CS202851B1 - Shaft furnace - Google Patents

Shaft furnace Download PDF

Info

Publication number
CS202851B1
CS202851B1 CS149377A CS149377A CS202851B1 CS 202851 B1 CS202851 B1 CS 202851B1 CS 149377 A CS149377 A CS 149377A CS 149377 A CS149377 A CS 149377A CS 202851 B1 CS202851 B1 CS 202851B1
Authority
CS
Czechoslovakia
Prior art keywords
working
units
space
shaft furnace
working units
Prior art date
Application number
CS149377A
Other languages
Czech (cs)
Slovak (sk)
Inventor
Cestmir Wykrent
Karel Svoboda
Original Assignee
Cestmir Wykrent
Karel Svoboda
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cestmir Wykrent, Karel Svoboda filed Critical Cestmir Wykrent
Priority to CS149377A priority Critical patent/CS202851B1/en
Publication of CS202851B1 publication Critical patent/CS202851B1/en

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Description

Vynález se týká šachtové pece k páleni zrnitých materiálů, vytvořené třemi pracovními jednotkami k vedení plynů vzájemně propojenými kanály, v nichž tepelný proces probíhá střídavě v souproudu a protiproudu v každé jednotce samostatně.BACKGROUND OF THE INVENTION The present invention relates to a shaft furnace for firing granular materials, formed by three working units for conducting gases through interconnected channels in which the thermal process takes place alternately in co-current and in counter-current in each unit separately.

Šachtové pece k pálení zrnitých materiálů, například vápna, jsou v závislosti na používanou technologii upraveny jako jedna, dvě nébo tři pracovní jednotky, u nichž tepelný proces probíhá pomocí horkých plynů, prostupujících přiváděným vápencem ke zpracování střídavě v souproudu a protiproudu. Tento výpal vápna se vyznačuje značnou tepelnou účinností a zlepšenou kvalitou vypáleného produktu. K dosažení vyšších výkonů vypáleného produktu jsou šachtové pece navrhovány se třemi pracovními jednotkami. Pracovní jednotky jsou po délce své pracovní části kruhového průřezu nebo čtyřúhelníkového průřezu a vůči sobě uspořádány tak, že jako celek tvoří pálicí jednotku ve tvaru trojúhelníku. Každá šachta takto upravené pálicí jednotky má ve své horní části vstup pro vápenec k výpalu a je opatřena vstupními a výstupními otvory k přivádění a odvádění plynu a vypáleného vápna. V oblasti pálicího pásma má každá jednotka přívodní otvory pro palivo. Průtočný průřez těchto otvorů v závislosti na podmínkách provozu je řiditelný. Pro dodávku plynů je použito dmychadlo, jehož výtlačné či nasávací potrubí je možno podle požadavku provozu přepojovat na jednotlivé otvory každé pracovní jednotky šachtové pece. Uspořádání šachtové pece se C,řemi pracovními jednotkami ve tvaru trojúhelníku je v určitých případech projekčního řešení nevýhodné z hlediska zastavovacího prostoru, nehledě k tomu, že přístup k pracovním jednotkám podle potřeby během provozu i mimo provoz je z důvodů jejich uspořádání ve tvaru trojúhelníka obtížný, pracovně náročný a z hlediska bezpečnosti nevýhodný.Depending on the technology used, shaft furnaces for firing granular materials, such as lime, are provided as one, two or three working units in which the thermal process is carried out by means of hot gases passing through the incoming limestone for treatment alternately in countercurrent and countercurrent. This lime burning is characterized by considerable heat efficiency and improved quality of the fired product. In order to achieve higher fired product performance, shaft furnaces are designed with three working units. The working units are arranged along the length of their working part of a circular cross-section or a quadrangular cross-section and arranged so as to form a triangular cutting unit as a whole. Each shaft of the firing unit thus treated has in its upper part an inlet for limestone to be fired and is provided with inlet and outlet openings for the inlet and outlet of gas and fired lime. In the region of the firing zone, each unit has fuel inlets. The flow cross-section of these holes is controllable depending on the operating conditions. A gas blower is used for the gas supply, whose discharge or suction piping can be connected to individual openings of each working unit of the shaft furnace according to the requirements of operation. The arrangement of a shaft furnace with four C-shaped working units is in some cases of design solution disadvantageous in terms of stopping space, despite the fact that access to the working units as needed during and out of operation is difficult due to their triangular configuration, labor intensive and disadvantageous in terms of safety.

Uvedené nedostatky odstraňuje šachtová pec podle vynálezu, jehož podstata spočívá v tom, že tři pracovní jednotky pece jsou uspořádány A k vedení plynů mezi sebou propojeny v sérii. Prostor prostřední pracovní jednotky je propojen s prostory krajních pracovních jednotek kanály. Kanály prostoru prostřední pracovní jednotky jsou s prostory krajních pracovních jed202851 notek upraveny v jedné přímce spojující středy prostoru těchto pracovních jednotek v rovině kanálů nebo v přímkách s touto rovinou rovnoběžných.' Prostor všech pracovních jednotek v rovině zaústěných kanálů je kruhového průřezu, přičemž v komínu prostřední jednotky je Škrticí element. ...These drawbacks are overcome by the shaft furnace according to the invention, which is characterized in that the three furnace operating units are arranged A to conduct the gases interconnected in series. The space of the middle working unit is connected to the space of the extreme working units by channels. The channels of the space of the middle working unit are arranged with the spaces of the extreme working units in a single line connecting the centers of the space of these working units in the plane of the channels or in lines parallel to this plane. The space of all working units in the plane of the inlet ducts is of circular cross-section, with a throttling element in the chimney of the central unit. ...

Řešením šachtové pece podle vynálezu se dosáhne výhodnosti uspořádání jednotlivých pracovních jednotek šachtové pece v návaznosti na zastavovací prostor pro její instalaci, konstrukční jednoduchosti řešení pracovních jednotek pece, zjednodušení jejich výroby, zpřístupnění ke každé pracovní jednotce v jakékoliv 'situaci během provozu i mimo provoz, zlepšení podmínek obsluhy a zvýšení bezpečnosti práce.The solution of the shaft furnace according to the invention achieves the advantageous arrangement of the individual working units of the shaft furnace in relation to the stopping space for its installation, constructional simplicity of the design of the furnace working units, simplification of their production, accessibility to each working unit in any situation during operation and out of operation conditions of operation and increase of work safety.

Vynález je zřejmý z přiloženého výkre.su, na němž obr. 1 znázorňuje schematické uspořádání pracovních jednotek svislé šachty v· pohledu, obr. 2 řez A-A ve spodní části pracovních jednotek svislé šachty podle obr, 1.BRIEF DESCRIPTION OF THE DRAWINGS The invention is apparent from the accompanying drawing, in which FIG. 1 shows a schematic arrangement of the working units of the vertical shaft in view, FIG. 2 shows a section A-A at the bottom of the working units of the vertical shaft of FIG.

Šachtová pec 1 pro výpal zrnitých materiálů je vytvořena třemi pracovními jednotkami 2_. Každá pracovní jednotka _2 je pro vedení plynů a vápence ve své spodní a horní části opatřena vstupními otvory 6. a výstupními otvory 7~, V horní části každé pracovní jednotky 2, je zaústěno potrubí 8, ve vstupním otvoru 6, pracovní jednotky £ násypky k přivádění vápence. Násypka z výkresu není zřejmá. Ve spodní Části každé pracovní jednotky 2 je výstupní otvor 7_ k odvádění vypáleného vápna do výsypky. Tato z výkresu také není zřejmá. V horní části každé pracovní jednotky 2 je uspořádán komín 4 k odvádění ochlazených plynů mimo jejich pracovní prostor. Pracovní jednotky 2 šachtové pece _£ jsou uspořádány a k vedení plynů mezi sebou propojeny v sérii. Pracovní prostor prostřední pracovní jednotky 2 je 8 pra-covnírai prostory krajních pracovních jednotek 2 k vedení plynů propojen kanály 3.· Kanály 3. pracovního prostoru prostřední jednotky 2. jsou s pracovními prostory krajních jednotek 2. upraveny v jedné přímce spojující středy pracovního prostoru těchto jednotek 2 v rovině kanálů 3 nebo v přímkách s touto rovinou rovnoběžných. Pracovní prostor prostřední pracovní jednotky £ Šachtové pece t. v rovině zaústěných kanálů 3. nebo v přímkách s touto rovinou rovnoběžných je kruhového průřezu, k dosažení vetší účinnosti plynů při jejich odtahování z jedné pracovní jednotky £ do druhé pracovní jednotky 2.· V komínu prostřední pracovní jednotky 2* je škrticí .element 5_. Jeho přiškrcením nebo otevřením se reguluje přivádění množství plynů v závislosti na podmínkách provozu do příslušných pracovních jednotek £ šachtové peceThe shaft furnace 1 for firing granular materials is formed by three working units 2. Each working unit 2 is provided with inlet openings 6 and outlet openings 7 for leading the gases and limestone in its lower and upper portions. At the top of each working unit 2, a duct 8 is connected in the inlet opening 6 of the working unit 6 of the hopper. supply of limestone. The hopper from the drawing is not obvious. In the lower part of each working unit 2 there is an outlet 7 for discharging the lime to be discharged. This is also not obvious from the drawing. In the upper part of each working unit 2 there is a chimney 4 for discharging the cooled gases outside their working space. The working units 2 of the shaft furnace 6 are arranged and connected to each other in series. The working space of the middle working unit 2 is connected to the gas channels by 8 workers, and the working space of the outer working units 2 to the gas conduits is interconnected by channels 3. · The working space channels 3 of the intermediate unit 2 are arranged in one line units 2 in the plane of the channels 3 or in lines parallel to this plane. The working space of the central working unit 6 of the shaft furnace, i.e. in the plane of the inlet ducts 3 or in lines parallel to this plane, is of circular cross-section, to achieve greater efficiency of gases when withdrawing them from one working unit 6 to the other working unit 2. of the working unit 2 * is a throttle element 5. By throttling or opening, the supply of gases to the respective operating units 6 of the shaft furnace is controlled depending on the operating conditions.

Vápenec, k výpalu vstupuje do horní části pracovní jednotky 2_ potrubím 8_ z násypky do vstupního otvoru 6 pracovní jednotky _2. Vzduch se přivádí například do krajní pracovní jednotky 2 šachtové pece 1 v prvním pracovním cyklu vstupním otvorem 6, a výstupním otvorem 7 a za současného přivádění paliva prochází vápenec'touto pracovní jednotkou 2. pásmem předehřívacím, pálicím a chladicím. Vypálený vápenec se pak odvádí ze spodní části této pracovní jednotky 2 výstupním otvorem J7. do výsypky a k dalšímu zpracování. Spalné plyny vzniklé ze spalovacího procesu v této pracovní jednotce 2 proudí do navazujících pracovních jednotek 2_ kanály 3'. Pracovními jednotkami 2. postupují v protiproudu směrem ke vstupním otvorům 6 s vápencem, ochlazují se a komínem 4 se odvádí do ovzduší. V další fázi procesu se palivo spaluje v druhé pracovní jednotce 2,, přičemž postup plynů je stejný, jak bylo popsáno. Během pálicího procesu se neustále střídají pracovní jednotky 2jv fti-chž se palivo spaluje, přičemž teplo se v příslušné pracovní jednotce předává materiálu v souproud.u, ve zbývajících dvou pracovních .jednotkách 2_ v protiproudu.The limestone to be fired enters the upper part of the working unit 2 via a pipe 8 from the hopper into the inlet opening 6 of the working unit 2. Air is supplied, for example, to the outer working unit 2 of the shaft furnace 1 in the first working cycle through the inlet 6 and the outlet 7 and, while supplying fuel, passing through the limestone working unit 2 through the preheating, burning and cooling zones. The calcined limestone is then discharged from the bottom of the working unit 2 through the outlet opening 17. into the hopper and for further processing. The combustion gases resulting from the combustion process in this working unit 2 flow into the downstream working units 2 via channels 3 '. The working units 2 proceed in a countercurrent direction towards the inlet openings 6 with limestone, they are cooled and discharged through the chimney 4 into the atmosphere. In the next stage of the process, the fuel is combusted in the second working unit 2, the gas flow being the same as described. During the firing process, the working units 2j alternate continuously in which the fuel is combusted, the heat being transferred in the respective working unit in co-current, in the remaining two working units 2 in countercurrent.

Uspořádáním pracovních jednotek šachtové pece v sérii se dosáhne konstrukční jednoduchostí řešení těchto pracovních jednotek a výhodnosti řešení zejména z pevnostního hlediska v kritických místech propojení příslušných pracovních jednotek k vedení plynů kanály. Vlastní uspořádání pracovních jednotek představuje také zjednodušeni výroby a jejich montáže. Řešeni podle vynálezu znamená rovněž zvýhodnění z hlediska požadavků na zastavovací prostor potřebný k instalaci pracovních jednotek a také jednodušší zpřístupnění ke každé pracovní jednotce v jakékoliv situací během provozu i mimo provoz. Jednodušší přístup ke každé pracovní jednotce znamená pro obsluhu zlepšení pracovních podmínek a také zvýšení bezpečnosti práce.By arranging the working units of the shaft furnace in series, the constructional simplicity of the design of these working units and the advantageousness of the solution in particular at the critical points of connection of the respective working units to the gas conduits through the ducts are achieved. The actual arrangement of the work units also simplifies production and their assembly. The solution according to the invention also means an advantage in terms of the requirements of the stopping space required for the installation of the working units and also easier access to each working unit in any situation during and out of operation. Easier access to each work unit means improved working conditions for the operator as well as increased occupational safety.

Claims (3)

PŘEDMĚT VYNALEZUOBJECT OF THE INVENTION 1. Šachtová pec pro výpal zrnitých materiálů, například vápna, vytvořená třemi pracovními jednotkami pro vedení plynů'vzáj emně propojenými vstupními a výstupními otvory, v nichž vápenec přiváděný do pracovního prostoru každé pracovní jednotky prochází střídavě pásmem předehřívacím, pálicím a chladicím, vyznačující še tím, že pracovní jednotky /2/ pece /1/ jsou uspořádány a k vedení plynů mezi sebou propojeny v sérii, přičemž prostor prostřední pracovní jednotky /2/ je propojen s prostory krajních pracovních jednotek /2/ a kanály /3/.A shaft furnace for firing granular materials, such as lime, formed by three gas handling units, interconnected by inlet and outlet openings, in which the limestone supplied to the working space of each processing unit passes alternately through a preheating, burning and cooling zone, characterized in that The furnace units are arranged and connected to each other in series, the space of the central unit being connected to the spaces of the extreme units and the channels. 2. Šachtová pec podle bodu 1 vyznačující se tím, že kanály /3/ prostoru pro“střední pracovní jednotky /2/ jsou s prostory krajních pracovních jednotek /2/ upraveny v jedné přímce spojující středy prostoru těchto pracovních jednotek /2/ v rovině kanálů /3/ nebo v přímkách s touto rovinou rovnoběžných.A shaft furnace according to claim 1, characterized in that the channels (3) of the space for the intermediate working units (2) are arranged with the spaces of the extreme working units (2) in a single line connecting the centers of the space of these working units (2). (3) or in lines parallel to this plane. 3. Šachtová pec podle bodů 1 a 2, vyznačující se tím, že prostor všech pracovních jednotek /2/ v rovině zaústěných kanálů /3/ je kruhového průřezu, přičemž v komínu /4/ prostřední pracovní jednotky /2/ je škrticí element /5/.Shaft furnace according to Claims 1 and 2, characterized in that the space of all working units (2) in the plane of the inlet ducts (3) is of circular cross-section, with a throttling element (5) in the chimney (4). /.
CS149377A 1977-03-07 1977-03-07 Shaft furnace CS202851B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CS149377A CS202851B1 (en) 1977-03-07 1977-03-07 Shaft furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CS149377A CS202851B1 (en) 1977-03-07 1977-03-07 Shaft furnace

Publications (1)

Publication Number Publication Date
CS202851B1 true CS202851B1 (en) 1981-02-27

Family

ID=5349474

Family Applications (1)

Application Number Title Priority Date Filing Date
CS149377A CS202851B1 (en) 1977-03-07 1977-03-07 Shaft furnace

Country Status (1)

Country Link
CS (1) CS202851B1 (en)

Similar Documents

Publication Publication Date Title
US3864075A (en) Apparatus for burning granular or pulverous material
KR930006372A (en) Auxiliary Oxygen Burner for Glass Melting Cross Heating Regenerative Furnace
JPS589355B2 (en) A particulate material heat treatment device that has multiple combustion devices attached to a heat exchange device.
US3914098A (en) Suspension-type preheating system for powdery raw materials
US3836323A (en) Pre-heating apparatus in rotary kiln plant
FI58688C (en) ROTERUGNSANLAEGGNING FOER KALCINERING OCH SINTRING AV MINERALISKA MATERIAL SAERSKILT RAOMATERIAL FOER CEMENT
CS202851B1 (en) Shaft furnace
US3761567A (en) Vertical kiln system and process
US3544096A (en) Cross-current blast furnace
SU554824A3 (en) Installation for calcining powdered material
US4270900A (en) Suspension preheater
CS247070B2 (en) Production method of cement and apparatus to perform this method
HU176302B (en) Method and apparatus for buring cement clinker
US3392969A (en) Installation and method for firing materials such as limestone
US2495386A (en) Combustion unit
US3061292A (en) Blast heating system for blast furnaces and method of operating the same
CS201688B1 (en) Apparatus for preheating and partial calcination of bulk and lump materials
SU785625A1 (en) Rotary drying furnace
SU773410A1 (en) Tunnel furnace
DE963584C (en) Shaft furnace for burning limestone, dolomite or magnesite, which is connected to a gas generator
GB1194036A (en) Improvements relating to furnaces including and elongated furnace chamber with conveyer means for conveying work to be heated along a feed path within the furnace chamber
NO128083B (en)
SU798460A1 (en) Furnace for heat treating of granular materials
US660661A (en) Boiler-furnace.
JPS6158750B2 (en)