DE102009061034A1 - Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine - Google Patents

Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine Download PDF

Info

Publication number
DE102009061034A1
DE102009061034A1 DE102009061034A DE102009061034A DE102009061034A1 DE 102009061034 A1 DE102009061034 A1 DE 102009061034A1 DE 102009061034 A DE102009061034 A DE 102009061034A DE 102009061034 A DE102009061034 A DE 102009061034A DE 102009061034 A1 DE102009061034 A1 DE 102009061034A1
Authority
DE
Germany
Prior art keywords
transport device
machine frame
machine
conveyor belt
tensioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE102009061034A
Other languages
German (de)
Other versions
DE102009061034B4 (en
Inventor
Winfried von Schönebeck
Thomas Mannebach
Cyrus Dr. Barimani
Günter Dr. Hähn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wirtgen GmbH
Original Assignee
Wirtgen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wirtgen GmbH filed Critical Wirtgen GmbH
Priority to DE102009013709A priority Critical patent/DE102009013709B4/en
Priority to DE102009061034.0A priority patent/DE102009061034B4/en
Publication of DE102009061034A1 publication Critical patent/DE102009061034A1/en
Application granted granted Critical
Publication of DE102009061034B4 publication Critical patent/DE102009061034B4/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines

Abstract

Bei einer Abbaumaschine (1) zum Abarbeiten eines Bodens (3), insbesondere Surface Miner, mit einem Maschinenrahmen (2), einer in dem Maschinenrahmen (2) gelagerten Schneidwalze (4), einer ersten Transporteinrichtung (6), die Abbaumaterial von der Schneidwalze (4) übernimmt, einer zweiten Transporteinrichtung (12), die das Abbaumaterial von der ersten Transporteinrichtung (6) an einer am unteren Ende (14) der zweiten Transporteinrichtung (12) angeordneten Übernahmestelle (18) übernimmt, die sich unterhalb des oberen Endes (22) der ersten Transporteinrichtung (6) befindet, einer um eine vertikale Schwenkachse (8) schwenkbar am Maschinenrahmen (2) gelagerten Bandaufhängeeinrichtung (10) für die zweite Transporteinrichtung (12), wobei die zweite Transporteinrichtung (12) um eine quer zur Längsrichtung der zweiten Transporteinrichtung (12) verlaufende, und in der Bandaufhängeeinrichtung (10) gelagerte erste horizontale Schwenkachse (24) schw8) der Bandaufhängeeinrichtung (10) im Wesentlichen zentral durch die Übernahmestelle (18) verläuft, ist vorgesehen, dass die Bandaufhängeeinrichtung (10) gemeinsam mit der zweiten Transporteinrichtung (12) relativ zu dem Maschinenrahmen (2) um eine zweite horizontale Schwenkachse (28) schwenkbar ist.In a mining machine (1) for working off a soil (3), in particular a surface miner, with a machine frame (2), a cutting roller (4) mounted in the machine frame (2), a first transport device (6), the mining material from the cutting roller (4) takes over, a second transport device (12), which takes over the mining material from the first transport device (6) at a transfer point (18) arranged at the lower end (14) of the second transport device (12), which is located below the upper end ( 22) of the first transport device (6) is located, a belt suspension device (10) for the second transport device (12), which is pivotable about a vertical pivot axis (8) on the machine frame (2), the second transport device (12) by a transverse to the longitudinal direction of the second transport device (12) and mounted in the tape suspension device (10) first horizontal pivot axis (24) schw8) of the tape suspension device (10) essentially n runs centrally through the transfer point (18), it is provided that the tape suspension device (10) can be pivoted together with the second transport device (12) relative to the machine frame (2) about a second horizontal pivot axis (28).

Description

Die Erfindung betrifft eine Abbaumaschine, insbesondere einen Surface Miner nach dem Oberbegriff des Anspruchs 1, sowie ein Verfahren zum Aus- und Einbauen einer Transporteinrichtung bei einer Abbaumaschine nach dem Oberbegriff des Anspruchs 13.The The invention relates to a mining machine, in particular a surface Miner according to the preamble of claim 1, and a method for removing and installing a transport device in a mining machine according to the preamble of claim 13.

Derartige Abbaumaschinen werden im Tagebau, Erd- und Felsbau eingesetzt, wobei eine solche Abbaumaschine z. B. Gestein in einem Arbeitsgang schneidet, bricht und lädt, ohne dass Sprengvorgänge notwendig sind.such Mining machines are used in opencast mining, earthworks and rock construction, where Such a mining machine z. B. cuts rocks in one operation, breaks and loads, without any blasting operations necessary.

Die Abbaumaschine ist auch zur Gewinnung von Gips, weichem Kalkstein oder auch Kohle geeignet. Als Abbauwerkzeug wird eine Schneidesalze verwendet, die das Abbaumaterial auf eine erste Transporteinrichtung überträgt, die innerhalb des Maschinenrahmens ortsfest aber auswechselbar angeordnet ist. Das Abbaumaterial wird schräg nach oben auf der ersten Transporteinrichtung bis zu einer Abwurfstelle transportiert, an der das Abbaumaterial auf eine zweite Transporteinrichtung abgeworfen wird, deren unteres Ende sich unterhalb des oberen Endes der ersten Transporteinrichtung befindet. Die zweite Transporteinrichtung transportiert das Abbaumaterial von einer Übernahmestelle am unteren Ende der zweiten Transporteinrichtung ebenfalls nach oben zu einer Abwurfstelle, an der das Abbaumaterial entweder auf ein Transportfahrzeug oder auch seitlich neben der Abbaumaschine abgeworfen werden kann. Hierzu ist die zweite Transporteinrichtung seitlich um jeweils ±90° verschwenkbar, indem eine Bandaufhängeeinrichtung für die zweite Transporteinrichtung um eine vertikale Achse schwenkbar ist, die virtuell durch die Übernahmestelle hindurchläuft. Zusätzlich ist die zweite Transporteinrichtung um eine horizontale Schwenkachse schwenkbar, um das obere Ende der zweiten Transporteinrichtung auf eine gewünschte Abwurfhöhe zu bringen. Die Angaben vertikal und horizontal sind so zu verstehen, dass die Abbaumaschine auf einem horizontalen Boden steht.The Removal machine is also for the extraction of gypsum, soft limestone or coal suitable. As a removal tool, a cutting salt is used which transfers the decomposition material to a first transport device, the fixed but interchangeable within the machine frame is. The decomposition material becomes inclined up on the first transport device to a discharge point transported, at which the decomposition material on a second transport device is dropped, the lower end below the upper end of the first transport device is located. The second transport device transports the excavated material from a takeover point at the bottom the second transport device also upwards to a discharge point, at the the mining material either on a transport vehicle or can also be dropped laterally next to the mining machine. For this if the second transport device can be swiveled laterally by ± 90 °, by a band hanger for the second transport device is pivotable about a vertical axis, the virtual through the takeover passes. In addition is the second transport device about a horizontal pivot axis pivotable to the upper end of the second conveyor on a desired one discharge height bring to. The information vertical and horizontal should be understood as that the removal machine stands on a horizontal ground.

