DE10106496A1 - Guide device for a pipe laid in a concrete ceiling - Google Patents
Guide device for a pipe laid in a concrete ceilingInfo
- Publication number
- DE10106496A1 DE10106496A1 DE10106496A DE10106496A DE10106496A1 DE 10106496 A1 DE10106496 A1 DE 10106496A1 DE 10106496 A DE10106496 A DE 10106496A DE 10106496 A DE10106496 A DE 10106496A DE 10106496 A1 DE10106496 A1 DE 10106496A1
- Authority
- DE
- Germany
- Prior art keywords
- pipe
- housing
- guide device
- concrete ceiling
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009415 formwork Methods 0.000 description 8
- 230000002787 reinforcement Effects 0.000 description 4
- 238000009416 shuttering Methods 0.000 description 4
- 230000004913 activation Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 102000020897 Formins Human genes 0.000 description 1
- 108091022623 Formins Proteins 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D3/00—Hot-water central heating systems
- F24D3/10—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system
- F24D3/1058—Feed-line arrangements, e.g. providing for heat-accumulator tanks, expansion tanks ; Hydraulic components of a central heating system disposition of pipes and pipe connections
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Thermal Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
- Road Signs Or Road Markings (AREA)
- Magnetic Resonance Imaging Apparatus (AREA)
- Fishing Rods (AREA)
- Insulators (AREA)
Abstract
Description
Die Erfindung betrifft eine Führungsvorrichtung für ein in einer Betondecke verlegtes Rohr und insbesondere für das Ende mindestens eines in einer eine Ober- und eine Unterseite aufweisenden Betondecke verlegten Rohres.The invention relates to a guide device for a in a concrete ceiling laid pipe and especially for the end of at least one in one The top and bottom of the concrete ceiling laid pipe.
Bei der Herstellung von Betondecken mit Betonkernaktivierung wird in einer parallel zur Ober- und zur Unterseite verlaufenden etwa mittleren Ebene der Betondecke ein Rohr angeordnet, das innerhalb der Bewehrungskonstruktion der Betondecke gehalten ist. Die Rohrenden müssen aus dem von der Ver schalung gebildeten Verschalungsraum herausgeführt werden. Da man in zu nehmendem Maße dazu übergeht, bei der späteren Installation und dem spä teren Anschluss des Rohrleitungssystems für die Betonkernaktivierung die notwendigen Verteiler von unten an der Unterseite der Betondecke anzuord nen, müssten also die Rohrenden nach unten durch die Verschalungswand herausgeführt werden. Damit müsste man die Verschalungswand zerstören bzw. Durchführungen in der unteren Verschalungswand vorsehen, was zu Dichtigkeitsproblemen führt.In the production of concrete ceilings with concrete core activation in one parallel to the top and bottom approximately middle level of the Concrete ceiling placed a pipe inside the reinforcement structure the concrete ceiling is held. The pipe ends must be from the ver Formwork formed formwork are led out. Since you are in too increasingly passes to the later installation and the late connection of the piping system for the concrete core activation the necessary distributor from below to the bottom of the concrete ceiling the pipe ends would have to go down through the casing wall be brought out. This would have to destroy the formwork wall or feedthroughs in the lower formwork wall, what to Leakage problems leads.
Zur Vermeidung dieses Problems ist es aus der EP-A-0 962 710 bekannt, die Rohrenden in einem Rohrhalter anzuordnen, der ein nach unten offenes Ge häuse aufweist, das auf der unteren Verschalungswand befestigt wird. Über schräg zur Bewehrungskonstruktion hin gerichtete Öffnungen werden die Rohrenden in den Rohrhalter eingeführt. Nach dem Vergießen der Betondecke und der Entfernung der unteren Verschalungswand befindet sich damit ein von der Unterseite der Betondecke aus zugänglicher Raum, in dem die Rohrenden liegen. Diese Rohrenden können nun manuell erfasst und an einen unterhalb der Betondecke angeordneten Verteiler angeschlossen werden. Ein gewisser Nachteil des bekannten Rohrhalters ist darin zu sehen, dass die Länge an im Rohrhalter untergebrachten Rohrendabschnitt konstruktiv begrenzt ist und insbesondere für die Anordnung des Verteilers im Eckenbereich zwischen der Unterseite einer Betondecke und der Wand nur eine geringe Rohrlänge zur Verfügung steht. Darüber hinaus sind die Rohrenden bei fertig gegossener Betondecke nur nach der Entfernung der unteren Verschalungswand zugäng lich, um beispielsweise die in der Betondecke verlegte Rohrleitung einer Dich tigkeitsprüfung zu unterziehen (sogenanntes Abdrücken).To avoid this problem it is known from EP-A-0 962 710 which Arrange pipe ends in a pipe holder, which has a downwardly open Ge has housing that is attached to the lower formwork wall. about The openings directed diagonally towards the reinforcement construction Pipe ends inserted into the pipe holder. After pouring the concrete ceiling and the distance from the lower formwork wall is therefore one of the bottom of the concrete ceiling from accessible space in which the pipe ends lie. These pipe ends can now be recorded manually and at one below distributors arranged on the concrete ceiling. Someone specific Disadvantage of the known pipe holder is the fact that the length in Pipe holder housed pipe end section is structurally limited and especially for the arrangement of the distributor in the corner area between the Bottom of a concrete ceiling and the wall only a small pipe length Available. In addition, the pipe ends are ready cast Concrete ceiling can only be accessed after removing the lower formwork wall Lich, for example, the pipeline laid in the concrete ceiling to undergo an activity test (so-called triggering).
Der Erfindung liegt die Aufgabe zu Grunde, eine Führungsvorrichtung für min destens ein in einer Betondecke verlegtes Rohr zu schaffen, die bei möglichst kleinen Abmessungen die Aufnahme eines möglichst langen Rohrendabschnitts ermöglicht.The invention is based on the object, a guide device for min to create a pipe laid in a concrete ceiling, which if possible small dimensions, the inclusion of the longest possible pipe end section allows.
Zur Lösung dieser Aufgabe wird mit der Erfindung eine Führungsvorrichtung
für das Ende mindestens eines in einer eine Ober- und einer Unterseite auf
weisenden Betondecke verlegten Rohres vorgeschlagen, wobei die Führungs
vorrichtung versehen ist mit
To solve this problem, the invention proposes a guide device for the end of at least one pipe laid in a top and a bottom facing concrete ceiling, the guide device being provided with
- - einem Gehäuse, das eine Oberseitenwand, eine an diese angrenzende Seitenwand und eine zumindest teilweise offene Unterseite aufweist,- A housing that a top wall, an adjacent to this Has a side wall and an at least partially open underside,
- - wobei das Gehäuse mit seiner Unterseite im wesentlichen in Höhe der Unterseite der Betondecke liegend positionierbar ist,- The housing with its underside essentially at the level of The bottom of the concrete ceiling can be positioned horizontally,
- - einer Durchbrechung in der Seitenwand des Gehäuses zum Hineinführen des Endes des mindestens einen in der Betondecke verlegten Rohres in das Gehäuse und- An opening in the side wall of the housing for insertion the end of the at least one pipe laid in the concrete ceiling in the housing and
- - mindestens einem von der Oberseitenwand des Gehäuses abstehenden Rohrdurchführungsvorsprung zur Aufnahme und Durchführung des Roh res in Richtung auf die Oberseite der Betondecke.- At least one protruding from the top wall of the housing Pipe lead-through for receiving and carrying the raw res towards the top of the concrete ceiling.
Bei der erfindungsgemäßen Führungsvorrichtung ragt von der Oberseite des Gehäuses, die der zumindest teilweise offenen Unterseite des Gehäuses ge genüberliegt, ein Rohrdurchführungsvorsprung ab, der nach Art eines Rohr führungsbogens ausgebildet ist. Dieser Rohrdurchführungsvorsprung ist zur Oberseite der Betondecke, also von der Unterseite des Gehäuses weggerichtet. Das durch diesen Rohrdurchführungsvorsprung hindurchgeführte Rohr er streckt sich also in Richtung auf die Oberseite der Betondecke. Die Höhe des hohlen Rohrdurchführungsvorsprungs ist entweder an die Dicke der Beton decke angepasst, so dass der Rohrdurchführungsvorsprung über die Oberseite der Betondecke übersteht, oder aber an das dem Gehäuse abgewandte Ende des Rohrdurchführungsvorsprungs lässt sich ein Leerrohr (beispielsweise Wellrohr) anfügen. Damit ist es möglich, die Rohrdurchführung von der Unter seite der Betondecke zur Oberseite der Betondecke zu verlängern, so dass der eigentliche Rohrdurchführungsvorsprung eine geringere Höhe als die Dicke der Betondecke aufweisen kann. Das Rohrende erstreckt sich durch eine Durch brechung, die zweckmäßigerweise gegenüber dem Rohr abdichtet, in das Ge häuse hinein.In the guide device according to the invention protrudes from the top of the Housing, the ge at least partially open bottom of the housing opposite, a pipe lead-through projection, which is in the manner of a pipe guide arch is formed. This pipe lead-through projection is for Top of the concrete ceiling, i.e. facing away from the bottom of the housing. The pipe passed through this pipe lead-through projection so stretches towards the top of the concrete ceiling. The amount of Hollow pipe lead-through is either to the thickness of the concrete ceiling adjusted so that the pipe penetration protrusion over the top protrudes from the concrete ceiling, or at the end facing away from the housing an empty pipe (for example Corrugated tube). This makes it possible to remove the pipe duct from the bottom extend the side of the concrete ceiling to the top of the concrete ceiling so that the actual pipe lead-through projection a smaller height than the thickness of the Can have concrete ceiling. The pipe end extends through a through refraction, which expediently seals against the pipe, into the Ge into the house.
Durch die Herausführung des mindestens einen Rohrendes aus der Oberseite der Betondecke oder, bei entsprechend angepasster Ausrichtung der Rohr durchführungsvorsprünge zu einer Schmalseite (Stoßfläche) der Betondecke ist es möglich, bei der Verlegung des Rohres in der Bewehrungskonstruktion der Betondecke einen ausreichend langen Rohrendabschnitt vorzusehen, so dass für den späteren Anschluss dieses Rohrendabschnitts an einem an der Unterseite der Betondecke angeordneten Verteiler o. dgl. ausreichend Rohr länge zur Verfügung steht. Dies gilt insbesondere dann, wenn sich der Vertei ler im Eckenbereich zwischen der Unterseite der Betondecke und der Vertikal gebäudewand befindet. Ferner wird diese Länge an Rohrendabschnitt bei klei nen Längen- bzw. Breitenabmessungen der erfindungsgemäßen Führungsvor richtung erzielt. Das Rohrende lässt sich nach Aushärtung der Betondecke und Entfernung der Verschalung zerstörungsfrei aus der Unterseite des Gehäuses herausziehen.By leading the at least one pipe end out of the top the concrete ceiling or, if the pipe is adjusted accordingly, the pipe lead-through projections to a narrow side (butt surface) of the concrete ceiling it is possible when laying the pipe in the reinforcement structure to provide the concrete ceiling with a sufficiently long pipe end section, so that for the later connection of this pipe end section to one on the Sufficient pipe arranged on the underside of the concrete ceiling or the like length is available. This is especially true if the distribution in the corner area between the underside of the concrete ceiling and the vertical building wall is located. Furthermore, this length at the pipe end section is too small NEN length or width dimensions of the guide according to the invention direction achieved. The pipe end can be removed after the concrete ceiling and Removal of the casing from the underside of the housing without destruction pull out.
Zur Verbesserung des Ergreifens des durch den Rohrdurchführungsvorsprung hindurchgeführten Rohrendes von der Unterseite der Betondecke (nach Ent fernung der Verschalung) mit der Hand ist es zweckmäßig, wenn sich zumindest an einer der beiden Seiten des durch das Gehäuse verlaufenden Rohren des insbesondere im Bereich des Rohrdurchführungsvorsprungs zur Seiten wand des Gehäuses hin ein Zwischenraum befindet. Zweckmäßigerweise wird dieser Zwischenraum durch eine entsprechende Vorwölbung der Seitenwand des Gehäuses gebildet.To improve the grip of the through the pipe lead-through projection pipe end passed through from the bottom of the concrete ceiling (after Ent removal of the formwork) by hand, it is useful if at least on one of the two sides of the pipe running through the housing especially in the area of the pipe lead-through projection Wall of the housing is a gap. Expediently this space through a corresponding bulging of the side wall of the housing formed.
Das Gehäuse der erfindungsgemäßen Führungsvorrichtung ist zweckmäßiger weise länglich und weist an seinem einen Ende die Durchbrechung auf, wäh rend an dem gegenüberliegenden Ende von der Oberseitenwand der Rohr durchführungsvorsprung absteht.The housing of the guide device according to the invention is more appropriate wise elongated and has the opening at one end, weh rend at the opposite end from the top wall of the tube implementation lead stands out.
Aus Stabilitätsgründen und zur besseren Rohrführung ist es von Vorteil, wenn die Durchbrechung in der Seitenwand zur Unterseite des Gehäuses hin durch ein vorzugsweise gegenüber dem Rohr abdichtendes Rohrführungselement abgeschlossen ist. Dieses Rohrführungselement ist insbesondere lösbar an dem Gehäuse anbringbar. Das Rohrführungselement unterstützt das Rohr in dessen sich durch die Durchbrechung erstreckenden Bereich und leitet es an gewinkelt nach oben aus dem Gehäuse heraus. Dadurch kommt es zu einem sanften Übergang zwischen dem Gehäuse und der Rohrverlegungsebene innerhalb der Betondecke.For reasons of stability and for better pipe routing, it is advantageous if the opening in the side wall through to the bottom of the housing a pipe guide element, preferably sealing against the pipe is completed. This pipe guiding element is in particular detachable attachable to the housing. The pipe guide element supports the pipe in whose area extends through the opening and guides it angled up out of the housing. This leads to one smooth transition between the housing and the pipe installation level inside the concrete ceiling.
Zweckmäßigerweise ist die erfindungsgemäße Rohrführungsvorrichtung zur Aufnahme und Führung beider Rohrenden des in der Betondecke verlegten Rohres ausgebildet. Demzufolge erstrecken sich also durch die Durchbrechung in der Seitenwand des Gehäuses beide Rohrenden, die sich dann weiter durch das Gehäuse hindurch bis in einen gemeinsamen Rohrdurchführungsvorsprung oder bis in zwei voneinander getrennte Rohrdurchführungsvorsprünge er strecken. Es reicht aus, wenn bei der Verlegung zweier Rohrenden durch die Rohrführungsvorrichtung neben einem der beiden Rohre ein Zwischenraum zur erleichterten Erfassung der Rohrenden und zum Herausziehen dieser Rohren den aus den Durchführungsvorsprüngen ausgebildet ist. The pipe guiding device according to the invention is expediently for Picking up and guiding both pipe ends of the one laid in the concrete ceiling Tube trained. Accordingly, they extend through the opening in the side wall of the housing both pipe ends, which then continue through through the housing into a common pipe lead-through projection or he in two separate pipe lead-through projections stretch. It is sufficient if when laying two pipe ends through the Pipe guiding device next to one of the two pipes an intermediate space easier detection of the pipe ends and for pulling out these pipes which is formed from the lead-through projections.
Nachfolgend wird anhand der Figuren ein Ausführungsbeispiel der Erfindung näher erläutert. Im einzelnen zeigen:An exemplary embodiment of the invention is described below with reference to the figures explained in more detail. In detail show:
Fig. 1 eine perspektivische Ansicht des Gehäuses der Führungsvorrichtung, Fig. 1 is a perspective view of the housing of the guide device,
Fig. 2 eine Teilschnittansicht durch eine gegossene Betondecke mit unterer Verschalungswand und auf dieser angeordneter Führungsvorrichtung mit von dieser aufgenommenen Rohrenden, Fig. 2 is a partial sectional view of a cast concrete slab with lower shuttering wall and on this guide device arranged with recorded from this tube ends,
Fig. 3 eine Schnittansicht entlang der Linie III-III der Fig. 2 zur Veran schaulichung der Unterseite der Führungsvorrichtung und Fig. 3 is a sectional view taken along the line III-III of Fig. 2 to Veran the underside of the guide device and
Fig. 4 einen Schnitt durch den Bereich einer Betondecke ohne Verscha lungswand, in dem die Führungsvorrichtung angeordnet ist, wobei die von ihr aufgenommenen Rohre nach unten herausgeführt sind. Fig. 4 shows a section through the area of a concrete ceiling without shuttering wall, in which the guide device is arranged, the pipes received by it being led out downwards.
Fig. 1 zeigt ein Ausführungsbeispiel der Führungsvorrichtung für die beiden Rohrenden eines der Betonkernaktivierung dienenden und in einer Betondecke verlaufenden Rohres. Die Führungsvorrichtung 10 weist ein Gehäuse 12 mit einer Oberseitenwand 14 und einer sich daran anschließenden umlaufenden Seitenwand 16,18 auf. Das Gehäuse 12 ist zu seiner Unterseite 20 hin offen. Ferner ist das Gehäuse 12 länglich und weist an seiner das eine Ende 22 bil denden Seitenwand 18 eine Durchbrechung 24 und am anderen Ende 26 zwei Rohrdurchführungsvorsprünge 28 auf, die von der Oberseitenwand 14 nach oben abstehen und hohl sind. Im Bereich eines der beiden Rohrdurchfüh rungsvorsprünge 28 ist die Seitenwand 16 ausgewölbt (bei 30 dargestellt). Fig. 1 shows an embodiment of the guide device for the two pipe ends of the concrete core serving, and extending in a concrete ceiling tube. The guide device 10 has a housing 12 with an upper side wall 14 and an adjoining peripheral side wall 16 , 18 . The housing 12 is open towards its underside 20 . Furthermore, the housing 12 is elongated and has at its one end 22 bil end wall 18 an opening 24 and at the other end 26 two pipe lead-through projections 28 which project upwards from the top wall 14 and are hollow. In the area of one of the two pipe lead-through projections 28 , the side wall 16 is curved (shown at 30).
Die Einbausituation des Gehäuses 12 innerhalb einer Betondecke ist in den Fig. 2 und 4 gezeigt. Vor dem Gießen der Betondecke 32 wird das Gehäuse 12 mit seiner offenen Unterseite auf die Verschalungswand 34 aufgelegt. Zu vor wurde die Bewehrungskonstruktion 36,38,40 erstellt und ein der Beton kernaktivierung dienendes Rohr 42 entsprechend verlegt. Die beiden Enden 44,46 des Rohres 42 werden durch die Durchbrechung 24 in der Seitenwand 18 des Gehäuses 12 in dieses hineingeführt. Dabei ist die Durchbrechung 24 zur Verschalungswand 34 hin durch ein Rohrführungselement 48 abgeschlos sen, das eine Schrägfläche zum Leiten des Rohres 42 von der Verschalungs wand 34 zur Verlegungsebene aufweist.The installation situation of the housing 12 within a concrete ceiling is shown in FIGS. 2 and 4. Before the concrete ceiling 32 is poured, the housing 12 is placed with its open underside on the casing wall 34 . Before, the reinforcement structure 36 , 38 , 40 was created and a tube 42 serving for the concrete core activation was laid accordingly. The two ends 44 , 46 of the tube 42 are inserted through the opening 24 in the side wall 18 of the housing 12 . The opening 24 to the shuttering wall 34 is closed off by a pipe guide element 48 , which has an inclined surface for guiding the tube 42 from the shuttering wall 34 to the laying plane.
Die beiden Rohrenden 44,46 erstrecken sich durch das Gehäuse 12 und durch die Rohrdurchführungsvorsprünge 28 hindurch. In diesem Ausführungsbeispiel sind die Rohrdurchführungsvorsprünge 28 in ihrer Höhe niedriger als die Dicke der Betondecke. Es wäre aber auch möglich, dass die Höhe der Rohrdurch führungsvorsprünge derart gewählt ist, dass deren Enden über die Oberseite 50 der Betondecke 32 übersteht.The two pipe ends 44 , 46 extend through the housing 12 and through the pipe lead-through projections 28 . In this embodiment, the pipe lead-through projections 28 are lower in height than the thickness of the concrete ceiling. However, it would also be possible for the height of the pipe lead-through projections to be selected in such a way that their ends protrude beyond the top side 50 of the concrete ceiling 32 .
In diesem Ausführungsbeispiel wird dieser Überstand durch Aufstecken von Leerrohren 52 in Form von Wellrohren auf die Rohrdurchführungsvorsprünge 28 erzielt. Die aus den Rohrdurchführungsvorsprüngen 28 herausgeführten Rohrenden 44,46 erstrecken sich demzufolge bis über die Oberseite 50 durch die Leerrohre 52 hindurch.In this exemplary embodiment, this projection is achieved by plugging empty pipes 52 in the form of corrugated pipes onto the pipe lead-through projections 28 . The pipe ends 44 , 46 led out of the pipe lead-through projections 28 accordingly extend through the empty pipes 52 to over the upper side 50 .
In der Situation gemäß Fig. 2 härtet nun der Beton oder Mörtel 54 der Beton decke 32 aus. Anschließend wird die Verschalung 34 entfernt, so dass sich nach dem Herausziehen der Rohrenden die Situation gemäß Fig. 4 ergibt. Bei Betrachtung des Gehäuses 12 von dessen offenen Unterseite 20 aus (siehe Fig. 3) ist der Zwischenraum 54 (Freiraum) zu erkennen, in den mit den Fin gern einer Hand gegriffen werden kann, um jeweils eines der beiden Rohre 44,46 zum Herausziehen aus den Rohrdurchführungsvorsprüngen 28 zu er greifen. Insoweit vorteilhaft ist es, wenn sich der Zwischenraum 54 nicht nur seitlich der Rohrenden 44,46, sondern auch zur Oberseitenwand 14 des Ge häuses 12 erstreckt. Dies ist in Fig. 1 und in den Fig. 2 und 4 zu erkennen.In the situation according to FIG. 2, the concrete or mortar 54 of the concrete ceiling 32 hardens. The casing 34 is then removed, so that the situation according to FIG. 4 results after the pipe ends have been pulled out. When viewing the housing 12 from its open underside 20 (see FIG. 3), the intermediate space 54 (free space) can be seen, into which one hand can be reached with the fin, in order to pull out one of the two tubes 44 , 46 from the pipe lead-through projections 28 to reach. To this extent, it is advantageous if the intermediate space 54 extends not only to the side of the tube ends 44 , 46 , but also to the upper side wall 14 of the housing 12 . This can be seen in Fig. 1 and in Figs. 2 and 4.
Claims (9)
- - einem Gehäuse (12), das eine Oberseitenwand (14), eine an diese angrenzende Seitenwand (16, 18) und eine zumindest teilweise offene Unterseite (20) aufweist,
- - wobei das Gehäuse (12) mit seiner Unterseite (20) im wesentlichen in Höhe der Unterseite (20) der Betondecke (32) liegend positionierbar ist,
- - einer Durchbrechung (24) in der Seitenwand (18) des Gehäuses (12) zum Hineinführen des Endes (44, 46) des mindestens einen in der Betondecke (32) verlegten Rohres (44, 46) in das Gehäuse (12) und
- - mindestens einem von der Oberseitenwand (14) des Gehäuses (12) abstehenden Rohrdurchführungsvorsprung (28) zur Aufnahme und Durchführung des Rohres (44, 46) in Richtung auf die Oberseite (50) der Betondecke (32).
- a housing ( 12 ) which has an upper side wall ( 14 ), an adjacent side wall ( 16 , 18 ) and an at least partially open lower side ( 20 ),
- the bottom ( 20 ) of the housing ( 12 ) can be positioned lying substantially at the bottom ( 20 ) of the concrete ceiling ( 32 ),
- - An opening ( 24 ) in the side wall ( 18 ) of the housing ( 12 ) for inserting the end ( 44 , 46 ) of the at least one pipe ( 44 , 46 ) laid in the concrete ceiling ( 32 ) into the housing ( 12 ) and
- - At least one of the top wall ( 14 ) of the housing ( 12 ) projecting pipe lead-through projection ( 28 ) for receiving and guiding the pipe ( 44 , 46 ) in the direction of the top ( 50 ) of the concrete ceiling ( 32 ).
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10106496A DE10106496C2 (en) | 2001-02-13 | 2001-02-13 | Guide device for a pipe laid in a concrete ceiling |
DE50205941T DE50205941D1 (en) | 2001-02-13 | 2002-01-15 | GUIDANCE APPARATUS FOR A PIPE INSTALLED IN A POND CONCRETE |
ES02710009T ES2256446T3 (en) | 2001-02-13 | 2002-01-15 | GUIDE DEVICE FOR A TUBE TENDED IN A CONCRETE SIGNATURE. |
DK02710009T DK1360441T3 (en) | 2001-02-13 | 2002-01-15 | Liner for a pipe laid in a concrete floor |
PCT/EP2002/000321 WO2002065021A1 (en) | 2001-02-13 | 2002-01-15 | Guiding device for a pipe which is laid in a concrete floor |
AT02710009T ATE319050T1 (en) | 2001-02-13 | 2002-01-15 | GUIDING DEVICE FOR A PIPE LAYED IN A CONCRETE CEILING |
EP02710009A EP1360441B1 (en) | 2001-02-13 | 2002-01-15 | Guiding device for a pipe which is laid in a concrete floor |
PT02710009T PT1360441E (en) | 2001-02-13 | 2002-01-15 | GUIDING DEVICE FOR A TUBE PLACED ON A BETAO CEILING |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10106496A DE10106496C2 (en) | 2001-02-13 | 2001-02-13 | Guide device for a pipe laid in a concrete ceiling |
Publications (2)
Publication Number | Publication Date |
---|---|
DE10106496A1 true DE10106496A1 (en) | 2002-08-29 |
DE10106496C2 DE10106496C2 (en) | 2003-01-23 |
Family
ID=7673782
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10106496A Expired - Fee Related DE10106496C2 (en) | 2001-02-13 | 2001-02-13 | Guide device for a pipe laid in a concrete ceiling |
DE50205941T Expired - Lifetime DE50205941D1 (en) | 2001-02-13 | 2002-01-15 | GUIDANCE APPARATUS FOR A PIPE INSTALLED IN A POND CONCRETE |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE50205941T Expired - Lifetime DE50205941D1 (en) | 2001-02-13 | 2002-01-15 | GUIDANCE APPARATUS FOR A PIPE INSTALLED IN A POND CONCRETE |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP1360441B1 (en) |
AT (1) | ATE319050T1 (en) |
DE (2) | DE10106496C2 (en) |
DK (1) | DK1360441T3 (en) |
ES (1) | ES2256446T3 (en) |
PT (1) | PT1360441E (en) |
WO (1) | WO2002065021A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202016106917U1 (en) | 2016-02-04 | 2017-02-08 | Safet Hoxha | Formwork protector with distributor |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2964172A1 (en) * | 2010-08-27 | 2012-03-02 | Eurl Snt | Elbow-shaped guide device for lifting e.g. hot water feed pipes mounted in concrete slab in sanitary or heating installation in dwelling, has bracing and fixing unit for fixing mouth-piece against wall or partition so as to maintain ducts |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8522996U1 (en) * | 1984-08-30 | 1985-09-26 | Georg Fischer AG, Schaffhausen, CH, Niederlassung: Georg Fischer AG, 7700 Singen | Device for supporting and holding flexible conduit pipes |
CH660618A5 (en) * | 1984-10-16 | 1987-05-15 | Roland Favre | Device for guiding tubes and/or pipes coming out of concrete slabs and its use |
EP0962710A1 (en) * | 1998-05-15 | 1999-12-08 | D.F. Liedelt " Velta" Produktions- Und Vertriebs-Gmbh | Pipe support device for laying sanitary, heating pipes or the like in concrete floors |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8632274U1 (en) * | 1986-12-02 | 1987-02-26 | Cronatherm GmbH, 5206 Neunkirchen-Seelscheid | Pipe guide bend with mounting plate |
DE19912930A1 (en) * | 1999-03-22 | 2000-09-28 | Simplex Wilfer Gmbh & Co | Wall mounting device for esp. heating radiators with flexible connection pipes and wall-mounted pipe bending device |
-
2001
- 2001-02-13 DE DE10106496A patent/DE10106496C2/en not_active Expired - Fee Related
-
2002
- 2002-01-15 DE DE50205941T patent/DE50205941D1/en not_active Expired - Lifetime
- 2002-01-15 PT PT02710009T patent/PT1360441E/en unknown
- 2002-01-15 AT AT02710009T patent/ATE319050T1/en active
- 2002-01-15 WO PCT/EP2002/000321 patent/WO2002065021A1/en active IP Right Grant
- 2002-01-15 ES ES02710009T patent/ES2256446T3/en not_active Expired - Lifetime
- 2002-01-15 DK DK02710009T patent/DK1360441T3/en active
- 2002-01-15 EP EP02710009A patent/EP1360441B1/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8522996U1 (en) * | 1984-08-30 | 1985-09-26 | Georg Fischer AG, Schaffhausen, CH, Niederlassung: Georg Fischer AG, 7700 Singen | Device for supporting and holding flexible conduit pipes |
CH660618A5 (en) * | 1984-10-16 | 1987-05-15 | Roland Favre | Device for guiding tubes and/or pipes coming out of concrete slabs and its use |
EP0962710A1 (en) * | 1998-05-15 | 1999-12-08 | D.F. Liedelt " Velta" Produktions- Und Vertriebs-Gmbh | Pipe support device for laying sanitary, heating pipes or the like in concrete floors |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202016106917U1 (en) | 2016-02-04 | 2017-02-08 | Safet Hoxha | Formwork protector with distributor |
DE102016109215A1 (en) | 2016-02-04 | 2017-08-10 | Safet Hoxha | Formwork protector with distributor |
DE102016109215B4 (en) * | 2016-02-04 | 2020-03-19 | Safet Hoxha | Formwork cover with distributor |
Also Published As
Publication number | Publication date |
---|---|
DK1360441T3 (en) | 2006-05-29 |
PT1360441E (en) | 2006-07-31 |
EP1360441B1 (en) | 2006-03-01 |
DE50205941D1 (en) | 2006-04-27 |
ES2256446T3 (en) | 2006-07-16 |
DE10106496C2 (en) | 2003-01-23 |
ATE319050T1 (en) | 2006-03-15 |
WO2002065021A1 (en) | 2002-08-22 |
EP1360441A1 (en) | 2003-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1559044B1 (en) | Face formwork for individual concrete wall sections with a holding device for a joint sealing plate | |
DE10106496C2 (en) | Guide device for a pipe laid in a concrete ceiling | |
DE19523069C2 (en) | Lost formwork component | |
AT503638B1 (en) | HOLLOW BODY FOR CONCRETE CONSTRUCTION INSTALLATION | |
DE20102443U1 (en) | Guide device for a pipe laid in a concrete ceiling | |
DE202014007356U1 (en) | Water drain with insert | |
DE3508706A1 (en) | Blockout body | |
EP0657015B2 (en) | Chimney base | |
EP2086078A2 (en) | Distributor box for fitting in a wall opening | |
DE19742806A1 (en) | Form element for creating a recess in a concrete component | |
DE3632703A1 (en) | Joint-shuttering element | |
EP0100560B1 (en) | Shaped member forming the playing lines of tennis courts | |
DE613080C (en) | Extendable box-shaped formwork support | |
DE3832992C2 (en) | Road or bridge drain | |
DE3312654C1 (en) | Floor gulley | |
DE3007691C2 (en) | ||
EP0071187A2 (en) | Fixing means for forming boards for the pouring of concrete floors | |
DE29618030U1 (en) | Reinforcement stirrups for facing masonry | |
DE2910340A1 (en) | Gable end roof tile angular sealing unit - has two of three shanks forming tile guide channel | |
DE855156C (en) | Dismantling device for extendable formwork beams | |
DE8705506U1 (en) | Device for insertion into a formwork for a concrete component | |
DE7233188U (en) | SPACERS FOR CONCRETE FORMWORKS | |
AT400459B (en) | Wall block | |
DE1559044C (en) | End-face formwork for individual concrete wall sections with a holding device for a joint sealing plate | |
DE19819440C1 (en) | Machine for twisting concrete rebar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20140902 |