DE102009021945B4 - Loading procedure for loading and unloading railway trains by lorry in a maximum of 12 minutes. - Google Patents
Loading procedure for loading and unloading railway trains by lorry in a maximum of 12 minutes. Download PDFInfo
- Publication number
- DE102009021945B4 DE102009021945B4 DE102009021945.5A DE102009021945A DE102009021945B4 DE 102009021945 B4 DE102009021945 B4 DE 102009021945B4 DE 102009021945 A DE102009021945 A DE 102009021945A DE 102009021945 B4 DE102009021945 B4 DE 102009021945B4
- Authority
- DE
- Germany
- Prior art keywords
- loading
- bridge
- platform
- track
- truck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D47/00—Loading or unloading devices combined with vehicles, e.g. loading platforms, doors convertible into loading and unloading ramps
- B61D47/005—Loading or unloading devices combined with road vehicles carrying wagons, e.g. ramps, turntables, lifting means
Abstract
Verladeverfahren zum Be- und Entladen von Güterzügen mit LKW unter Benutzung eines Bahnsteiges (2) und eines Gegenbahnsteiges (3), deren Oberkante gleichhoch mit der Beladefläche der Waggons (4) ist und der Spalt zwischen den Bahnsteigkanten und dem Waggon klein genug zum Überrollen ist, auf welchen die LKW von den schräg angeordneten Warteplätzen aus in einer Art S-Kurve auf die Waggons auffahren, dadurch gekennzeichnet, dass das Auffahren mit Hilfe einer Lichtsignalsteuerung unterstützt wird, um die Lkw-Fahrer beim Befahren der S-Kurve zu lotsen, dass zu einem 1. Lichtsignal (6) für den Auffahrstart weitere Lichtsignale (7) vorgesehen werden, die mittels Kontaktschwellen gesteuert werden.Loading method for loading and unloading of goods trains with trucks using a platform (2) and a counter platform (3), the upper edge of which is equal to the loading area of the wagons (4) and the gap between the platform edges and the wagon is small enough to roll over in which the trucks drive from the obliquely arranged waiting places in a kind of S-curve on the wagons, characterized in that the starting is supported by means of a light signal control to pilot the truck driver when driving on the S-curve, that for a first light signal (6) for the start-up start further light signals (7) are provided, which are controlled by means of contact thresholds.
Description
Die Erfindung betrifft das Verladeverfahren auf Verladestationen für den kombinierten Lkw-Verkehr Straße-Schiene für zukünftige Lkw-Güterbahnstrecken entlang ausgewählter Autobahnen mit Lkws hochfrequentierter Autobahnen zur Gewährleistung einer Zugaufenthaltsdauer von maximal 12 min.The invention relates to the loading method on loading stations for the combined truck traffic road-rail for future truck freight lines along selected highways with trucks high-traffic highways to ensure a maximum residence time of 12 min.
Derzeitiges Problem: Der bis heute schon sehr stark angewachsene Lkw-Verkehr auf den Autobahnen mit all seinen negativen Folgen soll laut amtlichen Prognosen von 2005–2025 noch um ca. 70% anwachsen. Die bisher bekannten Vorschläge, mehr Verkehr auf die Schiene zu bringen, sind nicht geeignet, eine durchgreifende Verbesserung zu erreichen. In den zurückliegenden Jahren wurden als „Verbesserung” gegenüber der schon lange existierenden „rollenden Landstraße” verschiedene Verladesysteme vorgeschlagen, welche durch eine Verkürzung der Verladezeit dazu beitragen sollten, den Güterverkehr auf der Schiene attraktiver zu machen.Current problem: The truck traffic on the highways with all its negative consequences, which has already grown considerably today, is expected to increase by approx. 70% according to official forecasts from 2005-2025. The previously known proposals to bring more traffic to the rail are not suitable to achieve a thorough improvement. Over the past few years, various loading systems have been proposed as an "improvement" over the long existing "rolling highway", which should help to make rail freight transport more attractive by reducing loading time.
Als Beispiele seien genannt die Druckschrift
Das Problem wird gelöst mit den Merkmalen des Anspruchs 1. Dies ermöglicht eine hohe Verladekapazität und eine hohe Reisegeschwindigkeit des Lkw auf der Schiene. Dazu ist es weiter notwendig, dass entsprechende Güterbahnstrecken entlang der Autobahn mit Verladestationen in genügend engem Abstand und mit einer möglichst kurzen Verladezeit gebildet werden und so zu einer Verlagerung des Güterverkehrs auf die Schiene beitragen.The problem is solved with the features of
Beschreibung des Verladeverfahrens auf Verladestationen mit seinen technischen Komponenten.Description of the loading procedure on loading stations with its technical components.
Die Station hat neben dem Durchgangsgleis (0) – je nach erforderlicher Kapazität-1 oder mehr Verladegleise (
Der Spalt (
Um ein kosten- und zeitaufwändiges Palettensystem, wie bei anderen Erfindungsvorschlägen, zu vermeiden, fahren die Lkw unter Mitbenutzung des „Gegenbahnsteiges” (3) in einer optimierten Fahrkurve selbsttätig auf die Waggons. (
Auf der einen Seite des Gleises stellen sich die Lkw auf ihnen zugewiesene Aufstellspuren (
Da die überwiegende Mehrzahl der zu transportierenden Lkw Sattelschlepper sind, ist die Waggonlänge so auszulegen, dass diese auf den für sie vorgesehenen Waggon ohne zusätzliche Fläche (in Längsrichtung) auffahren können.Since the vast majority of trucks to be transported are semi-trailers, the length of the wagon should be designed so that they can run on the wagon intended for them without additional space (in the longitudinal direction).
Vor dem Auffahren der Lkws auf die Waggons fahren die Lkw, welche an der betreffenden Station den Zug verlassen, über den Gegenbahnsteig (
Dazu müssen diejenigen Fahrer, welche in der Lokkabine mitgefahren sind, durch Benutzung eines Personenbeförderungsfahrzeuges zu den Einstiegsstellen ihres Lkw gefahren werden. Dadurch wird die sonst längere Gehzeit wesentlich verkürzt. Diese Fahrzeuge sind seitlich offen, damit das Ein- und Aussteigen in kürzest möglicher Zeit von statten geht. Mit den gleichen Fahrzeugen werden die Fahrer der auf die Waggons gefahrenen Lkw zur Lokkabine transportiert.For this purpose, those drivers who are driven in the Lokkabine must be driven by using a passenger vehicle to the entry points of their truck. This significantly shortens the otherwise longer walking time. These vehicles are open at the side so that getting in and out of the car in the shortest possible time is possible. The drivers of the trucks driven onto the wagons are transported to the loco cab with the same vehicles.
Um beim Auffahren der Lkw auf die Waggons die vorgesehene Auffahrlänge mit Sicherheit einhalten zu können, ist für jeden „Stellplatz” eine Lichtsignalsteuerung einzurichten, welche durch entsprechende Kontaktschwellen im Boden gesteuert werden, und den Lkw-Fahrer in einer Art S-Kurve auf den Waggon lotsenIn order to be able to comply with the intended run-on length when driving the trucks onto the wagons, a light signal control must be set up for each "parking space", which are controlled by corresponding contact thresholds in the ground, and the truck driver in a kind of S-curve on the wagon guide
Außer der 1. Signalampel (
Für die ca. 19 m langen Lkw mit Hänger (
Die Lkw werden während der Zugfahrt gegen Brems- und Beschleunigungskräfte des Zuges an Ihrer Vorderachse gesichert (
Die Platten vor dem Rad werden automatisch hochgestellt und arretiert, sobald die Vorderräder eine Kontaktschwelle (
Für die Sicherung gegen seitliches Verrutschen während der Fahrt ist an jedem seitlichen Rand der Waggons eine mindestens 3 cm hohe Stahlleiste (
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102009021945.5A DE102009021945B4 (en) | 2009-05-08 | 2009-05-08 | Loading procedure for loading and unloading railway trains by lorry in a maximum of 12 minutes. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102009021945.5A DE102009021945B4 (en) | 2009-05-08 | 2009-05-08 | Loading procedure for loading and unloading railway trains by lorry in a maximum of 12 minutes. |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102009021945A1 DE102009021945A1 (en) | 2010-11-11 |
DE102009021945B4 true DE102009021945B4 (en) | 2018-01-04 |
Family
ID=42932549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102009021945.5A Active DE102009021945B4 (en) | 2009-05-08 | 2009-05-08 | Loading procedure for loading and unloading railway trains by lorry in a maximum of 12 minutes. |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102009021945B4 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2128478A1 (en) * | 1971-06-08 | 1972-12-28 | Sel | Device for controlling the loading of railway wagons |
DE9113863U1 (en) * | 1991-11-07 | 1992-01-09 | Pflaesterer, Guenter, 6940 Weinheim, De | |
FR2817526A1 (en) * | 2000-12-04 | 2002-06-07 | Michel Jean Marie Sompayrac | Railway network with loops for transporting heavy goods vehicles, containers and freight on low flatbed wagons on a level with platforms |
DE10212214A1 (en) * | 2001-03-19 | 2002-11-21 | Michael Werner | Rail transport system for articulated lorries comprises flat bed truck with swiveling central frame supported by rollers, swivel bearing consisting of central ring and bearing rollers moving over its surface |
