DE102008022558B4 - Method for the continuous processing of freight cars - Google Patents
Method for the continuous processing of freight cars Download PDFInfo
- Publication number
- DE102008022558B4 DE102008022558B4 DE102008022558.4A DE102008022558A DE102008022558B4 DE 102008022558 B4 DE102008022558 B4 DE 102008022558B4 DE 102008022558 A DE102008022558 A DE 102008022558A DE 102008022558 B4 DE102008022558 B4 DE 102008022558B4
- Authority
- DE
- Germany
- Prior art keywords
- track
- loading
- freight
- picking
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61J—SHIFTING OR SHUNTING OF RAIL VEHICLES
- B61J3/00—Shunting or short-distance haulage devices; Similar devices for hauling trains on steep gradients or as starting aids; Car propelling devices therefor
- B61J3/04—Car shunting or haulage devices with cable traction or endless-chain driving means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L17/00—Switching systems for classification yards
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Warehouses Or Storage Devices (AREA)
Abstract
Verfahren zum kontinuierlichen Bearbeiten von Güterwagen auf Gleisen bei dem wenigstens ein Güterwagen in eine Ladestation (6) auf einem Ladegleis (2) in Einfahrrichtung verschoben wird, wobei das Ladegleis (2) – in Einfahrtrichtung gesehen – hinter der Ladestation (6) über eine Weiche (7) mit einem Kommissioniergleis (3) verbunden wird, auf das der Güterwagen entgegen der Einfahrtrichtung verschoben wird, wobei die Weiche (7) das Ladegleis (2) und das Kommissioniergleis (3) jeweils in einen ersten Streckenabschnitt (8, 10) und in einen zweiten Streckenabschnitt (9, 11) unterteilt, wobei der Güterwagen auf dem ersten und zweiten Streckenabschnitt (8, 9) des Ladegleises (2) und/oder dem ersten und zweiten Streckenabschnitt (10, 11) des Kommissioniergleises (3) durch jeweils eine eigene Förderanlage in Form einer Spillanlage (12, 13, 14) gefördert wird.Method for the continuous processing of freight wagons on tracks in which at least one freight wagon is moved in a loading station (6) on a loading track (2) in the retraction, wherein the loading track (2) - seen in the direction of entry - behind the charging station (6) via a switch (7) is connected to a picking track (3) to which the freight wagon is moved against the entry direction, wherein the switch (7) the loading track (2) and the order picking (3) each in a first stretch section (8, 10) and subdivided into a second section (9, 11), wherein the freight car on the first and second sections (8, 9) of the loading track (2) and / or the first and second sections (10, 11) of the picking track (3) by respectively a separate conveyor in the form of a spill plant (12, 13, 14) is promoted.
Description
Die Erfindung betrifft ein Verfahren zum kontinuierlichen Bearbeiten, insbesondere zum Entladen und Beladen, von Güterwagen auf Gleisen.The invention relates to a method for continuous processing, in particular for unloading and loading, of freight wagons on tracks.
Beim Transport von Waren wird verstärkt auf den Transport mit der Bahn zurückgegriffen. Dabei werden mehrere Güterwagen aneinander gekoppelt und mit einer Antriebsmaschine, wie beispielsweise einer Lokomotive, auf einem Schienennetz von einem Abfahrtsort zu einem Zielort transportiert. Um die Güterwagen mit Waren zu beladen oder diese wieder zu entladen, werden die Güterwagen einzeln oder in kleinen Gruppen in eine Ent- oder Beladezone verschoben. Hierzu ist es unter Umständen notwendig, die Güterwagen aus ihrem Zugverband auszukoppeln, um diese beispielsweise in eine räumlich geschlossene Ent- oder Beladestation, im folgenden Ladestation, einzustellen. Anschließend müssen die leeren bzw. befüllten Güterwagen entsprechend ihres Zielortes wieder zu einem Zugverband zusammengestellt werden.When transporting goods is increasingly resorting to the transport by rail. Several freight cars are coupled together and transported with a prime mover, such as a locomotive, on a rail network from a departure to a destination. To load the goods wagons with goods or unload them, the freight wagons are moved individually or in small groups in a discharge or loading zone. For this purpose, it may be necessary to decouple the freight cars from their train, in order to set them, for example, in a spatially closed unloading or loading station, in the following charging station. Subsequently, the empty or filled freight cars must be reassembled according to their destination to a train.
Da das Ab- und Ankoppeln ein zeitlich und personell intensiver Prozess ist, wurde insbesondere bei Just-in-Time- oder Just-in-Sequence-Transporten dazu übergegangen, die Güterwagen nicht mehr voneinander abzukoppeln, sondern diese nach und nach kontinuierlich in die Ladestation einzuschieben. Beispielsweise werden die ersten zwei Güterwagen eines Zugverbands in die Ladestation eingeschoben, dort ent- oder beladen und anschließend in der gleichen Fahrtrichtung aus der Ladestation auf einen sich anschließenden Streckenabschnitt wieder ausgeschoben. Dies wird sooft wiederholt, bis der Zugverband vollständig be- bzw. entladen ist. Anschließend wird der Zugverband in umgekehrter Richtung durch die Ladestation ausgefahren und zum Abfahrtsort zurücktransportiert. Dieses Verfahren hat den Nachteil, dass die Ladestation für die Zeit der Ausfahrt des Zugverbands für einen neuen Zugverband blockiert ist.Since the uncoupling and coupling is a time and personnel intensive process, especially in just-in-time or just-in-sequence transports has gone over to no longer decouple the freight cars from each other, but gradually gradually into the charging station insert. For example, the first two freight cars of a train are inserted into the charging station, there unloaded or loaded and then pushed out in the same direction from the charging station on a subsequent section again. This is repeated until the train is completely loaded or unloaded. Subsequently, the train is extended in the reverse direction through the charging station and transported back to the departure. This method has the disadvantage that the charging station is blocked for the time of departure of the train for a new train.
Der Stand der Technik ist in der
Die Aufgabe der Erfindung besteht darin, Stillstandszeiten bei einem Verfahren zum kontinuierlichen Bearbeiten von Güterwagen auf Gleisen zu reduzieren.The object of the invention is to reduce downtime in a method for continuously processing freight cars on tracks.
Die Aufgabe wird erfindungsgemäß mit den Merkmalen des Patentanspruchs 1 gelöst.The object is achieved with the features of claim 1.
Vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus den Merkmalen der Unteransprüche.Advantageous embodiments of the invention will become apparent from the features of the subclaims.
Der Kern der Erfindung besteht darin, zusätzlich zu einem Ladegleis in der Ladestation ein Kommissioniergleis mit jeweils einer eigenen Förderanlage, beispielsweise einer Spillanlage, zu versehen. Das Ladegleis und das Kommissioniergleis sind über eine Weiche miteinander verbunden, wobei das Ladegleis und das Kommissioniergleis durch die Weiche in jeweils einen ersten Streckenabschnitt links und in einen zweiten Streckenabschnitt rechts der Weiche unterteilt ist. Die Förderanlage dient dazu, die Güterwagen ohne Lokomotive auf den Gleisen zu fördern. Sobald der Zugverband auf dem Ladegleis angekommen ist, kann die Lokomotive abgekoppelt werden. Die Förderanlage des Ladegleises wird an einen der Güterwagen angeschlossen und fördert den oder die ersten Güterwagen in die Ladestation. Dort wird der Güterwagen ent- oder beladen. Anschließend wird dieser aus der Ladestation in der gleichen Richtung ausgefördert und zwar entweder auf den zweiten Streckenabschnitt des Ladegleises hinter der Weiche oder auf den zweiten Streckenabschnitt des Kommissioniergleises hinter der Weiche. Von dort kann der Güterwagen auf den Streckenabschnitt des Kommissioniergleises vor der Weiche verschoben werden. Hierzu wird die Förderanlage des ersten Streckenabschnitts des Kommissioniergleises verwendet. Jede der Förderanlagen kann in beide Richtungen fördern. Dieses Verfahren hat den Vorteil, dass die Güterwagen vereinzelt werden können und durch das Abstellen auf den zweiten Streckenabschnitten beliebig zu einem neuen Zugverband zusammengestellt werden können. Ein Auslagern der bearbeiteten Gleiswagen ist auch dann noch möglich, wenn sich Güterwagen eines neuen Zugverbands zum Bearbeiten in der Ladestation befindet.The essence of the invention is, in addition to a loading track in the loading station a picking track, each with its own conveyor system, such as a spill system to provide. The loading track and the picking track are connected to each other via a switch, wherein the loading track and the picking track is divided by the switch in each case a first section on the left and in a second section on the right of the switch. The conveyor system is used to promote the freight cars without locomotive on the tracks. Once the train has arrived on the loading track, the locomotive can be disconnected. The conveyor of the loading track is connected to one of the freight cars and promotes the first or the first freight cars in the charging station. There, the freight car is unloaded or loaded. Subsequently, this is discharged from the loading station in the same direction and either on the second stretch of the loading track behind the switch or on the second stretch of the picking track behind the switch. From there, the freight car can be moved to the section of the picking track before the switch. For this purpose, the conveyor system of the first section of the picking track is used. Each of the conveyors can convey in both directions. This method has the advantage that the freight cars can be singled and can be put together as desired to a new train by parking on the second sections. It is also possible to outsource the processed track wagons if freight wagons of a new train association are located in the loading station for processing.
Vorzugsweise verfügt der zweite Streckabschnitt des Kommissioniergleises, der sich – in Einfahrtrichtung gesehen – hinter der Weiche befindet, über eine diesem Streckenabschnitt zugeordneten Förderanlage. Damit kann der Güterwagen vom ersten Streckenabschnitt des Ladegleises über die Weiche direkt auf den zweiten Streckenabschnitt des Kommissioniergleises gefördert werden.Preferably, the second stretch section of the picking track, which is located behind the switch, as viewed in the entry direction, has a conveyor system assigned to this section. Thus, the freight car from the first section of the loading track on the switch directly to the second section of the picking track be promoted.
Zusätzlich und beispielsweise zur Instandsetzung von defekten Güterwagen kann das Kommissioniergleis mit einem Puffergleis verbunden werden, auf dem der Güterwagen zwischengepuffert wird. Hier kann an einer Instandsetzungsplattform der Güterwagen zumindest soweit repariert werden, dass er wieder in das Schienennetz eingestellt werden darf.In addition, and for example for the repair of defective freight wagons, the order picking track can be connected to a buffer track on which the freight wagon is buffered. Here, at a repair platform, the freight wagons can be repaired, at least to the extent that they can be re-adjusted to the rail network.
Weitere vorteilhafte Ausgestaltungen der Erfindung werden im Folgenden anhand der Zeichnung näher erläutert. Dabei zeigt die einzige Figur eine schematische Darstellung einer Anlage, mit der das erfindungsgemäße Verfahren durchgeführt werden kann.Further advantageous embodiments of the invention will be explained in more detail below with reference to the drawing. The single figure shows a schematic representation of a plant with which the inventive method can be performed.
Die Anlage umfasst ein Gleis
Das Ladegleis
Hinter der Ladestation
Das Ladegleis
Im ersten Streckenabschnitt
Das Verladegleis
Das gleiche trifft auf das Puffergleis
Mit der beschriebenen Anordnung lässt sich das Verfahren beispielsweise zum Entladen eines Zugverbandes folgendermaßen durchführen: Ein Zugverband wird gemäß Pfeilrichtung A in Einfahrrichtung von der Antriebsmaschine (Lokomotive) aus dem offiziellen Schienennetz über das Gleis
Der nunmehr ohne Lokomotive auf dem Ladegleis
Durch separate Spillanlagen der einzelnen Streckenabschnitte
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008022558.4A DE102008022558B4 (en) | 2008-04-30 | 2008-04-30 | Method for the continuous processing of freight cars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008022558.4A DE102008022558B4 (en) | 2008-04-30 | 2008-04-30 | Method for the continuous processing of freight cars |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102008022558A1 DE102008022558A1 (en) | 2009-11-05 |
DE102008022558B4 true DE102008022558B4 (en) | 2017-03-09 |
Family
ID=41131043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102008022558.4A Expired - Fee Related DE102008022558B4 (en) | 2008-04-30 | 2008-04-30 | Method for the continuous processing of freight cars |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102008022558B4 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108340940B (en) * | 2018-03-20 | 2023-07-25 | 攀钢集团矿业有限公司 | Rail vehicle traction equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1835059A (en) * | 1929-11-13 | 1931-12-08 | Link Belt Co | Cable car haul |
US2910578A (en) * | 1955-12-23 | 1959-10-27 | Westinghouse Air Brake Co | Automatic control of railway classification yard switches |
-
2008
- 2008-04-30 DE DE102008022558.4A patent/DE102008022558B4/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1835059A (en) * | 1929-11-13 | 1931-12-08 | Link Belt Co | Cable car haul |
US2910578A (en) * | 1955-12-23 | 1959-10-27 | Westinghouse Air Brake Co | Automatic control of railway classification yard switches |
Also Published As
Publication number | Publication date |
---|---|
DE102008022558A1 (en) | 2009-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1651546B1 (en) | System and method for commissioning goods into order containers | |
DE4244351C2 (en) | Automatic transport system | |
AT516404B1 (en) | Shelf warehouse with a roundabout on a closed guideway | |
DE102009058125B4 (en) | Transport device for distribution of various general cargo and method for operating a transport device | |
DE102014102092A1 (en) | Method and station for picking articles according to the goods-to-man principle | |
DE19905967B4 (en) | System for order picking, in particular for order picking of food in rectangular package containers | |
WO2014127972A1 (en) | Device and method for transporting objects | |
DE102016002760A1 (en) | High-bay warehouse with connected picking stations and / or in training as a flow shelf | |
WO2016113002A1 (en) | Sorting device and method for sorting bulk material | |
WO2015036598A1 (en) | Conveying and storage device and device for loading loading surfaces | |
EP3394689A1 (en) | Method for sorting conveyed objects on a conveyor system using time control | |
EP2928795A1 (en) | Sorting device and method for sorting objects in a conveying system | |
DE102015005643B4 (en) | Method and device for providing different body component variants | |
DE10312927A1 (en) | Separating device and separating method | |
DE102008022558B4 (en) | Method for the continuous processing of freight cars | |
DE3902712C2 (en) | Method and device for assembling groups of clothing | |
DE102012011534A1 (en) | Distribution system for workpieces or tools for large-volume production in manufacturing plant, comprises two transfer stations flexibly arranged with line portals, and distribution tracks with carrier adapted to approach transfer stations | |
EP2113450B1 (en) | Production line for motor vehicles | |
EP2113452B1 (en) | Production line for production of motor vehicles | |
DE1208692B (en) | Storage device for pneumatic tube boxes, in particular large pneumatic tube containers | |
DE102018108150B4 (en) | Process for handling small load carriers in production processes and modular system for handling small load carriers in production processes | |
EP2113451B1 (en) | Method and device for producing motor vehicles | |
DE102020213540A1 (en) | Manufacturing plant for series production of motor vehicles and method for manufacturing a motor vehicle | |
EP1275600A1 (en) | Apparatus for feeding articles to a processing unit, particulary to a printing machine | |
DE2148355A1 (en) | CONVEYOR SYSTEM, IN PARTICULAR RAIL CONVEYOR SYSTEM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8127 | New person/name/address of the applicant |
Owner name: DR. ING. H.C. F. PORSCHE AKTIENGESELLSCHAFT, 7, DE |
|
R012 | Request for examination validly filed | ||
R012 | Request for examination validly filed |
Effective date: 20150113 |
|
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |