CN110212324A - A kind of hanging device and method of voltage levels temporary ground wire - Google Patents
A kind of hanging device and method of voltage levels temporary ground wire Download PDFInfo
- Publication number
- CN110212324A CN110212324A CN201910469687.6A CN201910469687A CN110212324A CN 110212324 A CN110212324 A CN 110212324A CN 201910469687 A CN201910469687 A CN 201910469687A CN 110212324 A CN110212324 A CN 110212324A
- Authority
- CN
- China
- Prior art keywords
- wire
- insulating
- clamped
- insulating rope
- pulley mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R11/00—Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
- H01R11/11—End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
- H01R11/12—End pieces terminating in an eye, hook, or fork
- H01R11/14—End pieces terminating in an eye, hook, or fork the hook being adapted for hanging on overhead or other suspended lines, e.g. hot line clamp
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
技术领域technical field
本发明涉及输变电工程技术领域,尤其涉及一种高电压等级临时接地线的挂接装置及方法。The invention relates to the technical field of power transmission and transformation engineering, in particular to a hooking device and method for a high-voltage level temporary grounding wire.
背景技术Background technique
当电力设备需要停电检修时,根据电业安全工作规程的要求,为了保证作业人员的安全,需要在停电检修设备的各个可能来电侧装设临时接地线。When power equipment needs to be repaired in a power outage, according to the requirements of the safety work regulations of the electrical industry, in order to ensure the safety of the operators, it is necessary to install temporary grounding wires on each possible incoming power side of the power outage maintenance equipment.
在挂接临时接地线时,常常需要考虑以下问题:When hooking up temporary ground wires, the following issues often need to be considered:
第一、由于变电场地所需停电设备周边可能存在带电设备,在临时挂接地线时需考虑到操作工具距离临近带电设备的安全距离应满足要求。First, because there may be live equipment around the power outage equipment required in the substation site, when temporarily connecting the ground wire, it is necessary to consider that the safe distance between the operating tool and the adjacent live equipment should meet the requirements.
第二,在挂接临时接地线时需要考虑到所挂接设备残余的感应电、工具的绝缘性能、挂接过程是否会对设备造成不可逆的机械性损伤。Second, when connecting the temporary grounding wire, it is necessary to consider the residual induced electricity of the connected equipment, the insulation performance of the tool, and whether the connection process will cause irreversible mechanical damage to the equipment.
第三、临时接地线挂接过程不能过于繁琐,繁琐的步骤将影响停送电时间,使用过多的辅助设备会增加设备维护的成本。Third, the process of connecting the temporary grounding wire should not be too cumbersome. The cumbersome steps will affect the time of power outage and power transmission, and the use of too many auxiliary equipment will increase the cost of equipment maintenance.
第四、方案还需考虑对不同的设备的普适性,应能广泛应用在不同类型设备上。Fourth, the solution also needs to consider the universality of different devices, and it should be widely applicable to different types of devices.
但是,对于电压等级较高的设备,一般安装位置比较高,从而导致临时接地线的装设位置也比较高,所以临时接地线的绝缘操作杆一般都比较长、比较重,操作起来十分困难,且绝缘操作杆支撑从水平方向到垂直方向时容易造成操作杆断裂,常常会导致操作困难、操作时间长、严重影响停送电时间以及威胁人机工效。同时,还需要采用吊车辅助人员进行挂接,租用吊车成本高昂,且吊臂与带电设备安全距离难以把控,存在一定程度的作业风险。However, for equipment with a higher voltage level, the general installation position is relatively high, which leads to a relatively high installation position of the temporary ground wire, so the insulation operating rod of the temporary ground wire is generally long and heavy, and it is very difficult to operate. Moreover, when the insulating operating rod is supported from the horizontal direction to the vertical direction, it is easy to cause the operating rod to break, which often leads to difficult operation, long operating time, seriously affects the power-off time, and threatens ergonomics. At the same time, it is necessary to use a crane to assist personnel to mount it. The cost of renting a crane is high, and it is difficult to control the safe distance between the boom and the live equipment, and there is a certain degree of operational risk.
发明内容Contents of the invention
本发明的目的在于提供一种高电压等级临时接地线的挂接装置及方法,克服现有挂接方案存在的成本高、操作困难、操作时间长以及作业风险大等缺陷。The purpose of the present invention is to provide a hooking device and method for a high-voltage level temporary grounding wire, which overcomes the defects of high cost, difficult operation, long operation time and high operation risk in the existing hooking scheme.
为达此目的,本发明采用以下技术方案:For reaching this purpose, the present invention adopts following technical scheme:
一种高电压等级临时接地线的挂接装置,包括:第一绝缘绳、滑轮机构、第二绝缘绳以及操作杆;A hooking device for a high-voltage level temporary grounding wire, comprising: a first insulating rope, a pulley mechanism, a second insulating rope and an operating rod;
所述第一绝缘绳的尾端连接至滑轮机构;The tail end of the first insulating rope is connected to the pulley mechanism;
所述滑轮机构包括可绕中心轴旋转的圆轮;The pulley mechanism includes a circular wheel that can rotate around a central axis;
所述第二绝缘绳绕设于滑轮机构的圆轮的圆周面上,且所述第二绝缘绳的尾端连接至操作杆;The second insulating rope is wound on the circumferential surface of the round wheel of the pulley mechanism, and the tail end of the second insulating rope is connected to the operating rod;
所述操作杆包括绝缘杆,绝缘杆顶部连接临时接地线的接地线夹;The operating rod includes an insulating rod, and the top of the insulating rod is connected to a grounding clamp of a temporary grounding wire;
所述第一绝缘绳的长度不小于待夹导线距离至地面的高度;所述第二绝缘绳的长度不小于待夹导线距离至地面的高度的两倍。The length of the first insulating rope is not less than the height from the wire to be clamped to the ground; the length of the second insulating rope is not less than twice the height from the wire to be clamped to the ground.
可选的,所述挂接装置还包括细绳,所述细绳的首端系有重物,所述细绳的尾端连接至第一绝缘绳的首端。Optionally, the hooking device further includes a string, a head end of the string is tied with a weight, and a tail end of the string is connected to the head end of the first insulating rope.
可选的,所述细绳的长度不小于待夹导线距离至地面的高度的两倍。Optionally, the length of the string is not less than twice the height from the wire to be clamped to the ground.
可选的,所述操作杆包括可顺序组装连接的多个所述绝缘杆。Optionally, the operating rod includes a plurality of insulating rods that can be sequentially assembled and connected.
可选的,所述挂接装置还包括至少一对绝缘支柱,每对绝缘支柱用于在挂接操作过程中对所述待夹导线进行支撑。Optionally, the hooking device further includes at least one pair of insulating pillars, each pair of insulating pillars is used to support the wire to be clamped during the hooking operation.
可选的,所述重物为验电笔。Optionally, the weight is an electroscope pen.
一种高电压等级临时接地线的挂接方法,应用如上任一所述的挂接装置实现,包括步骤:A method for hooking up a high-voltage level temporary grounding wire, which is realized by using any one of the above-mentioned hooking devices, including steps:
通过跨过待夹导线的第一绝缘绳,将滑轮机构提升至临近待夹导线的指定高度位置;Lift the pulley mechanism to a designated height position adjacent to the wire to be clamped by crossing the first insulating rope of the wire to be clamped;
牵引绕过所述滑轮机构的第二绝缘绳的首端,以提升连接于第二绝缘绳的尾端的操作杆;pulling the head end of the second insulating rope around the pulley mechanism to lift the operating rod connected to the tail end of the second insulating rope;
待操作杆的接地线夹与待夹导线等高时,控制接地线夹夹住待夹导线。When the grounding wire clamp of the operating rod is equal to the height of the wire to be clamped, the grounding wire clamp is controlled to clamp the wire to be clamped.
可选的,所述通过跨过待夹导线的第一绝缘绳,将滑轮机构提升至临近待夹导线的指定高度位置,包括:Optionally, lifting the pulley mechanism to a specified height position close to the wire to be clamped by crossing the first insulating rope of the wire to be clamped includes:
将所述第一绝缘绳的首端连接至一细绳的尾端,并在所述细绳的首端系重物;connecting the head end of the first insulating rope to the tail end of a string, and attaching a weight to the head end of the string;
将所述细绳跨过待夹导线的上端,使得细绳的首端在所述重物的重力作用下自然下降;Cross the upper end of the wire to be clamped by the thin rope, so that the head end of the thin rope naturally descends under the gravity of the weight;
待所述第一绝缘绳的首端被所述细绳下拉至地面时,牵引所述第一绝缘绳的首端,以提升连接于第一绝缘绳的尾端的滑轮机构;When the head end of the first insulating rope is pulled down to the ground by the string, pull the head end of the first insulating rope to lift the pulley mechanism connected to the tail end of the first insulating rope;
待所述滑轮机构提升至临近待夹导线的指定高度位置时,将所述第一绝缘绳的首端固定于地桩。When the pulley mechanism is lifted to a designated height position close to the wire to be clamped, the head end of the first insulating rope is fixed to the ground pile.
可选的,所述挂接方法还包括:在所述牵引绕过滑轮机构的第二绝缘绳的首端,以提升连接于第二绝缘绳的尾端的操作杆的过程中,在所述操作杆的底部加装绝缘杆,直至所述操作杆的总长度与待夹导线的高度相等。Optionally, the hooking method further includes: during the process of pulling the head end of the second insulating rope that goes around the pulley mechanism to lift the operating rod connected to the tail end of the second insulating rope, during the operation An insulating rod is installed on the bottom of the rod until the total length of the operating rod is equal to the height of the wire to be clamped.
可选的,所述挂接方法中,通过自动牵引机构牵引所述第二绝缘绳的首端。Optionally, in the hooking method, the head end of the second insulating rope is pulled by an automatic pulling mechanism.
与现有技术相比,本发明实施例具有以下有益效果:Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
利用滑轮的单向传动的机械特性来实现,使得整个挂接过程简单高效,无需辅助工具,且不会对设备造成不可逆的机械性损伤,大大降低操作及维护成本;占用的操作空间较小,可有效保证操作工具与临近带电设备保持安全距离,大大降低作用风险;操作时间短,最大程度地缩短了停电检修设备的停送电时间,提高人机功效;普适性强,能够广泛应用于不同类型的设备上。It is realized by using the mechanical characteristics of the one-way transmission of the pulley, which makes the whole hooking process simple and efficient, without the need for auxiliary tools, and will not cause irreversible mechanical damage to the equipment, greatly reducing the operation and maintenance costs; the operation space occupied is small, It can effectively ensure that the operating tools keep a safe distance from nearby live equipment, greatly reducing the risk of action; the short operation time minimizes the power-off time of the power-off maintenance equipment and improves the man-machine efficiency; it is universal and can be widely used on different types of devices.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其它的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained according to these drawings on the premise of not paying creative efforts.
图1为本发明实施例提供的高电压等级临时接地线的挂接方法流程图。Fig. 1 is a flowchart of a method for hooking up a high-voltage level temporary grounding wire provided by an embodiment of the present invention.
图2至图7为本发明实施例提供的各个挂接操作过程示意图。FIG. 2 to FIG. 7 are schematic diagrams of various hooking operation processes provided by the embodiments of the present invention.
具体实施方式Detailed ways
为使得本发明的发明目的、特征、优点能够更加的明显和易懂,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,下面所描述的实施例仅仅是本发明一部分实施例,而非全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。In order to make the purpose, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the following The described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
下面结合附图并通过具体实施方式来进一步说明本发明的技术方案。The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and through specific implementation methods.
本实施例提供了一种高电压等级临时接地线的挂接装置,主要包括:细绳①、第一绝缘绳②、滑轮机构⑤、第二绝缘绳③以及操作杆④。This embodiment provides a hooking device for a high-voltage temporary grounding wire, which mainly includes: a string ①, a first insulating rope ②, a pulley mechanism ⑤, a second insulating rope ③ and an operating rod ④.
其中,细绳①的首端系有重物,尾端与第一绝缘绳②的首端连接;第一绝缘绳②的尾端连接至滑轮机构⑤。Wherein, the head end of the thin rope ① is tied with a weight, and the tail end is connected to the head end of the first insulating rope ②; the tail end of the first insulating rope ② is connected to the pulley mechanism ⑤.
滑轮机构⑤包括可以绕着中心轴旋转的圆轮,第二绝缘绳③绕设于圆轮的圆周面上。同时,第二绝缘绳③的尾端连接至操作杆④。The pulley mechanism ⑤ includes a round wheel that can rotate around the central axis, and the second insulating rope ③ is wound on the circumferential surface of the round wheel. Meanwhile, the tail end of the second insulating rope ③ is connected to the operating rod ④.
操作杆④包括位于顶部的接地线夹和可顺序组装连接的多个绝缘杆。The operating rod ④ includes a grounding clamp on the top and a plurality of insulating rods that can be sequentially assembled and connected.
此外,该挂接装置还包括至少一对绝缘支柱,每对绝缘支柱用于在挂接操作过程中对所述待夹导线进行支撑,以避免挂接操作过程中因牵引力过大对待夹导线产生损伤。In addition, the hooking device also includes at least one pair of insulating pillars, each pair of insulating pillars is used to support the wire to be clamped during the hooking operation, so as to avoid the occurrence of excessive traction force on the wire to be clamped during the hooking operation. damage.
在进行挂架操作时,先将细绳①跨过待夹导线上端,由于细绳①的首端系有重物,在重力作用下细绳①的首端会自然下垂至地面,同时通过第一绝缘绳②拉动滑动机构上升;待滑动机构上升至临近待夹导线的指定高度位置时,将第一绝缘绳②的首端固定于地桩上,使得滑动机构在当前高度位置保持不动;然后,下拉第二绝缘绳③的首端,利用滑动机构的圆轮的旋转,使得系于第二绝缘绳③尾端的操作杆④提升;在操作杆④提升的过程中,可在操作杆④的底部按需加装绝缘杆,以增加操作杆④的整体长度,直至操作杆④顶部的接地线夹与待夹导线等高后,将接地线夹夹住待夹导线,至此完成临时接电线的挂接。When carrying out the hanger operation, first cross the string ① over the upper end of the wire to be clamped. Since the head end of the string ① is tied with a heavy object, the head end of the string ① will naturally droop to the ground under the action of gravity, and at the same time pass the first end of the string ① to the ground. An insulating rope ② pulls the sliding mechanism to rise; when the sliding mechanism rises to the specified height position close to the wire to be clamped, fix the head end of the first insulating rope ② on the ground pile, so that the sliding mechanism remains at the current height position; Then, the head end of the second insulating rope ③ is pulled down, and the rotation of the round wheel of the sliding mechanism is used to lift the operating rod ④ tied to the tail end of the second insulating rope ③; during the lifting process of the operating rod ④, the operating rod ④ Install insulating rods as needed at the bottom of the operating rod ④ to increase the overall length of the operating rod ④ until the grounding wire clamp on the top of the operating rod ④ is equal to the height of the wire to be clamped, then clamp the grounding wire clamp to the wire to be clamped, and complete the temporary wire connection of the mount.
请参阅图1,本实施例还提供了一种应用上述挂接装置实现的挂接方法,包括步骤:Referring to Fig. 1, this embodiment also provides a hooking method implemented by using the above-mentioned hooking device, including steps:
步骤101、将首端系有重物的细绳①跨过待夹导线上端,使得细绳①的首尾两端分居待夹导线的两侧。Step 101, cross the upper end of the wire to be clamped with the thin rope ① tied with a weight at the head end, so that the two ends of the thin rope ① are separated from the two sides of the wire to be clamped.
如图2所示,系于细绳①首端的重物可以为验电笔等具有一定重量的物体,其作用在于在重力作用下带动细绳①的首端自然向下运动。As shown in Figure 2, the heavy object tied to the head end of the string ① can be an object with a certain weight such as an electroscope pen, and its function is to drive the head end of the string ① to move downward naturally under the action of gravity.
在细绳①跨过待夹导线上端后,在重物的重力作用下,细绳①的首端将会自然下降至地面。After the string ① crosses the upper end of the wire to be clamped, under the gravity of the weight, the head end of the string ① will naturally drop to the ground.
细绳①的长度不小于第一预设长度,该第一预设长度可选为待夹导线距离至地面的高度的两倍。在细绳①的首端自然下垂至地面时,细绳①的尾端仍处于地面或者距离地面较低的位置,方便工作人员对细绳①的尾端进行操作。The length of the string ① is not less than a first preset length, and the first preset length may be twice the height from the wire to be clamped to the ground. When the head end of the string ① hangs down to the ground naturally, the tail end of the string ① is still on the ground or at a lower position from the ground, which is convenient for the staff to operate the tail end of the string ①.
步骤102、如图3所示,待细绳①的首端下垂至地面后,将细绳①的尾端连接至第一绝缘绳②的首端,在第一绝缘绳②的尾端固定滑轮机构⑤,在滑轮机构⑤上穿设第二绝缘绳③,在第二绝缘绳③的尾端连接固定有临时接地线的操作杆④。Step 102, as shown in Figure 3, after the head end of the string ① hangs down to the ground, connect the tail end of the string ① to the head end of the first insulating rope ②, and fix the pulley at the tail end of the first insulating rope ② Mechanism ⑤, on the pulley mechanism ⑤, the second insulating rope ③ is worn, and the tail end of the second insulating rope ③ is connected with the operating rod ④ fixed with the temporary grounding wire.
其中,第一绝缘绳②连接于细绳①的尾端与滑轮机构⑤之间,其长度为第二预设长度,该第二预设长度不小于待夹导线距离至地面的高度。Wherein, the first insulating rope ② is connected between the tail end of the thin rope ① and the pulley mechanism ⑤, and its length is a second preset length, and the second preset length is not less than the distance from the wire to be clamped to the height of the ground.
第二绝缘绳③穿设于滑轮机构⑤上,其首端将作为工作人员的牵引端、尾端用于连接操作杆④。第二绝缘绳③的长度为第三预设长度,该第三预设长度可选为待夹导线距离至地面的高度的两倍,使得滑轮机构⑤到达临近待夹导线的高度位置时第二绝缘绳③的首端和尾端均位于接近地面的较低位置,以方便工作人员分别在首端和尾端进行操作。The second insulating rope ③ is passed on the pulley mechanism ⑤, and its head end will be used as the traction end of the staff, and the tail end is used to connect the operating rod ④. The length of the second insulating rope ③ is the third preset length, and the third preset length can be twice the height of the wire to be clamped to the ground, so that the pulley mechanism ⑤ reaches the height position of the wire to be clamped in the second The head end and the tail end of insulating rope ③ all are positioned at the lower position close to the ground, to facilitate the staff to operate at the head end and the tail end respectively.
步骤103、牵引细绳①的首端,通过第一绝缘绳②带动滑轮机构⑤上升,直至滑轮机构⑤上升至临近待夹导线的指定高度位置,如图4所示;Step 103, pull the head end of the thin rope ①, drive the pulley mechanism ⑤ to rise through the first insulating rope ②, until the pulley mechanism ⑤ rises to the specified height position close to the wire to be clamped, as shown in Figure 4;
在滑轮机构⑤上升至指定高度位置的同时,第一绝缘绳②的首端也会到达地面位置,此时将第一绝缘绳②的首端固定至地桩,如图5所示,使得滑轮机构⑤保持在指定高度位置。When the pulley mechanism ⑤ rises to the specified height position, the head end of the first insulating rope ② will also reach the ground position. At this time, the head end of the first insulating rope ② is fixed to the ground pile, as shown in Figure 5, so that the pulley Mechanism ⑤ is kept at the designated height position.
另外,在滑轮机构⑤上升至指定高度位置时,第二绝缘绳③的首端和尾端仍会位于地面的临近位置。In addition, when the pulley mechanism ⑤ rises to the designated height position, the head end and tail end of the second insulating rope ③ will still be located near the ground.
步骤104、牵引第二绝缘绳③的首端,利用滑轮机构⑤的单向传动的机械特性,第二绝缘绳③拉动固定于其尾端的操作杆④上升,如图6所示,使得操作杆④上的临时接地线提升,直至临时接地线上的接地线夹与待夹导线等高后,将接地线夹夹住待夹导线,如图7所示。Step 104, pulling the head end of the second insulating rope ③, using the mechanical characteristics of the one-way transmission of the pulley mechanism ⑤, the second insulating rope ③ pulls the operating rod ④ fixed at its tail end to rise, as shown in Figure 6, so that the operating rod ④ Lift the temporary grounding wire on the top until the grounding wire clip on the temporary grounding wire is equal to the height of the wire to be clamped, then clamp the grounding wire clamp to the wire to be clamped, as shown in Figure 7.
其中,操作杆④包括位于顶部的接地线夹和可顺序组装连接的多个绝缘杆。绝缘杆的实际应用数量,可根据当前环境下待夹导线的高度来确定。因此,操作杆④的整体长度可调,可满足不同高度的待夹导线的使用需求,具有较高的普适性。Wherein, the operating rod ④ includes a grounding clamp on the top and a plurality of insulating rods that can be sequentially assembled and connected. The actual application quantity of insulating rods can be determined according to the height of the wires to be clamped under the current environment. Therefore, the overall length of the operating rod ④ is adjustable, which can meet the use requirements of wires to be clamped at different heights, and has high universality.
在操作过程中,可以两人配合操作,一人牵引第二绝缘绳③的首端,另一人一边提升临时接地线一边按需加装绝缘杆,直至整个操作杆④的长度与待夹导线等高。During the operation, two people can work together, one person pulls the head end of the second insulating rope ③, and the other person lifts the temporary grounding wire while installing an insulating rod as needed until the length of the entire operating rod ④ is equal to the height of the wire to be clamped .
当然,也可采用自动牵引机构来牵引第二绝缘绳③,替换人工牵引方式,提高效率,降低人工成本。Of course, an automatic pulling mechanism can also be used to pull the second insulating rope ③, replacing the manual pulling method, improving efficiency and reducing labor costs.
在上述方法中,利用两根绝缘绳和一个滑轮即可完成临时接地线的挂接,与传统的采用吊车辅助挂接方式相比,具有以下明显优点:In the above method, two insulating ropes and one pulley can be used to complete the hooking of the temporary grounding wire. Compared with the traditional crane-assisted hooking method, it has the following obvious advantages:
利用滑轮的单向传动的机械特性来实现,使得整个挂接过程简单高效,无需辅助工具,且不会对设备造成不可逆的机械性损伤,大大降低操作及维护成本;占用的操作空间较小,可有效保证操作工具与临近带电设备保持安全距离,大大降低作用风险;操作时间短,最大程度地缩短了停电检修设备的停送电时间,提高人机功效;普适性强,能够广泛应用于不同类型的设备上。It is realized by using the mechanical characteristics of the one-way transmission of the pulley, which makes the whole hooking process simple and efficient, without the need for auxiliary tools, and will not cause irreversible mechanical damage to the equipment, greatly reducing the operation and maintenance costs; the operation space occupied is small, It can effectively ensure that the operating tools keep a safe distance from nearby live equipment, greatly reducing the risk of action; the short operation time minimizes the power-off time of the power-off maintenance equipment and improves the man-machine efficiency; it is universal and can be widely used on different types of devices.
以上所述,以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。As mentioned above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still understand the foregoing The technical solutions recorded in each embodiment are modified, or some of the technical features are replaced equivalently; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910469687.6A CN110212324A (en) | 2019-05-31 | 2019-05-31 | A kind of hanging device and method of voltage levels temporary ground wire |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910469687.6A CN110212324A (en) | 2019-05-31 | 2019-05-31 | A kind of hanging device and method of voltage levels temporary ground wire |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110212324A true CN110212324A (en) | 2019-09-06 |
Family
ID=67789918
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910469687.6A Pending CN110212324A (en) | 2019-05-31 | 2019-05-31 | A kind of hanging device and method of voltage levels temporary ground wire |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110212324A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111864424A (en) * | 2020-08-20 | 2020-10-30 | 云南玉溪中汇电力设备有限责任公司 | Auxiliary hanger for hanging wire and hanging method thereof |
| CN120527797A (en) * | 2025-07-23 | 2025-08-22 | 国网安徽省电力有限公司灵璧县供电公司 | A wire resetting traction and rewinding mechanism and a wire resetting method |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63161804A (en) * | 1986-12-24 | 1988-07-05 | 四国電力株式会社 | Method of attaching working machine on lines |
| JP2007116835A (en) * | 2005-10-20 | 2007-05-10 | Tokyo Electric Power Co Inc:The | Suspension pulley device used in the overhead ground wire replacement method and overhead ground wire replacement method |
| CN101436764A (en) * | 2008-11-13 | 2009-05-20 | 江苏省电力公司宜兴市供电公司 | Crossover stringing method for overhead line and stringing sheave pulley |
| CN102545103A (en) * | 2012-03-05 | 2012-07-04 | 饶阳县电力局 | Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method |
| CN202444204U (en) * | 2012-03-05 | 2012-09-19 | 饶阳县电力局 | Traction lifting device for high-altitude circuit tools and appliances |
| CN105896379A (en) * | 2016-06-13 | 2016-08-24 | 江西电力职业技术学院 | Hot-line work platform used for overhead transmission line |
| CN106451231A (en) * | 2016-10-08 | 2017-02-22 | 广西电网有限责任公司电力科学研究院 | Method for rapidly hitching power distribution network ice-melting connection lead |
| CN208478598U (en) * | 2018-07-27 | 2019-02-05 | 国网福建省电力有限公司 | Ground hanging and dismantling device for ground wire of primary equipment in substation |
-
2019
- 2019-05-31 CN CN201910469687.6A patent/CN110212324A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63161804A (en) * | 1986-12-24 | 1988-07-05 | 四国電力株式会社 | Method of attaching working machine on lines |
| JP2007116835A (en) * | 2005-10-20 | 2007-05-10 | Tokyo Electric Power Co Inc:The | Suspension pulley device used in the overhead ground wire replacement method and overhead ground wire replacement method |
| CN101436764A (en) * | 2008-11-13 | 2009-05-20 | 江苏省电力公司宜兴市供电公司 | Crossover stringing method for overhead line and stringing sheave pulley |
| CN102545103A (en) * | 2012-03-05 | 2012-07-04 | 饶阳县电力局 | Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method |
| CN202444204U (en) * | 2012-03-05 | 2012-09-19 | 饶阳县电力局 | Traction lifting device for high-altitude circuit tools and appliances |
| CN105896379A (en) * | 2016-06-13 | 2016-08-24 | 江西电力职业技术学院 | Hot-line work platform used for overhead transmission line |
| CN106451231A (en) * | 2016-10-08 | 2017-02-22 | 广西电网有限责任公司电力科学研究院 | Method for rapidly hitching power distribution network ice-melting connection lead |
| CN208478598U (en) * | 2018-07-27 | 2019-02-05 | 国网福建省电力有限公司 | Ground hanging and dismantling device for ground wire of primary equipment in substation |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111864424A (en) * | 2020-08-20 | 2020-10-30 | 云南玉溪中汇电力设备有限责任公司 | Auxiliary hanger for hanging wire and hanging method thereof |
| CN120527797A (en) * | 2025-07-23 | 2025-08-22 | 国网安徽省电力有限公司灵璧县供电公司 | A wire resetting traction and rewinding mechanism and a wire resetting method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103175998B (en) | A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance | |
| WO2021042601A1 (en) | Discharge apparatus and discharge method for direct-current voltage withstand test of oil-filled submarine cable | |
| CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
| CN101958519B (en) | Method for transforming tangent tower of double-circuit double-bundle transmission lines by lifting in electrified mode in another place | |
| CN107834434A (en) | Crossing method for the construction of transmission line of electricity tension stringing | |
| CN104535804A (en) | Portable current transformer test clamp | |
| CN110212324A (en) | A kind of hanging device and method of voltage levels temporary ground wire | |
| CN201449397U (en) | Multi-purpose wiring operating lever based on field high voltage test | |
| CN109342898A (en) | A wiring system for electrical withstand voltage test of insulating tools | |
| CN101546894A (en) | Method for replacing 220KV steel pipe tower composite insulator electrifiedly | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN113009379A (en) | Ultra-high voltage line artificial short circuit test method based on unmanned aerial vehicle inclined pulling method | |
| CN105375391A (en) | Automatic elevation type temporary cross arm | |
| CN102403674A (en) | Live-wire work insulating cross arm | |
| CN114784587B (en) | An auxiliary bonding device for transformer grounding wires | |
| CN201742028U (en) | Pulley used for overhaul of overhead power transmission lines | |
| CN209841999U (en) | A liftable insulating tool electrical withstand voltage test wiring device | |
| CN209948529U (en) | Live lifting mechanism for three-phase lead of straight-line section of 10kV distribution network line | |
| CN105514867A (en) | Method for replacing V-shaped insulator string of power transmission line pole | |
| CN201234089Y (en) | Protective interval for live operation on 1000kV AC very high voltage line | |
| CN203839885U (en) | 10kV/35kV double-loop straight-line electrified pole replacing device | |
| CN219811753U (en) | Unmanned aerial vehicle auxiliary assembly and disassembly ground wire hook | |
| CN102510029B (en) | Ground potential electrified bar cutter device changing method | |
| CN206442059U (en) | A kind of insulated gin | |
| CN209045808U (en) | 500kV transformer substation grounding wire installs auxiliary device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190906 |
|
| RJ01 | Rejection of invention patent application after publication |