Bei derartigen Abbaumaschinen besteht der Nachteil, dass sich aufgrund der Übergabe des Abbaumaterials von der ersten Transporteinrichtung auf die zweite Transporteinrichtung zwangsläufig die Transporteinrichtungen überlappen. Insbesondere bei scharfkantigem Abbaumaterial ist es bei Beschädigung des Transportbandes einer Transporteinrichtung erforderlich, diese auszuwechseln.at Such mining machines has the disadvantage that due to the handover the decomposition material from the first transport device to the second Transport device inevitably the transport devices overlap. Especially with sharp-edged mining material, it is damaged in the Transport belt a transport device required to replace them.

Auch bei anderen Störungen im Betriebsablauf der ersten ortsfesten Transporteinrichtung ist häufig ein Ausbau der ersten Transporteinrichtung erforderlich. Der Ausbau der ersten Transporteinrichtung wird allerdings durch die Anordnung der zweiten Transporteinrichtung erheblich behindert, wobei zusätzlich die Gefahr der Beschädigung der zweiten Transporteinrichtung beim Ausbau besteht. Im Resultat ist der Ein- und Ausbau der erste Transporteinrichtung äußerst zeitaufwendig, da sich beispielsweise das Transportband in der eingebauten Position der ersten Transporteinrichtung nicht auswechseln lässt.Also in other disorders in the operation of the first stationary transport device is often a Removal of the first transport device required. The expansion However, the first transport device is by the arrangement the second transport significantly impeded, in addition to the Risk of damage the second transport device when removing exists. In the result the installation and removal of the first transport device is extremely time-consuming, because, for example, the conveyor belt in the installed position of first transport device can not be replaced.

Der Erfindung liegt daher die Aufgabe zugrunde, eine Abbaumaschine der eingangs genannten Art, sowie ein Verfahren zum Ein- und Ausbauen einer ortsfesten Transporteinrichtung bei einer Abbaumaschine zu schaffen, bei denen der Ein- und Ausbau der Transporteinrichtung mit geringem Zeitaufwand möglich ist.Of the Invention is therefore the object of a mining machine of the aforementioned type, and a method for installing and removing a to provide a stationary transport device in a mining machine, in which the installation and removal of the transport device with low Time required is.

Zur Lösung dieser Aufgabe dienen die Merkmale der Ansprüche 1 und 13.to solution This object is achieved by the features of claims 1 and 13.

Die Erfindung sieht in vorteilhafter Weise vor, dass die Bandaufhängeeinrichtung gemeinsam mit der zweiten Transporteinrichtung relativ zu dem Maschinenrahmen um eine zweite horizontale Schwenkachse schwenkbar ist. Auf diese Weise kann die zweite Transporteinrichtung mit der sie tragenden Bandaufhängeinrichtung um einen bestimmten Winkel, z. B. von 30°, geschwenkt werden, so dass sich das untere Ende der zweiten Transporteinrichtung nicht mehr unterhalb des oberen Endes der ersten Transporteinrichtung befindet. Hierzu werden in vorteilhafter Weise Maschinenelemente verwendet, die ohnehin an der Abbaumaschine vorhanden sind. Die Bandaufhängeeinrichtung ist gelenkig mit dem Maschinenrahmen verbunden und die zweite Schwenkachse ist derart an der Bandaufhängeeinrichtung vorgesehen, dass die Bandaufhängeeinrichtung mit der zweiten Transporteinrichtung aus dem Überlappungsbereich herausgeschwenkt werden kann.The The invention advantageously provides that the band suspension device together with the second transport device relative to the machine frame is pivotable about a second horizontal pivot axis. To this Way, the second transport device with the carrying them Bandaufhängeinrichtung at a certain angle, z. B. of 30 °, are pivoted, so that the lower end of the second conveyor no longer located below the upper end of the first conveyor. For this purpose, machine elements are used in an advantageous manner, which are already present at the mining machine anyway. The band hanger is pivotally connected to the machine frame and the second pivot axis is so on the tape hanger provided that the band suspension device swung out of the overlap area with the second transport device can be.

Hierzu ist die zweite horizontale Schwenkachse zumindest in Höhenrichtung relativ zur ersten Schwenkachse nach oben versetzt.For this is the second horizontal pivot axis at least in the height direction offset upwards relative to the first pivot axis.

Es kann vorgesehen sein, dass die zweite horizontale Schwenkachse zumindest während des Verschwenkens der Bandaufhängeeinrichtung einen vertikalen Abstand von dem Boden aufweist, der größer ist als der direkte Abstand der Schwenkachse zu dem unteren äußeren Ende der zweiten Transporteinrichtung.It can be provided that the second horizontal pivot axis at least while the pivoting of the tape hanger has a vertical distance from the ground that is larger as the direct distance of the pivot axis to the lower outer end the second transport device.

Vorzugsweise ist vorgesehen, dass die Bandaufhängeeinrichtung in einer Arbeitsposition zum Verschwenken der zweiten Transporteinrichtung und in einer Schwenkposition zum Ein- und Ausbauen der ersten Transporteinrichtung arretierbar ist.Preferably It is provided that the tape hanger in a working position for Pivoting the second transport device and in a pivot position lockable for installing and removing the first transport device is.

Die Bandaufhängeeinrichtung ist relativ zu dem Maschinenrahmen verschwenkbar, wobei die zweite horizontale Schwenkachse in einem Element des Maschinenrahmens gelagert ist, in dem auch Arretiervorrichtungen vorgesehen sein können, die die Bandaufhängeeinrichtung in zwei unterschiedlichen Schwenkpositionen arretieren.The tape hanger is pivotable relative to the machine frame, with the second horizontal pivot axis is mounted in an element of the machine frame, in which also locking devices can be provided, which lock the Bandaufhängeeinrichtung in two different pivot positions.

Im Einzelnen besteht das Element des Maschinenrahmens aus beiderseitig der Bandaufhängeeinrichtung angeordneten Platten, die einerseits die zweite horizontale Schwenkachse an ihren Enden lagern und andererseits Bohrungen, die winkelmäßig um einen gewünschten Winkel, z. B. 30°, relativ zur zweiten horizontalen Schwenkachse versetzt sind. Durch diese Bohrungen greifen Bolzen, die in die Bandaufhängeeinrichtung ein, so dass die Bandaufhängeinrichtung in den jeweiligen Winkelstellungen fixiert werden kann. Es versteht sich, dass die Arretierbolzen nicht nur manuell gesetzt werden können, sondern auch mit Hilfe eines Antriebs in eine Sperr- oder Freigabeposition gebracht werden können.in the Specifically, the element of the machine frame consists of both sides the Bandaufhängeeinrichtung arranged plates, on the one hand, the second horizontal pivot axis store at their ends and on the other hand holes that are angularly to a desired Angle, z. B. 30 °, are offset relative to the second horizontal pivot axis. By These holes engage bolts that are in the band hanger one, leaving the tape hanger can be fixed in the respective angular positions. It understands itself, that the locking bolts can not only be set manually, but also with the aid of a drive in a blocking or release position can be brought.

Ein auf dem Maschinenrahmen gelagerter Drehkranz ist um die vertikale Schwenkachse verschwenkbar und trägt auf einer Seite des Drehkranzes die Bandaufhängeeinrichtung für die zweite Transporteinrichtung. Auf der gegenüberliegenden Seite kann zusätzlich ein Gegengewicht vorgesehen sein.One The slewing ring mounted on the machine frame is vertical Swivel axis swivels and carries on one side of the turntable the band hanger for the second transport device. On the opposite side may additionally one Counterweight be provided.

Das Gegengewicht dient dazu, die auf den Maschinenrahmen einwirkenden Momente aufgrund der Gewichtsbelastung und der Schwenkstellung der zweiten Transporteinrichtung zu kompensieren.The Counterweight serves to the acting on the machine frame Moments due to the weight load and the pivot position of the second Compensate transport device.

Das Verschwenken der Bandaufhängeinrichtung kann mit motorischer Hilfe erfolgen, wobei beispielsweise im Bereich der zweiten horizontalen Schwenkachse ein vorzugsweise hydraulischer Drehantrieb, ggf. kombiniert mit einem Untersetzungsgetriebe, die Bandaufhängeeinrichtung relativ zu dem Maschinenrahmen um die zweite horizontale Schwenkachse verschwenkt.The Swiveling the band hanger can be done with motor assistance, for example, in the field the second horizontal pivot axis a preferably hydraulic rotary drive, if necessary combined with a reduction gear, the band suspension device relative to the machine frame about the second horizontal pivot axis pivoted.

Alternativ kann eine am Drehkranz oder am Maschinenrahmen befestigte Stelleinrichtung mit vertikalem Abstand von der zweiten horizontalen Schwenkachse an der Bandaufhängeeinrichtung angreifen, um die Bandaufhängeeinrichtung um die zweite horizontale Schwenkachse zu verschwenken.alternative can be an attached to the turntable or on the machine frame adjusting device at a vertical distance from the second horizontal pivot axis at the band hanger Attack to the tape hanger to pivot about the second horizontal pivot axis.

Beispielsweise kann eine Stelleinrichtung einer Verfahreinrichtung für das Gegengewicht auch zum Verschwenken der Bandaufhängeeinheit verwendet werden.For example can an adjusting device of a traversing device for the counterweight also be used for pivoting the tape suspension unit.

Die zweite Transporteinrichtung weist ein endlos umlaufendes Transportband auf, das an den beiderseitigen Enden über eine Antriebsrolle und eine Umlenkrolle geführt ist. Die Antriebsrolle ist vorzugsweise am oberen Ende der zweiten Transporteinrichtung angeordnet und kann über eine Bandspanneinrichtung zum Spannen nach außen verlagert werden.The second transport device has an endless circulating conveyor belt on, at the opposite ends on a drive roller and a Guided pulley is. The drive roller is preferably at the upper end of the second Transport device arranged and can have a belt tensioning device for clamping to the outside be relocated.

Nach dem Stand der Technik ist vorgesehen, die Achse der Antriebsrolle mit Gewindeschrauben zu verlagern. Hierzu müsste sich ein Monteur zur oberen Spitze der zweiten Transporteinrichtung begeben, deren Ende sich in erheblicher Höhe befinden kann. Es versteht sich, dass damit ein erheblicher Zeitaufwand verbunden ist.To the prior art is provided, the axis of the drive roller with threaded screws to relocate. For this, a fitter would have to go to the top Tip of the second conveyor to go, the end of which at a considerable height can be located. It is understood that doing so a considerable amount of time connected is.

Bei einer vorteilhaften Weiterentwicklung der Abbaumaschine ist daher vorgesehen, dass die Bandspanneinrichtung aus einem Fettspanner besteht. Dies hat den Vorteil, dass die Bandspanneinrichtung von einem entfernten Ort aus bedient werden kann.at An advantageous further development of the mining machine is therefore provided that the band clamping device from a grease clamp consists. This has the advantage that the belt tensioning of can be operated from a remote location.

Beispielsweise kann eine Fettzuführeinrichtung für den Fettspanner vorgesehen sein, die sich über die gesamte Länge der zweiten Transporteinrichtung erstreckt, und die am unteren Ende der zweiten Transporteinrichtung oder am Maschinenrahmen einen Fettzuführanschluss aufweist, derart, dass der Fettzuführanschluss für eine auf dem Boden stehende Person zugänglich ist.For example can be a grease feeder for the Provided grease, extending over the entire length of the second transport means extends, and at the lower end the second transport device or on the machine frame a grease feed port such that the grease supply port is for one accessible to the ground is.

In der Arbeitsposition ist die Bandaufhängeeinrichtung über die zweite horizontale Schwenkachse mit dem Maschinenrahmen verbunden sowie mit Arretierbolzen, die durch ein Element des Maschinenrahmens hindurchgeführt sind und die in die Bandaufhängeeinrichtung eingreifen, in der Arbeitsposition gesichert.In the working position is the band hanger over the second horizontal pivot axis connected to the machine frame as well as with locking bolts passing through an element of the machine frame passed are and in the band hanger engage, secured in the working position.

Soll die ortsfeste Transporteinrichtung ausgebaut werden, wird zunächst die Arretierung für die Schwenkposition der Bandaufhängeeinrichtung aufgehoben und mit Hilfe eines Antriebs die Bandaufhängeeinrichtung um die zweite horizontale Schwenkachse verschwenkt, bis die gewünschte und voreingestellte Schwenkposition erreicht ist. Anschließend werden wiederum die Arretiereinrichtungen eingebracht, um die Bandaufhängeeinrichtung in der Schwenkposition zu arretieren.Should the stationary transport device to be expanded, is first the Lock for the pivot position of the tape hanger lifted and with the help of a drive belt hoop pivoted about the second horizontal pivot axis until the desired and preset Pivoting position is reached. Subsequently, turn the locking devices introduced to the band hanger to lock in the swivel position.

Durch das Verschwenken der Bandaufhängeeinrichtung ist auch das untere Ende der zweiten Transporteinrichtung derart verschwenkt, dass sich dieses nicht mehr mit dem oberen Ende der ortsfesten Transporteinrichtung, die in dem Maschinenrahmen befestigt ist, überlappt. Daraufhin kann mit Hilfe z. B. einer Hubeinrichtung, insbesondere einem Flaschenzug, die zunächst am oberen Ende von dem Maschinenrahmen gelöste ortsfeste Transporteinrichtung herabgelassen werden.By the pivoting of the tape hanger is also the lower end of the second transport device such swung that this is no longer with the upper end of the stationary transport device, which is fixed in the machine frame is, overlaps. Then, with the help of z. B. a lifting device, in particular a pulley, the first at the upper end of the machine frame solved stationary transport device be lowered.

In einem dritten Schritt kann das untere Ende von dem Maschinenrahmen entkoppelt werden und anschließend die Abbaumaschine nach vorne aus ihrer Einbauposition in dem Maschinenrahmen herausgezogen werden. Dann kann die Bandaufhängeeinrichtung wieder in ihre Arbeitsposition zurückverschwenkt und dort arretiert werden. Nachdem die ausgebaute erste Transporteinrichtung auf dem Boden frei aufliegt, können die erforderlichen Wartungsarbeiten, z. B. ein Bandaustausch, leicht zugänglich durchgeführt werden. Der Einbau der ersten Transporteinrichtung erfolgt in entgegengesetzter Reihenfolge.In a third step, the lower end of the machine frame can be decoupled and then the mining machine are pulled forward from its installed position in the machine frame. Then the Bandaufhängeeinrichtung can be pivoted back into its working position and locked there. After the removed first transport device rests freely on the ground, the required maintenance, such. As a band exchange, be carried out easily accessible. The installation of the first transport device takes place in the opposite order.

Im folgenden wird unter Bezugnahme auf die Zeichnungen ein Ausführungsbeispiel der Erfindung näher erläutert.in the The following will be an embodiment with reference to the drawings closer to the invention explained.

Es zeigen:It demonstrate:

1 eine Abbaumaschine, insbesondere einen Surface Miner, mit einer ersten und zweiten Transporteinrichtung in der arretieren Arbeitsposition, 1 a mining machine, in particular a surface miner, with a first and second transport device in the locked working position,

2 die Bandaufhängeeinrichtung in der arretierten Schwenkposition, 2 the Bandaufhängeeinrichtung in the locked pivot position,

3 das Demontieren der ortsfesten Transporteinrichtung, und das Wegfahren der Abbaumaschine, 3 dismantling the stationary transport device, and driving away the mining machine,

4 das Zurückschwenken der Bandaufhängeeinrichtung, 4 pivoting back the tape hanger,

5 die Befestigung der ersten Transporteinrichtung am Maschinenrahmen, und 5 the attachment of the first transport device on the machine frame, and

6 die erste Transporteinrichtung in der Entnahmeposition. 6 the first transport device in the removal position.

1 zeigt eine Abbaumaschine 1, nämlich einen Surface Miner zum Abarbeiten von Abbaumaterial beispielsweise Gestein, Kalkstein oder Kohle u. dgl. 1 shows a mining machine 1 , namely a surface miner for working off mining material such as rock, limestone or coal u. like.

Die Abbaumaschine 1 weist einen Maschinenrahmen 2 auf, in dem eine Schneidwalze 4 gelagert ist, mit der das Abbaumaterial aus dem Boden 3 abgefräst wird. Die in 1 gezeigte Schneidesalze 4 wird hierzu auf den Boden 3 abgesenkt und auf eine voreingestellte Frästiefe gebracht. Die Schneidesalze 4 wirft aufgrund ihrer Rotation das Abbaumaterial auf eine erste ortsfest, aber ausbaubar in dem Maschinenrahmen 2 gehaltene erste Transporteinrichtung 6, die von der Schneidesalze 4 ausgehend sich schräg nach oben in dem Maschinenrahmen 2 erstreckt. Die erste Transporteinrichtung 6 hat ein endlos umlaufendes Transportband 7, das das Abbaumaterial am oberen hinteren Ende 22 der ersten Transporteinrichtung 6 auf eine Übernahmestelle 18 einer zweiten Transporteinrichtung 12 abwirft. Die erste Transporteinrichtung 6 ist an ihrem unteren vorderen Ende in einen Bandschuh 9 eingehängt und an ihrem oberen Ende 22 lösbar am Maschinenrahmen 2 befestigt.The removal machine 1 has a machine frame 2 in which a cutting roller 4 is stored, with the decomposition material from the ground 3 is milled. In the 1 cutting salts shown 4 this is on the ground 3 lowered and brought to a preset depth of cut. The cutting salts 4 due to its rotation, throws the excavation material to a first stationary but expandable in the machine frame 2 held first transport device 6 that of the cutting salts 4 starting obliquely upwards in the machine frame 2 extends. The first transport device 6 has an endless circulating conveyor belt 7 that the mining material at the upper rear end 22 the first transport device 6 to a takeover point 18 a second transport device 12 yields. The first transport device 6 is in a band shoe at its lower front end 9 hooked and at its upper end 22 detachable on the machine frame 2 attached.

Die zweite Transporteinrichtung 12 weist ebenfalls ein endlos umlaufendes Transportband 50 auf, das das Abbaumaterial von der Übernahmestelle 18 im unteren Bereich der zweiten Transporteinrichtung 12 zu einer Abwurfstelle 20 transportiert, an der das Abbaumaterial auf ein Fahrzeug abgeladen werden kann oder auch seitlich auf den Boden 3 abgeworfen werden kann.The second transport device 12 also has an endless circulating conveyor belt 50 on that the removal material from the takeover point 18 in the lower region of the second transport device 12 to a discharge point 20 transported on which the decomposition material can be dumped onto a vehicle or laterally on the ground 3 can be dropped.

Die zweite Transporteinrichtung 12 wird von einer Bandaufhängeeinrichtung 10 getragen, die schwenkbar an dem Maschinenrahmen 2 befestigt ist. Die Bandaufhängeeinrichtung 10 besteht beispielsweise aus einem Portal 13, das die zweite Transporteinrichtung 12 zwischen Streben 11 aufnimmt. Die parallelen, vorzugsweise sich vertikal erstreckenden Streben 11 des Portals 13 sind an ihrem unteren Ende nach vorne in Richtung auf den Maschinenrahmen 2 abgewinkelt und nehmen an ihrem dem unteren Ende 14 der zweiten Transporteinrichtung zugewandten Ende eine horizontale Schwenkachse 24 auf, um die die zweite Transporteinrichtung 12 schwenkbar in der Bandaufhängeeinrichtung 10 zu lagern. Mit Hilfe einer Stelleinrichtung 16 in Verbindung mit einem Seilzug 17, die an dem oberen Ende des Portals 12 schwenkbar gelagert sind, kann die zweite Transporteinrichtung 12 hinsichtlich ihres Steigungswinkels verändert werden und damit die Höhe der Abwurfstelle 20 bestimmt werden. Hierzu greift der Seilzug 17 vorzugsweise im oberen Drittel der zweiten Transporteinrichtung 12 an.The second transport device 12 is from a tape hanger 10 worn, which is pivotable on the machine frame 2 is attached. The band hanger 10 For example, it consists of a portal 13 that is the second transport device 12 between struts 11 receives. The parallel, preferably vertically extending struts 11 of the portal 13 are at their lower end forward towards the machine frame 2 angled and take at her the lower end 14 the second conveyor facing the end of a horizontal pivot axis 24 on to the the second transport device 12 swiveling in the band hanger 10 to store. With the help of an adjusting device 16 in conjunction with a cable 17 at the top of the portal 12 are pivotally mounted, the second transport device 12 be changed in terms of their pitch angle and thus the height of the discharge point 20 be determined. For this purpose, the cable pulls 17 preferably in the upper third of the second transport device 12 at.

Die Bandaufhängeeinrichtung 10 ist um eine zweite horizontale Schwenkachse 28 verschwenkbar, die einerseits in den vertikalen Streben 11 und andererseits an einem Element 25 des Maschinenrahmens 2 gelagert ist. Das Element 25 des Maschinenrahmens 2 weist zwei im wesentlichen dreieckförmige Platten 26 auf, die an ihrem unteren Ende Löcher 27 und 29 für das Durchstecken von Arretierbolzen aufweist. Die Löcher 27 und 29 sind winkelmäßig um einen gewünschten Schwenkwinkel für die Bandaufhängeeinrichtung 10 beabstandet. Dieser Schwenkwinkel kann beispielsweise 30° betragen. In der in 1 gezeigten Arbeitsstellung sind Arretierbolzen in die Löcher 27 gesteckt, so dass die Streben 11 der Bandaufhängeeinrichtung 10 vertikal arretiert sind. In der in 2 gezeigten Schwenkposition der Bandaufhängeeinrichtung 10 befinden sich die Arretierbolzen in den Löchern 29, und zwar in beiden zueinander parallel verlaufenden Streben 11 beiderseitig der zweiten Transporteinrichtung 12. Dadurch wird die Bandaufhängeeinrichtung 10 in der in 2 ersichtlichen Schwenkposition arretiert.The band hanger 10 is about a second horizontal pivot axis 28 swiveling, on the one hand in the vertical struts 11 and on the other hand on an element 25 of the machine frame 2 is stored. The element 25 of the machine frame 2 has two substantially triangular plates 26 on, which holes at its lower end 27 and 29 for the insertion of locking bolts. The holes 27 and 29 are angularly at a desired pivot angle for the tape hanger 10 spaced. This swivel angle can be for example 30 °. In the in 1 shown working position locking pins in the holes 27 stuck, so the struts 11 the Bandaufhängeeinrichtung 10 are locked vertically. In the in 2 shown pivot position of the tape hanger 10 are the locking bolts in the holes 29 , in two mutually parallel struts 11 on both sides of the second transport device 12 , This will cause the tape hanger 10 in the in 2 apparent pivot position locked.

Zum Verschwenken der Bandaufhängeeinrichtung 10 wird eine Stelleinrichtung 36 in Verbindung mit einem Zugseil 38 verwendet, das mit vertikalem Abstand von der Schwenkachse 28 am oberen Ende der Streben 11 angreift, und zwar vorzugsweise an beiden Streben 11 des Portals 13.For pivoting the tape hanger 10 becomes an adjusting device 36 in conjunction with a pull rope 38 used, with vertical distance from the pivot axis 28 at the top of the struts 11 attacks, preferably on both struts 11 of the portal 13 ,

Die Stelleinrichtung 36 kann direkt mit dem Maschinenrahmen 2 gekoppelt sein, oder wie in den Zeichnungen gezeigt, an einem Drehkranz 30 befestigt sein, der um eine vertikale Achse 8 relativ zum Maschinenrahmen 2 um beispielsweise ±90° schwenkbar ist und damit über die Bandaufhängeeinrichtung 10 ein Verschwenken der zweiten Transporteinrichtung 12 zur Seite hin ermöglicht.The adjusting device 36 can directly with the machine frame 2 be coupled, or as shown in the drawings, on a turntable 30 be attached to a vertical axis 8th relative to the machine frame 2 can be pivoted, for example ± 90 ° and thus on the tape hanger 10 a pivoting of the second transport device 12 to the side allows.

An dem Drehkranz 30 kann auf der der Bandaufhängeeinrichtung 10 gegenüberliegenden Seite ein verfahrbares Gegengewicht 34 angeordnet sein, das zur Verringerung von auf dem Maschinenrahmen 2 wirkenden Momenten in unterschiedliche Stellungen verfahren werden kann. Das Gegengewicht 34 kann demzufolge entsprechend der Belastung der zweiten Transporteinrichtung 12 mit Abbaumaterial und in Abhängigkeit von der Schwenkstellung der zweiten Transporteinrichtung 12 sowohl seitlich als auch in Höhenrichtung, unterschiedlich weit herausgefahren werden. Hierzu kann die bereits erwähnte Stelleinrichtung 36 verwendet werden, die das Gegengewicht 34 mit Hilfe eines Gelenkgetriebes 44 auf einem Schlitten 39 unterschiedlich weit nach außen verfahren kann.At the turntable 30 Can be on the the band hanger 10 opposite side a movable counterweight 34 be arranged to reduce on the machine frame 2 Acting moments can be moved in different positions. The counterweight 34 can therefore according to the load of the second transport device 12 with decomposition material and in dependence on the pivot position of the second transport device 12 both side and in height direction, be moved out far different. For this purpose, the already mentioned adjusting device 36 used, which is the counterweight 34 with the help of a joint gear 44 on a sledge 39 can move differently far outward.

In vorteilhafter Weise kann die Stelleinrichtung 36, wie bereits erläutert, auch zum Verschwenken der Bandaufhängeeinrichtung 10 verwendet werden.Advantageously, the adjusting device 36 , as already explained, also for pivoting the Bandaufhängeeinrichtung 10 be used.

In der aus 2 ersichtlichen Position kann die erste Transporteinrichtung demontiert werden, indem zunächst das vordere Ende 22 der ersten Transporteinrichtung 6 von dem Maschinenrahmen 2 gelöst wird und die erste Transporteinrichtung, wie aus 3 ersichtlich, über eine Hubeinrichtung, z. B. einem Flaschenzug abgesenkt werden kann. 3 zeigt die erste Transporteinrichtung 6 in der abgesenkten Position, bei der die Bandaufhängeeinrichtung 10 wieder zurück in die Arbeitsposition verschwenkt worden ist. Es versteht sich, dass die Bandaufhängeeinrichtung 10 in der Schwenkposition verbleiben kann.In the out 2 apparent position, the first transport device can be dismantled by first the front end 22 the first transport device 6 from the machine frame 2 is solved and the first transport device, as shown 3 visible, via a lifting device, for. B. a pulley can be lowered. 3 shows the first transport device 6 in the lowered position at which the tape hanger 10 has been pivoted back into the working position. It is understood that the tape hanger 10 can remain in the swivel position.

Nach dem Ablassen des vorderen Endes der ersten Transporteinrichtung 6 kann die Befestigung der ersten Transporteinrichtung 6 an dem Bandschuh 9 gelöst werden und dadurch die erste Transporteinrichtung 6 vollständig von dem Maschinenrahmen 2 gelöst werden.After draining the front end of the first conveyor 6 may be the attachment of the first transport device 6 on the belt shoe 9 be solved and thereby the first transport device 6 completely from the machine frame 2 be solved.

Anschließend kann die Abbaumaschine 1 in Vorwärtsrichtung weggefahren werden, wodurch die erste Transporteinrichtung 6 vollkommen freiliegt, so dass Wartungsarbeiten in einfacher Weise durchgeführt werden können. Die 5 und 6 zeigen die Aufnahmeeinrichtung 46 für das untere vordere Ende der ersten Transporteinrichtung 6 an dem Bandschuh 9.Subsequently, the mining machine 1 be moved away in the forward direction, whereby the first transport device 6 completely exposed, so that maintenance can be carried out in a simple manner. The 5 and 6 show the recording device 46 for the lower front end of the first transport device 6 on the belt shoe 9 ,

5 zeigte eine Seitenansicht einer Befestigungsplatte 48, mit der die erste Transporteinrichtung 6 beidseitig an dem Bandschuh 9 befestigt werden kann. Seitlich von der ersten Transporteinrichtung 6 abstehende Lagerbolzen 55 können nach dem Entfernen der beiderseitigen Befestigungsplatten 48 aus der Halterung 46 z. B. dadurch herausgezogen werden, dass die Abbaumaschine 1 vorwärtsbewegt wird, wobei die seitlich überstehenden Lagerbolzen 55 auf den beiderseitigen Schrägen 56 am Bandschuh heruntergleiten können und die erste Transporteinrichtung 6 auf den Boden 3 absetzen können. 5 showed a side view of a mounting plate 48 with which the first transport device 6 on both sides of the belt shoe 9 can be attached. Laterally from the first transport device 6 protruding bearing pin 55 can after removing the mutual mounting plates 48 from the holder 46 z. B. be pulled out that the mining machine 1 is moved forward, with the laterally projecting bearing pin 55 on the mutual slopes 56 can slide down the belt shoe and the first transport device 6 on the ground 3 can settle.

Das Transportband 50 der zweiten Transporteinrichtung 12 kann mit Hilfe einer aus einem Fettspanner 58 bestehenden Bandspanneinrichtung gespannt gehalten werden, wobei der Fettspanner auf die linear bewegliche Achse 60 der oberen Antriebsrolle 52 für das Transportband 50 einwirkt.The conveyor belt 50 the second transport device 12 can with the help of one from a fat tensioner 58 existing band tensioning device are kept taut, the fat tensioner on the linearly movable axis 60 the upper drive roller 52 for the conveyor belt 50 acts.

Das endlos umlaufende Transportband 50 wird über die obere Antriebsrolle 52 angetrieben und über die untere Umlenkrolle 54 umgelenkt. Der Fettspanner 58 weist eine Fettzuführeinrichtung 62 auf, die sich längs der zweiten Transporteinrichtung 12 nach unten erstreckt und in einem Fettzuführanschluss 64 mündet, der vom Boden 3 aus zugänglich ist.The endlessly circulating conveyor belt 50 gets over the upper drive roller 52 driven and over the lower pulley 54 diverted. The fat tensioner 58 has a grease feeder 62 on, extending along the second transport device 12 extends down and in a grease feed port 64 which flows from the ground 3 is accessible from.

Claims (11)

Abbaumaschine (1) zum Abarbeiten eines Bodens (3) mit – einem Maschinenrahmen (2), – einer in dem Maschinenrahmen (2) gelagerten Schneidesalze (4), – mindestens einer Transporteinrichtung (6, 12), – wobei die Transporteinrichtung (6, 12) ein endlos umlaufendes Transportband (7, 50) aufweist, das an dem oberen Ende (15) der Transporteinrichtung (12) über eine Antriebsrolle (52) und an dem unteren Ende (14) über eine Umlenkrolle (54) geführt ist, und – wobei eine Bandspanneinrichtung die obere Antriebsrolle (52) zum Spannen des Transportbandes (7, 50) verlagern kann, dadurch gekennzeichnet, dass die Bandspanneinrichtung fernbedienbar ist.Mining machine ( 1 ) for working off a soil ( 3 ) with - a machine frame ( 2 ), - one in the machine frame ( 2 ) stored cutting salts ( 4 ), - at least one transport device ( 6 . 12 ), - the transport device ( 6 . 12 ) an endlessly circulating conveyor belt ( 7 . 50 ), which at the upper end ( 15 ) of the transport device ( 12 ) via a drive roller ( 52 ) and at the lower end ( 14 ) via a deflection roller ( 54 ), and - wherein a belt tensioning device, the upper drive roller ( 52 ) for tensioning the conveyor belt ( 7 . 50 ), characterized in that the band tensioning device can be operated remotely. Abbaumaschine nach Anspruch 1, dadurch gekennzeichnet, dass die Bandspanneinrichtung am unteren Ende (15) der Transporteinrichtung (6, 12) oder am Maschinenrahmen (2) fernbedienbar ist.Dismantling machine according to claim 1, characterized in that the belt tensioning device at the lower end ( 15 ) of the transport device ( 6 . 12 ) or on the machine frame ( 2 ) is remotely controllable. Abbaumaschine nach einem der Ansprüche 1 oder 2, dadurch gekennzeichnet, dass die Bandspanneinrichtung aus einem Fettspanner (58) besteht.Dismantling machine according to one of claims 1 or 2, characterized in that the belt tensioning device consists of a grease tensioner ( 58 ) consists. Abbaumaschine (1) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass eine erste Transporteinrichtung (6) Abbaumaterial von der Schneidesalze (4) übernimmt, und eine zweite Transporteinrichtung (12) das Abbaumaterial von der ersten Transporteinrichtung (6) übernimmt und nach oben zu einer Abwurfstelle (20) transportiert.Mining machine ( 1 ) according to one of claims 1 to 3, characterized in that a first transport device ( 6 ) Removal material from the cutting salt ( 4 ), and a second transport device ( 12 ) the decomposition material from the first transport device ( 6 ) and up to a discharge point ( 20 ). Abbaumaschine nach Anspruch 3 oder 4, dadurch gekennzeichnet, dass eine Fettzuführeinrichtung (62) für den Fettspanner (58) am unteren Ende (15) der Transporteinrichtung (6, 12) oder am Maschinenrahmen (2) einen Fettzuführanschluss (64) aufweist.Removal machine according to claim 3 or 4, characterized in that a grease feed device ( 62 ) for the grease tensioner ( 58 ) at the lower end ( 15 ) of the transport device ( 6 . 12 ) or on the machine frame ( 2 ) a grease feed connection ( 64 ) having. Abbaumaschine nach Anspruch 5, dadurch gekennzeichnet, dass die Fettzuführeinrichtung sich längs der Transporteinrichtung (6, 12) erstreckt.Dismantling machine according to Claim 5, characterized in that the grease feed device extends along the transport device ( 6 . 12 ). Abbaumaschine nach einem der Ansprüche 3 bis 6, dadurch gekennzeichnet, dass der Fettspanner (58) auf eine bewegliche Achse (60) der oberen Antriebsrolle (52) für das Transportband (50) einwirkt.Dismantling machine according to one of claims 3 to 6, characterized in that the fat tensioner ( 58 ) on a movable axis ( 60 ) of the upper drive roller ( 52 ) for the conveyor belt ( 50 ) acts. Abbaumaschine nach einem der Anspruch 7, dadurch gekennzeichnet, dass die Achse (60) der Antriebsrolle (52) zum Spannen des Transportbandes (50) nach außen beweglich ist.Discharge machine according to one of the claims 7, characterized in that the axis ( 60 ) of the drive roller ( 52 ) for tensioning the conveyor belt ( 50 ) is movable outwards. Abbaumaschine nach Anspruch 8, dadurch gekennzeichnet, dass die Achse (60) linear verschiebbar ist.Dismantling machine according to claim 8, characterized in that the axis ( 60 ) is linearly displaceable. Abbaumaschine nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass die Abbaumaschine ein Surface Miner ist.Removal machine according to one of claims 1 to 9, characterized in that the mining machine is a surface miner is. Verfahren zum Spannen eines Transportbandes (50) einer Transporteinrichtung (6, 12) bei einer Abbaumaschine (1) zum Abarbeiten eines Bodens (3) bei der – von einer Schneidesalze (4) abgearbeitetes Abbaumaterial auf eine Transporteinrichtung (6, 12) mit einem endlos umlaufenden Transportband (7, 50) abgeworfen wird, – wobei das Transportband (7, 50) von einer auf eine obere Antriebsrolle (52) des Transportbandes (7, 50) einwirkende Bandspanneinrichtung gespannt werden kann, dadurch gekennzeichnet, dass ein Fettspanner (58) als Fettspanneinrichtung verwendet wird, wobei Fett dem Fettspanner (58) zugeführt wird, das am unteren Ende (15) der Transporteinrichtung (6, 12) oder am Maschinenrahmen (2) eingespeist wird.Method for tensioning a conveyor belt ( 50 ) a transport device ( 6 . 12 ) at a mining machine ( 1 ) for working off a soil ( 3 ) in which - by a cutting salt ( 4 ) processed mining material on a transport device ( 6 . 12 ) with an endlessly circulating conveyor belt ( 7 . 50 ), - the conveyor belt ( 7 . 50 ) from one to an upper drive roller ( 52 ) of the conveyor belt ( 7 . 50 ) tensioning band tensioning device, characterized in that a grease tensioner ( 58 ) is used as a fat tensioning device, wherein fat is the fat tensioner ( 58 ), which at the lower end ( 15 ) of the transport device ( 6 . 12 ) or on the machine frame ( 2 ) is fed.
DE102009061034.0A 2009-03-20 2009-03-20 Removal machine and method for tensioning the conveyor belt of a transport device in a mining machine Expired - Fee Related DE102009061034B4 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102009013709A DE102009013709B4 (en) 2009-03-20 2009-03-20 Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine
DE102009061034.0A DE102009061034B4 (en) 2009-03-20 2009-03-20 Removal machine and method for tensioning the conveyor belt of a transport device in a mining machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102009013709A DE102009013709B4 (en) 2009-03-20 2009-03-20 Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine
DE102009061034.0A DE102009061034B4 (en) 2009-03-20 2009-03-20 Removal machine and method for tensioning the conveyor belt of a transport device in a mining machine

Publications (2)

Publication Number Publication Date
DE102009061034A1 true DE102009061034A1 (en) 2011-02-24
DE102009061034B4 DE102009061034B4 (en) 2014-07-17

Family

ID=42139025

Family Applications (2)

Application Number Title Priority Date Filing Date
DE102009013709A Expired - Fee Related DE102009013709B4 (en) 2009-03-20 2009-03-20 Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine
DE102009061034.0A Expired - Fee Related DE102009061034B4 (en) 2009-03-20 2009-03-20 Removal machine and method for tensioning the conveyor belt of a transport device in a mining machine

Family Applications Before (1)

Application Number Title Priority Date Filing Date
DE102009013709A Expired - Fee Related DE102009013709B4 (en) 2009-03-20 2009-03-20 Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine

Country Status (2)

Country Link
EP (2) EP2835495B1 (en)
DE (2) DE102009013709B4 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014001921A1 (en) 2013-02-22 2014-08-28 Bomag Gmbh Milling roller with a, in particular interchangeable, Materialleiteinrichtung and Materialleiteinrichtung for a milling drum
CN104251012A (en) * 2013-06-27 2014-12-31 沈阳铝镁设计研究院有限公司 Connecting structure for belt veranda base steel plate and wall surface purline
CN105986822A (en) * 2015-01-28 2016-10-05 山东重拓机械股份有限公司 Full-automatic open-pit mining machine
DE102015212902A1 (en) 2015-07-09 2017-01-12 Wirtgen Gmbh Milling machine for processing of ground surfaces, transfer device, and method for transferring milled material
DE102020001163A1 (en) 2020-02-21 2021-08-26 Bomag Gmbh MATERIAL TRANSFER DEVICE FOR A SOIL MILLING MACHINE AND TILLER WITH SUCH A MATERIAL TRANSFER DEVICE
CN113622919B (en) * 2021-08-26 2023-06-16 宁夏天地西北煤机有限公司 Anti-slip device and displacement type belt conveyor

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4342485A (en) * 1980-08-29 1982-08-03 Dynapac Maskin Ab Cold surface planer cooling apparatus
DE3509671A1 (en) * 1985-03-18 1986-09-25 Reinhard 5461 Windhagen Wirtgen Apparatus for exploiting deposits according to the surface-winning method
DE3621420C1 (en) * 1986-04-07 1987-10-29 Phb Weserhuette Ag Open-pit milling machine
DE19726122C2 (en) * 1997-06-20 2002-03-07 Wirtgen Gmbh Device for milling off floor coverings, in particular roadways
US6276758B1 (en) * 1998-09-05 2001-08-21 MAN TAKRAF Fördertechnik GmbH Surface miner with tilting superstructure for depth control
DE202005005919U1 (en) * 2005-04-12 2005-06-30 Dbt Mineral Processing Gmbh Heavy duty conveyor especially for hopper fed onto conveyor has a conventional vehicle track fitted with scraper bars
CA2567644C (en) * 2005-11-09 2014-01-14 Suncor Energy Inc. Mobile oil sands mining system
DE202007005756U1 (en) * 2007-04-19 2008-08-28 Wirtgen Gmbh Self-propelled construction machine
DE102007028812B4 (en) * 2007-06-20 2009-08-20 Wirtgen Gmbh Self-propelled machine for cutting or milling, in particular machine for the exploitation of deposits in open-pit mining
DE102007044090A1 (en) * 2007-09-14 2009-04-09 Wirtgen Gmbh Road milling machine or machine for the exploitation of deposits

Also Published As

Publication number Publication date
EP2236745A2 (en) 2010-10-06
EP2835495B1 (en) 2017-08-02
DE102009013709B4 (en) 2011-04-28
EP2835495A1 (en) 2015-02-11
DE102009013709A1 (en) 2011-01-05
DE102009061034B4 (en) 2014-07-17
EP2236745A3 (en) 2013-10-02
EP2236745B1 (en) 2014-10-29

Similar Documents

Publication Publication Date Title
DE202009003824U1 (en) Removal machine, in particular Surfac Miner
DE102009013709B4 (en) Mining machine, in particular surface miner, and method for removing and installing a transport device in a mining machine
DE102005017093A1 (en) Milling machine and method of working the soil
DE102012021379B4 (en) Floor milling machine with swiveling drive unit
DE112016000961T5 (en) Core drilling device for installation in an excavator
DE102014011878B4 (en) Ground milling machine, method of dismantling and method of installing a milling device
DE3013175C2 (en)
AT506122A1 (en) BORING MACHINE
DE3608024A1 (en) REMOVING MACHINE
DE102016006276A1 (en) Vehicle for sewer cleaning
DE690577C (en) ng connected hammer drill carrier
EP3617445A1 (en) Open pit milling machine
EP3081699B1 (en) Civil engineering device and method for creating a foundation element in the ground
DE10150904C1 (en) Drilling and anchor setting arrangement
DE102020120833B4 (en) Attachment device for a truck for applying a covering layer of pourable building material to a road and/or path substructure
AT522864B1 (en) wire saw
DE102016114872B4 (en) Mounting device for setting road delineators
DE2801365C3 (en) Equipment for the transport and installation of a provisional route expansion and expansion frame for the provisional route expansion
EP3133238B1 (en) Tunnel construction system
DE202020104550U1 (en) Attachment device for a truck for applying a cover layer of pourable building material to a road and / or path substructure
DE8520715U1 (en) Sinking machine for sinking shafts, in particular blind and freezing shafts
DE2406751C2 (en) Hydraulic pit lining
DE839485C (en) Security and auxiliary devices for the mining of coal or the like.
DE3339611C1 (en) Support arrangement for stope-like winning with a short-front machine in the longwall face
DE19732946B4 (en) Extraction device for underground mining, especially for coal mining in longwall mining

Legal Events

Date Code Title Description
R016 Response to examination communication
AC Divided out of

Ref document number: 102009013709

Country of ref document: DE

Kind code of ref document: P

OP8 Request for examination as to paragraph 44 patent law
R018 Grant decision by examination section/examining division
R020 Patent grant now final
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee