DE102017129383A1 - Method for producing a multilayer prefabricated component - Google Patents

Method for producing a multilayer prefabricated component Download PDF

Info

Publication number
DE102017129383A1
DE102017129383A1 DE102017129383.3A DE102017129383A DE102017129383A1 DE 102017129383 A1 DE102017129383 A1 DE 102017129383A1 DE 102017129383 A DE102017129383 A DE 102017129383A DE 102017129383 A1 DE102017129383 A1 DE 102017129383A1
Authority
DE
Germany
Prior art keywords
cavity
layer
material mixture
mixture
shuttering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102017129383.3A
Other languages
German (de)
Inventor
Anmelder Gleich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE102017129383.3A priority Critical patent/DE102017129383A1/en
Publication of DE102017129383A1 publication Critical patent/DE102017129383A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/34Horizontally-travelling moulds for making walls blockwise or section-wise
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • B28B1/16Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted for producing layered articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B19/00Machines or methods for applying the material to surfaces to form a permanent layer thereon
    • B28B19/003Machines or methods for applying the material to surfaces to form a permanent layer thereon to insulating material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/028Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members for double - wall articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0091Transformable moulds allowing the change of shape of an initial moulded preform by preform deformation or the change of its size by moulding on the preform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/044Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/049Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres completely or partially of insulating material, e.g. cellular concrete or foamed plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/18Forms, which are completely dismantled after setting of the concrete and re-built for next pouring for double walls

Abstract

Die Erfindung betrifft ein Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements, insbesondere eines Decken- und/oder Wandelements.The invention relates to a method for producing a multilayer finished component, in particular a ceiling and / or wall element.

Description

Gebiet der ErfindungField of the invention

Die Erfindung betrifft ein Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements, insbesondere eines Decken- und/oder Wandelements.The invention relates to a method for producing a multilayer finished component, in particular a ceiling and / or wall element.

Stand der TechnikState of the art

Fertigbauelemente für Gebäude sind aus dem Stand der Technik bekannt. Die bekannten Elemente werden in von der Baustelle entfernten Werken vorgefertigt und anschließend zur Baustelle transportiert. Dabei werden bekannten Fertigbauelemente nachträglich am Gebäude oder auf der Baustelle mit separaten Wärmedämmelementen versehen.Prefabricated building elements are known from the prior art. The known elements are prefabricated in remote from the site works and then transported to the site. In this case, known prefabricated components are subsequently provided on the building or on the construction site with separate thermal insulation elements.

Nachteilig an den bekannten Fertigbauelementen und den Verfahren zur Herstellung von bekannten Fertigbauelementen ist, dass die Fertigbauelemente zunächst in einer Fabrik vorgefertigt werden und anschließend z kostenintensiv zur Baustelle transportiert werden müssen. Zudem müssen die bekannten Fertigbauelemente in einem zusätzlichen Arbeitsschritt mit Wärmedämmelementen versehen werden.A disadvantage of the known prefabricated components and the method for the production of known prefabricated components that the prefabricated elements are first prefabricated in a factory and then z must be transported to the construction site costly. In addition, the known prefabricated components must be provided in an additional step with thermal insulation elements.

Aufgabenstellungtask

Ausgehend von diesem Stand der Technik ist es Aufgabe der Erfindung ein Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements bereitzustellen, welches es ermöglicht, ein mehrschichtiges Fertigbauelement vor Ort mit definierten Schichtdicken in wirtschaftlichem Maße herzustellen und insbesondere ein Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements bereitzustellen, welches es ermöglicht, ein mehrschichtiges Fertigbauelement mit wenigstens einer tragenden Schicht und wenigstens einer wärmedämmenden Schicht, insbesondere einer wärmedämmenden Außenfassade, vor Ort in einem wirtschaftlichen Maße herzustellen.Based on this prior art, it is an object of the invention to provide a method for producing a multilayer prefabricated component, which makes it possible to economically produce a multilayer prefabricated component with defined layer thicknesses and in particular to provide a method for producing a multi-layer finished component, which makes it possible to produce a multi-layer prefabricated structural element with at least one load-bearing layer and at least one heat-insulating layer, in particular a heat-insulating outer facade, on site to an economic degree.

Darlegung der ErfindungPresentation of the invention

Diese Aufgabe wird durch das erfindungsgemäße Verfahren gemäß Anspruch 1 gelöst. Weiterbildungen und vorteilhafte Ausgestaltungen ergeben sich aus den abhängigen Ansprüchen.This object is achieved by the method according to claim 1. Further developments and advantageous embodiments will be apparent from the dependent claims.

Im Folgenden wird das erfindungsgemäße Verfahren beschrieben. Dabei entspricht die textliche Abfolge der Beschreibung zumindest weitestgehend dem zeitlichen Ablauf des Verfahrens. Es ist jedoch durchaus möglich, dass vor, während oder im Anschluss an einen beschriebenen Verfahrensschritt ein weiterer Verfahrensschritt zeitlich vorgeschaltet ist, zeitgleich abläuft oder zeitlich nachgeschaltet ist.The process according to the invention is described below. At the same time, the textual sequence of the description at least largely corresponds to the time sequence of the method. However, it is quite possible that before, during or after a described process step, a further process step is upstream in time, runs at the same time or is connected in time.

Das erfindungsgemäße Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements, insbesondere eines Decken- und/oder Wandelements, für ein Gebäude sieht vor, dass in einem ersten Verfahrensschritt mittels einer Mehrzahl von Verschalungselementen, insbesondere wiederverwendbaren Verschalungselementen wie beispielsweise Magnetverschalungselementen, ein erster Hohlraum ausgeformt wird. Der erste Hohlraum dient dabei der Herstellung einer ersten Schicht des mehrschichtigen Fertigbauelements. Vorteilhafterweise werden die Verschalungselemente in einer Rahmenkonstruktion einer Fertigbaumaschine angeordnet. Die Fertigbaumaschine ist für die Ausführung des erfindungsgemäßen Verfahrens jedoch nicht zwingend notwendig und wird daher nicht weiter beschrieben. In einer Fertigbaumaschine können mehr als ein mehrschichtiges Fertigbauelement nebeneinander und in kurzer zeitlicher Abfolge oder zeitglich hergestellt werden.The inventive method for producing a multi-layer prefabricated component, in particular a ceiling and / or wall element, for a building provides that in a first method step by means of a plurality of shuttering elements, in particular reusable shuttering elements such as Magnetverschalungselementen, a first cavity is formed. The first cavity serves to produce a first layer of the multilayer finished component. Advantageously, the shuttering elements are arranged in a frame construction of a prefabricated construction machine. However, the prefabricated construction machine is not absolutely necessary for carrying out the method according to the invention and will therefore not be described further. In a prefabricated construction machine, more than one multilayer prefabricated component can be produced side by side and in a short time sequence or in a timely manner.

Die Verschalungselemente werden vorteilhafterweise derart angeordnet, dass die Flächensenkrechte des herzustellenden, mehrschichtigen Fertigbauelements zumindest weitestgehend senkrecht zu einer Füllrichtung, insbesondere horizontal, ausgerichtet ist. Als Füllrichtung wird dabei die Flussrichtung des in den Hohlraum einzubringenden Werkstoffs betrachtet. Die Füllrichtung beziehungsweise die Flussrichtung des Werkstoffs entspricht vorteilhafterweise der Richtung der Schwerkraft.The shuttering elements are advantageously arranged in such a way that the surface perpendicularity of the multilayer prefabricated component to be produced is oriented at least substantially perpendicular to a filling direction, in particular horizontally. The filling direction is considered to be the direction of flow of the material to be introduced into the cavity. The filling direction or the flow direction of the material advantageously corresponds to the direction of gravity.

In einem zeitlich nachfolgenden, weiter unten beschriebenen, Verfahrensschritt wird wenigstens ein Verschalungselement um eine definierte Strecke verschoben, um das Verschieben des wenigstens einen Verschalungselement mit möglichst geringem Arbeits- und Kraftaufwand zu ermöglichen, kann es vorteilhaft sein, wenn wenigstens ein Verschalungselement verschiebbar gelagert ist.In a subsequent process step, described below, at least one shuttering element is moved by a defined distance to allow the displacement of the at least one shuttering element with the least possible effort and force, it may be advantageous if at least one shuttering element is slidably mounted.

Nachdem der erste Hohlraum mittels der Mehrzahl von Verschalungselemente ausgeformt wurde, wird in einem zeitlich nachgelagerten Verfahrensschritt zumindest ein erster Werkstoff oder zumindest ein erstes Werkstoffgemisch in den ersten Hohlraum eingebrachtAfter the first cavity has been formed by means of the plurality of shuttering elements, at least one first material or at least one first material mixture is introduced into the first cavity in a temporally downstream process step

Vorteilhafterweise wird der erste Werkstoff oder das erste Werkstoffgemisch solange in den ersten Hohlraum eingebracht, bis der erste Werkstoff oder das erste Werkstoffgemisch den ersten Hohlraum zumindest weitestgehend vollständig ausfüllt.Advantageously, the first material or the first material mixture is introduced into the first cavity until the first material or the first material mixture at least largely completely fills the first cavity.

Es ist denkbar, dass neben einem ersten Werkstoff oder einem ersten Werkstoffgemisch ein weiterer Werkstoff oder ein weiteres Werkstoffgemisch in den ersten Hohlraum eingebracht wird. Möglicherweise ist es erforderlich, dass ein Teilbereich der mittels des ersten Werkstoffs herzustellenden ersten Schicht des späteren mehrschichtigen Fertigbauelements von dem Rest der ersten Schicht unterschiedliche Eigenschaften aufweisen soll. In diesem Fall kann es angebracht sein, einen weiteren Werkstoff oder ein weiteres Werkstoffgemisch in einen Teilbereich des ersten Hohlraums einzubringen. Unter einem weiteren Werkstoff kann insbesondere Styropor oder Styroporelemente, die zur Ausformung von Aussparungen in dem herzustellenden Fertigbauelement in dem ersten Hohlraum angeordnet werden, verstanden werden. Es ist auch denkbar, dass zur Ausformung von Aussparungen in dem herzustellenden Fertigbauelement weitere Verschalungselemente, insbesondere Magnetverschalungselemente, in dem ersten Hohlraum angeordnet werden.It is conceivable that, in addition to a first material or a first material mixture, a further material or a further material mixture is introduced into the first cavity. It may be necessary for a portion of the first layer of the subsequent multilayer finished component to be produced by the first material to have different properties from the remainder of the first layer. In this case, it may be appropriate to introduce a further material or a further material mixture in a partial region of the first cavity. Styrofoam or styrofoam elements, which are arranged in the first cavity for forming recesses in the prefabricated component to be produced, can be understood as a further material in particular. It is also conceivable that further shuttering elements, in particular magnetic shuttering elements, are arranged in the first cavity for the purpose of forming recesses in the prefabricated component to be produced.

Nachdem der erste Werkstoff oder das erste Werkstoffgemisch in den ersten Hohlraum eingebracht wurde, muss der erste Werkstoff oder das erste Werkstoffgemisch und/oder weitere in den ersten Hohlraum eingebrachte Werkstoffe oder Werkstoffgemische aushärten. Idealerweise härtet der erste Werkstoff oder das erste Werkstoffgemisch so lange, bis der erste Werkstoff oder das erste Werkstoffgemisch formstabil ausgehärtet, jedoch noch nicht vollständig durchgehärtet ist. Wenn der erste Werkstoff oder das erste Werkstoffgemisch zumindest formstabil ausgehärtet ist, kann von einer ersten Schicht gesprochen werden.After the first material or the first material mixture has been introduced into the first cavity, the first material or the first material mixture and / or other introduced into the first cavity materials or mixtures of materials must be cured. Ideally, the first material or the first material mixture hardens until the first material or the first material mixture has hardened in a dimensionally stable manner, but is not yet completely through-hardened. If the first material or the first material mixture is cured at least dimensionally stable, can be spoken of a first layer.

Vorteilhafterweise handelt es sich bei der ersten Schicht um eine tragende Schicht. Für eine tragende Schicht bietet sich als erster Werkstoff oder als erstes Werkstoffgemisch insbesondere Leichtbeton oder Stahlbeton an. Vorteilhafterweise weist die tragende Schicht eine Stärke von 8 cm bis 20 cm, bevorzugt von 15 cm, auf. Unter einer tragenden Schicht wird insbesondere eine Schicht verstanden, die in einem aus den erfindungsgemäßen Fertigbauelementen hergestellten Gebäude eine statisch tragende Funktion erfüllen und/oder zur Abtragung von Gebäudelasten dienen.Advantageously, the first layer is a supporting layer. For a load-bearing layer, lightweight concrete or reinforced concrete is the first material or the first mixture of materials. Advantageously, the supporting layer has a thickness of 8 cm to 20 cm, preferably 15 cm. A load-bearing layer is understood in particular to mean a layer which, in a building produced from the prefabricated building elements according to the invention, fulfills a statically supporting function and / or serves for the removal of building loads.

Nachdem der erste Werkstoff oder das erste Werkstoffgemisch zumindest formstabil ausgehärtet ist, wird in einem zeitlich nachgelagerten Verfahrensschritt das wenigstens eine verschiebbar gelagerte Verschalungselement von der ersten Schicht abgerückt. Durch das Abrücken des verschiebbar gelagerten Verschalungselements von der ersten Schicht, entsteht zwischen der ersten Schicht und dem verschiebbar gelagerten, abgerückten Verschalungselement ein zweiter Hohlraum. Der zweite Hohlraum dient dabei der Herstellung einer zweiten Schicht des mehrschichtigen Fertigbauelements.After the first material or the first material mixture has cured at least dimensionally stable, the at least one displaceably mounted shuttering element is moved away from the first layer in a temporally downstream process step. As a result of the removal of the displaceably mounted shuttering element from the first layer, a second cavity is created between the first layer and the displaceably mounted shuttering element. The second cavity serves to produce a second layer of the multilayer finished component.

Vorteilhafterweise wird das verschiebbar gelagerte Verschalungselemente um eine definierte Strecke abgerückt, welche insbesondere der Stärke einer weiteren herzustellenden Schicht entspricht.Advantageously, the displaceably mounted shuttering elements are moved away by a defined distance, which corresponds in particular to the thickness of a further layer to be produced.

Nachdem der zweite Hohlraum durch das Abrücken des verschiebbar gelagerten Verschalungselements von der ersten Schicht ausgeformt ist, wird in einem zeitlich nachgelagerten Verfahrensschritt zumindest ein zweiter Werkstoff oder ein zweites Werkstoffgemisch in den zweiten Hohlraum eingebracht. After the second cavity has been formed by the removal of the displaceably mounted shuttering element from the first layer, at least one second material or a second material mixture is introduced into the second cavity in a temporally downstream process step.

Vorteilhafterweise wird der zweite Werkstoff oder das zweite Werkstoffgemisch solange in den zweiten Hohlraum eingebracht, bis der zweite Werkstoff oder das zweite Werkstoffgemisch den zweiten Hohlraum zumindest weitestgehend vollständig ausfüllt.Advantageously, the second material or the second material mixture is introduced into the second cavity until the second material or the second material mixture at least largely completely fills the second cavity.

Es ist denkbar, dass neben einem zweiten Werkstoff oder einem zweiten Werkstoffgemisch ein weiterer Werkstoff oder ein weiteres Werkstoffgemisch in den zweiten Hohlraum eingebracht wird. Möglicherweise ist es erforderlich, dass ein Teilbereich der mittels des zweiten Werkstoffs herzustellenden zweiten Schicht des späteren mehrschichtigen Fertigbauelements von dem Rest der zweiten Schicht unterschiedliche Eigenschaften aufweisen soll. In diesem Fall kann es angebracht sein, einen weiteren Werkstoff oder ein weiteres Werkstoffgemisch in einen Teilbereich des zweiten Hohlraums einzubringen. Unter einem weiteren Werkstoff kann insbesondere Styropor oder Styroporelemente, die zur Ausformung von Aussparungen in dem herzustellenden Fertigbauelement in den zweiten Hohlraum angeordnet werden, verstanden werden. Es ist auch denkbar, dass zur Ausformung von Aussparungen in dem herzustellenden Fertigbauelement weitere Verschalungselemente, insbesondere Magnetverschalungselemente, in dem zweiten Hohlraum angeordnet werden.It is conceivable that, in addition to a second material or a second material mixture, another material or a further material mixture is introduced into the second cavity. It may be necessary for a portion of the second layer of the subsequent multilayer prefabricated component to be produced by means of the second material to have different properties from the remainder of the second layer. In this case, it may be appropriate to introduce a further material or a further material mixture in a partial region of the second cavity. In particular, styrofoam or polystyrene elements which are arranged in the second cavity for the purpose of forming recesses in the prefabricated component to be produced can be understood as a further material. It is also conceivable for further shuttering elements, in particular magnetic shuttering elements, to be arranged in the second cavity for the purpose of forming recesses in the prefabricated component to be produced.

Nachdem der zweite Werkstoff oder das zweite Werkstoffgemisch in den zweiten Hohlraum eingebracht wurde, muss der zweite Werkstoff oder das zweite Werkstoffgemisch und/oder weitere in den zweiten Hohlraum eingebrachte Werkstoffe oder Werkstoffgemische aushärten. Dabei gehen der zumindest formstabil ausgehärtete erste Werkstoff oder das erste zumindest formstabil ausgehärtete Werkstoffgemisch während des Einbringens des zweiten Werkstoffs oder des zweiten Werkstoffgemischs und/oder während des Aushärtens des zweiten Werkstoffs oder des zweiten Werkstoffgemischs eine stoff- und/oder formschlüssige Verbindung mit dem zweiten Werkstoff oder dem zweiten Werkstoffgemisch ein. Wenn der zweite Werkstoff oder das zweite Werkstoffgemisch zumindest formstabil ausgehärtet ist, kann von einer zweiten Schicht gesprochen werden.After the second material or the second material mixture has been introduced into the second cavity, the second material or the second material mixture and / or further introduced into the second cavity materials or mixtures of materials must be cured. During the introduction of the second material or of the second material mixture and / or during curing of the second material or of the second material mixture, the material hardened at least dimensionally stable hardened first material or the first at least dimensionally stable hardened composite material and / or a form-locking connection with the second material or the second material mixture. If the second material or the second material mixture is cured at least dimensionally stable, can be spoken of a second layer.

Vorteilhafterweise handelt es sich bei der zweiten Schicht um eine wärmedämmende Schicht, insbesondere um eine Fassadendämmung für ein Gebäude. Unter einer wärmedämmenden Schicht wird insbesondere eine Schicht mit einem geringen Wärmedurchgang oder eine Schicht mit einem geringen Wärmedurchgangskoeffizienten verstanden, die sich vorteilhafterweise für den Einsatz als gedämmte Außenfassade eines Gebäudes eignet. Für eine wärmedämmende Schicht bietet sich als zweiter Werkstoff oder als zweites Werkstoffgemisch insbesondere ein Porenleichtbeton in Form von beispielsweise Schaumbeton oder Schaummörtel. Vorteilhafterweise weist die wärmedämmende Schicht eine Stärke von 10 cm bis 25 cm, bevorzugt von 16 cm bis 20 cm, auf. Advantageously, the second layer is a heat-insulating layer, in particular a facade insulation for a building. Under a heat-insulating layer is in particular a layer with a low heat transfer or a layer with a low heat transfer coefficient understood, which is advantageously suitable for use as a insulated exterior facade of a building. For a heat-insulating layer, as a second material or as a second material mixture, in particular a pore-lightweight concrete in the form of, for example, foam concrete or foam mortar is suitable. Advantageously, the heat-insulating layer has a thickness of 10 cm to 25 cm, preferably 16 cm to 20 cm.

Der Einsatz von konventionellem Porenleichtbeton führte zu der Problematik, dass hinreichende Wärmedurchgangswerte lediglich mit Stärken der zweiten Schicht erreichen ließen, die sich in der Herstellung als unwirtschaftlich herausstellten. Diese Problematik ließ sich überwinden, indem ein Porenleichtbeton mit einer Rohdichte von 100 kg/m3 bis 500 kg/m3, bevorzugt 100 kg/m3 bis 400 kg/m3, besonders bevorzugt von 100 kg/m3 bis 200 kg/m3, eingesetzt wird.The use of conventional lightweight pore concrete led to the problem that sufficient heat transfer values could only be achieved with second layer thicknesses which turned out to be uneconomical in production. This problem could be overcome by using a lightweight concrete with a bulk density of 100 kg / m 3 to 500 kg / m 3 , preferably 100 kg / m 3 to 400 kg / m 3 , particularly preferably from 100 kg / m 3 to 200 kg / m 3 , is used.

Nachdem der zweite Werkstoff oder das zweite Werkstoffgemisch zumindest formstabil ausgehärtet ist, kann in einem zeitlich nachgelagerten Verfahrensschritt das mehrschichtige Fertigbauelement entformt werden, indem die Verschalungselemente von dem Fertigbauelement entfernt werden und das Fertigbauelement aus der Fertigbaumaschine entfernt wird.After the second material or the second material mixture has cured at least dimensionally stable, in a temporally downstream process step, the multi-layer prefabricated component can be removed by the shuttering elements are removed from the finished component and the finished component is removed from the prefabricated machine.

Vorteilhafterweise kann in den ersten Hohlraum eine Bewehrung, insbesondere eine Stahlbewehrung, und/oder in den zweiten Hohlraum eine Bewehrung, insbesondere ein Glasfasergewebe, eingebracht werden. Zudem kann die Bewehrung vorteilhafterweise teilweise über das herzustellende, mehrschichtige Fertigbauelement hinausragen. An die überstehenden Bewehrungselemente lassen sich nach der Herstellung des mehrschichtigen Fertigbauelements Lasthaken anschlagen mittels derer das mehrschichtige Fertigbauelement aus dem Verschalungselementen und/oder der Fertigbaumaschine entformt werden kann.Advantageously, a reinforcement, in particular a steel reinforcement, and / or in the second cavity, a reinforcement, in particular a glass fiber fabric, are introduced into the first cavity. In addition, the reinforcement can advantageously partially protrude beyond the produced multilayer prefabricated component. After the production of the multi-layer prefabricated construction element, load hooks can be hooked onto the projecting reinforcing elements by means of which the multi-layer prefabricated building element can be demolded from the shuttering elements and / or the prefabricated construction machine.

Des Weiteren ist es denkbar, in dem ersten Hohlraum und/oder dem zweiten Hohlraum zumindest teilweise eine Zwischenschicht anzuordnen, die während des Einbringens eines ersten Werkstoffs oder eines ersten Werkstoffgemischs bzw. eines zweiten Werkstoffs oder eines zweiten Werkstoffgemischs in den ersten Hohlraum bzw. in den zweiten Hohlraum zumindest teilweise von dem ersten Werkstoff oder dem ersten Werkstoffgemisch bzw. dem zweiten Werkstoff oder dem zweiten Werkstoffgemisch bedeckt und in die erste Schicht bzw. in die zweite Schicht eingegossen wird.Furthermore, it is conceivable to arrange in the first cavity and / or the second cavity at least partially an intermediate layer which during the introduction of a first material or a first material mixture or a second material or a second material mixture in the first cavity or in the second cavity is at least partially covered by the first material or the first material mixture or the second material or the second material mixture and poured into the first layer or in the second layer.

Darüber hinaus ist es denkbar, zumindest auf einen Teilbereich der Oberfläche der zumindest formstabil ausgehärteten, ersten Schicht eine Zwischenschicht anzuordnen, die während des Einbringens des zweiten Werkstoffs oder des zweiten Werkstoffgemischs in den zweiten Hohlraum zumindest teilweise von dem zweiten Werkstoff oder dem zweiten Werkstoffgemisch bedeckt und zwischen die erste Schicht und die zweite Schicht eingegossen wird.In addition, it is conceivable to arrange at least on a portion of the surface of the at least dimensionally stable hardened, first layer an intermediate layer which covers during the introduction of the second material or the second material mixture in the second cavity at least partially by the second material or the second material mixture and is poured between the first layer and the second layer.

Als Zwischenschicht eignet sich insbesondere eine Folie, vorteilhafterweise eine Strukturfolie. Unter einer Strukturfolie wird dabei eine Folie verstanden, die zumindest auf einer Seite, bevorzugt auf beiden Seiten, Fortsätze, insbesondere Noppen, aufweist.As an intermediate layer is particularly suitable a film, advantageously a structural film. In this case, a structured film is understood as meaning a film which has extensions, in particular knobs, on at least one side, preferably on both sides.

Vorteilhafterweise sollte die Zwischenschicht, die auf zumindest einen Teilbereich einer Oberfläche einer ersten Schicht angeordnet wird, derart ausgestaltet sein, dass der zweite Werkstoff oder das zweite Werkstoffgemisch der zweiten Schicht die Zwischenschicht zumindest teilweise durchdringt, so dass sich die zweite Schicht stoff- und/oder formschlüssig mit der ersten Schicht verbinden kann.Advantageously, the intermediate layer, which is arranged on at least a portion of a surface of a first layer, should be configured such that the second material or the second material mixture of the second layer at least partially penetrates the intermediate layer, so that the second layer material and / or can positively connect with the first layer.

Es ist denkbar zwischen zwei beliebige nebeneinander angeordneten Schichten, insbesondere zwischen die erste Schicht und die zweite Schicht oder die erste Schicht und die Zwischenschicht oder die zweite Schicht und die Zwischenschicht, einen Haftvermittler anzuordnen, sodass sich die nebeneinander angeordneten Schichten, insbesondere die erste Schicht und die zweite Schicht oder die erste Schicht und die Zwischenschicht oder die zweite Schicht und die Zwischenschicht, jeweils stoffschlüssig mit dem Haftvermittler verbinden und/oder eine Haft- bzw. Klebeverbindung zwischen zwei nebeneinander angeordneten Schichten ausbildet.It is conceivable between any two adjacent layers, in particular between the first layer and the second layer or the first layer and the intermediate layer or the second layer and the intermediate layer to arrange a bonding agent, so that the juxtaposed layers, in particular the first layer and the second layer or the first layer and the intermediate layer or the second layer and the intermediate layer, in each case materially connect to the adhesion promoter and / or forms an adhesive or adhesive bond between two layers arranged next to one another.

Es ist denkbar während des Einbringens des ersten Werkstoffs oder des ersten Werkstoffgemischs oder nach dem Einbringen des ersten Werkstoffs oder des ersten Werkstoffgemischs in den ersten Hohlraum Verbindungselemente in dem ersten Werkstoff oder dem ersten Werkstoffgemisch derart anzuordnen, dass die Verbindungselemente teilweise über eine Oberfläche der ersten Schicht hinausragen und beim Einbringen des zweiten Werkstoffs oder des zweiten Werkstoffgemischs in den zweiten Hohlraum von dem zweiten Werkstoff oder dem zweiten Werkstoffgemisch zumindest teilweise umschlossen werden. Nach dem vollständigen Aushärten der ersten Schicht ist die erste Schicht stoff- und/oder formschlüssig mit den Verbindungselementen verbunden. Nach dem vollständigen Aushärten der zweiten Schicht ist die zweite Schicht stoff- und/oder formschlüssig mit den Verbindungselementen verbunden.It is conceivable during the introduction of the first material or the first material mixture or after the introduction of the first material or the first material mixture in the first cavity connecting elements in the first material or the first material mixture to be arranged such that the connecting elements partially over a surface of the first layer protrude and are at least partially enclosed when introducing the second material or the second material mixture in the second cavity of the second material or the second material mixture. After complete curing of the first layer, the first layer is material and / or positively connected to the connecting elements. After complete curing of second layer, the second layer is material and / or positively connected to the connecting elements.

Ein wesentlicher Vorteil der bevorzugten, erfindungsgemäßen, horizontalen Anordnung der Flächensenkrechten des herzustellenden, mehrschichtigen Fertigbauelements und der senkrecht zur Flächensenkrechten ausgerichteten Füllrichtung besteht darin, dass das Gewicht des zweiten Werkstoffs oder des zweiten Werkstoffgemischs nicht auf der ersten Schicht lastet. Somit ist es möglich die zweite Schicht im Vergleich zu aus dem Stand der Technik bekannten Verfahren zeitlich früher herzustellen. In bekannten Verfahren muss die erste Schicht so weit aushärten, dass diese durch das Aufbringen oder das Gewicht einer zweiten Schicht nicht beschädigt wird. Bei dem erfindungsgemäßen Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements kann die erste Schicht eine höhere Restfeuchte aufweisen.An essential advantage of the preferred horizontal arrangement according to the invention of the surface perpendiculars of the multilayer prefabricated component to be produced and the filling direction aligned perpendicular to the surface perpendicular is that the weight of the second material or of the second material mixture does not bear on the first layer. Thus, it is possible to make the second layer earlier in time compared to prior art methods. In known methods, the first layer must cure to such an extent that it is not damaged by the application or weight of a second layer. In the method according to the invention for producing a multilayer prefabricated component, the first layer may have a higher residual moisture content.

Vorteilhafterweise weist die erste Schicht beim Einbringen des zweiten Werkstoffs oder des zweiten Werkstoffgemischs eine Restfeuchte auf, die es ermöglicht, dass sich ein erstes Bindemittel, insbesondere Zement, des ersten Werkstoffs oder des ersten Werkstoffgemischs sich mit einem zweiten Bindemittel, insbesondere Zement, des zweiten Werkstoffs oder des zweiten Werkstoffgemischs stoff- und/oder formschlüssig verbindet. Je größer die Restfeuchte der ersten Schicht, desto besser verbindet sich das erste Bindemittel mit dem zweiten Bindemittel.Advantageously, when introducing the second material or the second material mixture, the first layer has a residual moisture, which makes it possible for a first binder, in particular cement, of the first material or of the first material mixture to interact with a second binder, in particular cement, of the second material or the second material mixture material and / or positively connects. The greater the residual moisture content of the first layer, the better the first binder bonds to the second binder.

Unter einem Werkstoffgemisch kann auch ein Verbundwerkstoff verstanden werden.A mixture of materials may also be understood as a composite material.

Mittels des oben beschriebenen Verfahrens und der vorteilhaften Ausgestaltungen desselbigen lassen sich beliebig viele Schichten eines Fertigbauelements ausbilden. Die Nomenklatur der ersten Schicht und der zweiten Schicht dient lediglich dem besseren Verständnis und ist nicht einschränkend. Entsprechend gelten obige Ausführungen auch für ein mehrschichtiges Fertigbauelement, welches mehr als zwei Schichten aufweist. Zudem kann zuerst eine Schicht aus wärmedämmendem Werkstoff und anschließend eine tragende Schicht gegossen werden.By means of the method described above and the advantageous embodiments thereof, any desired number of layers of a finished component can be formed. The nomenclature of the first layer and the second layer is for convenience of understanding only and is not limiting. Accordingly, the above statements also apply to a multi-layer prefabricated component which has more than two layers. In addition, first a layer of heat-insulating material and then a load-bearing layer can be cast.

Darüber hinaus sieht eine erfindungsgemäße Fertigbaumaschine zur Ausführung des erfindungsgemäßen Verfahrens vor, dass in der Rahmenkonstruktion der Fertigbaumaschine eine Mehrzahl von Hohlräumen nebeneinander angeordnet werden können und eine Mehrzahl von erfindungsgemäßen Fertigbauelementen in zeitlich kurzer Abfolge oder gleichzeitig hergestellt werden können. In addition, a prefabricated construction machine according to the invention for carrying out the method according to the invention provides that in the frame construction of the prefabricated construction machine, a plurality of cavities can be arranged side by side and a plurality of prefabricated components according to the invention can be produced in short time or simultaneously.

Weiterbildungen und vorteilhafte Ausgestaltungen der Erfindung können sich auch aus der nachfolgenden Beschreibung eines vorteilhaften Ausführungsbeispiels ergeben, die in der Zeichnung dargestellt ist. Erfindungswesentliche Merkmale können sich auch aus der Anordnung einzelner Elemente oder Bauteile zueinander ergeben. Werden in den Figuren gleiche oder gestrichene Bezugszeichen verwendet, so bezeichnen diese gleiche oder ähnliche Teile.Further developments and advantageous embodiments of the invention may also be apparent from the following description of an advantageous embodiment, which is illustrated in the drawing. Essential features of the invention may also result from the arrangement of individual elements or components to each other. If the same or painted reference numerals are used in the figures, these designate the same or similar parts.

Figurenlistelist of figures

In diesen Zeigen:

  • 1 bis 4 eine schematische Darstellung des Verfahrensablaufs des erfindungsgemäßen Verfahrens,
  • 5 eine schematische Darstellung einer in eine Schicht eingegossenen Zwischenschicht (5 b)) bzw. einer zwischen zwei Schichten angeordneten Zwischenschicht (5 a)).
In this show:
  • 1 to 4 a schematic representation of the procedure of the method according to the invention,
  • 5 a schematic representation of a cast in a layer intermediate layer ( 5 b) ) or an intermediate layer arranged between two layers ( 5 a) ).

Ausführliche Beschreibung der ZeichnungenDetailed description of the drawings

Die 1 bis 4 beschreiben anhand von schematischen Darstellungen einzelner Verfahrensschritte den prinzipiellen Verfahrensablauf des erfindungsgemäßen Verfahrens zur Herstellung eines mehrschichtigen Fertigbauelements 10. Gezeigt ist eine vorteilhafte Ausführungsform der Erfindung, in welcher die Flächensenkrechte 12 des herzustellenden, mehrschichtigen Fertigbauelements 10 zumindest weitestgehend senkrecht zu einer Füllrichtung 14 der Fertigbaumaschine ausgerichtet ist. Vorteilhafterweise ist die Flächensenkrechte 12 des herzustellenden, mehrschichtigen Fertigbauelements 10 horizontal ausgerichtet und der Werkstoff wird in einem Schwerkraftgießverfahren in die Hohlräume 18a, 18b eingebracht (vgl. 1 und 3).The 1 to 4 describe on the basis of schematic representations of individual process steps, the basic process flow of the inventive method for producing a multi-layer prefabricated device 10 , Shown is an advantageous embodiment of the invention, in which the surface perpendicular 12 of the manufactured, multilayer finished component 10 at least largely perpendicular to a filling direction 14 the prefabricated construction machine is aligned. Advantageously, the surface perpendicular 12 of the manufactured, multilayer finished component 10 aligned horizontally and the material is gravity-injection in the cavities 18a . 18b introduced (cf. 1 and 3 ).

Die Füllmaschine für die Herstellung von erfindungsgemäßen Fertigbauelementen 10 umfasst noch weitere Elemente bzw. Bauteile, die vorliegend zur Vereinfachung der zeichnerischen Darstellung des erfindungsgemäßen Verfahrens weggelassen wurden. Vielmehr wurde sich auf die wesentlichen Merkmale zur Ausführung des erfindungsgemäßen Verfahrens beschränkt. Des Weiteren wird das erfindungsgemäße Verfahren mittels eines vereinfachten, zweischichtigen Fertigbauelements 10 beschrieben.The filling machine for the production of prefabricated components according to the invention 10 includes other elements or components that have been omitted herein to simplify the graphic representation of the method according to the invention. Rather, was limited to the essential features for carrying out the method according to the invention. Furthermore, the method according to the invention by means of a simplified, two-layer finished component 10 described.

Die gezeigten Darstellungen sollen dabei nicht als einschränkend betrachtet werden. Es ist vielmehr möglich, die Flächensenkrechte 12 des Fertigbauelements 10 parallel zu der Füllrichtung 14 anzuordnen und/oder ein Fertigbauelement 10 mit mehr als zwei Schichten 20, 22 herzustellen.The illustrations shown should not be considered as limiting. It is rather possible, the surface perpendicular 12 of the finished component 10 parallel to the filling direction 14 to arrange and / or a finished component 10 with more than two layers 20 . 22 manufacture.

In einem ersten Verfahrensschritt wird eine Mehrzahl von wiederverwendbaren Verschalungselementen 16a, 16b, 16c, 16' derart in einer Rahmenkonstruktion einer Fertigbaumaschine eingebracht, dass ein erster Hohlraum 18a ausgeformt wird (vgl. 1). Dabei ist wenigstens ein Verschalungselement 16' verschiebbar an der Rahmenkonstruktion angeordnet (vgl. 2). In den ersten Hohlraum 18a wird eine Bewehrung, insbesondere eine Stahlbewehrung eingebracht (nicht gezeigt).In a first method step, a plurality of reusable shuttering elements 16a . 16b . 16c . 16 ' so in one Frame construction of a prefabricated construction machine introduced that a first cavity 18a is formed (see. 1 ). At least one shuttering element is here 16 ' slidably disposed on the frame structure (see. 2 ). In the first cavity 18a a reinforcement, in particular a steel reinforcement is introduced (not shown).

Eine vereinfachte Bauform des Fertigbauelements 10 sieht vor, dass keine weiteren Elemente eingegossen werden. Es ist jedoch möglich, dass mittels weiterer Verschalungselemente 16, insbesondere Magnetschalungen, Aussparungen für beispielsweise Fenster oder Türen in dem Hohlraum 18a, 18b angeordnet werden, in welche beim Einbringen des Werkstoffs oder des Werkstoffgemischs kein Werkstoff eindringen kann (nicht gezeigt).A simplified design of the finished component 10 provides that no further elements are poured in. However, it is possible that by means of further Verschalungselemente 16 , In particular magnetic formwork, recesses for example, windows or doors in the cavity 18a . 18b can be arranged, in which when introducing the material or the material mixture no material can penetrate (not shown).

Nachdem der erste Hohlraum 18a mittels der Verschalungselemente 16a, 16b, 16c, 16' ausgeformt ist, wird zumindest ein erster Werkstoff, insbesondere Stahlbeton oder Leichtbeton, oder ein erstes Werkstoffgemisch aus einem Vorratsbehälter 19 in den ersten Hohlraum 18a eingebracht (vgl. 1). Die Flächensenkrechte 12 des herzustellenden, mehrschichtigen Fertigbauelements 10 ist zumindest weitestgehend horizontal ausgerichtet und der erste Werkstoff oder das erste Werkstoffgemisch wird über eine Schmalseite des erfindungsgemäßen Fertigbauelements 10 in den ersten Hohlraum 18a eingebracht (vgl. 1). Dabei wird der erste Werkstoff oder das erste Werkstoffgemisch mittels eines Vorratsbehälters 19 zum ersten Hohlraum 18a verbracht und mittels eines Schwerkraftgießverfahrens in den ersten Hohlraum 18a eingebracht.After the first cavity 18a by means of the shuttering elements 16a . 16b . 16c . 16 ' is formed, at least a first material, in particular reinforced concrete or lightweight concrete, or a first material mixture from a reservoir 19 in the first cavity 18a introduced (cf. 1 ). The surface perpendicular 12 of the manufactured, multilayer finished component 10 is at least largely aligned horizontally and the first material or the first material mixture is over a narrow side of the finished device according to the invention 10 in the first cavity 18a introduced (cf. 1 ). In this case, the first material or the first material mixture by means of a reservoir 19 to the first cavity 18a spent and by means of a gravity casting in the first cavity 18a brought in.

Vorzugsweise füllt der erste Werkstoff oder das erste Werkstoffgemisch den ersten Hohlraum 18a zumindest weitestgehend vollständig aus (vgl. 2).Preferably, the first material or the first material mixture fills the first cavity 18a at least as far as possible completely (cf. 2 ).

Nachdem der erste Werkstoff oder das erste Werkstoffgemisch in den ersten Hohlraum 18a eingebracht wurde, muss der erste Werkstoff oder das erste Werkstoffgemisch aushärten. Idealerweise härtet der erste Werkstoff oder das erste Werkstoffgemisch so lange, bis der erste Werkstoff oder das erste Werkstoffgemisch formstabil ausgehärtet, jedoch noch nicht vollständig durchgehärtet ist. Wenn der erste Werkstoff oder das erste Werkstoffgemisch zumindest formstabil ausgehärtet ist, kann von einer ersten Schicht 20 gesprochen werden.After the first material or the first material mixture in the first cavity 18a has been introduced, the first material or the first material mixture must cure. Ideally, the first material or the first material mixture hardens until the first material or the first material mixture has hardened in a dimensionally stable manner, but is not yet completely through-hardened. If the first material or the first material mixture is cured at least dimensionally stable, can of a first layer 20 to be spoken.

Nachdem der erste Werkstoff oder das erste Werkstoffgemisch zumindest formstabil ausgehärtet ist, wird das wenigstens eine verschiebbar gelagerte Verschalungselement 16' um eine definierte Strecke von der ersten Schicht 20 abgerückt (vgl. 2 und 3a)). Die Strecke, um die das verschiebbar gelagerte Verschalungselement 16' abgerückt wird, entspricht der Stärke der zweiten zu herzustellenden Schicht 22. Durch das Abrücken des verschiebbar gelagerten Verschalungselements 16' von der ersten Schicht 20, entsteht zwischen der ersten Schicht 20 und dem verschiebbar gelagerten, abgerückten Verschalungselement 16' ein zweiter Hohlraum 18b (vgl. 3). Dabei werden in 3 die Verschalungselemente 16a, 16b, 16c, 16' und der zweite Hohlraum 18b zum einen in einer perspektivischen Darstellung (vgl. 3 a)) und zum anderen in einer schematischen Draufsicht (vgl. 3 b)) gezeigt.After the first material or the first material mixture has cured at least dimensionally stable, the at least one displaceably mounted shuttering element 16 ' by a defined distance from the first layer 20 moved away (cf. 2 and 3a) ). The distance to the displaceable mounted shuttering element 16 ' is withdrawn, corresponds to the thickness of the second layer to be produced 22 , By the removal of the displaceably mounted shuttering element 16 ' from the first layer 20 , arises between the first layer 20 and the displaceably mounted, withdrawn shuttering element 16 ' a second cavity 18b (see. 3 ). It will be in 3 the shuttering elements 16a . 16b . 16c . 16 ' and the second cavity 18b on the one hand in a perspective view (cf. 3 a) ) and on the other in a schematic plan view (see. 3 b) ).

Nachdem der zweite Hohlraum 18b durch das Abrücken des verschiebbar gelagerten Verschalungselements 16' von der ersten Schicht 20 ausgeformt ist, wird zumindest ein zweiter Werkstoff, insbesondere Porenleichtbeton, oder ein zweites Werkstoffgemisch aus einem Vorratsbehälter 19 in den zweiten Hohlraum 18b eingebracht (vgl. 3). Die Flächensenkrechte 12 des herzustellenden, mehrschichtigen Fertigbauelements 10 ist zumindest weitestgehend horizontal ausgerichtet und der zweite Werkstoff oder das zweite Werkstoffgemisch wird über eine Schmalseite des erfindungsgemäßen Fertigbauelements 10 in den zweiten Hohlraum 18b eingebracht (vgl. 3). Dabei wird der zweite Werkstoff oder das zweite Werkstoffgemisch mittels eines Vorratsbehälters 19 zum zweiten Hohlraum 18b verbracht und mittels eines Schwerkraftgießverfahrens in den zweiten Hohlraum 18b eingebracht.After the second cavity 18b by the removal of the displaceably mounted shuttering element 16 ' from the first layer 20 is formed, at least a second material, in particular porous lightweight concrete, or a second mixture of materials from a reservoir 19 in the second cavity 18b introduced (cf. 3 ). The surface perpendicular 12 of the manufactured, multilayer finished component 10 is at least largely aligned horizontally and the second material or the second material mixture is over a narrow side of the finished device according to the invention 10 in the second cavity 18b introduced (cf. 3 ). In this case, the second material or the second material mixture by means of a reservoir 19 to the second cavity 18b spent and by means of a gravity casting in the second cavity 18b brought in.

Vorzugsweise füllt der zweite Werkstoff oder das zweite Werkstoffgemisch den zweiten Hohlraum 18b zumindest weitestgehend vollständig aus. Der zweite Werkstoff oder das zweite Werkstoffgemisch geht eine stoff- und/oder formschlüssige Verbindung mit dem ersten Werkstoff oder dem ersten Werkstoffgemisch ein. Preferably, the second material or the second material mixture fills the second cavity 18b at least largely completely. The second material or the second material mixture is a material and / or positive connection with the first material or the first material mixture.

Nachdem der zweite Werkstoff oder das zweite Werkstoffgemisch in den zweiten Hohlraum 18b eingebracht wurde, muss der zweite Werkstoff oder das zweite Werkstoffgemisch zumindest soweit aushärten, bis der zweite Werkstoff oder das zweite Werkstoffgemisch formstabil ist.After the second material or the second material mixture in the second cavity 18b has been introduced, the second material or the second material mixture must cure at least until the second material or the second material mixture is dimensionally stable.

Nachdem der zweite Werkstoff oder das zweite Werkstoffgemisch zumindest formstabil ausgehärtet ist, kann das zweischichtige Fertigbauelement 10 entformt werden, indem die Verschalungselemente 16a, 16b, 16c, 16' von dem Fertigbauelement 10 entfernt werden und das Fertigbauelement 10 aus der Fertigbaumaschine entfernt wird.After the second material or the second material mixture has cured at least dimensionally stable, the two-layer prefabricated component 10 be removed from the mold by the shuttering elements 16a . 16b . 16c . 16 ' from the finished component 10 be removed and the finished component 10 is removed from the prefabricated construction machine.

5 zeigt schematisch eine Zwischenschicht 24 die zwischen einer ersten Schicht 20 und einer zweiten Schicht 22 angeordnet ist (vgl. 5a)) sowie eine Zwischenschicht 24, die während des Einbringens des ersten Werkstoffs oder des ersten Werkstoffgemischs in den ersten Hohlraum 18a in die erste Schicht 20 eingegossen wurde (vgl. 5b)). 5 schematically shows an intermediate layer 24 between a first layer 20 and a second layer 22 is arranged (see. 5a) ) as well as an intermediate layer 24 during the introduction of the first material or the first mixture of materials in the first cavity 18a in the first layer 20 was poured in (cf. 5b) ).

BezugszeichenlisteLIST OF REFERENCE NUMBERS

(ist Teil der Beschreibung)

10
Fertigbauelement
12
Flächensenkrechte
14
Füllrichtung
16, 16'
Verschalungselement
18
Hohlraum
19
Vorratsbehälter
20
erste Schicht
22
zweite Schicht
24
Zwischenschicht
(is part of the description)
10
finished component
12
vertical surface
14
Fill direction
16, 16 '
shuttering element
18
cavity
19
reservoir
20
first shift
22
second layer
24
interlayer

Claims (6)

Verfahren zur Herstellung eines mehrschichtigen Fertigbauelements (10), insbesondere eines Decken- und/oder Wandelements, wobei • in einem ersten Verfahrensschritt mittels einer Mehrzahl von Verschalungselementen (16, 16') ein erster Hohlraum (18a) ausgeformt wird, wobei wenigstens ein Verschalungselement (16') verschiebbar gelagert ist, • in einem zeitlich nachgelagerten Verfahrensschritt wird zumindest ein erster Werkstoff oder zumindest ein erstes Werkstoffgemisch in den ersten Hohlraum (18a) eingebracht, • abwarten, bis der erste Werkstoff oder das erste Werkstoffgemisch zumindest formstabil ausgehärtet ist, • in einem zeitlich nachgelagerten Verfahrensschritt wird wenigstens ein Verschalungselement (16') von dem zumindest formstabil ausgehärteten ersten Werkstoff oder ersten Werkstoffgemisch abgerückt, bis zwischen dem ersten Werkstoff oder dem ersten Werkstoffgemisch und dem abgerückten Verschalungselement (16') oder den abgerückten Verschalungselementen (16') ein zweiter Hohlraum (18b) ausgeformt wird, • in einem zeitlich nachgelagerten Verfahrensschritt wird zumindest ein zweiter Werkstoff oder zumindest ein zweites Werkstoffgemisch in den zweiten Hohlraum (18b) eingebracht, • abwarten, bis der zweite Werkstoff oder das zweite Werkstoffgemisch zumindest formstabil ausgehärtet ist, • entformen des Fertigbauelements.Method for producing a multilayer prefabricated component (10), in particular a ceiling and / or wall element, wherein A first cavity (18a) is formed in a first method step by means of a plurality of shuttering elements (16, 16 '), at least one shuttering element (16') being displaceably mounted, In a temporally downstream process step, at least one first material or at least one first material mixture is introduced into the first cavity (18a), • wait until the first material or the first material mixture has hardened at least dimensionally stable, • In a temporally downstream process step, at least one shuttering element (16 ') is moved away from the at least dimensionally stable hardened first material or first material mixture until between the first material or the first material mixture and the removed shuttering element (16') or the removed shuttering elements (16 '). ) a second cavity (18b) is formed, In a temporally downstream process step, at least one second material or at least one second material mixture is introduced into the second cavity (18b), • wait until the second material or the second material mixture has cured at least dimensionally stable, • demoulding the finished component. Verfahren nach wenigstens einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Verschalungselemente (16, 16') derart angeordnet werden, dass die Flächensenkrechte (12) des herzustellenden, mehrschichtigen Fertigbauelements (10) zumindest weitestgehend senkrecht zu einer Füllrichtung (14) des ersten Werkstoffs und/oder des zweiten Werkstoffs ausgerichtet ist.Method according to at least one of the preceding claims, characterized in that the shuttering elements (16, 16 ') are arranged such that the surface perpendiculars (12) of the multilayer prefabricated component (10) to be produced are at least substantially perpendicular to a filling direction (14) of the first material and / or the second material is aligned. Verfahren nach wenigstens einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zeitlich bevor der erste Werkstoff oder das erste Werkstoffgemisch in den ersten Hohlraum (18a) eingebracht wird und/oder der zweite Werkstoff oder das zweite Werkstoffgemisch in den zweiten Hohlraum (18b) eingebracht wird, in dem ersten Hohlraum (18a) und/oder dem zweiten Hohlraum (18b) wenigstens ein weiteres Verschalungselement (16), insbesondere ein Magnetverschalungselement, zur Ausformung von Aussparungen angeordnet wird.Method according to at least one of the preceding claims, characterized in that, before the first material or the first material mixture is introduced into the first cavity (18a) and / or the second material or the second material mixture is introduced into the second cavity (18b), in the first cavity (18a) and / or the second cavity (18b) at least one further shuttering element (16), in particular a Magnetverschalungselement, is arranged for the formation of recesses. Verfahren nach wenigstens einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zeitlich vor dem Befüllen des ersten Hohlraums (18a) mit dem ersten Werkstoff eine Bewehrung in dem ersten Hohlraum (18a) angeordnet wird, wobei die Bewehrung vorteilhafterweis derart in dem ersten Hohlraum (18a) angeordnet wird, dass ein Teil der Bewehrung über die erste Schicht (20) übersteht und in die zweite Schicht (22) hineinragt.A method according to at least one of the preceding claims, characterized in that a time prior to the filling of the first cavity (18a) with the first material, a reinforcement in the first cavity (18a) is arranged, the reinforcement advantageously in the first cavity (18a) is arranged so that a part of the reinforcement projects beyond the first layer (20) and projects into the second layer (22). Verfahren nach wenigstens einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zeitlich bevor der erste Werkstoff oder das erste Werkstoffgemisch in den ersten Hohlraum (18a) eingebracht wird und/oder der zweite Werkstoff oder das zweite Werkstoffgemisch in den zweiten Hohlraum (18b) eingebracht wird, eine Zwischenschicht (24) zumindest teilweise in dem ersten Hohlraum (18a) und/oder dem zweiten Hohlraum (18b) angeordnet wird.Method according to at least one of the preceding claims, characterized in that, before the first material or the first material mixture is introduced into the first cavity (18a) and / or the second material or the second material mixture is introduced into the second cavity (18b), an intermediate layer (24) is at least partially disposed in the first cavity (18a) and / or the second cavity (18b). Verfahren nach wenigstens einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zeitlich nachdem wenigstens ein Verschalungselement (16') von dem zumindest formstabil ausgehärteten ersten Werkstoff oder ersten Werkstoffgemisch abgerückt wurde und zeitlich bevor der zweite Werkstoff oder das zweite Werkstoffgemisch in den zweiten Hohlraum (18b) eingebracht wird, eine Zwischenschicht (24) zumindest auf einen Teilbereich der Oberfläche der zumindest formstabil ausgehärteten, ersten Schicht (20) angeordnet wird.Method according to at least one of the preceding claims, characterized in that after at least one shuttering element (16 ') has been moved away from the at least dimensionally stable hardened first material or first material mixture and in time before the second material or the second material mixture in the second cavity (18b) is introduced, an intermediate layer (24) is arranged at least on a portion of the surface of the at least dimensionally stable cured, first layer (20).
DE102017129383.3A 2017-12-11 2017-12-11 Method for producing a multilayer prefabricated component Pending DE102017129383A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102017129383.3A DE102017129383A1 (en) 2017-12-11 2017-12-11 Method for producing a multilayer prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102017129383.3A DE102017129383A1 (en) 2017-12-11 2017-12-11 Method for producing a multilayer prefabricated component

Publications (1)

Publication Number Publication Date
DE102017129383A1 true DE102017129383A1 (en) 2019-06-13

Family

ID=66629407

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102017129383.3A Pending DE102017129383A1 (en) 2017-12-11 2017-12-11 Method for producing a multilayer prefabricated component

Country Status (1)

Country Link
DE (1) DE102017129383A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3739137A1 (en) * 2019-05-16 2020-11-18 Weko Consulting and Engineering Ltd. Building wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1176525A (en) * 1915-07-10 1916-03-21 Maurice Deeks Concrete-wall machine.
DE1973344U (en) * 1965-09-30 1967-11-23 Poley K G FORM, IN PARTICULAR FOR THE PRODUCTION OF CONCRETE BODIES
DE4110565C1 (en) * 1991-03-30 1992-06-04 Gebrueder Christa Gmbh & Co Fertigbau Kg, 8880 Dillingen, De Mfg. sandwich panel with two concrete shells - involves upright shuttering with link bolts releasably inserted in one shuttering wall

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1176525A (en) * 1915-07-10 1916-03-21 Maurice Deeks Concrete-wall machine.
DE1973344U (en) * 1965-09-30 1967-11-23 Poley K G FORM, IN PARTICULAR FOR THE PRODUCTION OF CONCRETE BODIES
DE4110565C1 (en) * 1991-03-30 1992-06-04 Gebrueder Christa Gmbh & Co Fertigbau Kg, 8880 Dillingen, De Mfg. sandwich panel with two concrete shells - involves upright shuttering with link bolts releasably inserted in one shuttering wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3739137A1 (en) * 2019-05-16 2020-11-18 Weko Consulting and Engineering Ltd. Building wall

Similar Documents

Publication Publication Date Title
EP2281964B1 (en) Cast wall element and manufacturing method thereof
DE2135007A1 (en) Construction element
EP2166178B1 (en) Hollow or laminated wall
EP2956283B1 (en) Method for producing a multilayer, reinforced concrete element
DE2139197A1 (en) Prefabricated building components - with lost forms incorporated for subsequent fill with concrete
DE69731124T2 (en) PREPARED WALL ELEMENT OF GLASS FIBER REINFORCED CONCRETE
AT10642U2 (en) METHOD FOR THE PRODUCTION OF HOLLOW WALL AND CEILING SYSTEMS IN A LIGHTWEIGHT DESIGN
DE102017129383A1 (en) Method for producing a multilayer prefabricated component
DE102005025037B4 (en) Method for producing a wall component, in particular for the construction of buildings
DE19940423C2 (en) Insulation board and process for its manufacture
DE19516098A1 (en) Ceiling edge lost shuttering element for building erection
DE2235924A1 (en) METHOD AND DEVICE FOR MANUFACTURING CONCRETE COMPONENTS
EP0299353B1 (en) Method of making form elements for construction with permanent forms and elements made by same
DE3202336C2 (en)
WO2013017622A1 (en) Multi-layer component
EP3739137A1 (en) Building wall
AT509157A1 (en) COMPOSITE ELEMENT
EP0808238B1 (en) Process for the production of heat insulation panels for large panel construction
AT525522B1 (en) METHOD FOR PRODUCING A CORE-INSULATED PRECAST CONCRETE PART AND CORE-INSULATED PRECAST CONCRETE PART
DE2940349A1 (en) Universal prefab wall slab - comprises panels of various materials combining to provide cavities
DE2329243A1 (en) METHOD AND DEVICE FOR MANUFACTURING PRE-FABRICATED COMPONENTS FROM CONCRETE
DE102004013146A1 (en) Production of composite structure involves forming local reinforcement zone in core structure provided with fold valleys, prior to the application of cover layer on the core structure to produce composite sandwich structure
DE1609889C (en) Large-area component made of layered composite panels and the process for its manufacture
EP2146018B1 (en) Prefabricated wall and its method of production
DE1939150B2 (en) Process for the production of an at least double-walled heating oil container in a spherical oJL shape