DE102018107599B4 - transport system - Google Patents

transport system Download PDF

Info

Publication number
DE102018107599B4
DE102018107599B4 DE102018107599.5A DE102018107599A DE102018107599B4 DE 102018107599 B4 DE102018107599 B4 DE 102018107599B4 DE 102018107599 A DE102018107599 A DE 102018107599A DE 102018107599 B4 DE102018107599 B4 DE 102018107599B4
Authority
DE
Germany
Prior art keywords
elements
rail
assembly
lifting device
transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE102018107599.5A
Other languages
German (de)
Other versions
DE102018107599A1 (en
Inventor
gleich Patentinhaber Erfinder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE102018107599.5A priority Critical patent/DE102018107599B4/en
Publication of DE102018107599A1 publication Critical patent/DE102018107599A1/en
Application granted granted Critical
Publication of DE102018107599B4 publication Critical patent/DE102018107599B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Transportsystem (1) für mehrere, insbesondere in einer Reihe zu montierende Montageelemente (2), insbesondere Brandschutz- und Lüftungskanäle, Rohrleitungen und Kabelkanalelemente, für den Transport der Montageelemente (2) an eine Wand- oder Deckenfläche (3), umfassend eine Hebevorrichtung (4), mit welcher die Montageelemente (2) an ihren Montageort an der Deckenfläche (3) hebbar sind, umfassend zumindest ein flächiges Transportelement (5), auf welches die Montagelemente (2) auflegbar sind, und zumindest ein Gurtelement (6), welches am Transportelement (5) angeordnet ist und mit welchem dieses aufhängbar ist, wobei die Hebevorrichtung (4) in einer vertikalen Richtung (V) bewegbar ist, dadurch gekennzeichnet, dass das Transportsystem weitergehend eine Schienenvorrichtung (9) umfasst, welche zumindest ein Schienenelement (10), welches parallel zur zu montierenden Montageelementreihe ausgerichtet ist, und zumindest zwei Befestigungseinheiten (11) aufweist, mit welchen das Schienenelement (10) lösbar an der Deckenfläche (3) befestigbar ist, wobei das Schienenelement (10) entlang der Schienenelementlängsachse in einer Verschieberichtung (S) gegenüber den Befestigungseinheiten (11) verschiebbar ist, und die Hebevorrichtung (4) am Gurtelement (6) weitergehend ein Verankerungselement (12) aufweist, mit welchem die Hebevorrichtung (4) am Schienenelement (10) befestigbar ist wobei im vollständig angehobenen Zustand das Montageelement auf der Hebevorrichtung aufliegend zwischen den zwei Schienenelementen angeordnet ist,Transport system (1) for several assembly elements (2) to be assembled in particular in a row, in particular fire protection and ventilation ducts, pipelines and cable duct elements, for transporting the assembly elements (2) to a wall or ceiling surface (3), comprising a lifting device ( 4), with which the mounting elements (2) can be lifted to their mounting location on the ceiling surface (3), comprising at least one flat transport element (5) on which the mounting elements (2) can be placed, and at least one belt element (6) which is arranged on the transport element (5) and with which this can be suspended, the lifting device (4) being movable in a vertical direction (V), characterized in that the transport system further comprises a rail device (9) which has at least one rail element (10 ), which is aligned parallel to the row of mounting elements to be assembled and has at least two fastening units (11) with which the rail element (10) can be detachably fastened to the ceiling surface (3), the rail element (10) moving along the longitudinal axis of the rail element in a displacement direction ( S) can be displaced relative to the fastening units (11), and the lifting device (4) on the belt element (6) also has an anchoring element (12) with which the lifting device (4) can be fastened to the rail element (10), with the assembly element is arranged resting on the lifting device between the two rail elements,

Description

Die Erfindung betrifft ein Transportsystem für mehrere, insbesondere in einer Reihe zu montierende Montageelemente, insbesondere Brandschutz- und Lüftungskanäle, Rohrleitungen und Kabelkanalelemente, für den Transport der Montageelemente an eine Wand- oder Deckenfläche, umfassend eine Hebevorrichtung, mit welcher die Montageelemente an ihren Montageort an der Deckenfläche hebbar sind, umfassend zumindest ein flächiges Transportelement, auf welches die Montagelemente auflegbar sind, und zumindest ein Gurtelement, welches am Transportelement angeordnet ist und mit welchem dieses aufhängbar ist, wobei die Hebevorrichtung in einer vertikalen Richtung bewegbar ist.The invention relates to a transport system for several assembly elements to be assembled, in particular in a row, in particular fire protection and ventilation ducts, pipelines and cable duct elements, for transporting the assembly elements to a wall or ceiling surface, comprising a lifting device with which the assembly elements can be lifted to their assembly location on the ceiling surface, comprising at least one flat transport element on which the assembly elements can be placed, and at least one belt element, which is arranged on the transport element and with which it can be suspended, the lifting device being movable in a vertical direction is.

Die D1 ( DE 10 2017 121 603 A1 ) offenbart ein Förder- und Transportsystem für Tunnelbauwerke. Die parallel angeordneten Laufschienen der Zweischienenhängebahn sind hierbei über Querschwellen miteinander verbunden und am First des Tunnelbauwerkes aufgehängt. An den Schienenelementen sind über Laufwerke geführte Traglaufwagen hängend angeordnet. Die Traglaufwagen können Vorrichtungen zum Heben und Senken der Tragfläche aufweisen.The D1 ( DE 10 2017 121 603 A1 ) discloses a conveyor and transport system for tunnel structures. The running rails of the two-rail hanging railway, which are arranged in parallel, are connected to one another via cross sleepers and suspended from the ridge of the tunnel structure. Carrying carriages guided by running gears are suspended from the rail elements. The trolleys can have devices for raising and lowering the wing.

Die D2 (WO 2021/ 003 526 A1) offenbart ein hängendes, einspuriges Schienensystem zum Transport von Lasten in Mienen. An Ankerketten, die in der Decke der Mine befestigt sind, hängen mehrere obere Fahrgestelle, die eine Schiene aufnehmen. An dieser Schiene wiederum sind untere Fahrgestelle befestigt, die Transportvorrichtungen aufnehmen können.D2 (WO 2021/003 526 A1) discloses a suspended, single-track rail system for transporting loads in mines. Several upper trolleys, which hold a rail, are suspended from anchor chains that are fixed in the roof of the mine. In turn, lower chassis are attached to this rail, which can accommodate transport devices.

Die D3 ( DE 102 42 574 A1 ) offenbart ein Verfahren zur Herstellung eines Tunnels und einer Hängebahn. Hierbei wir in die Außenschale des Tunnels eine Aufhängevorrichtung für eine Schiene mit Beton eingespritzt. An der einspurigen Fahrschiene sind Fahrzeuge hängend angeordnet.The D3 ( DE 102 42 574 A1 ) discloses a method of making a tunnel and a monorail. A suspension device for a rail is injected with concrete into the outer shell of the tunnel. Vehicles are suspended from the single-track rail.

Die D4 ( DE 20 33 514 A ) offenbart ein Transportsystem für Fertigwände. Die Oberkannte einer Wand wird hier- bei mit Rollen versehen, so dass sie an einer Schiene hängend mit Gurtseilen bewegt werden können.The D4 ( DE 20 33 514 A ) discloses a transport system for prefabricated walls. The upper edge of a wall is provided with rollers so that they can be moved with belt ropes hanging on a rail.

Die nachträgliche Deckenmontage von Brandschutzkanälen in Hallen mit hoher Deckenhöhe gestaltet sich insbesondere dann schwierig, wenn die Halle bereits mit Maschinen oder anderweitiger Infrastruktur, bestückt ist. Die Brandschutzkanäle werden in der Regel aus einzelnen Elementen zusammengesetzt. Bei der Montage werden die Elemente einzeln an die Deckenfläche befördert und dort fortlaufend aneinander montiert und formen so eine Trasse. Zum Befördern der Kanalelemente an die Deckenfläche werden bisher Hubwagen oder Stapler verwendet, die auf dem Boden stehen und in einer vertikalen Richtung aus- bzw. einfahrbar sind. Dieses System funktioniert jedoch nur, wenn der Boden unmittelbar unter dem späteren Verlauf des Brandschutzkanals frei zugänglich ist. Steht dort beispielsweise eine Anlage oder Maschine (z.B. in einer Fabrikhalle), ist die Montage direkt über dieser Anlage nur mit sehr viel Aufwand und mehreren Arbeitskräften möglich.The retrofitting of fire protection ducts in halls with high ceilings is particularly difficult if the hall is already equipped with machines or other infrastructure. The fire protection ducts are usually composed of individual elements. During assembly, the elements are transported individually to the ceiling surface and assembled there consecutively, thus forming a route. For transporting the duct elements to the ceiling surface, hitherto lift trucks or forklifts have been used which stand on the floor and can be extended or retracted in a vertical direction. However, this system only works if the floor directly below where the fire protection duct will later run is freely accessible. If, for example, there is a system or machine (e.g. in a factory building), installation directly above this system is only possible with a great deal of effort and several workers.

Aufgabe der vorliegenden Erfindung ist es ein Transportsystem zur Verfügung zu stellen, mit dem Brandschutzkanalelemente oder andere Montageelemente einfach und schnell an eine Deckenfläche transportiert werden können ohne die Deckenfläche unnötig zu beschädigen und das Transportsystem auch dann verwendbar ist, wenn enge oder schwierige Platzverhältnisse herrschen und/oder andere Gewerke im Transportweg vorhanden sind und/oder der Boden unmittelbar unter dem Montageort der Montageelemente nicht frei zugänglich ist oder sich dort eine Öffnung im Boden befindet.The object of the present invention is to provide a transport system with which fire protection duct elements or other assembly elements can be transported quickly and easily to a ceiling surface without damaging the ceiling surface unnecessarily and the transport system can also be used when there is limited or difficult space and/or other trades are in the transport route and/or the floor directly below the installation site of the assembly elements is not freely accessible or there is an opening in the floor.

Diese Aufgabe wird gelöst durch ein Transportsystem für mehrere, insbesondere in einer Reihe zu montierende Montageelemente insbesondere Brandschutz- und Lüftungskanäle, Rohrleitungen und Kabelkanalelemente, für den Transport der Montageelemente an eine Wand- oder Deckenfläche, umfassend eine Hebevorrichtung, mit welcher die Montageelemente an ihren Montageort an der Deckenfläche hebbar sind, umfassend zumindest ein flächiges Transportelement, auf welches die Montagelemente auflegbar sind, und zumindest ein Gurtelement, welches am Transportelement angeordnet ist und mit welchem dieses aufhängbar ist, wobei die Hebevorrichtung in einer vertikalen Richtung bewegbar ist. Die Erfindung ist dadurch gekennzeichnet, dass das Transportsystem weitergehend eine Schienenvorrichtung umfasst, welche zumindest ein Schienenelement, welches parallel zur zu montierenden Montageelementreihe ausgerichtet ist, und zumindest zwei Befestigungseinheiten aufweist, mit welchen das Schienenelement lösbar an der Deckenfläche befestigbar ist, wobei das Schienenelement entlang der Schienenelementlängsachse in einer Verschieberichtung gegenüber den Befestigungseinheiten verschiebbar ist, und die Hebevorrichtung am Gurtelement weitergehend ein Verankerungselement aufweist, mit welchem die Hebevorrichtung am Schienenelement befestigbar ist, wobei im vollständig angehobenen Zustand das Montageelement auf der Hebevorrichtung aufliegend zwischen den zwei Schienenelementen angeordnet ist.This object is achieved by a transport system for several assembly elements, in particular fire protection and ventilation ducts, pipelines and cable duct elements to be assembled in a row, for transporting the assembly elements to a wall or ceiling surface, comprising a lifting device with which the assembly elements can be lifted to their assembly site on the ceiling surface, comprising at least one flat transport element on which the assembly elements can be placed, and at least one belt element, which is arranged on the transport element and with which it can be suspended, the lifting device moving in a vertical direction is cash. The invention is characterized in that the transport system further comprises a rail device, which has at least one rail element, which is aligned parallel to the row of assembly elements to be installed, and has at least two fastening units, with which the rail element can be detachably fastened to the ceiling surface, the rail element being displaceable along the longitudinal axis of the rail element in a displacement direction relative to the fastening units, and the lifting device on the belt element also has an anchoring element, with which the lifting device can be fastened to the rail element, with the lifting device being fastened to the rail element in the fully raised state the mounting element resting on the lifting device is arranged between the two rail elements.

Die Montageelemente können Brandschutz-, Lüftungs- oder Kabelkanalelemente, oder auch Rohre, oder andere Infrastrukturelemente sein. Es ist jedoch auch denkbar, das Transportsystem für jedes andere Element zu nutzen, welches zur Montage an eine Deckenfläche transportiert werden muss.The mounting elements can be fire protection, ventilation or cable duct elements, or also pipes, or other infrastructure elements. However, it is also conceivable to use the transport system for any other element that has to be transported for mounting on a ceiling surface.

Die Hebevorrichtung ist dabei bevorzugt als Vorrichtung ausgeführt, mit der ein vertikaler Transport der Montageelemente durchführbar ist. Bevorzugt sind mit dem Transportelement Lasten von bis zu 2500 kg hebbar, zumindest jedoch 25 kg. Bevorzugt ist das gesamte Transportsystem auf den Transport dieser Lasten ausgelegt. Weitergehend ist es jedoch ebenfalls denkbar, dass mit der Hebevorrichtung auch ein Transport der Montageelemente in horizontaler Richtung möglich ist. Das Transportelement der Hebevorrichtung ist bevorzugt als Platte oder nach oben offener Kasten ausgeführt. Das Transportelement ist bevorzugt in seiner horizontalen Ausdehnung ausziehbar und/oder zusammenschiebbar um an Montageelementen verschiedener Größen anpassbar zu sein. Bevorzugt sind mit dem erfindungsgemäßen Transportsystem Montageelemente mit einer Ausdehnung von bis zu 0,80 m x 12,0 m transportierbar, insbesondere bevorzugt mit einer Ausdehnung von 1,0 m x 3,0 m. Damit sind mit dem erfindungsgemäßen Transportsystem größere Montageelemente transportierbar als mit beispielsweise einem Hubwagen.The lifting device is preferably designed as a device with which the assembly elements can be transported vertically. The transport element can preferably be used to lift loads of up to 2500 kg, but at least 25 kg. The entire transport system is preferably designed for transporting these loads. However, it is also conceivable that the lifting device can also be used to transport the assembly elements in a horizontal direction. The transport element of the lifting device is preferably designed as a plate or a box that is open at the top. The horizontal extent of the transport element can preferably be pulled out and/or pushed together in order to be adaptable to mounting elements of different sizes. Assembly elements with an extent of up to 0.80 m x 12.0 m can preferably be transported with the transport system according to the invention, particularly preferably with an extent of 1.0 m x 3.0 m. Larger assembly elements can thus be transported with the transport system according to the invention than with a lift truck, for example.

Des Weiteren ist das Transportelement, bevorzugt im abgesenkten Zustand, als Arbeitstisch für die Vormontage der Montageelemente nutzbar. Bevorzugt ist die Hebevorrichtung bereits an der Schienenvorrichtung angeordnet. Beispielsweise können so Abschnitte von parallel nebeneinander zu montierenden Rohren oder Kanälen nebeneinander zu einem Montageelement vorbereitet werden und dann in diesem Zustand an die Deckenfläche transportiert werden. Auch sind mit dem Transportelement mehrere Montagelemente gleichzeitig transportierbar.Furthermore, the transport element, preferably in the lowered state, can be used as a work table for the pre-assembly of the assembly elements. The lifting device is preferably already arranged on the rail device. For example, sections of pipes or ducts to be assembled parallel to one another can be prepared next to one another to form an assembly element and then transported to the ceiling surface in this state. Several assembly elements can also be transported simultaneously with the transport element.

Die Montageelemente sind auf das Transportelement auflegbar oder im Falle eines nach oben offenen Kastens in das Transportelement hineinlegbar. Des Weiteren ist es denkbar, dass das Transportelement als geschlossener Kasten ausgeführt ist, welcher bevorzugt an einer seiner Außenflächen öffenbar ist. Beispielsweise sind dann kleinere Montageelemente in das Transportelement hineinlegbar, während größere Montageelemente auf das Transportelement auflegbar sind. Auch ist es denkbar, dass im inneren des Kastens ein Antriebselement zum Antrieb der Hebevorrichtung angeordnet ist, sodass das Transportelement durch sich selbst an den Gurtelementen hochziehbar ist.The assembly elements can be placed on the transport element or, in the case of a box that is open at the top, can be placed in the transport element. Furthermore, it is conceivable that the transport element is designed as a closed box, which can preferably be opened on one of its outer surfaces. For example, smaller assembly elements can then be placed in the transport element, while larger assembly elements can be placed on the transport element. It is also conceivable that a drive element for driving the lifting device is arranged inside the box, so that the transport element can be pulled up by itself on the belt elements.

Am Transportelement sind bevorzugt vier Gurtelemente angeordnet. Das Gurtelement ist dabei bevorzugt als Seil, Gurt, Zahnriemen oder Band ausgeführt. Bevorzugt besteht das Gurtelement aus thermoplastischem Polyurethan (PUR), einem textilen Gewebe, Kevlar oder Nylon. Das Gurtelement ist bevorzugt mit Lasten von bis zu 2500 kg belastbar.Four belt elements are preferably arranged on the transport element. The belt element is preferably designed as a rope, belt, toothed belt or band. The belt element is preferably made of thermoplastic polyurethane (PUR), a textile fabric, Kevlar or nylon. The belt element can preferably be loaded with loads of up to 2500 kg.

In einer bevorzugten Ausführungsform ist das Transportelement eine rechteckige Platte oder ein rechteckiger Kasten, wobei die vier Gurtelemente in der Nähe der vier, nach oben ausgerichteten Ecken angeordnet sind. Am freien Ende der Gurtelemente ist jeweils ein Verankerungselement angeordnet. Bevorzugt ist das Gurtelement in dem Verankerungselement geklemmt. Bevorzugt ist das Verankerungselement mit dem Schienenelement verschraubt oder in Verschieberichtung beweglich im Schienenelement eingehängt. Weiterhin ist es ebenfalls denkbar, dass das Verankerungselement als Haken ausgeführt ist oder mit einem Feder-Nut-System am Schienenelement einhängbar ist.In a preferred embodiment, the transport member is a rectangular plate or box with the four strap members located near the four upturned corners. An anchoring element is arranged at the free end of each belt element. The belt element is preferably clamped in the anchoring element. The anchoring element is preferably screwed to the rail element or suspended in the rail element so that it can move in the direction of displacement. Furthermore, it is also conceivable that the anchoring element is designed as a hook or can be hung on the rail element with a tongue and groove system.

Das Schienenelement ist als längliches Element ausgeführt, welches in seiner Längsrichtung eine größere Erstreckung aufweist als in seinem Querschnitt senkrecht zu dieser Längsrichtung. Das Schienenelement ist bevorzugt aus Metall, insbesondere Aluminium hergestellt. Das Schienenelement ist mit den Befestigungseinheiten an der Deckenfläche befestigbar.The rail element is designed as an elongate element which has a greater extent in its longitudinal direction than in its cross section perpendicular to this longitudinal direction. The rail element is preferably made of metal, in particular aluminum. The rail element can be fastened to the ceiling surface with the fastening units.

Bevorzugt weist das Schienensystem zwei Schienenelemente auf. Die Befestigungseinheiten werden in zwei Reihen entlang des geplanten Verlaufes der zu montierenden Montageelementreihe montiert. Bevorzugt ist jeweils eine Reihe an den Längsseiten des geplanten Verlaufes der zu montierenden Montageelementreihe angeordnet. Die beiden Reihen weisen bevorzugt einen Abstand zueinander auf, welcher etwas größer als die Breite der Montagelemente ist, sodass ein Montageelement zwischen den Reihen anordenbar ist. Die Schienenelemente sind an den Befestigungseinheiten befestigbar.The rail system preferably has two rail elements. The fastening units are mounted in two rows along the planned course of the row of mounting elements to be mounted. A row is preferably arranged on the longitudinal sides of the planned course of the row of assembly elements to be assembled. The two rows are preferably at a distance from one another which is slightly greater than the width of the mounting elements, so that a mounting element can be arranged between the rows. The rail elements can be fastened to the fastening units.

Im an den Befestigungseinheiten befestigten Zustand, sind die Schienenelemente gegenüber den Befestigungseinheiten entlang der Reihe der Befestigungseinheiten in der so definierten Verschieberichtung verschiebbar. Die Schienenelemente sind damit bevorzugt parallel zur zu montierenden Montageelementreihe ausgerichtet. Bevorzugt sind an jedem Schienenelement zwei Gurtelemente befestigbar, so dass das Transportelement mit Hilfe der Seil- und Schienenelemente parallel zur Deckenfläche und unter dem Montageort der Montageelemente angeordnet ist.When fastened to the fastening units, the rail elements can be displaced relative to the fastening units along the row of fastening units in the displacement direction thus defined. The rail elements are thus preferably aligned parallel to the row of mounting elements to be assembled. Two belt elements can preferably be fastened to each rail element, so that the transport element is arranged parallel to the ceiling surface and under the installation site of the installation elements with the aid of the cable and rail elements.

Der Montageort ist dabei der Ort an der Deckenfläche, an welchem gerade ein Montagelement montiert wird oder als nächstes montiert werden soll. Da beispielsweise bei Brandschutzkanälen ein Montageelement nach dem anderen erst an die Deckenfläche transportiert wird und dann am Ende einer Reihe von bereits montierten Montagelementen montiert wird, ändert sich der Montageort nach jedem Montieren eines Montageelements in Richtung der Verschieberichtung. Der Montageort verschiebt sich dabei horizontal um die Länge eines Montageelements in die Richtung der noch zu montierenden Montagelemente der geplanten Montageelementreihe in Verschieberichtung. Dieser Verschiebung kann die Hebevorrichtung nun durch horizontale Verschiebung in Verschieberichtung mit Hilfe des Schienensystems folgen. Auch kann die Hebevorrichtung an einem Ort herabgelassen und beladen werden, welcher nicht unmittelbar unterhalb des Montageorts ist. Nach dem Beladen kann die Hebevorrichtung dann in einer vertikalen Richtung hochgezogen werden und im hochgezogenen Zustand mit Hilfe des Schienensystems in der Verschieberichtung verschoben werden, bis der Montageort erreicht ist. Des Weiteren ist es ebenfalls denkbar, dass das erfindungsgemäße Montagesystem für die Demontage oder den Austausch von Montageelementen nutzbar ist.The mounting location is the location on the ceiling surface at which a mounting element is currently being mounted or is to be mounted next. For example, with fire protection ducts one mounting element after the other is first transported to the ceiling surface and then mounted at the end of a row of already mounted mounting elements, the mounting location changes after each mounting of a mounting element in the direction of the displacement. The assembly location shifts horizontally by the length of an assembly element in the direction of the assembly elements of the planned assembly element row that are still to be assembled in the direction of displacement. The lifting device can now follow this displacement by horizontal displacement in the direction of displacement with the aid of the rail system. The lifting device can also be lowered and loaded at a location which is not immediately below the installation site. After loading, the lifting device can then be pulled up in a vertical direction and, in the raised state, can be displaced in the direction of displacement with the aid of the rail system until the assembly site is reached. Furthermore, it is also conceivable that the assembly system according to the invention can be used for the disassembly or replacement of assembly elements.

Gemäß zumindest einer weiteren Ausführungsform weist das Transportsystem weitergehend eine Rahmenvorrichtung auf, welche ein flächiges, horizontal angeordnetes Basiselement, zumindest zwei flächige, vertikal angeordnete Seitenelemente, welche jeweils an einem Rand des Basiselements angeordnet sind, sowie zumindest drei Radelemente umfasst, welche unterhalb des Basiselements an diesem angeordnet sind und mit welchen die Rahmenvorrichtung auf einem Boden bewegbar ist, wobei die Hebevorrichtung mit ihren Verankerungselementen an den oberen Rändern der Seitenelemente befestigbar ist.According to at least one further embodiment, the transport system also has a frame device, which comprises a flat, horizontally arranged base element, at least two flat, vertically arranged side elements, which are each arranged on an edge of the base element, and at least three wheel elements, which are arranged underneath the base element on the latter and with which the frame device can be moved on a floor, the lifting device with its anchoring elements being able to be fastened to the upper edges of the side elements.

Das Basiselement ist dabei bevorzugt als Platte oder Gitter ausgeführt. Die Seitenelemente sind bevorzugt mit zwei jeweils an einer Ecke des Basiselements angeordneten Stangen ausgeführt, wobei die Stangen eines Seitenelements mit sich überkreuzenden Verstrebungen verbunden sind. Bevorzugt sind an der Unterseite des Basiselements vier Radelemente angeordnet. Die Radelemente sind bevorzugt als Räder oder Rollen ausgeführt. Die Rahmenvorrichtung bildet damit bevorzugt einen rollbaren Wagen.The base element is preferably designed as a plate or grid. The side elements are preferably designed with two rods each arranged at a corner of the base element, the rods of a side element being connected with crossed struts. Four wheel elements are preferably arranged on the underside of the base element. The wheel elements are preferably designed as wheels or rollers. The frame device thus preferably forms a rollable carriage.

Die Höhe der Seitenelemente ist frei wählbar und an den gewünschten Einsatzzweck anpassbar. Bevorzugt sind die Verankerungselemente der Hebevorrichtung am oberen Ende der Stangen der Seitenelemente befestigbar. Bevorzugt weisen die Stangen jeweils ein Führungselement auf, welches die Stangen entlang ihres Umfanges umschließt und in einer vertikalen Richtung auf den Stangen verschiebbar ist. Bevorzugt ist das Transportelement der Hebevorrichtung in die Führungselemente einhängbar, sodass das Transportelement sicher in einer vertikalen Richtung an der Rahmenvorrichtung führbar ist. Die Hebevorrichtung ist in diesem Zustand in der Rahmenvorrichtung auf- und absenkbar.The height of the side elements can be freely selected and adapted to the desired application. The anchoring elements of the lifting device can preferably be fastened to the upper end of the rods of the side elements. The rods preferably each have a guide element which encloses the rods along their circumference and can be displaced in a vertical direction on the rods. The transport element of the lifting device can preferably be hooked into the guide elements, so that the transport element can be guided securely in a vertical direction on the frame device. In this state, the lifting device can be raised and lowered in the frame device.

Die Rahmenvorrichtung ist bevorzugt dazu nutzbar, die Montageelemente mit Hilfe der an der Rahmenvorrichtung eingehängten Hebevorrichtung von z.B. einer erhöhten Ladefläche eines Transportfahrzeugs in die Nähe des Montageorts zu transportieren. Ebenfalls ist es denkbar, die Montageelemente mit der Rahmenvorrichtung direkt bis an den Montageort zu transportieren, beispielsweise wenn direkt unter dem Montageort der Boden frei zugänglich ist. Dabei sind die Montageelemente mit Hilfe der Rahmenvorrichtung und den Radelementen gegenüber dem Boden verschiebbar und mit Hilfe der Hebevorrichtung in vertikaler Richtung anhebbar und absenkbar.The frame device can preferably be used to transport the assembly elements from, for example, a raised loading area of a transport vehicle to the vicinity of the assembly site with the aid of the lifting device suspended from the frame device. It is also conceivable to transport the assembly elements with the frame device directly to the assembly site, for example if the floor is freely accessible directly below the assembly site. The assembly elements can be displaced relative to the ground with the aid of the frame device and the wheel elements and can be raised and lowered in the vertical direction with the aid of the lifting device.

Auch bei Anordnung der Hebevorrichtung am Rahmenelement ist das Transportelement, bevorzugt im abgesenkten Zustand, als Arbeitstisch für die Vormontage der Montageelemente nutzbar.Even when the lifting device is arranged on the frame element, the transport element can be used, preferably in the lowered state, as a work table for the pre-assembly of the assembly elements.

Gemäß zumindest einer weiteren Ausführungsform sind die Befestigungseinheiten der Schienenvorrichtung entlang einer geraden Linie und in einem Abstand kleiner als die Länge des Schienenelements an der Deckenfläche befestigbar und jeweils zumindest ein Rollenelement aufweisen, wobei das Schienenelement gegenüber dem Rollenelement in der Verschieberichtung parallel zur Deckenfläche verschiebbar ist.According to at least one further embodiment, the fastening units of the rail device can be fastened to the ceiling surface along a straight line and at a distance smaller than the length of the rail element and each have at least one roller element, the rail element being displaceable relative to the roller element in the displacement direction parallel to the ceiling surface.

Gemäß zumindest einer weiteren Ausführungsform ist das Schienenelement als Hohlprofil mit einer zum Rollenelement komplementär ausgebildeten Ausnehmung ausgeführt, wobei das Schienenelement das Rollenelement mit seiner die Ausnehmung begrenzenden Wandung umschließt und die Wandung weitergehend eine Aussparung aufweist, in welcher eine Verbindungseinheit führbar ist, welche das Rollenelement mit einem Befestigungselement verbindet, welche an der Deckenfläche angeordnet ist.According to at least one further embodiment, the rail element is designed as a hollow profile with a recess designed to complement the roller element, with the rail element enclosing the roller element with its wall delimiting the recess and the wall also having a recess in which a connecting unit can be guided, which connects the roller element to a fastening element, which is arranged on the ceiling surface.

Bevorzugt ist die Befestigungselement als Winkel ausgeführt, dessen eine Schenkelfläche an der Deckenfläche angeordnet ist und dessen anderer Schenkel an der Verbindungseinheit angeordnet ist. Die Verbindungseinheit ist bevorzugt vertikal ausgerichtet, mit ihrem oberen Ende an der Befestigungseinheit angeordnet und weist an ihrem unteren Ende ein Rollenelement auf. Die Verbindungseinheit ist bevorzugt auswechselbar gegen eine Verbindungseinheit mit einer, in ihrer vertikalen Richtung anderen Länge. Durch die Verwendung von längeren Verbindungseinheiten weist das Montageelement im vollständig angehobenen Zustand der Hebevorrichtung einen größeren Abstand zu Deckenfläche auf, sodass Hindernisse an der Deckenfläche, beispielsweise bestehende Rohrleitungen oder Träger, überwindbar sind.The fastening element is preferably designed as an angle, one leg surface of which is arranged on the ceiling surface and the other leg of which is arranged on the connecting unit. The connecting unit is preferably oriented vertically, arranged with its upper end on the fastening unit and has a roller element at its lower end. The connection unit can preferably be exchanged for a connection unit with a different length in its vertical direction. By using longer When the lifting device is in the fully raised state, the connection units have the mounting element at a greater distance from the ceiling surface, so that obstacles on the ceiling surface, for example existing pipelines or supports, can be overcome.

Das Rollenelement ist bevorzugt als Doppelrolle ausgeführt, wobei jeweils eine Rolle auf einer Seite der Verbindungseinheit angeordnet ist. Beide Rollen weisen eine gemeinsame Drehachse auf, welche bevorzugt parallel zur Deckenfläche und senkrecht zur Verschieberichtung angeordnet ist. Die Rollen bestehen bevorzugt aus einem Kunststoff oder auch einem Kunststoffgemisch, sodass diese besonders reibungsarm im Schienenelement abrollbar sind. Das Schienenelement ist bevorzugt als Hohlprofil ausgeführt. Das Schienenelement ist bevorzugt in Verschieberichtung auf die Rollenelemente aufsteckbar, sodass die Rollenelemente im umschlossenen Raum des Hohlprofils, auch als Ausnehmung bezeichnet, angeordnet sind. Die Rollenelemente laufen so im umschlossenen Raum des Hohlprofils. Somit ist das Schienenelement gegenüber den Befestigungseinheiten durch eine Abrollbewegung der Rollenelemente auf der Innenfläche des Schienenelements in Verschieberichtung verschiebbar.The roller element is preferably designed as a double roller, with one roller being arranged on each side of the connection unit. Both rollers have a common axis of rotation, which is preferably arranged parallel to the ceiling surface and perpendicular to the direction of displacement. The rollers are preferably made of a plastic or a plastic mixture, so that they can be rolled in the rail element with particularly little friction. The rail element is preferably designed as a hollow profile. The rail element can preferably be slipped onto the roller elements in the direction of displacement, so that the roller elements are arranged in the enclosed space of the hollow profile, also referred to as a recess. The roller elements run in the enclosed space of the hollow profile. The rail element can thus be displaced relative to the fastening units by a rolling movement of the roller elements on the inner surface of the rail element in the direction of displacement.

Die Befestigungseinheiten einer Reihe sind bevorzugt in einem Abstand zueinander an der Deckenfläche befestigt, der kleiner als die Länge des Schienenelements ist. So wird das Schienenelement immer von zumindest zwei Befestigungseinheiten parallel zur Deckenfläche und in Verschieberichtung geführt. Bevor bei Verschieben des Schienenelements ein Rollenelement an einem Ende des Schienenelements aus diesem herausgeführt wird, erreicht das andere Ende des Schienenelements immer zuvor eine weitere Befestigungseinheit und somit ein weiteres Rollenelement.The fastening units of a row are preferably fastened to the ceiling surface at a distance from one another that is smaller than the length of the rail element. The rail element is always guided by at least two fastening units parallel to the ceiling surface and in the direction of displacement. Before a roller element is guided out of one end of the rail element when the rail element is displaced, the other end of the rail element always reaches a further fastening unit and thus a further roller element.

Gemäß zumindest einer weiteren Ausführungsform sind die Befestigungseinheiten der Schienenvorrichtung in einer Bohrung der Deckenfläche, welche für die Befestigung der Montageelemente nutzbar ist, befestigbar.According to at least one further embodiment, the fastening units of the rail device can be fastened in a hole in the ceiling surface, which can be used for fastening the assembly elements.

Bevorzugter Weise wird ein erstes Montageelement mit dem erfindungsgemäßen Transportsystem an seinen Montageort transportiert und dort provisorisch an der Deckenfläche befestigt. Bevorzugt werden nicht in allen Bohrungen der Deckenfläche Befestigungseinheiten befestigt. Dies wird insbesondere dadurch ermöglicht, dass für die sichere Befestigung der Schienenvorrichtung weniger Befestigungspunkte als für die Befestigung der Montageelemente notwendig sind. Somit sind auch bei an der Deckenfläche angeordneter Schienenvorrichtung noch freie Bohrungen vorhanden, in welchen die Montageelemente befestigbar sind. Im Anschluss an die Befestigung des ersten Montageelements wird das zweite Montageelement an seinen Montageort transportiert, welcher in Verschieberichtung zum ersten Montageort versetzt angeordnet ist, aber direkt an den ersten Montageort angrenzt. Das zweite Montageelement wird zunächst ebenfalls befestigt. Das Transportsystem muss ab diesem Punkt nicht mehr entgegen der Verschieberichtung an den ersten Montageort zurückbewegt werden. Die Befestigungseinheiten für die Schienenelemente am ersten Montageort werden daher nicht mehr benötigt und können entfernt werden.A first assembly element is preferably transported to its assembly site with the transport system according to the invention and is temporarily fastened there to the ceiling surface. Fastening units are preferably not fastened in all bores of the ceiling surface. This is made possible in particular by the fact that fewer attachment points are required for the secure attachment of the rail device than for the attachment of the assembly elements. Thus, even when the rail device is arranged on the ceiling surface, there are still free bores in which the mounting elements can be fastened. Following the attachment of the first assembly element, the second assembly element is transported to its assembly site, which is offset in the direction of displacement to the first assembly site, but is directly adjacent to the first assembly site. The second mounting element is also attached first. From this point on, the transport system no longer has to be moved back to the first installation location in the opposite direction to the displacement direction. The fastening units for the rail elements at the first installation location are therefore no longer required and can be removed.

Bevorzugt wird nun das erste Montageelement endgültig in den nun freien Bohrungen der entfernten Befestigungseinheiten am ersten Montageort befestigt. In dieser Art und Weise können nacheinander sämtliche Montageelemente der Montageelementreihe zunächst provisorisch und dann endgültig befestig werden, wobei die endgültige Befestigung bevorzugt in den Bohrungen der entfernten Befestigungseinheiten erfolgt. Das Montageelement wird bevorzugt mit Schrauben und Dübeln in den Bohrungen der Deckenfläche befestigt, aber auch jede andere Befestigungsmethode ist hierbei denkbar, beispielsweise mit Hilfe von Nägeln, Kleber oder anderen, dem Fachmann bekannten Befestigungsmethoden.The first mounting element is now preferably finally fastened in the now free bores of the removed fastening units at the first mounting location. In this way, all mounting elements of the row of mounting elements can be fastened provisionally and then finally, one after the other, with the final fastening preferably taking place in the bores of the remote fastening units. The mounting element is preferably fastened with screws and dowels in the holes in the ceiling surface, but any other fastening method is also conceivable here, for example using nails, adhesive or other fastening methods known to those skilled in the art.

Gemäß zumindest einer weiteren Ausführungsform weist das Transportelement weitergehend zumindest ein Traversenelement auf, welches auf der Oberseite des Transportelements angeordnet ist, wobei es an den Endpunkten seiner länglichen Erstreckung jeweils zumindest eine Aussparung aufweist, in welcher jeweils ein Gurtelement am Traversenelement führbar ist.According to at least one further embodiment, the transport element has at least one traverse element, which is arranged on the upper side of the transport element, wherein it has at least one recess at the end points of its longitudinal extent, in which a belt element on the traverse element can be guided.

Das Traversenelement ist in seiner länglichen Erstreckung bevorzugt quer zur Verschieberichtung angeordnet. Bevorzugt ist damit das Gurtelement, welches an dem einen Ende des Traversenelements geführt ist mit einem der zwei Schienenelemente der Schienenvorrichtung verbunden und das andere Gurtelement, welches ab den anderen Ende des Traversenelements geführt ist mit dem anderen der zwei Schienenelemente verbunden.In its longitudinal extension, the traverse element is preferably arranged transversely to the direction of displacement. The belt element, which is guided at one end of the traverse element, is therefore preferably connected to one of the two rail elements of the rail device and the other belt element, which is guided from the other end of the traverse element, is connected to the other of the two rail elements.

Bevorzugt weist das Transportelement zwei Traversenelemente auf. Bevorzugt sind die zwei Traversenelemente parallel zueinander und quer zur Verschieberichtung am Transportelement angeordnet. Bevorzugt sind die zwei Traversenelemente auf der Oberseite des Transportelements angeordnet. Dabei sind die zwei Traversenelemente bevorzugt an der, in Verschieberichtung betrachtet, vorderen und hinteren Kante der Oberseite des Transportelements angeordnet. Es ist ebenfalls denkbar, dass das Transportelement mehr als zwei Traversenelemente aufweist. Bevorzugt sind in diesem Fall alle Traversenelemente parallel und quer zur Verschieberichtung angeordnet. Die zusätzlichen Traversenelemente sind bevorzugt zwischen den beiden Traversenelementen an der vorderen und hinteren Kante der Oberseite des Transportelements angeordnet. Bevorzugt sind an jedem Traversenelement zwei Gurtelemente angeordnet, sodass, wenn die Hebevorrichtung mehr als zwei Traversenelemente aufweist, sie auch zwei Mal so viele zusätzliche Gurtelemente aufweist wie zusätzliche Traversenelemente.The transport element preferably has two traverse elements. The two traverse elements are preferably arranged parallel to one another and transversely to the direction of displacement on the transport element. The two traverse elements are preferably arranged on the upper side of the transport element. The two traverse elements are preferably arranged on the front and rear edges of the upper side of the transport element, viewed in the direction of displacement. It is also conceivable that the transport element has more than two traverse elements. In this case, all traverse elements are preferably arranged parallel and transverse to the direction of displacement. The additional traverse elements are preferably arranged between the two traverse elements on the front and rear edges of the upper side of the transport element. Two belt elements are preferably arranged on each cross member, so that if the lifting device has more than two cross members, it also has twice as many additional belt elements as additional cross members.

Bevorzugt ist das Traversenelement ausziehbar und zusammenschiebbar, sodass die Länge des Traversenelements an die Breite der Montageelemente und somit auch an den Abstand der zwei Reihen der Befestigungseinheiten anpassbar ist. Bevorzugt weist das Traversenelement an seinem Ende eine Aussparung auf, in welcher das Gurtelement geführt wird. Somit tritt das Gurtelement, vom Schienenelement kommend betrachtet, bevorzugt von oben durch eine Eintrittsöffnung in das Traversenelement ein. Dabei ist es denkbar, dass sich an der Unterseite des Traversenelements eine Austrittsöffnung befindet, aus welcher das Gurtelement austritt und von dort auf die Unterseite des Transportelements führbar ist. Ebenfalls ist es denkbar, dass die Austrittsöffnung des Traversenelements direkt mit dem Innenraum des als Kasten ausgeführten Transportelements verbunden ist. In diesem Fall tritt das Gurtelement bevorzugt aus der Austrittsöffnung des Traversenelements aus und ist dann direkt im Innenraum des Transportelements angeordnet.Preferably, the traverse element can be pulled out and pushed together, so that the length of the traverse element can be adapted to the width of the mounting elements and thus also to the distance between the two rows of fastening units. The traverse element preferably has a recess at its end, in which the belt element is guided. Thus, viewed from the rail element, the belt element preferably enters the traverse element from above through an entry opening. It is conceivable that there is an outlet opening on the underside of the traverse element, from which the belt element emerges and from there it can be guided onto the underside of the transport element. It is also conceivable that the outlet opening of the traverse element is connected directly to the interior of the transport element designed as a box. In this case, the belt element preferably emerges from the outlet opening of the traverse element and is then arranged directly in the interior of the transport element.

Gemäß zumindest einer weiteren Ausführungsform umfasst die Hebevorrichtung ein Antriebselement, welches an der Unterseite des Transportelements angeordnet ist und mit welchem das Gurtelement verkürzbar und verlängerbar ist, wobei durch Verkürzen oder Verlängern des Gurtelements das Transportelement in einer vertikalen Richtung anhebbar und absenkbar ist.According to at least one further embodiment, the lifting device comprises a drive element which is arranged on the underside of the transport element and with which the belt element can be shortened and lengthened, the transport element being able to be raised and lowered in a vertical direction by shortening or lengthening the belt element.

Bevorzugt werden sämtliche Gurtelemente auf der Unterseite des Transportelements zum Antriebselement geführt. Bevorzugt umfasst das Antriebselement zumindest ein Spulenelement und zumindest ein Motorelement, mit welchem das Spulenelement antreibbar ist. Bevorzugt ist mit dem Spulenelement ein Gurtelement auf- und abwickelbar. Bevorzugt weist das Antriebelement gleich viele Spulenelemente auf, wie die Hebevorrichtung Gurtelemente aufweist. Es ist aber ebenfalls denkbar, dass mehrere Gurtelemente auf einem gemeinsamen Spulenelement auf- und abwickelbar sind. Bevorzugt weist jedes Spulenelement ein eigenes Motorelement auf, so dass jedes der Spulenelemente einzeln mit Hilfe eines Steuerelements steuerbar ist.All belt elements are preferably guided to the drive element on the underside of the transport element. The drive element preferably comprises at least one coil element and at least one motor element, with which the coil element can be driven. A belt element can preferably be wound up and unwound with the coil element. The drive element preferably has the same number of coil elements as the lifting device has belt elements. However, it is also conceivable that several belt elements can be wound up and unwound on a common coil element. Each coil element preferably has its own motor element, so that each of the coil elements can be controlled individually with the aid of a control element.

Durch das Aufwickeln des Gurtelements auf das Spulenelement wird das Gurtelement verkürzt und die Hebevorrichtung wird in einer vertikalen Richtung angehoben. Durch das Abwickeln des Gurtelements vom Spulenelement wird das Gurtelement verlängert und die Hebevorrichtung wird in einer vertikalen Richtung abgesenkt. Bevorzugt werden sämtliche Motorelemente mit Hilfe eines Steuerelements gesteuert, sodass ein gleichmäßige anheben und absenken des Transportelements erfolgt. Dabei ist es weiterhin denkbar, dass das Steuerelement ein Sensorelement aufweist, mit welchem die Lage des Transportelements im Raum messbar ist, sodass mit Hilfe dieser Sensorinformation die Motorelemente und Spulenelemente gezielt und unabhängig voneinander ansteuerbar sind, sodass beispielsweise eine Schieflage des Transportelements im Raum durch gezieltes Verlängern und/oder Verkürzen einzelner Gurtelemente ausgleichbar ist.By winding the strap member onto the spool member, the strap member is shortened and the hoist is lifted in a vertical direction. By unwinding the strap member from the spool member, the strap member is lengthened and the hoist is lowered in a vertical direction. All motor elements are preferably controlled with the aid of a control element, so that the transport element is raised and lowered evenly. It is also conceivable that the control element has a sensor element with which the position of the transport element in space can be measured, so that the motor elements and coil elements can be controlled in a targeted manner and independently of one another with the help of this sensor information, so that, for example, an inclined position of the transport element in space can be compensated for by targeted lengthening and/or shortening of individual belt elements.

Die Aufgabe wird auch durch ein Verfahren für die Montage gelöst, insbesondere die Montage an einer Deckenfläche, einer fortlaufenden Reihe von Montageelementen, insbesondere Brandschutz-, Lüftungs- und Kabelkanalelemente, mit einem Transportsystem, umfassend eine Hebevorrichtung, welche zumindest ein flächiges Transportelement, zumindest ein Gurtelement, und zumindest ein Verankerungselement aufweist und mit welcher die Montageelemente in einer vertikalen Richtung hebbar sind, und eine Schienenvorrichtung, welche zumindest eine Befestigungseinheit, umfassend zumindest ein Rollenelement, und zumindest ein Schienenelement, welches auf den Rollenelementen in einer Verschieberichtung ver-schiebbar schiebbar ist, aufweist, wobei im vollständig angehobenen Zustand das Montageelement auf der Hebevorrichtung aufliegend zwischen den zwei Schienenelementen angeordnet ist, umfassend die Schritte:

  • - Befestigen von zumindest zwei Befestigungseinheiten entlang einer Geraden am Montageort verteilt über die gesamte Länge der zu montierenden Montageelementreihe an einer Deckenfläche in einem Abstand zueinander, welcher kleiner als die Länge des Schienenelements in seiner Verschieberichtung ist;
  • - Befestigen der Hebevorrichtung an der Schienenvorrichtung durch Befestigen der Verankerungselemente der Hebevorrichtung am Schienenelement und Aufschieben des Schienenelements auf die Rollenelemente der Befestigungseinheiten in Verschieberichtung;
  • - Transport von zumindest einem Montageelement an den Montageort durch Auflegen von zumindest einem Montageelement auf das Transportelement und Bewegung der Hebevorrichtung in der vertikalen Richtung und/oder horizontale Bewegung der Hebevorrichtung durch Verschieben des Schienenelements in Verschieberichtung auf den Rollenelementen;
  • - Montage des Montageelements am Montageort,
wobei die letzten beiden Schritte beliebig oft wiederholbar sind bis sämtliche Montageelemente am Montageort montiert sind.The object is also achieved by a method for the assembly, in particular the assembly on a ceiling surface, of a continuous row of assembly elements, in particular fire protection, ventilation and cable duct elements, with a transport system comprising a lifting device which has at least one flat transport element, at least one belt element and at least one anchoring element and with which the assembly elements can be lifted in a vertical direction, and a rail device which has at least one fastening unit, comprising at least one roller element and at least one rail element which is mounted on the roller elements in a displacement direction -is slidably slidable, wherein in the fully raised state the mounting element is arranged resting on the lifting device between the two rail elements, comprising the steps:
  • - Fastening at least two fastening units along a straight line at the installation site distributed over the entire length of the row of mounting elements to be mounted on a ceiling surface at a distance from one another which is smaller than the length of the rail element in its direction of displacement;
  • - Fastening the lifting device to the rail device by fastening the anchoring elements of the lifting device to the rail element and pushing the rail element onto the roller elements of the fastening units in the direction of displacement;
  • - Transport of at least one assembly element to the assembly site by placing at least one assembly element on the transport element and movement of Hebevor direction in the vertical direction and/or horizontal movement of the lifting device by sliding the rail element in the direction of sliding on the roller elements;
  • - assembly of the assembly element at the assembly site,
The last two steps can be repeated as often as you like until all assembly elements have been assembled at the assembly site.

Bevorzugt werden in einem ersten Schritt die Befestigungseinheiten, wie zuvor beschrieben, in zwei Reihen an der Deckenfläche befestigt. Die zwei Reihen weisen bevorzugt einen Abstand zueinander auf, der größer als die Breite der Montageelemente ist. Innerhalb einer Reihe werden die Befestigungseinheiten bevorzugt in einem Abstand kleiner als die Länge des Schienenelements in Verschieberichtung zueinander befestigt. Die Reihen sind dabei parallel zueinander und parallel zur Verschieberichtung angeordnet.In a first step, the fastening units are preferably fastened in two rows to the ceiling surface, as described above. The two rows are preferably at a distance from one another which is greater than the width of the mounting elements. Within a row, the fastening units are preferably fastened at a distance from one another that is smaller than the length of the rail element in the direction of displacement. The rows are arranged parallel to each other and parallel to the direction of displacement.

Im zweiten Schritt wird die Hebevorrichtung an der Schienenvorrichtung befestigt. Dazu werden bevorzugt alle Verankerungselemente der Hebevorrichtung an den bevorzugt zwei Schienenelementen der Schienenvorrichtung befestigt und die Schienenelemente auf die Rollenelemente aufgeschoben. Bevorzugt wird ein Schienenelement auf zumindest zwei Rollenelemente von zumindest zwei Befestigungseinheiten einer Reihe von Befestigungseinheiten aufgeschoben und das andere Schienenelement bevorzugt auf zumindest zwei Rollenelemente von zumindest zwei Befestigungseinheiten der anderen Reihe von Befestigungseinheiten.In the second step, the lifting device is attached to the rail device. For this purpose, preferably all anchoring elements of the lifting device are fastened to the preferably two rail elements of the rail device and the rail elements are pushed onto the roller elements. One rail element is preferably pushed onto at least two roller elements of at least two fastening units in a row of fastening units and the other rail element is preferably pushed onto at least two roller elements of at least two fastening units in the other row of fastening units.

Das Transportsystem ist nun einsatzbereit und der Transport der Montageelemente an ihren jeweiligen Montageort kann beginnen.The transport system is now ready for use and the transport of the assembly elements to their respective assembly site can begin.

Dazu wird in einem dritten Schritt die Hebevorrichtung vertikal und mit Hilfe der Schienenvorrichtung horizontal bis an einen Beladeort bewegt. Am Beladeort wird zumindest ein Montageelement auf das Transportelement aufgelegt. Die Hebevorrichtung wird nun vertikal und mit Hilfe der Schienenvorrichtung horizontal bis an den Montageort verfahren. Dabei kann, beispielsweise durch eine erste vertikale Bewegung gefolgt von einer horizontalen Bewegung, ein Hindernis, beispielsweise eine Maschine oder Anlage, welche auf dem Boden steht, oder auch eine Schachtöffnung bewältigt werden, da mit Hilfe der Hebevorrichtung und der Schienenvorrichtung das Transportelement über dem Hindernis entlangführbar ist.For this purpose, in a third step, the lifting device is moved vertically and with the aid of the rail device horizontally to a loading location. At least one assembly element is placed on the transport element at the loading location. The lifting device is now moved vertically and with the help of the rail device horizontally to the installation site. An obstacle, for example a machine or system standing on the ground, or a shaft opening can be overcome, for example by a first vertical movement followed by a horizontal movement, since the transport element can be guided over the obstacle with the help of the lifting device and the rail device.

Im vierten Schritt wird nun das Montageelement am Montageort befestigt bzw. montiert.In the fourth step, the assembly element is attached or assembled at the assembly site.

Nun können die Schritte drei und vier so oft wiederholt werden, wie weitere Montageelemente zu montieren sind.Steps three and four can now be repeated as often as further assembly elements are to be assembled.

Gemäß zumindest einer weiteren Ausführungsform wird nach dem Transport eines Montageelements an seinen Montageort bei der Montage zumindest einer der Befestigungspunkte, welche zuvor für das Befestigen der Befestigungseinheiten genutzt wurden, zum Befestigen des Montageelements benutzt.According to at least one further embodiment, after a mounting element has been transported to its mounting location, at least one of the mounting points that were previously used for mounting the mounting units is used to mount the mounting element.

Dabei ist es denkbar, dass dieser Schritt statt des vierten Schrittes des zuvor beschriebenen Verfahrens ausgeführt wird. Es ist weiterhin ebenfalls denkbar, dass dieser Schritt zusätzlich zum vierten Verfahrensschritt ausgeführt wird und im vierten Verfahrensschritt lediglich eine provisorische Befestigung des Montageelements am Montageort stattfindet.It is conceivable that this step is carried out instead of the fourth step of the method described above. It is also conceivable that this step is carried out in addition to the fourth method step and that only a provisional attachment of the assembly element takes place at the assembly site in the fourth method step.

Gemäß zumindest einer weiteren Ausführungsform wird nach dem Befestigen der Befestigungseinheiten an der Deckenfläche die Hebevorrichtung mit ihren Verankerungselementen zunächst an einer Rahmenvorrichtung befestigt, welche zumindest drei Radelemente aufweist, mit welchen die Rahmenvorrichtung gegenüber einem Boden in einer horizontalen Ebene bewegbar ist, und anschließend die Montageelemente auf einem ersten Teil des Transportweges an den Montageort mit Hilfe der Hebevorrichtung, welche an der Rahmenvorrichtung angeordnet ist, transportiert werden und erst anschließend die Verankerungselemente der Hebevorrichtung am Schienenelement befestigt werden und die Schienenelemente auf die Rollenelemente der Befestigungseinheiten aufgeschoben werden.According to at least one further embodiment, after the fastening units have been fastened to the ceiling surface, the lifting device with its anchoring elements is first fastened to a frame device, which has at least three wheel elements with which the frame device can be moved in a horizontal plane relative to the floor, and then the mounting elements are transported on a first part of the transport route to the installation site using the lifting device, which is arranged on the frame device, and only then are the anchoring elements of the lifting device fastened to the rail element and the rail elements pushed onto the roller elements of the fastening units.

So kann ein Teil des Transportweges der Montageelemente zunächst mit der an der Rahmenvorrichtung angeordneten Hebevorrichtung überwunden werden. Beispielsweise das Entladen der Montageelemente von beispielsweise einem LKW oder anderem Transportmittel. Mit Hilfe der Rahmenvorrichtung können mit dem erfindungsgemäßen Transportsystem Montageelemente von einem Raum in einen anderen Raum oder von einem Gebäude in ein anderes Gebäude transportiert werden, da für die Nutzung des Schienensystems bevorzugt eine durchgehende Deckenfläche vorhanden ist.In this way, part of the transport path for the assembly elements can first be overcome with the lifting device arranged on the frame device. For example, unloading the assembly elements from a truck or other means of transport, for example. With the help of the frame device, assembly elements can be transported from one room to another room or from one building to another building with the transport system according to the invention, since a continuous ceiling surface is preferably present for the use of the rail system.

Die Hebevorrichtung wird zum Abbau von der Rahmenvorrichtung soweit abgesenkt, dass das Transportelement auf dem Basiselement aufliegt und die Gurtelemente nicht mehr belastet sind. Die Verankerungselemente können nun von den Stangen der Seitenelemente gelöst werden und an den bevorzugt zwei Schienenelementen befestigt werden. Das weitere Verfahren entspricht von nun an dem zweiten, dritten und vierten Verfahrensschritt des zuvor beschriebenen, erfindungsgemäßen Verfahrens.For dismantling, the lifting device is lowered from the frame device until the transport element rests on the base element and the belt elements are no longer loaded. The anchoring elements can now be detached from the rods of the side elements and fastened to the preferably two rail elements. The further method corresponds from now on to the second, third and fourth method step of the method according to the invention described above.

Gemäß zumindest einer weiteren Ausführungsform werden die Montageelemente mit der an der Rahmenvorrichtung angeordneten Hebevorrichtung durch horizontales Bewegen der Rahmenvorrichtung auf dem Boden und vertikalem Bewegen der Hebevorrichtung bis an den Montageort transportiert und der Schritt des Befestigens der Befestigungseinheiten an der Deckenfläche entfällt.According to at least one further embodiment, the assembly elements are transported to the installation site with the lifting device arranged on the frame device by moving the frame device horizontally on the floor and moving the lifting device vertically, and the step of attaching the fastening units to the ceiling surface is omitted.

Es somit ebenfalls denkbar, beispielsweise bei Räumen mit niedrigen Deckenhöhen oder wenn sich kein Hindernis am Boden unter dem Montageort befindet über welches die Montageelemente hinüber transportiert werden müssen, kein Umbau der Hebevorrichtung von der Rahmenvorrichtung an die Schienenvorrichtung notwendig ist. Es ist daher denkbar, dass die Montageelemente ausschließlich mit der an der Rahmenvorrichtung angeordneten Hebevorrichtung an den Montageort transportiert werden.It is therefore also conceivable, for example in rooms with low ceiling heights or if there is no obstacle on the floor below the installation site over which the installation elements have to be transported, that no conversion of the lifting device from the frame device to the rail device is necessary. It is therefore conceivable that the assembly elements are transported to the assembly site exclusively with the lifting device arranged on the frame device.

Weitere Vorteile, Ziele und Eigenschaften der vorliegenden Erfindung werden anhand nachfolgender Beschreibung der anliegenden Figuren erläutert. Gleichartige Komponenten können in den verschiedenen Ausführungsformen gleiche Bezugszeichen aufweisen.
In den Figuren zeigen:

  • 1 eine Übersichtsdarstellung der Hebe- und Schienenvorrichtung des Transportsystems
  • 2 eine Detaildarstellung der Hebe- und Schienenvorrichtung des Transportsystems
  • 3a eine Detaildarstellung der Schienenvorrichtung des Transportsystems
  • 3b eine weitere Detaildarstellung der Schienenvorrichtung des Transportsystems
  • 4 eine Übersichtsdarstellung der Hebe- und Rahmenvorrichtung des Transportsystems
  • 5 eine Detaildarstellung der Hebe- und Rahmenvorrichtung des Transportsystems
Further advantages, aims and properties of the present invention are explained on the basis of the following description of the appended figures. Similar components can have the same reference numbers in the different embodiments.
In the figures show:
  • 1 an overview of the lifting and rail device of the transport system
  • 2 a detailed representation of the lifting and rail device of the transport system
  • 3a a detailed representation of the rail device of the transport system
  • 3b a further detailed view of the rail device of the transport system
  • 4 an overview of the lifting and frame device of the transport system
  • 5 a detailed representation of the lifting and frame device of the transport system

1 zeigt das erfindungsgemäße Transportsystem 1. In dieser Figur erfolgt die Montage der Montageelemente 2 in einer Montageelementreihe, welche von rechts nach links verläuft, also in Verschieberichtung S, an der Deckenfläche 3. Das Montageelement 2 wird zum Transport an die Deckenfläche 3 auf das Transportelement 5 der Hebevorrichtung 4 aufgelegt. Dieses Beladen findet bevorzugt am linken Rand von 1 statt. Dazu wird die Hebevorrichtung 4 mit Hilfe der Schienenvorrichtung 9 in Verschieberichtung S nach links verschoben. Das in dieser gezeigten Ausführungsform im Inneren des Transportelements 5 angeordnete Antriebselement 7 (daher in 1 nicht sichtbar) verkürzt oder verlängert die Gurtelemente 6 und hebt das Transportelement 5 somit an oder senkt dieses ab in einer vertikalen Richtung V. Im beladenen Zustand wird die Hebevorrichtung 4 nun angehoben und das Montageelement 2 durch verschieben der Hebevorrichtung 4 mit Hilfe der Schienenvorrichtung 9 entgegen der Verschieberichtung S nach rechts bis an den Montageort transportiert. 1 shows the transport system 1 according to the invention. In this figure, the assembly elements 2 are assembled in a row of assembly elements, which runs from right to left, i.e. in the displacement direction S, on the ceiling surface 3. The assembly element 2 is placed on the transport element 5 of the lifting device 4 for transport to the ceiling surface 3. This loading takes place preferably on the left edge of 1 instead of. For this purpose, the lifting device 4 is moved to the left in the direction of displacement S with the aid of the rail device 9 . The drive element 7 arranged in the embodiment shown in the interior of the transport element 5 (therefore in 1 (not visible) shortens or lengthens the belt elements 6 and thus raises or lowers the transport element 5 in a vertical direction V. In the loaded state, the lifting device 4 is now raised and the assembly element 2 is transported by moving the lifting device 4 with the aid of the rail device 9 to the right, counter to the direction of displacement S, to the assembly site.

Das Transportelement weist in dieser Ausführungsform zwei Traversenelemente 24 auf, welche quer zur Verschieberichtung S auf der Oberseite des Transportelements 5 angeordnet sind. Die Traversenelemente 24 sind ausziehbar und/oder zusammenschiebbar, sodass die Breite des Transportelements quer zur Verschieberichtung S an die Breite der Montageelemente anpassbar ist.In this embodiment, the transport element has two traverse elements 24 which are arranged transversely to the displacement direction S on the upper side of the transport element 5 . The traverse elements 24 can be pulled out and/or pushed together, so that the width of the transport element can be adjusted transversely to the direction of displacement S to the width of the assembly elements.

Die Gurtelemente 6 sind mit Hilfe der Verankerungselemente 12 an den zwei Schienenelementen 10 der Schienenvorrichtung 9 befestigt. Die Verankerungselemente sind in dieser Ausführungsform als jeweils zwei Gurtelemente verbindende Stange ausgeführt, welche am Schienenelement 10 befestigbar ist. Die Montageelemente 2 werden zwischen den Schienenelementen 10 montiert und die Schienenelemente danach in Verschieberichtung S verfahren. Die fertige Montageelementreihe verläuft parallel zur Verschieberichtung S. Die Schienenelemente 10 sind mit Hilfe von Befestigungseinheiten 11 an der Deckenfläche 3 befestigt und gegenüber den Befestigungseinheiten 11 in Verschieberichtung S verschiebbar.The belt elements 6 are fastened to the two rail elements 10 of the rail device 9 with the aid of the anchoring elements 12 . In this embodiment, the anchoring elements are designed as rods that each connect two belt elements and can be fastened to the rail element 10 . The mounting elements 2 are mounted between the rail elements 10 and the rail elements are then moved in the displacement direction S. The finished row of assembly elements runs parallel to the direction of displacement S. The rail elements 10 are fastened to the ceiling surface 3 with the aid of fastening units 11 and can be displaced in the direction of displacement S in relation to the fastening units 11 .

Die bereits montierten Montageelemente sind mit Hilfe eines Befestigungsstangenelements 25 an der Deckenfläche 25 befestigt.The mounting elements already mounted are fastened to the ceiling surface 25 with the aid of a fastening rod element 25 .

2 zeigt eine Detaildarstellung der Hebevorrichtung 4 und der Schienenvorrichtung 9. In dieser Ausführungsform sind die Verankerungselemente 12 als einzelne Elemente ausgeführt. In dieser Ausführungsform wird somit jedes Gurtelement einzeln am Schienenelement befestigt. Die Befestigungselemente 11 werden in Bohrungen an der Deckenfläche 3 befestigt, in welchen ebenfalls das Befestigungsstangenelement 25 befestigbar ist. Das Schienenelement 10 ist gegenüber den Befestigungseinheiten 11 in Verschieberichtung S verschiebbar. In der hier gezeigten Ausführungsform weist die Hebevorrichtung ein Antriebselement 7 auf, welches an der Unterseite des Transportelements 5 angeordnet ist. Das Antriebselement 7 ist mit einem Steuerungselement 8 verbunden. Mit dem Steuerungselement 8 ist die Hebevorrichtung anhebbar und/oder absenkbar. Die Verbindung der Steuerungselements 8 mit dem Antriebselement 7 ist sowohl als physikalische Verbindung, beispielsweise über ein Kabel, oder auch als Funk-, WLAN-, Bluetooth- oder IR-Verbindung ausgeführt. In der hier gezeigten Ausführungsform ist das Transportelement 5 als nach oben offener Kasten ausgeführt. Die Traversenelemente 24 sind auf der Oberseite der Seitenelemente des Transportelements 5 angeordnet, welche quer zur Verschieberichtung S ausgerichtet sind. Das Montageelement 2 liegt in dieser Ausführungsform lediglich auf den Traversenelementen auf. Im nach oben offenen Transportelement sind beispielsweise Montagehilfsmittel und/oder auch die Befestigungsstangenelemente 25 und/oder Kleinteile wie z.B. Schrauben und Dübel und/oder auch Werkzeug transportierbar. 2 shows a detailed view of the lifting device 4 and the rail device 9. In this embodiment, the anchoring elements 12 are designed as individual elements. In this embodiment, each belt element is thus attached individually to the rail element. The fastening elements 11 are fastened in bores on the ceiling surface 3, in which the fastening rod element 25 can also be fastened. The rail element 10 can be displaced in the displacement direction S relative to the fastening units 11 . In the embodiment shown here, the lifting device has a drive element 7 which is arranged on the underside of the transport element 5 . The drive element 7 is connected to a control element 8 . The lifting device can be raised and/or lowered with the control element 8 . The connection of the control element 8 with the drive element 7 is both a physical connection, for example wise via a cable, or as a radio, WLAN, Bluetooth or IR connection. In the embodiment shown here, the transport element 5 is designed as a box that is open at the top. The traverse elements 24 are arranged on the upper side of the side elements of the transport element 5, which are aligned transversely to the direction of displacement S. In this embodiment, the mounting element 2 rests only on the traverse elements. In the transport element, which is open at the top, assembly aids and/or also the fastening rod elements 25 and/or small parts such as screws and dowels and/or tools can be transported, for example.

Im vollständig angehobenen Zustand ist das Montageelement auf der Hebevorrichtung aufliegend zwischen den zwei Schienenelementen angeordnet.In the fully raised state, the mounting element rests on the lifting device and is arranged between the two rail elements.

3a zeigt eine Detaildarstellung der Schienenvorrichtung 9. Die Befestigungseinheiten 11 umfassen jeweils ein Befestigungselement 23, welches an seiner Oberseite flächig an der Deckenfläche 3 anliegt und an dieser befestigbar ist. Am unteren Ende des Befestigungselements 23 weist dieses zwei zueinander parallel und senkrecht zur Deckenfläche angeordnete Fortsätze 26 auf. Zwischen diesen Fortsätzen 26 ist das Verbindungselement 22 angeordnet. Das Verbindungselement 22 ist an den Fortsätzen 26 durch eine Steckachse 27 befestigt, welche in ihrer länglichen Erstreckung parallel zur Deckenfläche und senkrecht zur Verschieberichtung angeordnet ist und sowohl durch die Fortsätze 26 als auch das Verbindungselement 22 hindurchsteckbar ist. Am unteren Ende des Verbindungselements 22 sind vier Rollenelemente 18 angeordnet. Dabei sind, in Verschieberichtung betrachtet, zwei Rollenelemente 18 auf der linken und zwei Rollenelemente 18 auf der rechten Seite des Verbindungselements 22 angeordnet. Die Rollenelemente 18 auf einer Seite des Verbindungselements 22 sind in Verschieberichtung versetzt zueinander und somit nebeneinander, aber auf gleicher Höhe angeordnet. 3a shows a detailed representation of the rail device 9. The fastening units 11 each comprise a fastening element 23, which rests flat on its upper side on the ceiling surface 3 and can be fastened to this. At the lower end of the fastening element 23, this has two extensions 26 arranged parallel to one another and perpendicular to the ceiling surface. The connecting element 22 is arranged between these extensions 26 . The connecting element 22 is fastened to the extensions 26 by a plug-in axle 27 which is arranged parallel to the ceiling surface and perpendicular to the direction of displacement in its longitudinal extension and can be inserted through both the extensions 26 and the connecting element 22 . Four roller elements 18 are arranged at the lower end of the connecting element 22 . Viewed in the direction of displacement, two roller elements 18 are arranged on the left side and two roller elements 18 on the right side of the connecting element 22 . The roller elements 18 on one side of the connecting element 22 are offset from one another in the direction of displacement and are therefore arranged next to one another, but at the same height.

Das Schienenelement 10 ist in Verschieberichtung, oder entgegen dieser, auf die Rollenelemente 18 der Befestigungseinheit 11 aufschiebbar. Das Schienenelement 10 ist als Hohlprofil mit einer eine Ausnehmung 19 umschließenden Wandung 20. Die Wandung 20 weist an der Oberseite des Schienenelements 10 eine Aussparung 21 auf. Diese Aussparung 21 ist in ihrer Ausdehnung quer zur Verschieberichtung S etwas breiter als das Verbindungselement 22 in dieser Richtung ausgeführt, sodass das Verbindungselement 22 in der Aussparung 21 anordenbar ist.The rail element 10 can be slid onto the roller elements 18 of the fastening unit 11 in the direction of displacement or counter to it. The rail element 10 is in the form of a hollow profile with a wall 20 enclosing a recess 19 . The wall 20 has a recess 21 on the upper side of the rail element 10 . This recess 21 is somewhat wider in its extension transversely to the displacement direction S than the connecting element 22 in this direction, so that the connecting element 22 can be arranged in the recess 21 .

3b zeigt eine Detaildarstellung in Blickrichtung der Verschieberichtung S des Schienensystems. Das Schienenelement 10 ist hier im auf die Rollenelemente 18 aufgeschobenen Zustand dargestellt. Die Rollenelemente 18 und das dazwischen angeordnete Verbindungselement 22 sind in der Ausnehmung 19 des Schienenelements 10 angeordnet. Die Rollenelemente 18 und das dazwischen angeordnete Verbindungselement 22 füllen die Ausnehmung 19 nahezu vollständig aus. 3b shows a detailed view in the direction of displacement S of the rail system. The rail element 10 is shown here in the state in which it has been pushed onto the roller elements 18 . The roller elements 18 and the connecting element 22 arranged between them are arranged in the recess 19 of the rail element 10 . The roller elements 18 and the connecting element 22 arranged between them fill the recess 19 almost completely.

An der Unterseite des Schienenelements 10 ist ein Führungselement 27, ähnlich dem Hohlprofil des Schienenelements 10, angeordnet. An dieses Führungselement 27 sind die Verankerungselemente 12 befestigbar. In einer anderen Ausführungsform sind die Verankerungselemente 12 in das Führungselement 27 einhängbar. Dabei ist es denkbar, dass die Verankerungselemente 12 im Führungselement 27 in Verschieberichtung S oder entgegen dieser verschiebbar sind.A guide element 27 , similar to the hollow profile of the rail element 10 , is arranged on the underside of the rail element 10 . The anchoring elements 12 can be fastened to this guide element 27 . In another embodiment, the anchoring elements 12 can be hooked into the guide element 27 . It is conceivable that the anchoring elements 12 in the guide element 27 can be displaced in the direction of displacement S or counter to it.

4 zeigt eine Übersichtsdarstellung der Hebe- und Rahmenvorrichtung 4, 13 des Transportsystems 1. Der Transport der Montageelemente 2 an die Deckenfläche 3 mit Hilfe der Rahmenvorrichtung funktioniert sehr ähnlich zu der Variante mit der Schienenvorrichtung 9. Allerdings erfolgt das Verschieben in Verschieberichtung S mit Hilfe der Rahmenvorrichtung 13, welche mit den Radelementen 16 über den Boden 17 rollbar ist und somit in Verschieberichtung S verschiebbar ist. Die Rahmenvorrichtung 13 weist ein Basiselement 14, welches parallel zum Boden 17 und zur Deckenfläche 3 angeordnet ist, und Seitenelemente 15 auf, welche parallel zur Verschieberichtung S angeordnet sind. Die Verankerungselemente 12 sind am oberen Ende der Seitenelemente 15 angeordnet. Damit ist die Hebevorrichtung 4 zwischen den Seitenelementen 15 angeordnet und kann zwischen diesen in einer vertikalen Richtung V auf und ab bewegt werden. Dabei kann das Transportelement bevorzugt maximal auf die Höhe des oberen Endes der Seitenelemente 15 angehoben werden. Das Montageelement 2 ist so auf das Transportelement 5 auflegbar und ist mit Hilfe der Hebevorrichtung in einer vertikalen Richtung V hebbar. Die Rahmenvorrichtung 13 ist bevorzugt in ihrer Breite quer zur Verschieberichtung S verstellbar, sodass sie an Montageelemente unterschiedlicher Breite anpassbar ist. Bevorzugt ist die Höhe der Seitenelemente 15 ebenfalls einstellbar, sodass diese an die Höhe des Montageorts über dem Boden 17 anpassbar sind und das Montageelement bevorzugt bis an den Montageort hebbar ist. 4 shows an overview of the lifting and frame device 4, 13 of the transport system 1. The transport of the assembly elements 2 to the ceiling surface 3 with the help of the frame device works very similarly to the variant with the rail device 9. However, the displacement in the displacement direction S takes place with the aid of the frame device 13, which can be rolled over the floor 17 with the wheel elements 16 and can therefore be displaced in the displacement direction S. The frame device 13 has a base element 14, which is arranged parallel to the floor 17 and to the ceiling surface 3, and side elements 15, which are arranged parallel to the displacement direction S. The anchoring elements 12 are arranged at the upper end of the side elements 15 . Thus, the lifting device 4 is arranged between the side members 15 and can be moved up and down in a vertical direction V between them. The transport element can preferably be raised to the height of the upper end of the side elements 15 at most. The assembly element 2 can thus be placed on the transport element 5 and can be lifted in a vertical direction V with the aid of the lifting device. The width of the frame device 13 is preferably adjustable transversely to the direction of displacement S, so that it can be adapted to mounting elements of different widths. The height of the side elements 15 is preferably also adjustable, so that they can be adapted to the height of the assembly site above the floor 17 and the assembly element can preferably be lifted up to the assembly site.

5 zeigt eine Detaildarstellung der Rahmenvorrichtung 13 mit daran angeordneter Hebevorrichtung 4. Das Basiselement 14 weist zwei Vierkantstangenelemente 28 auf, welche parallel zum Boden 17 und parallel zur Verschieberichtung S angeordnet sind. An beiden Enden des Vierkantstangenelements 28 ist jeweils ein Radelement 16 angeordnet. Die zwei Vierkantstangenelemente sind mit zwei Querstangenelementen 29 verbunden. Die Querstangenelemente 29 sind quer zur Verschieberichtung S und in einem rechten Winkel zu den Vierkantstangenelementen 28 angeordnet. 5 shows a detailed representation of the frame device 13 with the lifting device 4 arranged thereon. At both ends of the square rod member 28 is a wheel member 16 is attached arranges. The two square bar elements are connected to two cross bar elements 29 . The crossbar elements 29 are arranged transversely to the displacement direction S and at a right angle to the square bar elements 28 .

Auf der Oberseite der Vierkantstangenelemente 28 ist jeweils ein Seitenelement 15 angeordnet. Das Seitenelement ist in seiner flächigen Erstreckung parallel zur vertikalen Richtung V und zur Verschieberichtung S angeordnet. Die flächige Erstreckung des Seitenelements wird in Verschieberichtung S von zwei Vierkantstangenelementen 31 begrenzt. Diese sind vertikal ausgerichtet und stehen senkrecht auf den Vierkantstangenelementen 28 des Basiselements 14 und sind mit einem Winkel 30 stabilisiert.On the upper side of the square bar elements 28 a side element 15 is arranged in each case. The side element is arranged parallel to the vertical direction V and to the direction of displacement S in its planar extent. The two-dimensional extension of the side element is delimited in the direction of displacement S by two square rod elements 31 . These are aligned vertically and are perpendicular to the square rod elements 28 of the base element 14 and are stabilized at an angle 30 .

Die zwei Vierkantstangenelemente 31 der Seitenelemente 15 sind parallel zueinander ausgerichtet und durch Verstrebungselemente 32 miteinander verbunden. Die Verstrebungselemente 32 sind parallel zur Verschieberichtung S angeordnet. Am oberen Ende der zwei Vierkantstangenelemente 31 eines Seitenelements 13 ist ein oberstes Verstrebungselement 33 parallel zu den anderen Verstrebungselementen 32 angeordnet.The two square rod elements 31 of the side elements 15 are aligned parallel to one another and are connected to one another by strut elements 32 . The strut elements 32 are arranged parallel to the displacement direction S. At the upper end of the two square bar elements 31 of a side element 13 a top strut element 33 is arranged parallel to the other strut elements 32 .

Das oberste Verstrebungselement 33 ist auf der nach oben weisenden Stirnfläche der Vierkantstangenelemente 31 angeordnet. Das oberste Verstrebungselement 33 weist dabei eine Länge größer als der Abstand der zwei Vierkantstangenelemente 31 auf, sodass das oberste Verstrebungselement über die Vierkantstangenelemente 31 in Verschieberichtung S hinausragt. An der hinausragenden Unterseite des obersten Verstrebungselements 33 sind die Verankerungselemente 12 der Hebevorrichtung 4 befestigbar. Die Gurtelemente verlaufen somit parallel und in direkter Nähe der Vierkantstangenelemente 31.The uppermost strut element 33 is arranged on the face of the square rod elements 31 pointing upwards. The top strut element 33 has a length greater than the distance between the two square bar elements 31, so that the top strut element protrudes beyond the square bar elements 31 in the displacement direction S. The anchoring elements 12 of the lifting device 4 can be attached to the protruding underside of the uppermost strut element 33 . The belt elements thus run parallel and in the immediate vicinity of the square bar elements 31.

In dieser Ausführungsform umfassen die Traversenelemente 24 die Vierkantstangenelemente 31, sodass das Transportelement 5 sicher in der vertikalen Richtung V geführt ist. Die Traversenelemente 24 sind in dieser Ausführungsform ebenfalls ausziehbar und/oder zusammenschiebbar, sodass die Breite der Hebevorrichtung 4 im gleichen Maße wie die Breite der Rahmenvorrichtung 13 an die Breite der Montageelemente 2 anpassbar ist.In this embodiment, the traverse elements 24 include the square bar elements 31, so that the transport element 5 is guided securely in the vertical V direction. In this embodiment, the traverse elements 24 can also be pulled out and/or pushed together, so that the width of the lifting device 4 can be adapted to the width of the mounting elements 2 to the same extent as the width of the frame device 13 .

6 zeigt exemplarisch das erfindungsgemäße Transportsystem 1 mit der Hebevorrichtung 4 und der Schienenvorrichtung 9 bei der Verwendung zur Deckenmontage von Brandschutzkanälen 2 über einem Bodenhindernis 34 sowie einem Schacht 35, welcher sich im Boden befindet. 6 shows an example of the transport system 1 according to the invention with the lifting device 4 and the rail device 9 when used for ceiling mounting of fire protection ducts 2 over a ground obstacle 34 and a shaft 35, which is located in the ground.

Die Anmelderin behält sich vor, sämtliche in den Anmeldungsunterlagen offenbarten Merkmale als erfindungswesentlich zu beanspruchen, sofern sie einzeln oder in Kombination gegenüber dem Stand der Technik neu sind. Es wird weiterhin darauf hingewiesen, dass in den einzelnen Figuren auch Merkmale beschrieben wurden, welche für sich genommen vorteilhaft sein können. Der Fachmann erkennt unmittelbar, dass ein bestimmtes in einer Figur beschriebenes Merkmal auch ohne die Übernahme weiterer Merkmale aus dieser Figur vorteilhaft sein kann. Ferner erkennt der Fachmann, dass sich auch Vorteile durch eine Kombination mehrerer in einzelnen oder in unterschiedlichen Figuren gezeigter Merkmale ergeben können.The applicant reserves the right to claim all features disclosed in the application documents as essential to the invention, provided they are new compared to the prior art, either individually or in combination. It is also pointed out that the individual figures also describe features which can be advantageous in and of themselves. The person skilled in the art recognizes immediately that a specific feature described in a figure can also be advantageous without adopting further features from this figure. Furthermore, the person skilled in the art recognizes that advantages can also result from a combination of several features shown in individual figures or in different figures.

BezugszeichenlisteReference List

11
Transportsystemtransport system
22
Montageelementmounting element
33
Wand- oder Deckenflächewall or ceiling surface
44
Hebevorrichtunglifting device
55
Transportelementtransport element
66
Gurtelementbelt element
77
Antriebselementdrive element
88th
Steuerungselementcontrol element
99
Schienenvorrichtungrail device
1010
Schienenelementrail element
1111
Befestigungseinheitfastening unit
1212
Verankerungselementanchoring element
1313
Rahmenvorrichtungframe device
1414
Basiselementbase element
1515
Seitenelementpage element
1616
Radelementwheel element
1717
BodenFloor
1818
Rollenelementrole element
1919
Ausnehmungrecess
2020
Wandungwall
2121
Aussparungrecess
2222
Verbindungseinheitconnection unit
2323
Befestigungselementfastener
2424
Traversenelementtruss element
2525
Befestigungsstangenelementmounting rod element
2626
Fortsätzeappendages
2727
Führungselementguide element
2828
Vierkantstangenelement des BasiselementsSquare bar element of the base element
2929
Querstangenelementcrossbar element
3030
Winkelelementangle element
3131
Vierkantstangenelement des SeitenelementsSquare bar element of the side element
3232
Verstrebungselementebracing elements
3333
oberstes Verstrebungselementtop bracing element
3434
Bodenhindernisground obstacle
3535
Schacht im Bodenshaft in the ground
VV
vertikale Richtungvertical direction
SS
Verschieberichtungshift direction

Claims (11)

Transportsystem (1) für mehrere, insbesondere in einer Reihe zu montierende Montageelemente (2), insbesondere Brandschutz- und Lüftungskanäle, Rohrleitungen und Kabelkanalelemente, für den Transport der Montageelemente (2) an eine Wand- oder Deckenfläche (3), umfassend eine Hebevorrichtung (4), mit welcher die Montageelemente (2) an ihren Montageort an der Deckenfläche (3) hebbar sind, umfassend zumindest ein flächiges Transportelement (5), auf welches die Montagelemente (2) auflegbar sind, und zumindest ein Gurtelement (6), welches am Transportelement (5) angeordnet ist und mit welchem dieses aufhängbar ist, wobei die Hebevorrichtung (4) in einer vertikalen Richtung (V) bewegbar ist, dadurch gekennzeichnet, dass das Transportsystem weitergehend eine Schienenvorrichtung (9) umfasst, welche zumindest ein Schienenelement (10), welches parallel zur zu montierenden Montageelementreihe ausgerichtet ist, und zumindest zwei Befestigungseinheiten (11) aufweist, mit welchen das Schienenelement (10) lösbar an der Deckenfläche (3) befestigbar ist, wobei das Schienenelement (10) entlang der Schienenelementlängsachse in einer Verschieberichtung (S) gegenüber den Befestigungseinheiten (11) verschiebbar ist, und die Hebevorrichtung (4) am Gurtelement (6) weitergehend ein Verankerungselement (12) aufweist, mit welchem die Hebevorrichtung (4) am Schienenelement (10) befestigbar ist wobei im vollständig angehobenen Zustand das Montageelement auf der Hebevorrichtung aufliegend zwischen den zwei Schienenelementen angeordnet ist,Transport system (1) for several assembly elements (2) to be assembled in particular in a row, in particular fire protection and ventilation ducts, pipelines and cable duct elements, for transporting the assembly elements (2) to a wall or ceiling surface (3), comprising a lifting device (4) with which the assembly elements (2) can be lifted to their assembly site on the ceiling surface (3), comprising at least one flat transport element (5) onto which the assembly elements (2) can be placed, and at least one belt element (6) which is attached to the transport element ( 5) is arranged and with which this can be suspended, the lifting device (4) being movable in a vertical direction (V),characterizedthat the transport system further comprises a rail device (9), which has at least one rail element (10), which is aligned parallel to the row of assembly elements to be assembled, and at least two fastening units (11), with which the rail element (10) can be detachably fastened to the ceiling surface (3), the rail element (10) being displaceable along the longitudinal axis of the rail element in a displacement direction (S) relative to the fastening units (11), and the lifting device (4) on the belt element (6) furthermore has an anchoring element (12) with which the lifting device (4) can be fastened to the rail element (10), the mounting element being arranged on the lifting device between the two rail elements in the fully raised state, Transportsystem (1) nach Anspruch 1 dadurch gekennzeichnet, dass das Transportsystem (1) weitergehend eine Rahmenvorrichtung (13) aufweist, welche ein flächiges, horizontal angeordnetes Basiselement (14), zumindest zwei flächige, vertikal angeordnete Seitenelemente (15), welche jeweils an einem Rand des Basiselements (14) angeordnet sind, sowie zumindest drei Radelemente (16) umfasst, welche unterhalb des Basiselements (14) an diesem angeordnet sind und mit welchen die Rahmenvorrichtung (13) auf einem Boden (17) bewegbar ist, wobei die Hebevorrichtung (4) mit ihren Verankerungselementen (12) an den oberen Rändern der Seitenelemente (15) befestigbar ist.Transport system (1) according to claim 1 characterized in that the transport system (1) also has a frame device (13), which comprises a flat, horizontally arranged base element (14), at least two flat, vertically arranged side elements (15), which are each arranged on an edge of the base element (14), and at least three wheel elements (16) which are arranged underneath the base element (14) on the latter and with which the frame device (13) can be moved on a floor (17), the lifting device (4) being movable with its Anchoring elements (12) can be fastened to the upper edges of the side elements (15). Transportsystem (1) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Befestigungseinheiten (11) der Schienenvorrichtung (9) entlang einer geraden Linie und in einem Abstand kleiner als die Länge des Schienenelements (10) an der Deckenfläche (3) befestigbar sind und jeweils zumindest ein Rollenelement (18) aufweisen, wobei das Schienenelement (10) gegenüber dem Rollenelement (18) in der Verschieberichtung (S) parallel zur Deckenfläche verschiebbar ist.Transport system (1) according to claim 1 or 2 , characterized in that the fastening units (11) of the rail device (9) can be fastened to the ceiling surface (3) along a straight line and at a distance smaller than the length of the rail element (10) and each have at least one roller element (18), the rail element (10) being displaceable relative to the roller element (18) in the displacement direction (S) parallel to the ceiling surface. Transportsystem (1) nach einem der vorherigen Ansprüche. dadurch gekennzeichnet, dass das Schienenelement (10) als Hohlprofil mit einer zum Rollenelement (18) komplementär ausgebildeten Ausnehmung (19) ausgeführt ist, wobei das Schienenelement (10) das Rollenelement (18) mit seiner die Ausnehmung (19) begrenzenden Wandung (20) umschließt und die Wandung (20) weitergehend eine Aussparung (21) aufweist, in welcher eine Verbindungseinheit (22) führbar ist, welche das Rollenelement (18) mit einem Befestigungselement (23) verbindet, welche an der Deckenfläche (3) angeordnet ist.Transport system (1) according to one of the preceding claims. characterized in that the rail element (10) is designed as a hollow profile with a recess (19) designed to complement the roller element (18), the rail element (10) enclosing the roller element (18) with its wall (20) delimiting the recess (19) and the wall (20) also has a recess (21) in which a connecting unit (22) can be guided, which connects the roller element (18) to a fastening element (23). , which is arranged on the ceiling surface (3). Transportsystem (1) nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass die Befestigungseinheiten (11) der Schienenvorrichtung (9) in einer Bohrung der Deckenfläche (3), welche für die Befestigung der Montageelemente (2) nutzbar ist, befestigbar sind.Transport system (1) according to one of the preceding claims, characterized in that the fastening units (11) of the rail device (9) can be fastened in a hole in the ceiling surface (3) which can be used for fastening the assembly elements (2). Transportsystem (1) nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass das Transportelement (5) weitergehend zumindest ein Traversenelement (24) aufweist, welches auf der Oberseite des Transportelements (5) angeordnet ist, wobei es an den Endpunkten seiner länglichen Erstreckung jeweils zumindest eine Aussparung aufweist, in welcher jeweils ein Gurtelement (6) am Traversenelement (24) führbar ist.Transport system (1) according to one of the preceding claims, characterized in that the transport element (5) also has at least one crossbar element (24) which is arranged on the upper side of the transport element (5), wherein it has at least one recess at the end points of its longitudinal extent, in which a belt element (6) on the crossbar element (24) can be guided. Transportsystem (1) nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, dass die Hebevorrichtung ein Antriebselement (7) umfasst, welches an der Unterseite des Transportelements (5) angeordnet ist und mit welchem das Gurtelement (6) verkürzbar und verlängerbar ist, wobei durch Verkürzen oder Verlängern des Gurtelements (6) das Transportelement (5) in einer vertikalen Richtung (V) anhebbar und absenkbar ist.Transport system (1) according to one of the preceding claims, characterized in that the lifting device comprises a drive element (7) which is arranged on the underside of the transport element (5) and with which the belt element (6) can be shortened and lengthened, the transport element (5) being able to be raised and lowered in a vertical direction (V) by shortening or lengthening the belt element (6). Verfahren für die Montage, insbesondere die die Montage an einer Deckenfläche (3), einer fortlaufenden Reihe von Montageelementen (2), insbesondere Brandschutz-, Lüftungs- und Kabelkanalelemente, mit einem Transportsystem (1), umfassend eine Hebevorrichtung (4), welche zumindest ein flächiges Transportelement (5), zumindest ein Gurtelement (6), und zumindest ein Verankerungselement (12) aufweist und mit welcher die Montageelemente in einer vertikalen Richtung (V) hebbar sind, und eine Schienenvorrichtung (9), welche zumindest eine Befestigungseinheit (11), umfassend zumindest ein Rollenelement (18), und zumindest ein Schienenelement (10), welches auf den Rollenelementen (18) in einer Verschieberichtung (V) verschiebbar ist, aufweist, wobei im vollständig angehobenen Zustand das Montageelement auf der Hebevorrichtung aufliegend zwischen den zwei Schienenelementen angeordnet ist, umfassend die Schritte: - Befestigen von zumindest zwei Befestigungseinheiten (11) entlang einer Geraden am Montageort verteilt über die gesamte Länge der zu montierenden Montageelementreihe an einer Deckenfläche (3) in einem Abstand zueinander, welcher kleiner als die Länge des Schienenelements (10) in seiner Verschieberichtung (V) ist; - Befestigen der Hebevorrichtung (4) an der Schienenvorrichtung (9) durch Befestigen der Verankerungselemente (12) der Hebevorrichtung (4) am Schienenelement (10) und Aufschieben des Schienenelements (10) auf die Rollenelemente (18) der Befestigungseinheiten (11) in Verschieberichtung (V); - Transport von zumindest einem Montageelement (2) an den Montageort durch Auflegen von zumindest einem Montageelement auf das Transportelement (5) und Bewegung der Hebevorrichtung (4) in der vertikalen Richtung (V) und/oder horizontale Bewegung der Hebevorrichtung (4) durch Verschieben des Schienenelements (10) in Verschieberichtung (V) auf den Rollenelementen (18); - Montage des Montageelements (2) am Montageort, wobei die letzten beiden Schritte beliebig oft wiederholbar sind bis sämtliche Montageelemente am Montageort montiert sind.Method for assembly, in particular assembly on a ceiling surface (3), one continues running series of assembly elements (2), in particular fire protection, ventilation and cable duct elements, with a transport system (1) comprising a lifting device (4) which has at least one flat transport element (5), at least one belt element (6) and at least one anchoring element (12) and with which the assembly elements can be lifted in a vertical direction (V), and a rail device (9) which has at least one fastening unit (11) comprising at least one roller element (18) and at least one rail element (10) which is mounted on the roller elements ( 18) is displaceable in a displacement direction (V), wherein in the fully raised state the mounting element is arranged resting on the lifting device between the two rail elements, comprising the steps: - Fastening at least two fastening units (11) along a straight line at the mounting location distributed over the entire length of the row of mounting elements to be mounted on a ceiling surface (3) at a distance from one another which is smaller than the length of the rail element (10) in its displacement direction (V); - Fastening the lifting device (4) to the rail device (9) by fastening the anchoring elements (12) of the lifting device (4) to the rail element (10) and pushing the rail element (10) onto the roller elements (18) of the fastening units (11) in the direction of displacement (V); - Transport of at least one assembly element (2) to the assembly site by placing at least one assembly element on the transport element (5) and moving the lifting device (4) in the vertical direction (V) and/or horizontal movement of the lifting device (4) by moving the rail element (10) in the direction of movement (V) on the roller elements (18); - Assembly of the assembly element (2) at the assembly site, the last two steps can be repeated as often as necessary until all assembly elements are assembled at the assembly site. Verfahren nach Anspruch 8, dadurch gekennzeichnet, dass nach dem Transport eines Montageelements (2) an seinen Montageort bei der Montage zumindest einer der Befestigungspunkte, welche zuvor für das Befestigen der Befestigungseinheiten (11) genutzt wurden, zum Befestigen des Montageelements (2) benutzt wird.procedure after claim 8 , characterized in that after a mounting element (2) has been transported to its mounting location, at least one of the mounting points previously used for mounting the mounting units (11) is used to mount the mounting element (2). Verfahren nach Anspruch 8 oder 9, dadurch gekennzeichnet, dass nach dem Befestigen der Befestigungseinheiten (11) an der Deckenfläche (3) die Hebevorrichtung (4) mit ihren Verankerungselementen (12) zunächst an einer Rahmenvorrichtung (13) befestigt wird, welche zumindest drei Radelemente (16) aufweist, mit welchen die Rahmenvorrichtung (13) gegenüber einem Boden (17) in einer horizontalen Ebene bewegbar ist, und anschließend die Montageelemente (2) auf einem ersten Teil des Transportweges an den Montageort mit Hilfe der Hebevorrichtung (4), welche an der Rahmenvorrichtung (13) angeordnet ist, transportiert werden und erst anschließend die Verankerungselemente (12) der Hebevorrichtung (4) am Schienenelement (10) befestigt werden und die Schienenelemente (10) auf die Rollenelemente (18) der Befestigungseinheiten (11) aufgeschoben werden.procedure after claim 8 or 9 , characterized in that after the fastening units (11) have been fastened to the ceiling surface (3), the lifting device (4) with its anchoring elements (12) is first fastened to a frame device (13) which has at least three wheel elements (16) with which the frame device (13) can be moved in a horizontal plane in relation to a floor (17), and then the assembly elements (2) on a first part of the transport route to the assembly site with the aid of the lifting device (4) which is on the frame device (13) is arranged, are transported and only then are the anchoring elements (12) of the lifting device (4) fastened to the rail element (10) and the rail elements (10) are pushed onto the roller elements (18) of the fastening units (11). Verfahren nach Anspruch 10, dadurch gekennzeichnet, dass die Montageelemente (2) mit der an der Rahmenvorrichtung (13) angeordneten Hebevorrichtung (4) durch horizontales Bewegen der Rahmenvorrichtung (13) auf dem Boden und vertikalem Bewegen der Hebevorrichtung (4) bis an den Montageort transportiert werden und der Schritt des Befestigens der Befestigungseinheiten (11) an der Deckenfläche (3) entfällt.procedure after claim 10 , characterized in that the assembly elements (2) are transported to the assembly site with the lifting device (4) arranged on the frame device (13) by horizontally moving the frame device (13) on the floor and vertically moving the lifting device (4) and the step of fastening the fastening units (11) to the ceiling surface (3) is omitted.
DE102018107599.5A 2018-03-29 2018-03-29 transport system Active DE102018107599B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102018107599.5A DE102018107599B4 (en) 2018-03-29 2018-03-29 transport system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102018107599.5A DE102018107599B4 (en) 2018-03-29 2018-03-29 transport system

Publications (2)

Publication Number Publication Date
DE102018107599A1 DE102018107599A1 (en) 2019-10-02
DE102018107599B4 true DE102018107599B4 (en) 2023-07-27

Family

ID=67909735

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102018107599.5A Active DE102018107599B4 (en) 2018-03-29 2018-03-29 transport system

Country Status (1)

Country Link
DE (1) DE102018107599B4 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116354054B (en) * 2023-05-30 2023-08-04 广东蓓思涂汽车零部件有限公司 Intelligent conveying system for electrophoresis processing of automobile parts

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2033514A1 (en) 1970-07-07 1972-01-13 Technab, Les Brouzils, Vendee (Frankreich) Method and device for the construction of rooms, in particular for residential use
DE10242574A1 (en) 2002-09-11 2004-03-18 Max Bögl Bauunternehmung GmbH & Co. KG Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel
WO2012003526A1 (en) 2010-07-08 2012-01-12 Antony Scott A suspended rail system
DE102017121603A1 (en) 2017-09-18 2019-03-21 Smt Scharf Ag Conveying and transport system for tunnel structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2033514A1 (en) 1970-07-07 1972-01-13 Technab, Les Brouzils, Vendee (Frankreich) Method and device for the construction of rooms, in particular for residential use
DE10242574A1 (en) 2002-09-11 2004-03-18 Max Bögl Bauunternehmung GmbH & Co. KG Method for cutting a tunnel and erecting an overhead railway has the supports for the railway track attached to reinforcing and embedded in the sprayed concrete lining of the tunnel
WO2012003526A1 (en) 2010-07-08 2012-01-12 Antony Scott A suspended rail system
DE102017121603A1 (en) 2017-09-18 2019-03-21 Smt Scharf Ag Conveying and transport system for tunnel structures

Also Published As

Publication number Publication date
DE102018107599A1 (en) 2019-10-02

Similar Documents

Publication Publication Date Title
DE3512589C2 (en)
WO2019068469A1 (en) Method for constructing an elevator system having increasing usable lifting height
DE60309671T2 (en) Telescopic rails with carriage for holding a patient lift
EP2209731B1 (en) Portal device for use when mounting or servicing heavy parts of a transport device
DE1255902B (en) Process for erecting buildings from prefabricated space boxes
EP2759432A2 (en) Roof structure for sliding covers and roofs for utility vehicles
DE102018107599B4 (en) transport system
DE102017102930B4 (en) Lifting device and system for transporting general cargo
EP2832664A1 (en) Storing device for a plate-like article
DE1941940C3 (en) Vehicle with lifting device for large-volume boxes, preferably made of concrete, with recesses in the floor for telescopically adjustable legs of the lifting device
DE69015461T2 (en) Assembly line for maintenance and repair of vehicle bodies.
DE102017104751B4 (en) transport device
DE3517291C2 (en)
DE10132351A1 (en) conveyor system
DE2750916C2 (en) Compressed air-powered transport system for underground mining operations
DE2013025C3 (en) Method and device for erecting a building consisting of a frame structure and room units inserted therein
DE2542275A1 (en) VEHICLE FOR THE TRANSPORTATION OF REINFORCED CONCRETE ROOM CELLS, E.G. OF REINFORCED CONCRETE GARAGES
AT506336B1 (en) ON A FACADE UP AND DOWN MOVABLE HANGING UNIT
DE4332689C2 (en) Method and device for laying pipes
DE2123132A1 (en) Conveying device for scaffolding, in particular metal scaffolding
DE3624691A1 (en) Mounting process for roof segments
DE29607823U1 (en) Mast
DE102007002140A1 (en) Mobile building for automatic parking of vehicles, is constructed from steel profiles forming internal grid system, and can be located on any terrain without foundations
DE102014114400B4 (en) Chassis carrier for holding trolley and handling system
DE1434685A1 (en) Storage platform for automobile garages

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final