DE102009023553A1 - Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head - Google Patents

Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head Download PDF

Info

Publication number
DE102009023553A1
DE102009023553A1 DE200910023553 DE102009023553A DE102009023553A1 DE 102009023553 A1 DE102009023553 A1 DE 102009023553A1 DE 200910023553 DE200910023553 DE 200910023553 DE 102009023553 A DE102009023553 A DE 102009023553A DE 102009023553 A1 DE102009023553 A1 DE 102009023553A1
Authority
DE
Germany
Prior art keywords
concrete
pile head
additive
displacement body
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE200910023553
Other languages
German (de)
Inventor
Hans-Peter Schemm
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE200910023553 priority Critical patent/DE102009023553A1/en
Publication of DE102009023553A1 publication Critical patent/DE102009023553A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Abstract

The method involves bringing an additive or displacement body to the fresh concrete of a pile head. The additive is mechanically or manually mixed under the concrete. The displacement body is mechanically or manually brought to the fresh concrete of the pile head.

Description

Die Erfindung betrifft das Verfahren zur Verhinderung des Abbindevorganges von Beton in Ortbetonpfählen am Pfahlkopf um ein späteres Kappen des Pfahlkopfes im ausgehärteten Zustand des Betons zu vermeiden oder wesentlich zu erleichtern.The The invention relates to the method for preventing the Abbindevorganges of concrete in cast-in-place piles at the pile head at a later time Caps of the pile head in the hardened Condition of the concrete to avoid or substantially facilitate.

Bei der Herstellung von Ortbetonpfählen ist es nach dem Betoniervorgang fast immer erforderlich den Beton am Pfahlkopf auf die erforderliche Sollhöhe (= unterkante Fundament, Sohle oder Fundamentbalken) nach dem Aushärten abzustemmen und zu entsorgen. Diesen Vorgang nennt man Kappen. Dieser Kappvorgang kann erst nach den Erdarbeiten (= freilegen des Pfahlkopfes) erfolgen. Um eine Beschädigung des Pfahles zu vermeiden, dürfen die Erdarbeiten erst nach dem Aushärten des Betons angefangen werden. Diese Erdarbeiten sind mit großer Sorgfalt auszuführen um eine Beschädigung unterhalb des Pfahlkopfes durch ziehen am Pfahlkopf (= Bruch am unteren Pfahlschaft) zu vermeiden. Für das Kappen bedeutet das, dass der Beton am Pfahlkopf sehr weit ausgehärtet ist und somit sehr arbeitsintensiv durch Stemmarbeiten mit einem Presslufthammer gekappt werden muss. Die erforderliche Kapplänge ergibt sich aus der Distanz des zwischen Sollhöhe und überschüssigem Beton darüber. Je nach Bohr-, Press-, Vibrations- oder Rammverfahren von Ortbetonpfählen ist dieses Maß sehr unterschiedlich. Auch die technischen Voraussetzungen des Bauwerkes beeinflussen diese Länge. Normalerweise liegt diese Länge zwischen 0,30 m und 2,00 m. Längen bis 7 m und länger sind möglich. Die Durchmesser der Pfähle liegen üblicherweise zwischen 0,30 m und 2,00 m.at the production of in-situ concrete piles it is almost always required the concrete after concreting at the pile head to the required nominal height (= lower edge foundation, Sole or foundation beam) after curing and discard. This process is called caps. This clipping process can only after the earthworks (= exposing the pile head) done. To one damage to avoid the stake The earthworks started only after the concrete had hardened become. These earthworks are to be carried out with great care a damage below the pile head by pulling on the pile head (= break at lower pile shaft). For the cap, this means that the concrete at the pile head has hardened very far and thus very labor-intensive must be cut by caulking with a jackhammer. The required Kapplänge results itself from the distance between the desired height and excess concrete over it. ever according to drilling, pressing, vibration or piling method of in-situ concrete piles this measure very much differently. Also influence the technical requirements of the building this length. Usually this length is between 0.30 m and 2.00 m. lengths up to 7 m and longer are possible. The diameters of the piles are usually between 0.30 m and 2.00 m.

Es ist bekannt, dass es schon hydraulische Kappmaschinen zur Arbeitserleichterung, die an einen Bagger gehängt werden, gibt. Die Platzverhältnisse auf der Bastelle lassen dies aber nicht immer zu. Eine Entsorgung des Kappgutes bleibt weiterhin.It it is known that it already hydraulic cutting machines to facilitate work, who hangs on an excavator be there. The space conditions but on the Bastelle do not always allow this. A disposal of the Kappgutes remains.

Es ist bekannt, dass der obere später zu kappende Beton im sogenannten „Frischzustand” mittels Bagger abgearbeitet werden kann. Danach ist je nach Qualität und Machbarkeit der Ausführung kein oder nur noch ein kleines Nacharbeiten erforderlich. Dieses Arbeiten „Frisch in Frisch” sind jedoch aus baustellentechnischen Gründen sehr oft nicht möglich.It it is known that the upper one later To be cut concrete in the so-called "fresh state" by means of excavators can be processed. After that, depending on quality and feasibility the execution no or only a small rework required. This Working "Fresh in Frisch " However, for site-technical reasons very often not possible.

Es ist technisch nicht möglich nur den Beton für den Pfahlkopfbereich im Vorfeld mit Zusatzmitteln im Betonmischer oder in der Betonpumpe zu versehen, da durch die Größe des Betonmischers bzw. die Länge der Betonschläuche durch die gepumpt wird nie genau der Beton mit den Zusatzmitteln am Pfahlkopf wirklich passgenau eingepumpt werden kann.It is not technically possible just the concrete for the pile head area in advance with additives in the concrete mixer or in the concrete pump due to the size of the concrete mixer or the length the concrete hoses through the pumped is never exactly the concrete with the additives can be pumped really fit at the pile head.

Nachteile der Kapparbeiten am ausgehärteten Beton sind die arbeitsintensiven Stemmarbeiten, die sehr vorsichtig auszuführenden und zeitintensiven Erdarbeiten vor dem Kappen um den Pfahlkopf herum, mit der großen Gefahr der Beschädigung durch den Bagger und die Entsorgung des Kappgutes.disadvantage the capping works on the hardened Concrete is the labor-intensive caulking, which is very careful be executed and time-consuming earthworks before capping around the pile head, with the big one Risk of damage by the excavator and the disposal of the Kappgutes.

Aufgabe der Erfindung ist es den arbeitsintensiven und teuren Kappvorgang nach der Aushärtephase des Betons zu verhindern oder zu erleichtern. Ebenso sollen durch die Erfindung die zeitintensiven Erdarbeiten um den Pfahlkopf herum erleichtert werden. Auch die teure Kappgutentsorgung kann durch die Erfindung entfallen oder wesentlich verringert werden.task The invention is the labor-intensive and expensive Kappvorgang after the curing phase prevent or facilitate the concrete. Likewise, by the invention the time-consuming earthworks around the pile head around be relieved. The expensive Kappgutentsorgung can through the invention omitted or substantially reduced.

Durch das Einbringen von Zusatzmitteln oder Verdrängungskörpern nach dem Betoniervorgang in den Frischbeton oder leicht „angezogenen” Beton am Pfahlkopf zur Verhinderung oder Verringerung des Aushärtevorganges am normalerweise zu kappenden Pfahlkopfs wird die Aufgabe der Erfindung gelöst.By the introduction of additives or displacement bodies after the concreting process in the fresh concrete or slightly "tightened" concrete at the pile head to prevent or reduce the curing process on normally to be capped pile head, the object of the invention solved.

Durch das Verhindern des Aushärtens ist es möglich auf die zeit- und kostenintensiven Kapparbeiten ganz oder teilweise zu verzichten bzw. werden die Arbeiten wesentlich erleichtert. Die Entsorgung des Kappgutes entfällt ganz oder teilweise. Die Erdarbeiten um den Pfahlkopf herum sind wesentlich einfacher, da nicht mit einer so großen Sorgfalt gearbeitet werden muss. Die Gefahr der Beschädigung des Pfahles ist wesentlich geringer, da der Bagger keinen Anngriffspunkt (= ausgehärtete Beton) hat.By preventing hardening Is it possible on the time-consuming and costly Kapparbeiten whole or in part to refrain or the work is much easier. The Disposal of the Kappgutes deleted completely or partially. The earthworks around the pile head are around much easier, because not worked with such a great care got to. The risk of damaging the Stake is much lower because the excavator is not an attack point (= hardened Concrete).

Beispielbeschreibung einer PatentanmeldungExample description of a Patent application

Ausführungsbeispiele der Erfindung sind in den Zeichnungen dargestellt und werden im folgendem näher beschrieben.embodiments The invention are illustrated in the drawings and are in following described.

Es zeigenIt demonstrate

1: Einen hergestellten Ortbetonpfahl im Längsschnitt 1 : A manufactured in-situ concrete pile in longitudinal section

2: Einen hergestellten und im Pfahlkopfbereich freigegrabenen Ortbetonpfahl im Längsschnitt 2 : A manufactured and in the pile head area excavated Ortbetonpfahl in longitudinal section

3: Einen hergestellten und im Pfahlkopfbereich freigegrabenen und gekappten Ortbetonpfahl im Längsschnitt 3 : A manufactured and in the pile head area excavated and capped in-situ concrete pile in longitudinal section

4: Einen hergestellten und im Pfahlkopfbereich freigegrabenen und gekappten Ortbetonpfahl mit aufbetoniertem Fundament im Längsschnitt 4 : A prepared and cut in the Pfahlkopfbereich excavated and capped cast-in pile with concrete foundation in longitudinal section

5: Einen hergestellten Ortbetonpfahl im Längsschnitt mit eingebrachten Zusatzstoffen 5 : A manufactured cast-in pile in longitudinal section with added additives

6: Einen hergestellten Ortbetonpfahl im Längsschnitt mit eingebrachten Verdrängungskörpern 6 : A prepared in-situ concrete pile in longitudinal section with introduced displacement bodies

Die 14 zeigen den Stand der Technik:
In 1 ist ein fertiger Ortbetonpfahl 1 im Boden 11 mit Bewehrung 2 dargestellt. Bis das Fundament 4, ein Fundamentbalken oder eine Sohle aufbetoniert werden kann, muss die Größe des Fundamentes um den Pfahlkopf herum gemäß 2 ausgeschachtet werden. Diese Arbeiten können erst nach dem erhärten des Betons durchgeführt werden. In einem zu frühen Stadium würden die seitlich fahrenden Bagger den noch frischen Beton durch die Verkehrslast seitlich weg drücken und beschädigen. Auch die Baggerarbeiten sind sehr vorsichtig durchzuführen, damit der Pfahl keinen Schaden nimmt. Nach den Ausschachtungsarbeiten wird die Sauberkeitsschicht 3 eingebaut. In der 3 ist der Pfahlkopf gekappt und das Kappgut 5 wird seitlich zur weiteren Entsorgung gelagert. Die Bewehrung 2 schaut oben aus dem gekappten Pfahl heraus. Anschließend kann das Fundament 4 auf den gekappten Pfahl betoniert werden (4).
The 1 - 4 show the state of the art:
In 1 is a finished cast-in-place pile 1 in the ground 11 with reinforcement 2 shown. Until the foundation 4 , a foundation beam or a sole can be concreted, the size of the foundation around the pile head must be according to 2 be excavated. This work can be done only after the hardening of the concrete. At an early stage, the dredgers on the sides would push and damage the still fresh concrete sideways due to the traffic load. Also, the dredging work should be done very carefully so that the pile is not damaged. After the excavation work, the cleanliness layer 3 built-in. In the 3 is the pile cap cut and the Kappgut 5 is stored sideways for further disposal. The reinforcement 2 looks up out of the capped pole. Subsequently, the foundation can 4 be concreted on the capped pile ( 4 ).

Die 56 zeigen die Erfindung:
In der 5 wird nach der Herstellung des Ortbetonpfahles (wie in 1) mechanisch oder manuell ein Zusatzmittel 6 eingebracht welches das Abbinden verhindert, den leicht „angezogenen” Beton wieder bricht oder den Abbindevorgang um viele Tage verzögert bis die Erdarbeiten fertig sind. Die Tiefe der Einbringung 7 richtet sich nach der späteren Unterkante des Fundamentes 4. Die Einbringung kann durch rühren mittels Quirl, per Hand oder auch durch Druck mittels Düsenstrahl (Wasser oder Luft) erfolgen. Hier kann technisch alles eingesetzt werden was die Einbringung erleichtert bzw. ermöglicht. Auch nur Wasser zur Verringerung der Betonqualität würde die Kapparbeiten schon wesentlich erleichtern.
The 5 - 6 show the invention:
In the 5 is after the production of cast-in-place pile (as in 1 ) mechanically or manually an additive 6 which prevents the setting, the easily "tightened" concrete breaks again or delays the setting process by many days until the earthworks are done. The depth of insertion 7 depends on the later lower edge of the foundation 4 , The introduction can be done by stirring by whisk, by hand or by pressure by means of jet (water or air). Here everything can be used technically which makes the introduction easier or possible. Even only water to reduce the quality of the concrete would make the work much easier.

In der 6 wird nach dem Herstellen des Ortbetonpfahles wie in 1 mechanisch oder manuell ein Verdrängungskörper z. B. in Form einer aufpumpbaren Blase 8 oder eines Styroporkörpers 9 etc. in den Frischbeton eingestellt. Dieser Bereich muss dann später nicht mehr gekappt werden bzw. der noch vorhandene Randbeton 10 ist nur noch sehr dünn und somit leicht zu entfernen. Hier kann technisch alles eingesetzt werden was die Einbringung erleichtert bzw. ermöglicht. Auch eingeblasene Styroporkugeln zur Verringerung der Betonqualität würden die Kapparbeiten wesentlich erleichtern.In the 6 is after making the in-situ concrete pile as in 1 mechanically or manually a displacement body z. B. in the form of an inflatable bladder 8th or a styrofoam body 9 etc. set in the fresh concrete. This area then no longer has to be cut later or the existing edge concrete 10 is only very thin and thus easy to remove. Here everything can be used technically which makes the introduction easier or possible. Even injected Styrofoam balls to reduce the quality of concrete would make the Kapparbeiten much easier.

Claims (5)

Verfahren zur Verhinderung des Abbindevorganges von Beton bei Ortbetonpfählen am Pfahlkopf, dadurch gekennzeichnet, dass ein Zusatzmittel 6 oder Verdrängungskörper (8 + 9) in den Frischbeton des Pfahlkopfes eingebracht wird um den Kappvorgang zu verhindern oder zu erleichtern.A method for preventing the Abbindevorganges of concrete Ortbetonpfählen the pile head, characterized in that an additive 6 or displacement body ( 8th + 9 ) is introduced into the fresh concrete of the pile head to prevent or facilitate the Kappvorgang. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Zusatzmittel (6) mechanisch oder manuell unter den Beton gemischt wird.Method according to claim 1, characterized in that the additive ( 6 ) is mixed mechanically or manually under the concrete. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Verdrängungskörper (8 oder 9) mechanisch oder manuell in den Frischbeton des Pfahlkopfes eingebracht wird und somit den Beton verdrängt und das Betonvolumen verkleinert.Method according to claim 1, characterized in that the displacement body ( 8th or 9 ) is introduced mechanically or manually into the fresh concrete of the pile head and thus displaces the concrete and reduces the concrete volume. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das Zusatzmittel alles sein kann was das Abbinden von Beton verhindert oder die Betonqualität verringert.Method according to claim 1 or 2, characterized that the admixture can be anything that the setting of concrete prevents or the concrete quality reduced. Verfahren nach Anspruch 1 oder 3, dadurch gekennzeichnet, dass der Verdrängungskörper alles sein kann was den Beton verdrängt oder die Betonqualität wesentlich verringert.Method according to claim 1 or 3, characterized that the repressive body is everything what can displace the concrete or the concrete quality significantly reduced.
DE200910023553 2009-05-30 2009-05-30 Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head Withdrawn DE102009023553A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200910023553 DE102009023553A1 (en) 2009-05-30 2009-05-30 Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200910023553 DE102009023553A1 (en) 2009-05-30 2009-05-30 Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head

Publications (1)

Publication Number Publication Date
DE102009023553A1 true DE102009023553A1 (en) 2010-12-02

Family

ID=43028555

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200910023553 Withdrawn DE102009023553A1 (en) 2009-05-30 2009-05-30 Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head

Country Status (1)

Country Link
DE (1) DE102009023553A1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58191815A (en) * 1982-05-01 1983-11-09 Iichi Shiomi Treatment of pile head using liquid
JPS61158517A (en) * 1984-12-29 1986-07-18 Mitsui Constr Co Ltd Method of processing extra-banking concrete for cast-in-place pile
JPH01219214A (en) * 1988-02-26 1989-09-01 Shuzo Tamoto Pile head processing method for cast-in-place concrete pile
EP0888481A1 (en) * 1996-03-22 1999-01-07 Robert Arthur Merritt Method of breaking concrete piles
GB2398333A (en) * 2003-02-07 2004-08-18 Cementation Found Skanska Ltd Techniques for pile breaking
GB2400880A (en) * 2003-04-22 2004-10-27 Cordek Ltd Former for use in removing the tops of piles
DE102005044104B3 (en) * 2005-09-15 2007-02-15 Franki Grundbau Gmbh & Co.Kg Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58191815A (en) * 1982-05-01 1983-11-09 Iichi Shiomi Treatment of pile head using liquid
JPS61158517A (en) * 1984-12-29 1986-07-18 Mitsui Constr Co Ltd Method of processing extra-banking concrete for cast-in-place pile
JPH01219214A (en) * 1988-02-26 1989-09-01 Shuzo Tamoto Pile head processing method for cast-in-place concrete pile
EP0888481A1 (en) * 1996-03-22 1999-01-07 Robert Arthur Merritt Method of breaking concrete piles
GB2398333A (en) * 2003-02-07 2004-08-18 Cementation Found Skanska Ltd Techniques for pile breaking
GB2400880A (en) * 2003-04-22 2004-10-27 Cordek Ltd Former for use in removing the tops of piles
DE102005044104B3 (en) * 2005-09-15 2007-02-15 Franki Grundbau Gmbh & Co.Kg Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle

Similar Documents

Publication Publication Date Title
US20180127938A1 (en) Water-permeable pipe pile system capable of accelerating soil consolidation and method of using the same
DE102007060379A1 (en) Connecting body e.g. load distribution element, for erecting steel tower of wind turbine, has upper and lower contact surfaces for tower and foundation body, respectively, where connecting body is arranged between tower and foundation body
EP2698476B1 (en) Method for the construction of an offshore structure and foundation for an offshore structure
DE2545572A1 (en) BUILDING ANCHORING
JP5808153B2 (en) How to construct a retaining wall
EP2650446A1 (en) Method of creating a foundation for a offshore structure
EP0258324B1 (en) Process for restoring channels threatening to collapse, in particular profiled channels
DE102012023185A1 (en) Method for producing a pile
DE102009023553A1 (en) Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head
CN102926382A (en) Construction method of soil mixing wall (SMW) engineering method
DE102012201281A1 (en) Reinforced concrete foundation pile structure used for roof, bridge or wall construction of gas station for e.g. electric vehicle, has reinforced concrete pile portions and spacing pile that are formed as three-pronged pile system
DE102017129705B4 (en) Process for the production of a fastening of a terrain jump, for the renovation of a pile foundation and for the new construction of a pile foundation by means of a supporting body
EP2400063B1 (en) Foundation system
DE19939799A1 (en) Procedure to refurbish or reinforce supports in brickwork entails enclosing support in textile casing which is closed to form a sealed sleeve which is then filled via connection with suitable filler
DE102005008679A1 (en) Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls
DE2413418A1 (en) METHOD OF MAKING PILE FOUNDATIONS USING PRE-FABRICATED CONCRETE PILES AND PRE-FABRICATED CONCRETE PILES FOR USE IN THIS PROCESS
EP0939168A2 (en) Method for restoring retaining walls
DE102004013017B4 (en) Device for manufacture of in-situ concrete foundations for overhead line masts, for example, comprises prefabricated shuttering component with outer walls or at least one outer wall having circular openings
EP3789469B1 (en) Method for producing a base module
EP3115512B1 (en) Method for producing an in-situ concrete ramming pile and device for same
DE69824010T2 (en) Method of deepening and / or strengthening, securing or renovating a quay wall
DE102007056408A1 (en) Roadway constructing system, has excavation area provided with gas, drinking water, and drainage lines, and embedment and soil exchange area, which are filled with self-condensing and hardable material mixture brought in flowable form
DE102005044104B3 (en) Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle
DE1944644C3 (en) Process for the production of a reinforced concrete pile from in-situ concrete used for the foundation of a corner post and steel pipe for the implementation of the process
EP3942114A1 (en) Foundation for a tower structure and method for establishing a foundation for a tower structure

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20111201