DE10225036A1 (en) * | 2002-06-06 | 2004-01-08 | Schwarz, Hartmut, Dipl.-Ing. | System for loading lorries on railway wagons comprises pallets, on to which lorries are driven, pallets being transferred by rows of drive wheels which cooperate with racks on their underside to flat-bed wagons |
-
2009
- 2009-05-08 DE DE102009021945.5A patent/DE102009021945B4/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2128478A1 (en) * | 1971-06-08 | 1972-12-28 | Sel | Device for controlling the loading of railway wagons |
DE9113863U1 (en) * | 1991-11-07 | 1992-01-09 | Pflaesterer, Guenter, 6940 Weinheim, De | |
FR2817526A1 (en) * | 2000-12-04 | 2002-06-07 | Michel Jean Marie Sompayrac | Railway network with loops for transporting heavy goods vehicles, containers and freight on low flatbed wagons on a level with platforms |
DE10212214A1 (en) * | 2001-03-19 | 2002-11-21 | Michael Werner | Rail transport system for articulated lorries comprises flat bed truck with swiveling central frame supported by rollers, swivel bearing consisting of central ring and bearing rollers moving over its surface |
DE10225036A1 (en) * | 2002-06-06 | 2004-01-08 | Schwarz, Hartmut, Dipl.-Ing. | System for loading lorries on railway wagons comprises pallets, on to which lorries are driven, pallets being transferred by rows of drive wheels which cooperate with racks on their underside to flat-bed wagons |
Also Published As
Publication number | Publication date |
---|---|
DE102009021945A1 (en) | 2010-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0885794B1 (en) | Transit system | |
EP2228278B1 (en) | Wagon | |
EP0273354A2 (en) | Railway freight car with a device for the loading or onloading of road vehicles | |
DE102013004687A1 (en) | Device for converting a railway carriage to a semi-trailer | |
DE3739277C2 (en) | ||
DE19855733C2 (en) | Transport vehicle in the form of a low-floor wagon or a low loader | |
EP1670671B1 (en) | Fully automatic traffic system | |
DE3425698C2 (en) | ||
DE866913C (en) | Road or rail truck for transporting smaller vehicles | |
DE60117834T2 (en) | SUPPORT STRUCTURE FOR THE SWIVEL MOVEMENT OF A ROTATABLE STRUCTURE OF A WAGON OF THE COMBINED RAIL / ROAD TRANSPORT | |
DE19610674C2 (en) | Handling system | |
DE102009021945B4 (en) | Loading procedure for loading and unloading railway trains by lorry in a maximum of 12 minutes. | |
DE102013010588A1 (en) | Railway wagons, in particular freight wagons for transporting road vehicles | |
DE102007027963A1 (en) | Lorry convoy track, has guide channels in driving surface, and motorway with passing lanes of entire media used for lorry and container transport, and spring mounted guide rail made of high tensile metal or plastic and inserted into channel | |
DE10258405A1 (en) | Transport device for transporting vehicles and products by rail comprises a rotating, pivoting and/or displaceable loading/transport arrangement for housing a transport product during transport | |
DE102006022674A1 (en) | Railway car for transporting lorry, has chassis and rotatable platform with same surface area, where platform retains hydraulic adjustable brake wedges for securing lorry, and platform is connected with underbody by rotating assembly | |
DE102005028846A1 (en) | Method and device for loading trailers on railway wagons | |
DE102012024857A1 (en) | Method for accelerating and moving train covered by locomotive, involves lowering drive wheel on rails for start-up process at batch wagon operating in train, where batch wagon is pressed with certain pressure force on rails | |
EP1366971B1 (en) | Trailer tractor | |
EP2778010A2 (en) | Load carrier for combined transport of goods | |
DE10238406B4 (en) | Arrangement for vehicle transport by train | |
DE202010012757U1 (en) | Rail car shunting | |
DE3838268A1 (en) | Method for the loading in layers of road-bound lorry units and in particular semitrailers onto railborne vehicles (and vice versa) and device for carrying out the method | |
DE202016008550U1 (en) | Railway wagon with a semitrailer dropped on it | |
DE102022135003A1 (en) | Interchangeable platform for railway wagons, railway wagon, and system with a railway wagon and an interchangeable platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R084 | Declaration of willingness to licence | ||
R012 | Request for examination validly filed | ||
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R016 | Response to examination communication | ||
R081 | Change of applicant/patentee |
Owner name: KOEHLER, WILHELM, DIPL.-ING., DE Free format text: FORMER OWNER: KOEHLER, WILHELM, 90441 NUERNBERG, DE |
|
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |