DE102009023553A1 - Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head - Google Patents
Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head Download PDFInfo
- Publication number
- DE102009023553A1 DE102009023553A1 DE200910023553 DE102009023553A DE102009023553A1 DE 102009023553 A1 DE102009023553 A1 DE 102009023553A1 DE 200910023553 DE200910023553 DE 200910023553 DE 102009023553 A DE102009023553 A DE 102009023553A DE 102009023553 A1 DE102009023553 A1 DE 102009023553A1
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- pile head
- additive
- displacement body
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
Abstract
Description
Die Erfindung betrifft das Verfahren zur Verhinderung des Abbindevorganges von Beton in Ortbetonpfählen am Pfahlkopf um ein späteres Kappen des Pfahlkopfes im ausgehärteten Zustand des Betons zu vermeiden oder wesentlich zu erleichtern.The The invention relates to the method for preventing the Abbindevorganges of concrete in cast-in-place piles at the pile head at a later time Caps of the pile head in the hardened Condition of the concrete to avoid or substantially facilitate.
Bei der Herstellung von Ortbetonpfählen ist es nach dem Betoniervorgang fast immer erforderlich den Beton am Pfahlkopf auf die erforderliche Sollhöhe (= unterkante Fundament, Sohle oder Fundamentbalken) nach dem Aushärten abzustemmen und zu entsorgen. Diesen Vorgang nennt man Kappen. Dieser Kappvorgang kann erst nach den Erdarbeiten (= freilegen des Pfahlkopfes) erfolgen. Um eine Beschädigung des Pfahles zu vermeiden, dürfen die Erdarbeiten erst nach dem Aushärten des Betons angefangen werden. Diese Erdarbeiten sind mit großer Sorgfalt auszuführen um eine Beschädigung unterhalb des Pfahlkopfes durch ziehen am Pfahlkopf (= Bruch am unteren Pfahlschaft) zu vermeiden. Für das Kappen bedeutet das, dass der Beton am Pfahlkopf sehr weit ausgehärtet ist und somit sehr arbeitsintensiv durch Stemmarbeiten mit einem Presslufthammer gekappt werden muss. Die erforderliche Kapplänge ergibt sich aus der Distanz des zwischen Sollhöhe und überschüssigem Beton darüber. Je nach Bohr-, Press-, Vibrations- oder Rammverfahren von Ortbetonpfählen ist dieses Maß sehr unterschiedlich. Auch die technischen Voraussetzungen des Bauwerkes beeinflussen diese Länge. Normalerweise liegt diese Länge zwischen 0,30 m und 2,00 m. Längen bis 7 m und länger sind möglich. Die Durchmesser der Pfähle liegen üblicherweise zwischen 0,30 m und 2,00 m.at the production of in-situ concrete piles it is almost always required the concrete after concreting at the pile head to the required nominal height (= lower edge foundation, Sole or foundation beam) after curing and discard. This process is called caps. This clipping process can only after the earthworks (= exposing the pile head) done. To one damage to avoid the stake The earthworks started only after the concrete had hardened become. These earthworks are to be carried out with great care a damage below the pile head by pulling on the pile head (= break at lower pile shaft). For the cap, this means that the concrete at the pile head has hardened very far and thus very labor-intensive must be cut by caulking with a jackhammer. The required Kapplänge results itself from the distance between the desired height and excess concrete over it. ever according to drilling, pressing, vibration or piling method of in-situ concrete piles this measure very much differently. Also influence the technical requirements of the building this length. Usually this length is between 0.30 m and 2.00 m. lengths up to 7 m and longer are possible. The diameters of the piles are usually between 0.30 m and 2.00 m.
Es ist bekannt, dass es schon hydraulische Kappmaschinen zur Arbeitserleichterung, die an einen Bagger gehängt werden, gibt. Die Platzverhältnisse auf der Bastelle lassen dies aber nicht immer zu. Eine Entsorgung des Kappgutes bleibt weiterhin.It it is known that it already hydraulic cutting machines to facilitate work, who hangs on an excavator be there. The space conditions but on the Bastelle do not always allow this. A disposal of the Kappgutes remains.
Es ist bekannt, dass der obere später zu kappende Beton im sogenannten „Frischzustand” mittels Bagger abgearbeitet werden kann. Danach ist je nach Qualität und Machbarkeit der Ausführung kein oder nur noch ein kleines Nacharbeiten erforderlich. Dieses Arbeiten „Frisch in Frisch” sind jedoch aus baustellentechnischen Gründen sehr oft nicht möglich.It it is known that the upper one later To be cut concrete in the so-called "fresh state" by means of excavators can be processed. After that, depending on quality and feasibility the execution no or only a small rework required. This Working "Fresh in Frisch " However, for site-technical reasons very often not possible.
Es ist technisch nicht möglich nur den Beton für den Pfahlkopfbereich im Vorfeld mit Zusatzmitteln im Betonmischer oder in der Betonpumpe zu versehen, da durch die Größe des Betonmischers bzw. die Länge der Betonschläuche durch die gepumpt wird nie genau der Beton mit den Zusatzmitteln am Pfahlkopf wirklich passgenau eingepumpt werden kann.It is not technically possible just the concrete for the pile head area in advance with additives in the concrete mixer or in the concrete pump due to the size of the concrete mixer or the length the concrete hoses through the pumped is never exactly the concrete with the additives can be pumped really fit at the pile head.
Nachteile der Kapparbeiten am ausgehärteten Beton sind die arbeitsintensiven Stemmarbeiten, die sehr vorsichtig auszuführenden und zeitintensiven Erdarbeiten vor dem Kappen um den Pfahlkopf herum, mit der großen Gefahr der Beschädigung durch den Bagger und die Entsorgung des Kappgutes.disadvantage the capping works on the hardened Concrete is the labor-intensive caulking, which is very careful be executed and time-consuming earthworks before capping around the pile head, with the big one Risk of damage by the excavator and the disposal of the Kappgutes.
Aufgabe der Erfindung ist es den arbeitsintensiven und teuren Kappvorgang nach der Aushärtephase des Betons zu verhindern oder zu erleichtern. Ebenso sollen durch die Erfindung die zeitintensiven Erdarbeiten um den Pfahlkopf herum erleichtert werden. Auch die teure Kappgutentsorgung kann durch die Erfindung entfallen oder wesentlich verringert werden.task The invention is the labor-intensive and expensive Kappvorgang after the curing phase prevent or facilitate the concrete. Likewise, by the invention the time-consuming earthworks around the pile head around be relieved. The expensive Kappgutentsorgung can through the invention omitted or substantially reduced.
Durch das Einbringen von Zusatzmitteln oder Verdrängungskörpern nach dem Betoniervorgang in den Frischbeton oder leicht „angezogenen” Beton am Pfahlkopf zur Verhinderung oder Verringerung des Aushärtevorganges am normalerweise zu kappenden Pfahlkopfs wird die Aufgabe der Erfindung gelöst.By the introduction of additives or displacement bodies after the concreting process in the fresh concrete or slightly "tightened" concrete at the pile head to prevent or reduce the curing process on normally to be capped pile head, the object of the invention solved.
Durch das Verhindern des Aushärtens ist es möglich auf die zeit- und kostenintensiven Kapparbeiten ganz oder teilweise zu verzichten bzw. werden die Arbeiten wesentlich erleichtert. Die Entsorgung des Kappgutes entfällt ganz oder teilweise. Die Erdarbeiten um den Pfahlkopf herum sind wesentlich einfacher, da nicht mit einer so großen Sorgfalt gearbeitet werden muss. Die Gefahr der Beschädigung des Pfahles ist wesentlich geringer, da der Bagger keinen Anngriffspunkt (= ausgehärtete Beton) hat.By preventing hardening Is it possible on the time-consuming and costly Kapparbeiten whole or in part to refrain or the work is much easier. The Disposal of the Kappgutes deleted completely or partially. The earthworks around the pile head are around much easier, because not worked with such a great care got to. The risk of damaging the Stake is much lower because the excavator is not an attack point (= hardened Concrete).
Beispielbeschreibung einer PatentanmeldungExample description of a Patent application
Ausführungsbeispiele der Erfindung sind in den Zeichnungen dargestellt und werden im folgendem näher beschrieben.embodiments The invention are illustrated in the drawings and are in following described.
Es zeigenIt demonstrate
Die
In
In
Die
In der
In the
In
der
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200910023553 DE102009023553A1 (en) | 2009-05-30 | 2009-05-30 | Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200910023553 DE102009023553A1 (en) | 2009-05-30 | 2009-05-30 | Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102009023553A1 true DE102009023553A1 (en) | 2010-12-02 |
Family
ID=43028555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200910023553 Withdrawn DE102009023553A1 (en) | 2009-05-30 | 2009-05-30 | Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102009023553A1 (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58191815A (en) * | 1982-05-01 | 1983-11-09 | Iichi Shiomi | Treatment of pile head using liquid |
JPS61158517A (en) * | 1984-12-29 | 1986-07-18 | Mitsui Constr Co Ltd | Method of processing extra-banking concrete for cast-in-place pile |
JPH01219214A (en) * | 1988-02-26 | 1989-09-01 | Shuzo Tamoto | Pile head processing method for cast-in-place concrete pile |
EP0888481A1 (en) * | 1996-03-22 | 1999-01-07 | Robert Arthur Merritt | Method of breaking concrete piles |
GB2398333A (en) * | 2003-02-07 | 2004-08-18 | Cementation Found Skanska Ltd | Techniques for pile breaking |
GB2400880A (en) * | 2003-04-22 | 2004-10-27 | Cordek Ltd | Former for use in removing the tops of piles |
DE102005044104B3 (en) * | 2005-09-15 | 2007-02-15 | Franki Grundbau Gmbh & Co.Kg | Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle |
-
2009
- 2009-05-30 DE DE200910023553 patent/DE102009023553A1/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58191815A (en) * | 1982-05-01 | 1983-11-09 | Iichi Shiomi | Treatment of pile head using liquid |
JPS61158517A (en) * | 1984-12-29 | 1986-07-18 | Mitsui Constr Co Ltd | Method of processing extra-banking concrete for cast-in-place pile |
JPH01219214A (en) * | 1988-02-26 | 1989-09-01 | Shuzo Tamoto | Pile head processing method for cast-in-place concrete pile |
EP0888481A1 (en) * | 1996-03-22 | 1999-01-07 | Robert Arthur Merritt | Method of breaking concrete piles |
GB2398333A (en) * | 2003-02-07 | 2004-08-18 | Cementation Found Skanska Ltd | Techniques for pile breaking |
GB2400880A (en) * | 2003-04-22 | 2004-10-27 | Cordek Ltd | Former for use in removing the tops of piles |
DE102005044104B3 (en) * | 2005-09-15 | 2007-02-15 | Franki Grundbau Gmbh & Co.Kg | Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20180127938A1 (en) | Water-permeable pipe pile system capable of accelerating soil consolidation and method of using the same | |
DE102007060379A1 (en) | Connecting body e.g. load distribution element, for erecting steel tower of wind turbine, has upper and lower contact surfaces for tower and foundation body, respectively, where connecting body is arranged between tower and foundation body | |
EP2698476B1 (en) | Method for the construction of an offshore structure and foundation for an offshore structure | |
DE2545572A1 (en) | BUILDING ANCHORING | |
JP5808153B2 (en) | How to construct a retaining wall | |
EP2650446A1 (en) | Method of creating a foundation for a offshore structure | |
EP0258324B1 (en) | Process for restoring channels threatening to collapse, in particular profiled channels | |
DE102012023185A1 (en) | Method for producing a pile | |
DE102009023553A1 (en) | Method for prevention of setting phase of concrete with local concrete piles at pile head, involves bringing additive or displacement body to fresh concrete of pile head | |
CN102926382A (en) | Construction method of soil mixing wall (SMW) engineering method | |
DE102012201281A1 (en) | Reinforced concrete foundation pile structure used for roof, bridge or wall construction of gas station for e.g. electric vehicle, has reinforced concrete pile portions and spacing pile that are formed as three-pronged pile system | |
DE102017129705B4 (en) | Process for the production of a fastening of a terrain jump, for the renovation of a pile foundation and for the new construction of a pile foundation by means of a supporting body | |
EP2400063B1 (en) | Foundation system | |
DE19939799A1 (en) | Procedure to refurbish or reinforce supports in brickwork entails enclosing support in textile casing which is closed to form a sealed sleeve which is then filled via connection with suitable filler | |
DE102005008679A1 (en) | Pile driving by head-, internal-, or vibration driving of pile tube, employs double-walled pile tube with filling of sand in annulus between walls | |
DE2413418A1 (en) | METHOD OF MAKING PILE FOUNDATIONS USING PRE-FABRICATED CONCRETE PILES AND PRE-FABRICATED CONCRETE PILES FOR USE IN THIS PROCESS | |
EP0939168A2 (en) | Method for restoring retaining walls | |
DE102004013017B4 (en) | Device for manufacture of in-situ concrete foundations for overhead line masts, for example, comprises prefabricated shuttering component with outer walls or at least one outer wall having circular openings | |
EP3789469B1 (en) | Method for producing a base module | |
EP3115512B1 (en) | Method for producing an in-situ concrete ramming pile and device for same | |
DE69824010T2 (en) | Method of deepening and / or strengthening, securing or renovating a quay wall | |
DE102007056408A1 (en) | Roadway constructing system, has excavation area provided with gas, drinking water, and drainage lines, and embedment and soil exchange area, which are filled with self-condensing and hardable material mixture brought in flowable form | |
DE102005044104B3 (en) | Foundation element capping method e.g. for upper end, involves capping upper end of element from concrete with jet arrangement provided which provides, under high pressure rinsing water or water air mixture across nozzle | |
DE1944644C3 (en) | Process for the production of a reinforced concrete pile from in-situ concrete used for the foundation of a corner post and steel pipe for the implementation of the process | |
EP3942114A1 (en) | Foundation for a tower structure and method for establishing a foundation for a tower structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20111201 |