CN87103428A - 一种回填长壁开采工作面的方法和回填长壁开采工作面的隔墙 - Google Patents
一种回填长壁开采工作面的方法和回填长壁开采工作面的隔墙 Download PDFInfo
- Publication number
- CN87103428A CN87103428A CN87103428A CN87103428A CN87103428A CN 87103428 A CN87103428 A CN 87103428A CN 87103428 A CN87103428 A CN 87103428A CN 87103428 A CN87103428 A CN 87103428A CN 87103428 A CN87103428 A CN 87103428A
- Authority
- CN
- China
- Prior art keywords
- backfill
- partition wall
- supporting
- work plane
- filter cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/02—Supporting means, e.g. shuttering, for filling-up materials
- E21F15/04—Stowing mats; Goaf wire netting; Partition walls
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0481—Supports specially adapted for use in combination with the placing of filling-up materials
Abstract
本发明是用液压支柱回填长壁开采工作面的一种方法,以及回填开采工作面的隔墙。本发明所述方法的实质是一过滤布5与回填隔墙工作面的过滤板一起构成,另一方面,在所有组支承移走后,所有的布相互连接起来,形成均匀的隔板,以免于水砂填料渗入到长壁工作面中。按本发明所述的隔墙具有方网的形式的支承结构1,和装在每组支承上的过滤布5的罐子4,在这些罐4的上方,有护罩8和导向滚子7。
Description
本发明的主题是一种用支承的液压支柱或其它形式的回填长壁开采工作面的方法,和使用这一方法的回填隔墙。
当使用井下长壁系统开采厚煤层以及煤层存在于地面保护目标之下时,通常用水砂充填深矿的工作面。根据长壁开采工作面使用的支承结构的不同,回填工作面的方法也不相同。
尽管如此,所有这些方法的共同之处是从长壁开采的工作面中,用称作回填隔墙的隔板分隔出回填空间,并且用水砂回填料(水和砂的混合物)回填这些分隔出的空间。
据波兰专利说明书75372号公开的方法,厚煤层的开采是应用在低层的人造炕道顶从顶层向低层逐层进行的。所以,在采掘未开采的煤时,横杆布置在长壁开采工作面的底部,以致相对于长壁前端的角度变化范围从30°到60°。具有平行于巷道壁前端的条板的网布置在这些横杆上,然后将支撑撤走,或者在长壁前端前移时,用水砂填料回填已采空的空间。
另一方面,波兰专利说明书64632号公开了同时开采厚煤层的两层煤的一种方法。后一种方法用具有纵向部件加强的柔性隔板将两个长壁开采回填隔墙的工作面之间相互连接起来。后一隔板用其一端连接回填隔墙工作面的底部并与上面的巷道壁的液压支柱连接,用其另一端连接下面的巷道壁的回填隔墙的顶部。
当长壁工作面的底部支承移动时,隔板形成折叠,而长壁工作面的顶部支承移动时,隔板沿着下面的巷道壁支承的顶梁移动。
据波兰专利说明书60804号公开的回填隔墙的工作面随着长壁前移而移动。这种隔墙由用系杆连接到刮板输送机的单独部件组成。此外,隔墙有用具有液压千斤顶的横杆把角铁撑和降低的支柱互相铰接起来的导轨。千斤顶的另一端接至上部的横杆,而横杆连接在滑动安装于降低的支柱的吊杆上。除了如上所述之外,该隔墙有两个隔板,上面的隔板的一端装在吊杆头部,另一端以隔板凹处部低于其接触的降低点的方式安装于横挡上。另一方面,下面的隔板支在条板上,隔板的一端装在横挡上,另一端安在楔形导轨上。这种隔墙结构太复杂并且在采矿上没有广泛应用。
本发明的目的是,分隔已采出煤的空间,并用回填料回填长壁开采工作面的空间,并且从回填空间的回填料中滤去水分,这一过程导致砂子或其它材料从回填空间充填的填料中分离。
按本发明的方法回填长壁开采工作面的本质包括在每个连续的腹板与工作面地板上的每组液压支承一起除去后,放置一块过滤布垂直于长壁工作面的前缘。过滤布与回填隔墙的工作面的过滤隔板是结合在一起的。其次,在所有组的支承已移至新位置后,全部过滤布互相连接于长壁开采工作面的全部长度和高度上,以至提供了免于水砂充填料渗透到长壁工作面的整体的保护隔板。
这种回填长壁开采工作面的方法极大地简化了回填工序,同时大大节省了材料和劳动力。
本发明的主题也包括回填长壁开采的隔墙工作面。这种隔墙的本质包括采用具有0.5至1.0米的方网眼的网的形式的露天开采的支承结构,最好用具有适当的抗弯强度的钢链或型钢制造。隔墙的支承结构的一端连接支承的顶梁,另一端连接底梁部件。
除了上面所述之外,隔墙还包括固定安装于后顶梁摇臂上的过滤布的罐,以及安装于后顶梁的导向滚子。
在清除工作面的一侧,每一个过滤布的罐用护罩保护起来,护罩同时对离开导向滚子的过滤布提供导向。这种隔墙结构允许回填隔墙工作面直立操作时能大大节省劳动力,能实现全部机械化。由于在长壁开采前移时,采用自动放开过滤布的罐,准备回填长壁工作面的时间显著减少了。
另一方面,采用过滤布纵向布置在底板上,以完全消除回填料渗透到长壁开采工作面。
本发明的主题已通过如图所示的实施例验证,图1示出回填隔墙工作面的侧视图,图2示出这种隔墙侧视图的一部分。
如图所示,本发明的回填长壁开采的隔墙工作面包括:以网孔范围0.5至1.0米的方网的形式制成的露天开采支承结构1,最好是用刮板运输机的链或适当抗弯强度的型钢制造。该结构在顶部和底部分别可折卸地固定在顶梁和液压支承的底梁部件3上。
隔墙还包括过滤布5的罐4固定安装在每组液压支承的后顶梁2的摇臂6上。每个罐的宽度与过滤布5的宽度相适应。而且,在每个罐的上方并在后顶梁2上固定安装导向滚子7和护罩8,以便在该工作面被除去后保护罐子。
上面所述的护罩对于离开导向滚子7的过滤布5也起导向作用。
按照本发明所述的长壁开采工作面的回填是如下进行的。在工作面向前推到下一个待开采的煤壁之后,各组液压支承移到新的地点,牢固地固定到这些组上的回填隔墙的支承结构1,随它们一起移动。
在上面所述的运动中,装在该组支承上的罐4中的过滤布5自动放开,布置于开采底板上的回填布被水砂充填料压住。卷绕在罐上的过滤布在罐的每边搭接0.4米。从罐上放开时,连接后的布的搭接宽度0.1~0.3米。
在所有组支承移至新位置后,各过滤布5垂直地互相连接给长壁工作面提供了均匀的保护隔板,免于水砂填料渗透到其中去。
在工作面每向前推进一个或几个工作距离以及液压支承移至给定的距离之后,可以充填所选择的工作面。
Claims (3)
1、一种用支承的液压支柱或其它形式的回填长壁开采工作面的方法以及一种随着支承前移而移动的回填隔墙的工作面,其特征在于:在工作面每向前推进一个工作距离以及每组支承被同时移走之后,过滤布与回填隔墙的工作面的隔板全布置在所选空间的底板上,在全部支承移至新位置后,在长壁工作面的整个长度和宽度的上方,所有的过滤布相互连接起来,这样它们组成了一个均匀的隔板,以防止水砂填料渗透到长壁开采工作区里。
2、一种用于支承的液压支柱或其它形式的长壁开采工作面的隔墙,其特征在于:它以网眼从0.5米至1.0米的方网的形式构成露天开采的支承结构1,最好用链子制造,并用其一端紧固连接支承的后顶梁2,用其另一端连接底梁3,还有固定安装于每个后顶梁2的摇臂6上的过滤布5的罐子4,还有安装于这些后顶梁上并安装在罐子4上方的导向滚子7,在清除工作面的一边时,这些罐子由护罩8护起来,护罩8亦对过滤布5脱离导向滚子7时提供导向作用。
3、按权利要求2所述的隔墙,其特征在于:用网眼0.5至1.0米的方网构成的露天开采的支承结构1由型钢制成。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL1986258791A PL149218B1 (en) | 1986-04-03 | 1986-04-03 | Method of filling mined-out longwall workings and filling stopping therefor |
PLP-258791 | 1986-04-03 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN87103428A true CN87103428A (zh) | 1987-10-14 |
Family
ID=20030979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN87103428A Pending CN87103428A (zh) | 1986-04-03 | 1987-04-02 | 一种回填长壁开采工作面的方法和回填长壁开采工作面的隔墙 |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN87103428A (zh) |
DE (1) | DE3710839A1 (zh) |
GB (1) | GB2188661B (zh) |
PL (1) | PL149218B1 (zh) |
SU (1) | SU1678216A3 (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101265808B (zh) * | 2008-04-16 | 2010-04-07 | 刘兴才 | 煤矿联体异步支架充填挡墙 |
CN101793159A (zh) * | 2010-03-19 | 2010-08-04 | 中国矿业大学 | 一种采空区堤坝式充填液压支架 |
CN101970795A (zh) * | 2008-02-19 | 2011-02-09 | 拉格股份公司 | 控制长壁开采作业的方法 |
CN102155259A (zh) * | 2011-03-08 | 2011-08-17 | 北京科技大学 | 一种利用掘进废石构筑充填挡墙及其构筑方法 |
CN102168567A (zh) * | 2010-02-25 | 2011-08-31 | 郑州四维机电设备制造有限公司 | 充填支护隔板支架 |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266914B (zh) * | 2013-06-07 | 2016-03-23 | 冀中能源集团有限责任公司 | 固体充填采煤自动化控制系统 |
CN105065049A (zh) * | 2015-08-26 | 2015-11-18 | 冀中能源股份有限公司邢东矿 | 高水充填开采液压支架 |
CN105178998A (zh) * | 2015-09-18 | 2015-12-23 | 冀中能源股份有限公司邢东矿 | 一种矸石充填液压支架 |
CN105715289B (zh) * | 2016-04-15 | 2018-05-08 | 陕西开拓建筑科技有限公司 | 沿空留巷端头支架 |
CN106014406B (zh) * | 2016-07-01 | 2017-05-10 | 黑龙江科技大学 | 一种具有充填功能的采煤机及采煤方法 |
CN109372564A (zh) * | 2018-12-10 | 2019-02-22 | 华电郑州机械设计研究院有限公司 | 一种充填采煤支护设备 |
CN112678020B (zh) * | 2021-01-16 | 2022-10-11 | 陕西煤业化工技术研究院有限责任公司 | 一种矿井斜巷行车安全防护系统及其布置方法 |
CN112627886A (zh) * | 2021-01-27 | 2021-04-09 | 福州大学 | 自适应可复用充填挡墙及其施工方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE807649A (fr) * | 1972-11-25 | 1974-03-15 | Lubba Artur | Procede et dispositifs de pose d'un garnissage en particulier dans des tailles fait de fils relies les uns aux autres en forme plate |
DE2442177A1 (de) * | 1974-09-03 | 1976-03-11 | Roesler Draht Kg | Verfahren und vorrichtung zum unterbinden des entstehens von staub, insbesondere gesteinsstaub, aus dem hangenden und dem bruch beim schild- oder schreitausbau, vornehmlich kohlebergbau |
GB2104941B (en) * | 1981-08-29 | 1985-01-16 | Dowty Mining Equipment Ltd | Mineral mining apparatus |
-
1986
- 1986-04-03 PL PL1986258791A patent/PL149218B1/pl unknown
-
1987
- 1987-04-01 DE DE19873710839 patent/DE3710839A1/de not_active Withdrawn
- 1987-04-01 SU SU874202246A patent/SU1678216A3/ru active
- 1987-04-02 GB GB8707846A patent/GB2188661B/en not_active Expired
- 1987-04-02 CN CN87103428A patent/CN87103428A/zh active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101970795A (zh) * | 2008-02-19 | 2011-02-09 | 拉格股份公司 | 控制长壁开采作业的方法 |
CN101970795B (zh) * | 2008-02-19 | 2013-06-12 | 拉格股份公司 | 控制长壁开采作业的方法 |
CN101265808B (zh) * | 2008-04-16 | 2010-04-07 | 刘兴才 | 煤矿联体异步支架充填挡墙 |
CN102168567A (zh) * | 2010-02-25 | 2011-08-31 | 郑州四维机电设备制造有限公司 | 充填支护隔板支架 |
CN101793159A (zh) * | 2010-03-19 | 2010-08-04 | 中国矿业大学 | 一种采空区堤坝式充填液压支架 |
CN102155259A (zh) * | 2011-03-08 | 2011-08-17 | 北京科技大学 | 一种利用掘进废石构筑充填挡墙及其构筑方法 |
CN102155259B (zh) * | 2011-03-08 | 2014-05-07 | 北京科技大学 | 一种利用掘进废石构筑充填挡墙及其构筑方法 |
Also Published As
Publication number | Publication date |
---|---|
GB8707846D0 (en) | 1987-05-07 |
DE3710839A1 (de) | 1987-10-08 |
SU1678216A3 (ru) | 1991-09-15 |
GB2188661B (en) | 1989-11-22 |
PL149218B1 (en) | 1990-01-31 |
GB2188661A (en) | 1987-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN87103428A (zh) | 一种回填长壁开采工作面的方法和回填长壁开采工作面的隔墙 | |
AU2006203671B2 (en) | Method for pillar recovery in chamber-and-pillar working and tubbing unit for pillar recovery | |
CN102128040B (zh) | 液压迈步式超前支护装备 | |
CN101487395A (zh) | 架后充填模板支架 | |
CN110306999A (zh) | 门架式掘锚护一体机及其掘锚施工方法 | |
CN111255459B (zh) | 一种用于急倾斜极破碎矿脉的联合下向机械化充填采矿法 | |
CN1807843A (zh) | 矸石充填采空区的方法 | |
CN101988388A (zh) | 带夯实机构的充填支护液压支架 | |
CN101105135A (zh) | 两柱掩护式低位放顶煤液压支架 | |
CN109026049A (zh) | 一种迈步式掘支锚联合机组及其使用方法 | |
CN109707430A (zh) | 一种巷道掘进工作面临时支护设备及使用方法 | |
PL91660B1 (zh) | ||
CN201232566Y (zh) | 新型炮采放顶煤液压支架 | |
CN201460939U (zh) | 带夯实机构的充填支护液压支架 | |
US3856356A (en) | Method of mining mineral | |
CN200964858Y (zh) | 掘、护、锚一体化掘进设备 | |
CN103016039A (zh) | 掘进工作面综合式液压支架 | |
CN2758486Y (zh) | “三软”煤层综采放顶煤支架系列快速移架装置 | |
US4143519A (en) | Drive shield | |
CN201982123U (zh) | 一种煤矿巷道工作面切眼锚网梯加单体支护装置 | |
CN101988389A (zh) | 带夯实机构的充填支护液压支架 | |
CN2116779U (zh) | 设有锚杆打眼机构的巷道用液压支架 | |
CN209925016U (zh) | 一种门架锚护机 | |
CN209277923U (zh) | 一种前后置式固体充填留巷端头支架 | |
CN209637795U (zh) | 一种巷道掘进工作面临时支护设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C01 | Deemed withdrawal of patent application (patent law 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |