CN2915292Y - Wire hanger remover - Google Patents

Wire hanger remover Download PDF

Info

Publication number
CN2915292Y
CN2915292Y CN 200620090882 CN200620090882U CN2915292Y CN 2915292 Y CN2915292 Y CN 2915292Y CN 200620090882 CN200620090882 CN 200620090882 CN 200620090882 U CN200620090882 U CN 200620090882U CN 2915292 Y CN2915292 Y CN 2915292Y
Authority
CN
China
Prior art keywords
framework
pulley
lead
scissor
conductor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620090882
Other languages
Chinese (zh)
Inventor
姜广敏
郑景宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION
Original Assignee
LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION filed Critical LIAONING ELECTRIC POWER Corp PANJIN POWER SUPPLY CORPORATION
Priority to CN 200620090882 priority Critical patent/CN2915292Y/en
Application granted granted Critical
Publication of CN2915292Y publication Critical patent/CN2915292Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a conductor hanger remover. A section of cut is positioned in front of a quadrilateral framework and an enclosed hook is arranged in front of the framework. A conductor pulley is arranged in the left internal of the framework, a U-shaped sliding plate is arranged outside the left side of the framework and a guide hole is positioned in the side. The guide hole is articulated in a conductor pulley shaft and positioning pin. A lacing ring is arranged in the left side of the U-shaped sliding plate. A tying ring is arranged in front of the framework. A spring is arranged between the tying ring and enclosed hook. A transmission rod is arranged in the convex arranged of the U-shaped sliding plate and the enclosed hook. A lacing pulley is arranged in the right side of the framework through a frame. A handle of a scissor is fixed in the back of the framework. A fixed pulley is arranged at the lower end of the scissor handle. The other scissor handle is in a free state and the spring is arranged between the axle head of the lacing pulley and the lower end of the scissor handle. The conductor hanger remover can be lifted to the position of the conductor through the rope by the operators standing on the ground, the scissor is closed by pulling the rope tying in the lower end of the movable scissor and the hanger is cut down. The utility model is time-saving and labor saving in the operation and can avoid the potential risks of the accidents.

Description

Lead is hung the thing remover
Technical field
The utility model belongs to the attending device of power supply electrical network, particularly removes the device of hanger on the outdoor aerial lead.
Background technology
Aerial condutor out of doors, particularly at 220 kilovolts--hanging object on the 66 kv grid leads, during as kite, electric power netting safe running is constituted a threat to, how hanger is disposed, become the difficult problem that electrical network is safeguarded.We threw to hanger with insulated wire in the past, and it is broken.Like this, effect is undesirable, and hanger is difficult to remove.At this moment, operating personnel directly ascending stair climbs near the hanger, and it is cut off.But the occasion little to distance between the lead, the operating personnel can't carry out the equipotential livewire work, and labour intensity is big, wastes time and energy.
Content of the present utility model
The purpose of this utility model be design a kind ofly save time, laborsaving, the lead of being convenient to safety operation is hung the thing remover.With this, following technical scheme is proposed.
A kind of lead is hung the thing remover, it is that one section opening is arranged in the front of quadrilateral frame, sealing is installed in front colludes, the inner lead pulley of installing in the left side of framework, left hand external at framework has U type sliding panel, pilot hole is all arranged on its two sides, pilot hole is sleeved on lead pulley spindle and the alignment pin, the left side of U type sliding panel is equipped with the wire rope handling ring, be equipped with the tether circle in the front of framework, mounting spring between tether circle and sealing are colluded is installed drive link between the high spot of U type sliding panel and sealing are colluded, by support the wire rope handling pulley is installed on the right side of framework, cut handle for one at the back of framework fixed blade, this is cut the lower end is equipped with fixed pulley, and another is cut being free state, mounting spring between its lower end and the wire rope handling pulley spindle nose.
This lead was hung the thing remover before using, fasten rope on the wire rope handling ring in first wire rope handling pulley, left side on the right side, rope is fastened in the lower end being cutting of free state, and fag end passed fixedly cut hanging down behind the fixed pulley of lower end, sealing is colluded erect, the front openings of framework opens wide, this moment, scissors was in open configuration under spring action.Tied up on the tether circle after then an end of an other bar insulation rope being thrown the lead that hangs with hanger, and this lead was hung thing remover rise near the lead, and lead is entered in the opening of framework front, leaned against on the lead pulley.At this moment, the rope on the pulling wire rope handling pulley, the lead pulley that makes this lead hang the thing remover rides on the lead, and this lead extension thing remover is vertical state, the wire rope handling pulley is in minimum point.And then pulling ties up to the rope on the wire rope handling ring of left side, makes U type sliding panel to lower slider, drives sealing and colludes around bearing pin and rotate, and with the opening closure of framework front, this lead was hung thing remover and was placed on the lead steadily this moment.And then the rope on the wire rope handling pulley of pulling right side, make this lead hang the thing remover and slide to hanger, when the approaching thing of hanging along lead, and make when hanging in the opening that thing enters scissors, pulling makes the scissors closure from fixedly cutting the fag end that the fixed pulley of lower end is passed and hangs down, and hanger is cut off.
The utlity model has following advantage: the operating personnel stands in ground, needn't enter highfield just can remove the extension thing, avoids accident potential.Reduce operating procedure and process, reduce labour intensity, remove lead hang thing save time, laborsaving.
Description of drawings
Fig. 1 is the stereogram of embodiment, and Fig. 2 is its rearview.
The specific embodiment
Further narrate the utility model with reference to the accompanying drawings.
Embodiment
A kind of lead is hung the thing remover, and it is to be welded into roughly tetragonal framework 15 with corrosion resistant plate, and one section opening is arranged in its front.By bearing pin 12 sealing is installed in the front of framework 15 and colludes 19, have on the right side of 15 frameworks with sealing and collude 19 grooves that match 2, the inner lead pulley 17 of installing in the left side of framework 15, left hand external at framework 15 has U type sliding panel 8, pilot hole 9 is all arranged on its two sides, pilot hole 9 is sleeved on lead pulley spindle 10 and is fixed on the alignment pin 11 on the framework 15, and U type sliding panel 8 can horizontally slip along the directions that lead pulley spindle 10 and alignment pin 11 are determined.The left side of U type sliding panel 8 is equipped with wire rope handling ring 25, be equipped with tether circle 7 in the front of framework 15, mounting spring 6 between the spindle nose of tether circle 7 and sealing colluded 19, between the high spot of U type sliding panel 8 and sealing collude 19, drive link 14 is installed, an end that is drive link 14 is hinged on the high spot of U type sliding panel 8 by bearing pin 13, and the other end is hinged on sealing by bearing pin 16 and colludes on 19.Wire rope handling pulley 21 is installed by support 20 in right side at framework 15, cut 5 for one in the back of framework 15 by bolt 22 fixed blades 18, this lower end of cutting 5 is equipped with fixed pulley 3, another is cut and is free state to 24, mounting spring 23 between the spindle nose of its lower end and wire rope handling pulley 21, keep scissors 18 and are in open configuration.
This lead was hung the thing remover before using, and elder generation passes the support 20 and the space between the wire rope handling pulley 21 on framework 15 right sides with rope 1 and rides on the wire rope handling pulley 21.On the wire rope handling ring 25 in framework 15 left sides, fasten rope 26, rope 4 is fastened in 24 lower end being cutting of free state, and fag end is passed the fixed pulley of fixedly cutting 5 lower ends 3 hang down.Make sealing collude 19 simultaneously and erect, keep the front openings of framework 15 to open wide, this moment, scissors 18 was in open configuration under spring 23 effects.Tied up on the tether circle 7 after then an end of an other bar insulation rope being thrown the lead that hangs with hanger, pulling insulation rope, this lead is hung thing remover to be risen near the lead, spur the rope 1 on the wire rope handling pulley 21 when making 17 contact wires of lead pulley again, the lead pulley 17 that makes this lead hang the thing remover rides on the lead, and at this moment this lead extension thing remover is vertical state, wire rope handling pulley 21 is in minimum point.Pulling ties up to the rope 26 on the left side wire rope handling ring 25 again, and U type sliding panel 8 is moved downward, and drives sealing and colludes 19 around bearing pin 12 rotations, and its tip enters in the groove 2 of framework 5, with the front openings closure of framework 15.This moment, this lead extension thing remover was placed on the lead steadily, and lead pulley 17 rides on the lead.And then the rope 1 on the pulling right side wire rope handling pulley 21, make this lead hang thing remover and move to hanger along lead, be actually lead pulley 17 and flow along lead, such structure can reduce and lead between friction.When lead is hung the thing remover near hanging thing, and make when hanging in the opening that thing enters scissors 18, pulling makes scissors 18 closures from fixedly cutting the fag end 4 that the fixed pulley 3 of 5 lower ends is passed and hangs down, and hanger is cut off.

Claims (1)

  1. A kind of lead is hung the thing remover, it is characterized in that one section opening is arranged in the front of quadrilateral frame, sealing is installed in front colludes, the inner lead pulley of installing in the left side of framework, left hand external at framework has U type sliding panel, pilot hole is all arranged on its two sides, pilot hole is sleeved on lead pulley spindle and the alignment pin, the left side of U type sliding panel is equipped with the wire rope handling ring, be equipped with the tether circle in the front of framework, mounting spring between tether circle and sealing are colluded is installed drive link between the high spot of U type sliding panel and sealing are colluded, by support the wire rope handling pulley is installed on the right side of framework, cut handle for one at the back of framework fixed blade, this is cut the lower end is equipped with fixed pulley, and another is cut being free state, mounting spring between its lower end and the wire rope handling pulley spindle nose.
CN 200620090882 2006-05-19 2006-05-19 Wire hanger remover Expired - Fee Related CN2915292Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620090882 CN2915292Y (en) 2006-05-19 2006-05-19 Wire hanger remover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620090882 CN2915292Y (en) 2006-05-19 2006-05-19 Wire hanger remover

Publications (1)

Publication Number Publication Date
CN2915292Y true CN2915292Y (en) 2007-06-27

Family

ID=38186199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620090882 Expired - Fee Related CN2915292Y (en) 2006-05-19 2006-05-19 Wire hanger remover

Country Status (1)

Country Link
CN (1) CN2915292Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102904189A (en) * 2012-09-19 2013-01-30 冀北电力有限公司秦皇岛电力公司 Device for removing foreign objects hung on overhead transmission line
CN104064987A (en) * 2013-03-19 2014-09-24 国家电网公司 Cleaning device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102904189A (en) * 2012-09-19 2013-01-30 冀北电力有限公司秦皇岛电力公司 Device for removing foreign objects hung on overhead transmission line
CN102904189B (en) * 2012-09-19 2015-12-16 冀北电力有限公司秦皇岛电力公司 A kind of overhead transmission line hanging foreign body eliminating apparatus
CN104064987A (en) * 2013-03-19 2014-09-24 国家电网公司 Cleaning device

Similar Documents

Publication Publication Date Title
CN201466571U (en) Automatic blocking rope ladder support of line working
CN102545103B (en) Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method
CN201802298U (en) Overhead power transmission line electrified ladder head locking device
CN111483951B (en) Auxiliary grounding wire hanging and detaching operation platform applied to voltage class of 110kV and above
CN201722117U (en) Light elevator hanging basket mounting device
CN202602175U (en) Foreign body cleaning device for overhead line
CN2915292Y (en) Wire hanger remover
CN201433031Y (en) Shaft overhead operation lifting basket
CN203352051U (en) Insulation protective umbrella
CN204057797U (en) cable cover hoisting device
CN104150393B (en) A kind of micro power power equipment rotary hoisting device
CN219980276U (en) Unmanned aerial vehicle hangs and gets earth connection device
CN201771418U (en) Automatic retaining device of insulating flexible ladder
CN208835584U (en) A kind of installation tool promoting aerial earth wire
CN203806914U (en) Single-phase hanging basket
CN203932831U (en) The automatic rope Locking device of work high above the ground
CN105186371A (en) High-altitude live-line work bolt clipper
CN202423980U (en) Foreign matter removing device for overhead wires
CN112704858B (en) Climbing device with adjustable bayonet
CN204947473U (en) A kind of novel electric power coaster
CN210779826U (en) Special gallows of multi-loop vertical arrangement wire equipotential operation special guidance ground wire
CN210608296U (en) Safety protection type climbing rod assembly
CN211924382U (en) High-power wind power generation tower with alarm function
CN202423977U (en) Tackle for eliminating foreign suspended objects on overhead line
CN201379921Y (en) Falling-down prevention brake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee