CN102545103B - Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method - Google Patents

Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method Download PDF

Info

Publication number
CN102545103B
CN102545103B CN201210054654.3A CN201210054654A CN102545103B CN 102545103 B CN102545103 B CN 102545103B CN 201210054654 A CN201210054654 A CN 201210054654A CN 102545103 B CN102545103 B CN 102545103B
Authority
CN
China
Prior art keywords
wire
electrical verification
hook
pull rope
pull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210054654.3A
Other languages
Chinese (zh)
Other versions
CN102545103A (en
Inventor
李秋峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Raoyang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Raoyang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd, Raoyang Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210054654.3A priority Critical patent/CN102545103B/en
Publication of CN102545103A publication Critical patent/CN102545103A/en
Application granted granted Critical
Publication of CN102545103B publication Critical patent/CN102545103B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention belongs to the technical fields of an electricity testing and grounding line hanging tool and an operation method, and particularly discloses an overhead power line electricity testing and grounding line hanging and disassembling tool and an operation method. The technical scheme provided by the invention is that: the overhead power line electricity testing and grounding line hanging and disassembling tool comprises a transmitting mechanism, an electricity testing mechanism, a tool and instrument lifting mechanism and a grounding line, wherein an electricity tester can contact an overhead wire on the ground through the transmitting mechanism; meanwhile, the tool and instrument lifting mechanism with a traction pulley is hung on the overhead wire through a second traction rope, and the grounding line is hung and disassembled through a first traction rope and the traction pulley; the grounding line can be hung on the overhead wire without climbing a pole or a tower, so that the labor intensity is reduced; operation can also be performed under the conditions of severe environments such as pole and tower icing, dense fog and the like; pole climbing operation can be prevented; overhead operation risk reduced; manpower resource is saved; the enterprise cost is reduced; the construction efficiency is increased; and economic benefit is created for enterprises.

Description

High-altitude power circuit electrical verification and extension dismounting ground wire instrument and method of operation
Technical field
The invention belongs to electrical verification and hanging earthing conductor instrument and method of operation technical field, particularly the power circuit electrical verification of a kind of high-altitude and extension dismounting ground wire instrument and method of operation.
Background technology
In the middle of power line construction, in order to ensure construction safety, before construction, must carry out electrical verification hanging earthing conductor, at present electrical verification and hanging earthing conductor must be stepped on bar or tower etc., when stepping on bar and operating not only charge for loss of working time, also do not ensure workmen's personal safety simultaneously.Especially run into dense fog or shaft tower freeze etc. bad weather, often therefore affect project progress, make company aspect engineering construction, suffer larger economic loss, wasted again human resources.
Summary of the invention
First technical problem that the present invention solves is just to provide one and can be conveniently carries out electrical verification and hang dismounting ground wire, the power circuit electrical verification of safe and convenient to use, weatherproof high-altitude and the extension clamping connection ground the Line tool of taking out stitches high altitude wire.
For solving the problems of the technologies described above, the technical scheme of the Line tool employing that high-altitude of the present invention power circuit electrical verification and extension are taken out stitches clamping connection is:
Comprise trigger mechanism, electrical verification mechanism, Work tool elevating mechanism and wire clamp earth connection,
Described trigger mechanism comprises launcher shell, elastic drag rope and transmitting bar;
Described electrical verification mechanism comprises the electroscope body with electrical verification head, insulating cord before being connected with on described electrical verification head, insulating cord after being provided with on described electroscope body;
Described Work tool elevating mechanism comprises the body of rod, on described body of rod top with hauling block, on described hauling block, be wound with the first pull rope, be provided with wire hook at the described body of rod near middle part, below described wire hook, be provided with the second pull rope hanging point, on this second pull rope hanging point, be fixed with the second pull rope, be provided with direction tricing line hanging point in the lower end of the described body of rod, on this direction tricing line hanging point, be fixed with direction tricing line;
Described wire clamp earth connection comprises the wire clip body with support bar and grounded metal wire, is provided with the first top draw ring in a side on described wire clip body top,
Described front insulating cord is fixed on the end of described transmitting bar, and described the second pull rope is connected with described front insulating cord, and described first pull rope one end is through described the first top draw ring, and the opposite side of the other end and wire clip body is fixed; Be provided with the first tail draw ring in described wire clip body afterbody one side, in described the first tail draw ring, be installed with the fixing tail stay cord of end and wire clip body opposite side.
Second technical problem that the present invention solves is just to provide and a kind ofly uses the power circuit electrical verification of above-mentioned high-altitude and hang the method for operation that the clamping connection ground the Line tool of taking out stitches carries out electrical verification and hangs the clamping connection ground wire of taking out stitches.
For solving the problems of the technologies described above, the present invention carry out electrical verification hang take out stitches clamping connection ground wire method of operation adopt technical scheme be:
The method comprises the following steps:
The first step, strides across high altitude wire
Front insulating cord is striden across to high altitude wire with trigger mechanism;
Second step, electrical verification
Pull front insulating cord, on high altitude wire, make high altitude wire always in electrical verification state on the electrical verification crown of electroscope body;
The 3rd step, hangs Work tool elevating mechanism
By pulling front insulating cord, drive the second pull rope, Work tool elevating mechanism is mentioned, near being promoted to high altitude wire time, pull direction tricing line, and by direction tricing line control body of rod direction, make the body of rod with a side of hauling block all the time in top, in the time that wire hook exceedes high altitude wire, pull direction tricing line downwards, wire hook is hung on high altitude wire;
The 4th step, hanging earthing conductor
First the first pull rope is striden across to high altitude wire, and fix wire clip body, wire clip body is opened simultaneously, pull around the first pull rope on hauling block, drive wire clip body rises, and in the time that the support bar of wire clip body withstands on high altitude wire below, continues to pull the first pull rope, high altitude wire top presses support bar to make wire clip body closure, and wire clip body is stuck on high altitude wire;
The 5th step, dismounting ground wire
Unclamp the first pull rope, pull tail stay cord downwards, in dragging under wire clip body, wire clip body two sides of tail is subject to pulling force to the inside simultaneously, and the folder power of wire clip body upper end reduces, and wire clip body opens,
The 6th step, unloads electroscope
Pull the rear insulating cord at electrical verification body rear downwards, electrical verification mechanism is left behind.
The 3rd technical problem that the present invention solves is just to provide another kind and can conveniently carries out electrical verification to high altitude wire and hang dismounting ground wire, the power circuit electrical verification of safe and convenient to use, weatherproof high-altitude and hang dismounting ground wire instrument.
For solving the problems of the technologies described above, the technical scheme that high-altitude of the present invention power circuit electrical verification and extension dismounting ground wire instrument adopt is:
Comprise trigger mechanism, electrical verification mechanism, Work tool elevating mechanism and hook earth connection,
Described trigger mechanism comprises launcher shell, elastic drag rope and transmitting bar;
Described electrical verification mechanism comprises the electroscope body with electrical verification head, insulating cord before being connected with on described electrical verification head, insulating cord after being provided with on described electroscope body;
Described Work tool elevating mechanism comprises the body of rod, on described body of rod top with hauling block, on described hauling block, be wound with the first pull rope, be provided with wire hook at the described body of rod near middle part, below described wire hook, be provided with the second pull rope hanging point, on this second pull rope hanging point, be fixed with the second pull rope, be provided with direction tricing line hanging point in the lower end of the described body of rod, on this direction tricing line hanging point, be fixed with direction tricing line;
Described hook earth connection comprises grounded metal wire, peg and hook, is provided with suspension ring on described hook top,
Described front insulating cord is fixed on the end of described transmitting bar, described the second pull rope is connected with described front insulating cord, on described suspension ring, be fixed with earth connection pull rope, described the first pull rope is closed annular rope, on described the first pull rope, be fixed with the collar, described earth connection pull rope is through the described collar.
Its additional technical feature is: below described peg, be provided with drop-down lanyard.
The 4th technical problem that the present invention solves be just to provide a kind of use the power circuit electrical verification of above-mentioned high-altitude and hang tear hook earth connection instrument open and carry out electrical verification and hang the method for operation of tearing hook earth connection open.
For solving the problems of the technologies described above, the present invention carry out electrical verification hang tear open hook earth connection method of operation adopt technical scheme be:
The method comprises the following steps:
The first step, strides across high altitude wire
Front insulating cord is striden across to high altitude wire with trigger mechanism;
Second step, electrical verification
Pull front insulating cord, on high altitude wire, make high altitude wire always in electrical verification state on the electrical verification crown of electroscope body;
The 3rd step, hangs Work tool elevating mechanism
By pulling front insulating cord, drive the second pull rope, Work tool elevating mechanism is mentioned, near being promoted to high altitude wire time, pull direction tricing line, and by direction tricing line control body of rod direction, make the body of rod with a side of hauling block all the time in top, in the time that wire hook exceedes high altitude wire, pull direction tricing line downwards, wire hook is hung on wire;
The 4th step, hanging earthing conductor
Pull around the first pull rope on hauling block, drive the collar fixing with the first pull rope to rise, pull earth connection pull rope simultaneously, suspension ring are withstood on the collar, in the time that the collar drives hook to exceed high altitude wire, rock a little grounded metal wire, in the time that hook hangs over high altitude wire top, pull grounded metal wire downwards, hook is tightly hung on high altitude wire;
The 5th step, dismounting ground wire
After having constructed, tension the first pull rope, then upwards pulls earth connection pull rope, hook is taken from high altitude wire,
The 6th step, unloads electroscope
Pull the rear insulating cord at electrical verification body rear downwards, electrical verification mechanism is left behind.
Its additional technical feature is:
In the 4th step hanging earthing conductor step, rock a little drop-down lanyard, in the time that hook hangs over wire top, pull drop-down lanyard downwards, hook is tightly hung on high altitude wire.
High-altitude provided by the present invention power circuit electrical verification and extension dismounting ground wire instrument compared with the existing technology have the following advantages: owing to comprising trigger mechanism, electrical verification mechanism, Work tool elevating mechanism and earth connection, described trigger mechanism comprises launcher shell, elastic drag rope and transmitting bar, described electrical verification mechanism comprises the electroscope body with electrical verification head, insulating cord before being connected with on described electrical verification head, insulating cord after being provided with on described electroscope body, described Work tool elevating mechanism comprises the body of rod, on described body of rod top with hauling block, on described hauling block, be wound with the first pull rope, be provided with wire hook at the described body of rod near middle part, below described wire hook, be provided with the second pull rope hanging point, on this second pull rope hanging point, be fixed with the second pull rope, be provided with direction tricing line hanging point in the lower end of the described body of rod, on this direction tricing line hanging point, be fixed with direction tricing line, just can make on the ground electroscope contact high altitude wire by trigger mechanism, Work tool elevating mechanism with hauling block is hung on high altitude wire by the second pull rope simultaneously, and hang dismounting ground wire by the first pull rope and hauling block, need not step on bar or tower just can hang over earth connection on high altitude wire, reduce labour intensity, at the attached ice of shaft tower, under the condition of the adverse circumstances such as dense fog, can operate equally, exempt to step on bar operation, reduce work high above the ground risk, save human resources, reduce entreprise cost, improve construction efficiency, for enterprise creates economic benefit.
Brief description of the drawings
Fig. 1 is the power circuit electrical verification of the first provided by the present invention high-altitude and the structural representation of hanging the clamping connection ground the Line tool of taking out stitches;
Fig. 2 is the structural representation of electrical verification mechanism;
Fig. 3 is the power circuit electrical verification of the first provided by the present invention high-altitude and hangs the structural representation of tearing hook earth connection instrument open.
Embodiment
Below in conjunction with the drawings and specific embodiments, the structure of high-altitude provided by the present invention power circuit electrical verification and extension dismounting ground wire instrument is described in further detail.
Earth connection is generally divided into wire clamp earth connection and links up with two kinds of earth connections, describes respectively below and adopts the high-altitude power circuit electrical verification of two kinds of earth connections and hang dismounting ground wire instrument.
As shown in Figure 1, be the power circuit electrical verification of the first high-altitude and the structural representation of hanging the clamping connection ground the Line tool of taking out stitches, this high-altitude power circuit electrical verification and extension dismounting ground wire instrument comprise trigger mechanism 1, electrical verification mechanism 2, Work tool elevating mechanism 3 and wire clamp earth connection 4,
Trigger mechanism 1 comprises launcher shell 11, elastic drag rope 12 and transmitting bar 13;
As shown in Figure 2, electrical verification mechanism 2 comprises the electroscope body 22 with electrical verification 21, insulating cord 23 before being connected with in electrical verification 21, insulating cord 24 after being provided with on electroscope body 22;
Work tool elevating mechanism 3 comprises the body of rod 31, on the body of rod 31 tops with hauling block 32, on hauling block 32, be wound with the first pull rope 33, be provided with wire hook 34 at the body of rod 31 near middle part, below wire hook 34, be provided with the second pull rope hanging point 35, on this second pull rope hanging point 35, be fixed with the second pull rope 36, be provided with direction tricing line hanging point 37 in the lower end of the body of rod 31, on this direction tricing line hanging point 37, be fixed with direction tricing line 38;
Wire clamp earth connection 4 comprises the wire clip body 43 with support bar 41 and grounded metal wire 42, is provided with the first top draw ring 44 in a side on wire clip body 43 tops,
Front insulating cord 23 is fixed on the end of transmitting bar 13, and the second pull rope 36 is connected with front insulating cord 23, and one end of the first pull rope 33 is through the first top draw ring 44, and the side that the other end is relative with the first top draw ring 44 with wire clip body 43 is fixed; Be provided with the first tail draw ring 45 in wire clip body 43 afterbody one sides, in the first tail draw ring 45, be installed with the fixing tail stay cord 46 of end and wire clip body 43 opposite sides.
Carrying out before power construction, first will be to high altitude wire electrical verification and hanging earthing conductor.Utilize the power circuit electrical verification of above-mentioned high-altitude and hang the method for operation that the clamping connection ground the Line tool of taking out stitches carries out electrical verification and hangs the clamping connection ground wire of taking out stitches, concrete operation method comprises the following steps:
The first step, strides across high altitude wire
Front insulating cord 23 is striden across to high altitude wire with trigger mechanism 1;
Second step, electrical verification
Pull front insulating cord 23, the electrical verification of electroscope body 22 21 is withstood on high altitude wire, make high altitude wire always in electrical verification state;
The 3rd step, hangs Work tool elevating mechanism
By pulling front insulating cord 23, drive the second pull rope 36, Work tool elevating mechanism is mentioned, near being promoted to high altitude wire time, pull direction tricing line 38, and control the direction of the body of rod 31 by direction tricing line 38, make the body of rod 31 with a side of hauling block 32 all the time in top, in the time that wire hook 34 exceedes high altitude wire, pull direction tricing line 38 downwards, wire hook 34 is hung on high altitude wire;
The 4th step, hanging earthing conductor
First the first pull rope 33 is striden across to high altitude wire, and fix wire clip body 43, wire clip body 43 is opened simultaneously, pull around the first pull rope 33 on hauling block 32, drive wire clip body 43 to rise, in the time that the support bar 41 of wire clip body withstands on high altitude wire below, continue to pull the first pull rope 33, high altitude wire top presses support bar 41 to make wire clip body 43 closures, and wire clip body 43 is stuck on high altitude wire;
The 5th step, dismounting ground wire
Unclamp the first pull rope 33, pull tail stay cord 46 downwards, when wire clip body is dragged for 43 times, wire clip body 43 two sides of tail are subject to pulling force to the inside simultaneously, and the folder power of wire clip body 43 upper ends reduces, and wire clip body 43 opens, and takes off wire clip body 43;
The 6th step, unloads electroscope
Pull the rear insulating cord 24 at electrical verification body 22 rears downwards, electrical verification mechanism 2 is left behind.
As shown in Figure 3, for the power circuit electrical verification of the second high-altitude with hang the structural representation of tearing hook earth connection instrument open, this high-altitude power circuit electrical verification and hang dismounting ground wire instrument and comprise trigger mechanism 1, electrical verification mechanism 2, Work tool elevating mechanism 3 and hook earth connection 5,
Trigger mechanism 1 comprises launcher shell 11, elastic drag rope 12 and transmitting bar 13;
As shown in Figure 2, electrical verification mechanism 2 comprises the electroscope body 22 with electrical verification 21, insulating cord 23 before being connected with in electrical verification 21, insulating cord 24 after being provided with on electroscope body 22;
Work tool elevating mechanism 3 comprises the body of rod 31, on the body of rod 31 tops with hauling block 32, on hauling block 32, be wound with the first pull rope 33, be provided with wire hook 34 at the body of rod 31 near middle part, below wire hook 34, be provided with the second pull rope hanging point 35, on this second pull rope hanging point 35, be fixed with the second pull rope 36, be provided with direction tricing line hanging point 37 in the lower end of the body of rod 31, on this direction tricing line hanging point 37, be fixed with direction tricing line 38;
Hook earth connection 5 comprises grounded metal wire 42, peg 52 and hook 53, is provided with suspension ring 54 on hook 53 tops,
Front insulating cord 23 is fixed on the end of transmitting bar 13, the second pull rope 36 is connected with front insulating cord 23, and on suspension ring 54, being fixed with earth connection pull rope 55, the first pull ropes 33 is closed annular rope, on the first pull rope 33, be fixed with the collar 56, earth connection pull rope 55 is through the collar 56.
For the ease of drop-down peg 52, prevent the easy generation accident of drop-down grounded metal wire 42, can below peg 52, be provided with drop-down lanyard 57.
Utilize the power circuit electrical verification of above-mentioned high-altitude and extension to tear hook earth connection instrument open and carry out electrical verification and hang the method for operation of tearing hook earth connection open, concrete operation method comprises the following steps:
The first step, strides across high altitude wire
Front insulating cord 23 is striden across to high altitude wire with trigger mechanism 1;
Second step, electrical verification
Pull front insulating cord 23, the electrical verification of electroscope body 22 21 is withstood on high altitude wire, make high altitude wire always in electrical verification state;
The 3rd step, hangs Work tool elevating mechanism
By pulling front insulating cord 23, drive the second pull rope 36, Work tool elevating mechanism is mentioned, near being promoted to high altitude wire time, pull direction tricing line 38, and control the direction of the body of rod 31 by direction tricing line 38, make the body of rod 31 with a side of hauling block 32 all the time in top, in the time that wire hook 34 exceedes high altitude wire, pull direction tricing line 38 downwards, wire hook 34 is hung on high altitude wire;
The 4th step, hanging earthing conductor
Pull around the first pull rope 33 on hauling block 32, drive the collar 56 fixing with the first pull rope 33 to rise, pull earth connection pull rope 55 simultaneously, suspension ring 54 are withstood on the collar 56, in the time that the collar 56 drives hook 53 to exceed high altitude wire, rock a little grounded metal wire 42, in the time that hook 53 hangs over high altitude wire top, pull grounded metal wire 42 downwards, make to link up with 53 and tightly hang on high altitude wire;
The 5th step, dismounting ground wire
After having constructed, tension the first pull rope 33, then upwards pulls earth connection pull rope 55, hook 53 is taken from high altitude wire,
The 6th step, unloads electroscope
Pull the rear insulating cord at electrical verification body rear downwards, electrical verification mechanism is left behind.
In the time using with the hook earth connection of drop-down lanyard 57, in above-mentioned the 4th step hanging earthing conductor step, rock a little drop-down lanyard 57, in the time that hook 53 is positioned at high altitude wire top, pull drop-down lanyard 57 downwards, make to link up with 53 and tightly hang on high altitude wire.
Just can make on the ground electricity-testing machine structure 2 contact high altitude wire by trigger mechanism 1, Work tool elevating mechanism 3 with hauling block 32 is hung on high altitude wire by the second pull rope 36 simultaneously, and hang dismounting ground wire 4 by the first pull rope 33 and hauling block 32, need not step on bar or tower just can hang over earth connection on high altitude wire, reduce labour intensity, at the attached ice of shaft tower, under the condition of the adverse circumstances such as dense fog, can operate equally, exempt to step on bar operation, reduce work high above the ground risk, save human resources, reduce entreprise cost, improve construction efficiency, for enterprise creates economic benefit.
Above-described embodiment is just to explanation of the present invention; therefore; protection scope of the present invention is not only confined to above-described embodiment, as long as structure is identical with extension dismounting ground wire instrument and method of operation with high-altitude of the present invention power circuit electrical verification, just drops on the scope of protection of the invention.

Claims (6)

1. the electrical verification of high-altitude power circuit and extension clamping connection ground the Line tool of taking out stitches, is characterized in that: comprise trigger mechanism, electrical verification mechanism, Work tool elevating mechanism and wire clamp earth connection,
Described trigger mechanism comprises launcher shell, elastic drag rope and transmitting bar;
Described electrical verification mechanism comprises the electroscope body with electrical verification head, insulating cord before being connected with on described electrical verification head, insulating cord after being provided with on described electroscope body;
Described Work tool elevating mechanism comprises the body of rod, on described body of rod top with hauling block, on described hauling block, be wound with the first pull rope, be provided with wire hook at the described body of rod near middle part, below described wire hook, be provided with the second pull rope hanging point, on this second pull rope hanging point, be fixed with the second pull rope, be provided with direction tricing line hanging point in the lower end of the described body of rod, on this direction tricing line hanging point, be fixed with direction tricing line;
Described wire clamp earth connection comprises the wire clip body with support bar and grounded metal wire, is provided with the first top draw ring in a side on described wire clip body top,
Described front insulating cord is fixed on the end of described transmitting bar, and described the second pull rope is connected with described front insulating cord, and described first pull rope one end is through described the first top draw ring, and the opposite side of the other end and wire clip body is fixed; Be provided with the first tail draw ring in described wire clip body afterbody one side, in described the first tail draw ring, be installed with the fixing tail stay cord of end and wire clip body opposite side.
2. utilize the power circuit electrical verification of high-altitude described in claim 1 and hang the method for operation that the clamping connection ground the Line tool of taking out stitches carries out electrical verification and hangs the clamping connection ground wire of taking out stitches, it is characterized in that: the method comprises the following steps:
The first step, strides across high altitude wire
Front insulating cord is striden across to high altitude wire with trigger mechanism;
Second step, electrical verification
Pull front insulating cord, on high altitude wire, make high altitude wire always in electrical verification state on the electrical verification crown of electroscope body;
The 3rd step, hangs Work tool elevating mechanism
By pulling front insulating cord, drive the second pull rope, Work tool elevating mechanism is mentioned, near being promoted to high altitude wire time, pull direction tricing line, and by direction tricing line control body of rod direction, make the body of rod with a side of hauling block all the time in top, in the time that wire hook exceedes high altitude wire, pull direction tricing line downwards, wire hook is hung on high altitude wire;
The 4th step, hanging earthing conductor
First the first pull rope is striden across to high altitude wire, and fix wire clip body, wire clip body is opened simultaneously, pull around the first pull rope on hauling block, drive wire clip body rises, and in the time that the support bar of wire clip body withstands on high altitude wire below, continues to pull the first pull rope, high altitude wire top presses support bar to make wire clip body closure, and wire clip body is stuck on high altitude wire;
The 5th step, dismounting ground wire
Unclamp the first pull rope, pull tail stay cord downwards, in dragging under wire clip body, wire clip body two sides of tail is subject to pulling force to the inside simultaneously, and the folder power of wire clip body upper end reduces, and wire clip body opens,
The 6th step, unloads electroscope
Pull the rear insulating cord at electrical verification body rear downwards, electrical verification mechanism is left behind.
3. the electrical verification of high-altitude power circuit and extension are torn hook earth connection instrument open, it is characterized in that: comprise trigger mechanism, electrical verification mechanism, Work tool elevating mechanism and hook earth connection,
Described trigger mechanism comprises launcher shell, elastic drag rope and transmitting bar;
Described electrical verification mechanism comprises the electroscope body with electrical verification head, insulating cord before being connected with on described electrical verification head, insulating cord after being provided with on described electroscope body;
Described Work tool elevating mechanism comprises the body of rod, on described body of rod top with hauling block, on described hauling block, be wound with the first pull rope, be provided with wire hook at the described body of rod near middle part, below described wire hook, be provided with the second pull rope hanging point, on this second pull rope hanging point, be fixed with the second pull rope, be provided with direction tricing line hanging point in the lower end of the described body of rod, on this direction tricing line hanging point, be fixed with direction tricing line;
Described hook earth connection comprises grounded metal wire, peg and hook, is provided with suspension ring on described hook top,
Described front insulating cord is fixed on the end of described transmitting bar, described the second pull rope is connected with described front insulating cord, on described suspension ring, be fixed with earth connection pull rope, described the first pull rope is closed annular rope, on described the first pull rope, be fixed with the collar, described earth connection pull rope is through the described collar.
4. high-altitude according to claim 3 power circuit electrical verification and extension are torn hook earth connection instrument open, it is characterized in that: below described peg, be provided with drop-down lanyard.
5. utilize the power circuit electrical verification of high-altitude described in claim 3 and extension to tear hook earth connection instrument open and carry out the method for operation that electrical verification extension is torn hook earth connection open, it is characterized in that: the method comprises the following steps:
The first step, strides across high altitude wire
Front insulating cord is striden across to high altitude wire with trigger mechanism;
Second step, electrical verification
Pull front insulating cord, on high altitude wire, make high altitude wire always in electrical verification state on the electrical verification crown of electroscope body;
The 3rd step, hangs Work tool elevating mechanism
By pulling front insulating cord, drive the second pull rope, Work tool elevating mechanism is mentioned, near being promoted to high altitude wire time, pull direction tricing line, and by direction tricing line control body of rod direction, make the body of rod with a side of hauling block all the time in top, in the time that wire hook exceedes high altitude wire, pull direction tricing line downwards, wire hook is hung on high altitude wire;
The 4th step, hanging earthing conductor
Pull around the first pull rope on hauling block, drive the collar fixing with the first pull rope to rise, pull earth connection pull rope simultaneously, suspension ring are withstood on the collar, in the time that the collar drives hook to exceed high altitude wire, rock a little grounded metal wire, in the time that hook hangs over high altitude wire top, pull grounded metal wire downwards, hook is tightly hung on high altitude wire;
The 5th step, dismounting ground wire
After having constructed, tension the first pull rope, then upwards pulls earth connection pull rope, hook is taken from high altitude wire,
The 6th step, unloads electroscope
Pull the rear insulating cord at electrical verification body rear downwards, electrical verification mechanism is left behind.
6. carry out according to claim 5 electrical verification and hang the method for operation of tearing hook earth connection open, it is characterized in that: in the time using with the hook earth connection of drop-down lanyard, in above-mentioned the 4th step hanging earthing conductor step, rock a little drop-down lanyard, in the time that hook is positioned at high altitude wire top, pull drop-down lanyard downwards, hook is tightly hung on high altitude wire.
CN201210054654.3A 2012-03-05 2012-03-05 Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method Active CN102545103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210054654.3A CN102545103B (en) 2012-03-05 2012-03-05 Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210054654.3A CN102545103B (en) 2012-03-05 2012-03-05 Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method

Publications (2)

Publication Number Publication Date
CN102545103A CN102545103A (en) 2012-07-04
CN102545103B true CN102545103B (en) 2014-08-20

Family

ID=46351339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210054654.3A Active CN102545103B (en) 2012-03-05 2012-03-05 Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method

Country Status (1)

Country Link
CN (1) CN102545103B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105703278B (en) * 2016-04-26 2017-09-22 邹平县供电公司 A kind of device and application method for aerial earth wire
CN106990280A (en) * 2017-05-11 2017-07-28 广东电网有限责任公司清远供电局 A kind of high voltage electroscope
CN107706689B (en) * 2017-09-18 2019-06-18 国网山东省电力公司济南供电公司 A kind of Special grounding device for no stay rod
CN109301754A (en) * 2018-11-15 2019-02-01 国网河北省电力有限公司石家庄供电分公司 Insulating bar and electroscope integrated device
CN110212324A (en) * 2019-05-31 2019-09-06 广东电网有限责任公司 A kind of hanging device and method of voltage levels temporary ground wire
CN112259976A (en) * 2020-10-16 2021-01-22 国网山东省电力公司潍坊供电公司 Grounding wire hanging tool with self-checking function
CN112485500B (en) * 2020-11-20 2024-02-23 榆林学院 Multifunctional electroscope for electroscope and hanging ground wire
CN112763789B (en) * 2020-12-24 2023-05-16 南方电网科学研究院有限责任公司 Power distribution network electricity inspection method and electricity inspection robot
CN114336107B (en) * 2022-01-05 2024-02-09 广东冠能电力科技发展有限公司 Electricity testing grounding robot and electricity testing grounding method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2051353U (en) * 1989-02-15 1990-01-17 杨军 Earthing device for high-pressure, superpressure line electroscopy
SU1686560A1 (en) * 1988-12-22 1991-10-23 Кишиневские электрические сети Производственного объединения "Молдэнерго" Method for applying portable earthing members to conductors of overhead power transmission lines
CN201829907U (en) * 2010-10-26 2011-05-11 江苏省电力公司徐州供电公司 Earth wire of overhead transmission line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1686560A1 (en) * 1988-12-22 1991-10-23 Кишиневские электрические сети Производственного объединения "Молдэнерго" Method for applying portable earthing members to conductors of overhead power transmission lines
CN2051353U (en) * 1989-02-15 1990-01-17 杨军 Earthing device for high-pressure, superpressure line electroscopy
CN201829907U (en) * 2010-10-26 2011-05-11 江苏省电力公司徐州供电公司 Earth wire of overhead transmission line

Also Published As

Publication number Publication date
CN102545103A (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN102545103B (en) Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method
CN102412525A (en) Anti-falling hook for power insulating protective umbrella
CN103663189B (en) Swing arm tower crane installation method
CN102904081A (en) Grounding wire safety operation device in power construction
CN207530438U (en) Tangent tower ground wire line lifter
CN202906345U (en) Electric power system safety ground wire device
CN202444206U (en) Wire clamp for grounding wire
CN203300837U (en) Throwing-hanging type ground wire
CN208433550U (en) A kind of earthing clamp
CN107394675B (en) Ground operation hanging and unloading method of door sealing self-locking pulley
CN201882717U (en) Tail wire take-up device for ground wire of high-voltage overhead power transmission line
CN104348111B (en) Charged changing tension-resisting insulator wire reserve protection and installation method thereof
CN104410009A (en) Climbing type steel wire rope ladder
CN209016557U (en) A kind of power line tension insulator gap bridge
CN103746316A (en) Device and method for replacing insulator string of straight corner tower in hot-line work mode
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN202977160U (en) Electric remote control lead traction apparatus for transformer high-voltage bushing
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN202917897U (en) Cable hoisting horizontal pulley
CN202444204U (en) Traction lifting device for high-altitude circuit tools and appliances
CN106081873B (en) A method of replacement linear tension electric pole
CN210113687U (en) Submarine cable traction device
CN202308922U (en) Anti-dropping hook of electric insulation protection umbrella
CN204118374U (en) The earth lead point protection device in succession of earth connection
CN202444205U (en) Grounding wire which people can hang without mounting a pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: STATE GRID HEBEI RAOYANG POWER SUPPLY COMPANY

Effective date: 20140718

Owner name: HENGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID H

Effective date: 20140718

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Applicant after: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

Address before: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Applicant before: Raoyang County Electric Power Bureau

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: RAOYANG POWER AUTHORITY TO: STATE GRID HEBEI RAOYANG POWER SUPPLY COMPANY

Free format text: CORRECT: ADDRESS; FROM: 053900 HENGSHUI, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140718

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID HEBEI ELECTRIC POWER COMPANY HENGSHUI POWER SUPPLY BRANCH

Applicant after: STATE GRID HEBEI ELECTRIC POWER Co.

Applicant after: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

Address before: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Applicant before: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant