CN2909132Y - 电石炉的下料装置 - Google Patents

电石炉的下料装置 Download PDF

Info

Publication number
CN2909132Y
CN2909132Y CN 200620034361 CN200620034361U CN2909132Y CN 2909132 Y CN2909132 Y CN 2909132Y CN 200620034361 CN200620034361 CN 200620034361 CN 200620034361 U CN200620034361 U CN 200620034361U CN 2909132 Y CN2909132 Y CN 2909132Y
Authority
CN
China
Prior art keywords
calcium carbide
raw material
blanking
electrodes
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620034361
Other languages
English (en)
Inventor
罗泽蓉
屈云燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yibin Tianyuan Group Co Ltd
Original Assignee
PINGSHAN TIANYUAN JINSHI CHEMICAL INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGSHAN TIANYUAN JINSHI CHEMICAL INDUSTRY Co Ltd filed Critical PINGSHAN TIANYUAN JINSHI CHEMICAL INDUSTRY Co Ltd
Priority to CN 200620034361 priority Critical patent/CN2909132Y/zh
Application granted granted Critical
Publication of CN2909132Y publication Critical patent/CN2909132Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Carbon And Carbon Compounds (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

本实用新型公开了一种电石炉的下料装置,包括位于电石炉内的数根分别与三根电极相对应的下料管,以及一根位于三根电极中心的中心下料管和与这些下料管相连的电石原料给料机构,所述的电石原料给料机构为相对独立的三组电石原料给料机构,三根电极所对应的下料管分别与三组电石原料给料机构相连,形成三组独立的下料结构,中心下料管与其中的任意一组电石原料给料机构相连,本实用新型实现了每根电极的单独进料,使电极进料配比由原来的不可控变成了可控,避免了因进料配比和电极电流变化不匹配所造成的电石质量不稳定的现象发生,保证了电石质量和正常生产,减少了线路损耗,降低了电石电耗。

Description

电石炉的下料装置
                      技术领域
本实用新型涉及一种电弧法生产碳化钙(电石)的电石炉,尤其是涉及电石炉的下料装置。
                      背景技术
生产碳化钙(电石)是用生石灰和碳素原料在电弧作用下熔融反应生产过程,通电电极从电石炉顶部放下时,与炉内的生石灰和碳素原料接触产生电弧,形成高温,在高温电弧的作用下,生石灰和碳素原料产生熔融现象,生产工业电石。常规的电石炉的下料装置包括位于电石炉内的数根分别与三根电极相对应的下料管以及一根位于三根电极中心的中心下料管和与这些下料管相连的两组电石原料给料机构,这些下料管在电石炉中布置成分别对应三根电极的位置,一组电石原料给料机构与其中几根下料管相连,另一组电石原料给料机构与另外几根剩余的下料管相连,这种连接方式就决定了每根电极对应的下料管不能单独对应一组电石原料给料机构,换句话说一组电石原料给料机构要同时为两根或三根电极对应的下料管供料,3根电极使用的原料相互混合,这种供料结构会带来以下技术问题:
由于每根电极所连接的短网长度不同,产生线路损耗也不同,在生产电石时,需要的操作电阻不同,每根电极上产生的电流不相等,电弧强度不同,这就要求三根电极所进物料的配方有所差异,否则将严重影响电石质量,造成电耗升高,影响正常生产。现有的供料结构不能实现每根电极的单独进料,致使电石质量极其不稳定。
                      发明内容
本实用新型的目的在于克服上述现有技术的缺点而提供一种电石炉的下料装置,该装置可以实现每根电极的单独配料和下料,能保证正常生产电石,电耗更低,所生产的电石质量稳定。
本实用新型的目的是通过如下技术方案实现的:
一种电石炉的下料装置,包括位于电石炉内的数根分别与三根电极相对应的下料管,以及一根位于三根电极中心的中心下料管和与这些下料管相连的电石原料给料机构,其特征在于所述的电石原料给料机构为相对独立的三组电石原料给料机构,三根电极所对应的下料管分别与三组电石原料给料机构相连,形成三组独立的下料结构,中心下料管与其中的任意一组电石原料给料机构相连。
作为本实用新型的进一步改进,可以利用现有的控制技术,如在生产过程中,根据仪表检测,通过DCS系统程序自动计算,显示出不同的操作电阻,生产操作人员根据每根电极操作电阻的变化,给每根电极配不同配比的原料,满足每根电极的不同需要,因为每根电极的电石原料给料机构,即电石原料的配料系统和下料系统是独立的。
本实用新型相比于现有技术有如下优点:
由于本实用新型采用了由三组电石原料给料机构和对应于三根电极的下料管组成的三组独立的下料结构,实现了每根电极的单独进料,使电极进料配比由原来的不可控变成了可控,避免了因进料配比和电极电流变化不匹配所造成的电石质量不稳定的现象发生,保证了电石质量和正常生产,减少了线路损耗,降低了电石电耗。
                    附图说明
图1是本实用新型的结构示意图。图中,电石炉1、电极2-1、2-2、2-3、下料管3-1、3-2、3-3、中心下料管4、电石原料给料机构5-1、5-2、5-3。
                  具体实施方式
下面结合附图和实施例对本实用新型做进一步详细说明,但本实用新型并不只限于这些例子:
实施例1:一种电石炉的下料装置,包括位于电石炉1内的三组12根分别与三根电极2-1、2-2、2-3相对应的下料管3-1、3-2、3-3,以及一根位于三根电极2-1、2-2、2-3中心位置的中心下料管4,三组下料管3-1、3-2、3-3分别和三组的电石原料给料机构5-1、5-2、5-3相连,形成三组独立的下料结构,中心下料管4可与其中的任意一组电石原料给料机构相连,比如,与电石原料给料机构5-1相连。

Claims (1)

1、一种电石炉的下料装置,包括位于电石炉内的数根分别与三根电极相对应的下料管,以及一根位于三根电极中心的中心下料管和与这些下料管相连的电石原料给料机构,其特征在于所述的电石原料给料机构为相对独立的三组电石原料给料机构,三根电极所对应的下料管分别与三组电石原料给料机构相连,形成三组独立的下料结构,中心下料管与其中的任意一组电石原料给料机构相连。
CN 200620034361 2006-05-22 2006-05-22 电石炉的下料装置 Expired - Fee Related CN2909132Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620034361 CN2909132Y (zh) 2006-05-22 2006-05-22 电石炉的下料装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620034361 CN2909132Y (zh) 2006-05-22 2006-05-22 电石炉的下料装置

Publications (1)

Publication Number Publication Date
CN2909132Y true CN2909132Y (zh) 2007-06-06

Family

ID=38128347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620034361 Expired - Fee Related CN2909132Y (zh) 2006-05-22 2006-05-22 电石炉的下料装置

Country Status (1)

Country Link
CN (1) CN2909132Y (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101526309B (zh) * 2008-03-03 2011-04-20 云南云维股份有限公司 一种密闭式电石炉加料嘴及制造工艺
CN103512365A (zh) * 2013-09-30 2014-01-15 郑州耐都耐材科技有限公司 带加强筋的电石炉下料管和具有该电石炉下料管的电石炉
CN103512366A (zh) * 2013-09-30 2014-01-15 郑州耐都耐材科技有限公司 带隔板的电石炉下料管和具有该电石炉下料管的电石炉
CN103512364A (zh) * 2013-09-30 2014-01-15 郑州耐都耐材科技有限公司 电石炉下料管和具有该电石炉下料管的电石炉
CN106643124A (zh) * 2017-02-20 2017-05-10 巴涌 矿热炉粉料直用与异粒径异配比给料

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101526309B (zh) * 2008-03-03 2011-04-20 云南云维股份有限公司 一种密闭式电石炉加料嘴及制造工艺
CN103512365A (zh) * 2013-09-30 2014-01-15 郑州耐都耐材科技有限公司 带加强筋的电石炉下料管和具有该电石炉下料管的电石炉
CN103512366A (zh) * 2013-09-30 2014-01-15 郑州耐都耐材科技有限公司 带隔板的电石炉下料管和具有该电石炉下料管的电石炉
CN103512364A (zh) * 2013-09-30 2014-01-15 郑州耐都耐材科技有限公司 电石炉下料管和具有该电石炉下料管的电石炉
CN103512365B (zh) * 2013-09-30 2015-11-18 郑州耐都耐材科技有限公司 带加强筋的电石炉下料管和具有该电石炉下料管的电石炉
CN103512366B (zh) * 2013-09-30 2015-11-18 郑州耐都耐材科技有限公司 带隔板的电石炉下料管和具有该电石炉下料管的电石炉
CN103512364B (zh) * 2013-09-30 2016-02-17 郑州耐都耐材科技有限公司 电石炉下料管和具有该电石炉下料管的电石炉
CN106643124A (zh) * 2017-02-20 2017-05-10 巴涌 矿热炉粉料直用与异粒径异配比给料

Similar Documents

Publication Publication Date Title
CN2909132Y (zh) 电石炉的下料装置
CN201737825U (zh) 一种中碱玻璃纤维池窑
CN110396567B (zh) 降低转炉终点碳氧积的炉底供气砖布局结构及底吹工艺
CN201212032Y (zh) 一种可实现两条浮法生产线同时生产的玻璃熔窑
CN105645411A (zh) 电石炉以及制备电石的方法
CN203256109U (zh) 生产玄武岩连续纤维的全电熔池窑
CN210457942U (zh) 一种全氧窑炉的烟气排放装置
CN101921051A (zh) 玻璃电熔窑炉
CN208604006U (zh) 一种玻璃窑炉用加热电极连接结构
AU655683B2 (en) An improved process for the continuous manufacture of impurity and iron-free electrodes for electric arc furnaces
CN214991118U (zh) 一种生产纯玄武岩纤维专用多漏板池窑
CN215365450U (zh) 玄武岩纤维立式加热炉
CN103276146A (zh) 一种高效防堵快速更换浸入式喂丝套管装置及方法
CN108439407A (zh) 一种氧热法生产电石的装置
CN202390564U (zh) 一种石墨热场加热器
CN205170894U (zh) 高钛渣冶炼炉加盖装置
CN207742562U (zh) 一种盖板或基板玻璃生产池炉两侧料山状态监测装置
CN112080649A (zh) 一种红土镍矿经矿热炉高功率下冶炼镍铁的工艺
CN201052994Y (zh) 玻璃纤维池窑结构
CN202369849U (zh) 连接竹片双螺旋的专用连接管
CN205873910U (zh) 一种内串石墨化炉装置
CN103717988B (zh) 还原炉
CN201875718U (zh) 玻璃车床用的喷灯
CN100374370C (zh) 二次焙烧与石墨化系统及二次焙烧与石墨化工艺方法
CN209468472U (zh) 一种用于生产模具钢的lf精炼炉

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: YIBIN TIANYUAN GROUP CO., LTD.

Free format text: FORMER OWNER: PINGSHAN TIANYUAN CHEMICAL JINSHI CO.LTD.

Effective date: 20080321

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080321

Address after: Lower Jiangbei, Yibin City, Sichuan Province, China: 644004

Patentee after: YiBin TianYuan Group Co., Ltd.

Address before: Pingshan County of Sichuan province Jinsha Industrial Park, zip code: 645350

Patentee before: Pingshan Tianyuan Jinshi Chemical Industry Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070606

Termination date: 20150522

EXPY Termination of patent right or utility model