, die der Funkzelle (FZ0-FZ9) zugeordnet ist, und dem Fahrzeug (LOK) die Mobilfunknummer dieser zumindest einen anderen Streckeneinrichtung (RBC2/RBC3) mitzuteilen.Track facility (RBC1), which can use a mobile radio network (MNET) and can be assigned to a system section (SA1), in particular a system section (SA1) of a railway track system (EGA) and can communicate with vehicles (LOK) via the mobile radio network (MNET), characterized in that the route device (RBC1) is designed to - after receipt of a mobile phone call from a vehicle (LOK) to query from a network switching device (MSC) of the mobile network (MNET) from which radio cell (FZ0-FZ9) of the mobile network (MNET) Call originates, - then check whether the radio cell (FZ0-FZ9) is assigned to the link facility (RBC1) or not, and - in the event that the radio cell (FZ0-FZ9) is not assigned to the link facility (RBC1), at least one other route facility (RBC2 / RBC3) assigned to the radio cell (FZ0-FZ9), and the vehicle (LOK) the mobile number of this at least one other route facility (RBC2 / RBC3). Streckeneinrichtung (RBC1) nach Anspruch 9, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) dazu ausgebildet ist, nach Übermittlung der Mobilfunknummer der zumindest einen anderen Streckeneinrichtung (RBC2/RBC3) das Fahrzeug (LOK) aufzufordern, die Kommunikationsverbindung zu beenden oder selbst die Kommunikationsverbindung zu beenden.Line facility (RBC1) according to Claim 9 , characterized in that the route device (RBC1) is designed to request the vehicle (LOK) to end the communication connection or to end the communication connection itself after the mobile phone number of the at least one other route device (RBC2 / RBC3) has been transmitted. Streckeneinrichtung (RBC1) nach einem der voranstehenden Ansprüche 9 bis 10, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) eine Datenbankschnittstelle (A300) zum Anschluss an eine externe Datenbank (DBe) aufweist, in der abgespeichert ist, welche Funkzellen (FZ0-FZ9) welchen Streckeneinrichtungen (RBC1, RBC2, RBC3) zugeordnet sind.Route device (RBC1) according to one of the preceding Claims 9 to 10 , characterized in that the route facility (RBC1) has a database interface (A300) for connection to an external database (DBe), which stores which radio cells (FZ0-FZ9) are assigned to which route facilities (RBC1, RBC2, RBC3). Streckeneinrichtung (RBC1) nach einem der voranstehenden Ansprüche 9 bis 11, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) eine interne Datenbank (DBi) aufweist, in der abgespeichert ist, welche Funkzellen (FZ0-FZ9) welchen Streckeneinrichtungen (RBC1, RBC2, RBC3) zugeordnet sind.Route device (RBC1) according to one of the preceding Claims 9 to 11 , characterized in that the link facility (RBC1) has an internal database (DBi) in which is stored which radio cells (FZ0-FZ9) are assigned to which link facilities (RBC1, RBC2, RBC3). Streckeneinrichtung (RBC1) nach einem der voranstehenden Ansprüche 9 bis 11, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) dazu ausgebildet ist, dass sie - im Falle, dass die von der Netzvermittlungseinrichtung (MSC) identifizierte Funkzelle (FZ0-FZ9) der Streckeneinrichtung (RBC1) zugeordnet ist, die Kommunikationsverbindung weiter betreibt und das Überfahren einer Baliseneinrichtung (BL1-BL13) abwartet, - nach dem Eingang einer vom Fahrzeug (LOK) über die Kommunikationsverbindung übermittelten Nachricht über das Überfahren der Baliseneinrichtung (BL1-BL13) die in der Nachricht übermittelte Balisenkennung dahingehend überprüft, ob die Baliseneinrichtung (BL1-BL13) in dem Anlagenabschnitt (SA1) der Streckeneinrichtung (RBC1) angeordnet ist, und - im Falle, dass die Baliseneinrichtung (BL1-BL13) nicht in dem Anlagenabschnitt (SA1) der Streckeneinrichtung (RBC1) angeordnet ist, die zuständige Streckeneinrichtung (RBC1) ermittelt, die der Baliseneinrichtung (BL1-BL13) zugeordnet ist, dem Fahrzeug (LOK) die Mobilfunknummer dieser zuständigen Streckeneinrichtung (RBC1) mitteilt und anschließend die Kommunikationsverbindung selbst beendet oder vom Fahrzeug (LOK) beenden lässt, und - andernfalls die Kommunikationsverbindung weiterführt.Route device (RBC1) according to one of the preceding Claims 9 to 11 , characterized in that the route device (RBC1) is designed so that - in the event that the radio cell (FZ0-FZ9) identified by the network switching device (MSC) is assigned to the route device (RBC1), it continues to operate the communication link and the overrun a balise device (BL1-BL13), - after the receipt of a message transmitted by the vehicle (LOK) via the communication link about the crossing of the balise device (BL1-BL13), the balise identifier transmitted in the message is checked to determine whether the balise device (BL1-BL13 ) is arranged in the system section (SA1) of the line facility (RBC1), and - in the event that the balise facility (BL1-BL13) is not arranged in the system section (SA1) of the line facility (RBC1), the responsible line facility (RBC1) is determined , which is assigned to the balise device (BL1-BL13), the vehicle (LOK) the mobile phone number of this responsible route eneinrichtung (RBC1) and then terminates the communication link itself or lets the vehicle (LOK) terminate it, and - otherwise, continues the communication link. Streckeneinrichtung (RBC1) nach einem der voranstehenden Ansprüche 9 bis 13, dadurch gekennzeichnet, dass die Streckeneinrichtung (RBC1) eine Recheneinrichtung (210, 310) und einen Speicher (220, 320) aufweist, in dem ein Steuerprogrammmodul (SPM) abgespeichert ist, das bei Ausführung durch die Recheneinrichtung (210, 310) diese veranlasst, ein Verfahren nach einem der voranstehenden Ansprüche 1 bis 6 auszuführen, oder die in den Ansprüchen 7 bis 11 beschriebene Arbeitsweise der Streckeneinrichtung (RBC1) zu gewährleisten.Route device (RBC1) according to one of the preceding Claims 9 to 13 , characterized in that the route device (RBC1) has a computing device (210, 310) and a memory (220, 320) in which a control program module (SPM) is stored which, when executed by the computing device (210, 310), initiates it , a method according to one of the preceding Claims 1 to 6 run, or those in the Claims 7 to 11 to ensure the described mode of operation of the route facility (RBC1). Streckenanlage, dadurch gekennzeichnet, dass diese eine Mehrzahl an Anlagenabschnitten (SA1-SA3) aufweist, denen jeweils eine Streckeneinrichtung (RBC1-RBC3) nach einem der voranstehenden Ansprüche 9 bis 14 zugeordnet ist.Line system, characterized in that it has a plurality of system sections (SA1-SA3), each of which has a line device (RBC1-RBC3) according to one of the above Claims 9 to 14th assigned.
DE102019211641.8A 2019-08-02 2019-08-02 Route facility and method for operating a route facility Pending DE102019211641A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102019211641.8A DE102019211641A1 (en) 2019-08-02 2019-08-02 Route facility and method for operating a route facility
EP20183587.3A EP3771612B1 (en) 2019-08-02 2020-07-02 Drafting device and method for operating same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102019211641.8A DE102019211641A1 (en) 2019-08-02 2019-08-02 Route facility and method for operating a route facility

Publications (1)

Publication Number Publication Date
DE102019211641A1 true DE102019211641A1 (en) 2021-02-04

Family

ID=71452080

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102019211641.8A Pending DE102019211641A1 (en) 2019-08-02 2019-08-02 Route facility and method for operating a route facility

Country Status (2)

Country Link
EP (1) EP3771612B1 (en)
DE (1) DE102019211641A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114379618A (en) * 2021-12-23 2022-04-22 交控科技股份有限公司 Route control method, device, equipment and computer readable storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006014326A1 (en) * 2006-03-23 2007-10-04 Siemens Ag System and method for radio-based information exchange between wayside devices and along a route moving vehicles, in particular a railway system
EP2631152A1 (en) * 2012-02-24 2013-08-28 Schweizerische Bundesbahnen SBB Method and device for managing resources in a railway network
WO2018092789A1 (en) * 2016-11-21 2018-05-24 Mitsubishi Electric Corporation Method of managing transmission resources in infrastructure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006014326A1 (en) * 2006-03-23 2007-10-04 Siemens Ag System and method for radio-based information exchange between wayside devices and along a route moving vehicles, in particular a railway system
EP2631152A1 (en) * 2012-02-24 2013-08-28 Schweizerische Bundesbahnen SBB Method and device for managing resources in a railway network
WO2018092789A1 (en) * 2016-11-21 2018-05-24 Mitsubishi Electric Corporation Method of managing transmission resources in infrastructure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114379618A (en) * 2021-12-23 2022-04-22 交控科技股份有限公司 Route control method, device, equipment and computer readable storage medium
CN114379618B (en) * 2021-12-23 2024-03-26 交控科技股份有限公司 Access control method, device, equipment and computer readable storage medium

Also Published As

Publication number Publication date
EP3771612B1 (en) 2023-11-01
EP3771612A1 (en) 2021-02-03
EP3771612C0 (en) 2023-11-01

Similar Documents

Publication Publication Date Title
EP3782870B1 (en) Method and route control centre for operating a railway track
WO2016058681A1 (en) Method for setting up and operating a wireless vehicle network
DE102013101927A1 (en) Device for automatically controlling rolling stock of train e.g. locomotive, has train end monitor attached with rolling stock of train, where device detects whether train end monitor is attached with rolling stock of train
EP3771612B1 (en) Drafting device and method for operating same
DE102012202046A1 (en) System for controlling, securing and / or monitoring lanes of track-bound vehicles and method for operating such a system
WO2014040880A1 (en) Communication between cars of a rail vehicle
EP2069183B1 (en) Switchable, secure device for receiving and/or emitting signals for carrying out train control on a rail vehicle
DE102016220215A1 (en) Method for operating rail vehicles
EP3013666B1 (en) Method for operating a train control system and train control system
WO2018091231A1 (en) Rail vehicle and method for operating same
EP4117977A2 (en) Railway system with diagnostic system and method for operating same
DE102004038205B4 (en) Method and arrangement for carrying out a driving operation of rail vehicles
EP3109127A1 (en) Method for signalling an expansion of a movement authority from a route control station to a positioning body
EP3312073A1 (en) Method for testing a rail system and rail system
WO2014131629A2 (en) Rail vehicle having at least one train protection device according to a national standard and having an etcs vehicle apparatus and method for operating the rail vehicle
EP3374247B1 (en) Method for operating an etcs mobile radio antenna assembly and etcs railway vehicle having an etcs mobile radio antenna assembly
DE102011085304A1 (en) Device for wireless communication with e.g. goods train for obtaining maintenance and/or diagnosing data during maintenance of rail vehicle, has controllers of rail vehicles including interfaces for wireless point-to-point connection
EP3797058B1 (en) Operating method for vehicles with the formingation or configuring of a communications connection after the coupling process
WO2017045863A1 (en) Communication device and method for automatically exchanging messages in a railway system
EP3778349B1 (en) Vehicle influencing system, route control centre and operating method for a vehicle influencing system
EP3882762B1 (en) Method for installing new software and system
EP3778345A1 (en) Method for operating a vehicle and rail operation device
WO2016016004A1 (en) Monitoring a rail vehicle
DE102019220387A1 (en) Maintenance procedure and maintenance system for a means of transport
WO2023222476A1 (en) Train preparation method and gateway for a train preparation method

Legal Events

Date Code Title Description
R163 Identified publications notified
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee