CN2900754Y - Double layer slide frame propeller for drill vehicle - Google Patents

Double layer slide frame propeller for drill vehicle Download PDF

Info

Publication number
CN2900754Y
CN2900754Y CN 200620008537 CN200620008537U CN2900754Y CN 2900754 Y CN2900754 Y CN 2900754Y CN 200620008537 CN200620008537 CN 200620008537 CN 200620008537 U CN200620008537 U CN 200620008537U CN 2900754 Y CN2900754 Y CN 2900754Y
Authority
CN
China
Prior art keywords
balladeur train
oil cylinder
propeller
upper slide
propulsive mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620008537
Other languages
Chinese (zh)
Inventor
刘建
赵振国
胡赋
李志坚
任清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiakou Xuanhua Huatai Mining & Metallurgic Machinery Co Ltd
Original Assignee
Zhangjiakou Xuanhua Huatai Mining & Metallurgic Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiakou Xuanhua Huatai Mining & Metallurgic Machinery Co Ltd filed Critical Zhangjiakou Xuanhua Huatai Mining & Metallurgic Machinery Co Ltd
Priority to CN 200620008537 priority Critical patent/CN2900754Y/en
Application granted granted Critical
Publication of CN2900754Y publication Critical patent/CN2900754Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to digging mechanical units for mining or tunnel construction, in concrete to a propeller of two-layer carriages for a jumbo. The current propeller comprises a single-layer carriage, an oil cylinder which is a cable wire propeller, and a rock drill. The range of the jumbo hole is limited. The propeller is two-layer carriages, wherein, a bottom carriage comprises a bottom slide, a bottom block and an oil cylinder propeller, according to the relative movement between the top and the bottom carriages, the hole depth of the jumbo is improved by 1.5 times. The propeller can rotate upward to drill an anchor hole in a narrow entry, and the application scope of the jumbo is increased.

Description

The double-deck carriage mover of drill carriage
One. technical field:
The utility model belongs to mining or constructing tunnel mining machinery parts, specifically tunnels the double-deck carriage mover on the drill carriage.
Two. background technology
The driving drill carriage is the key equipment of rock gangway mechanization rock drilling.This machine is made up of several parts of propeller, support arm, chassis, power and hydraulic system, wherein propeller is the main working parts of drill carriage, the propeller of former drill carriage is the individual layer carriage mover, mainly form by balladeur train, slide plate, hammer drill, oil cylinder-wire rope propulsion system, hammer drill and puncheon centralizing device, its effective propelling stroke is by the stroke decision of balladeur train length and oil cylinder-wire rope propulsion system, and propeller length is fixed value.Because the drift section height is relatively low, former drill carriage propeller total length is greater than head-room, so can not bore bolthole upwards under the prerequisite of satisfied Drilling medium-length hole forward.
Three. summary of the invention;
The purpose of this utility model be also want when solving dark shot hole Drilling in the satisfying that the user proposes can the Drilling bolthole specific (special) requirements, we have designed double-deck carriage mover.
This utility model is achieved in that
This propeller comprises balladeur train, following balladeur train, hammer drill, wherein go up balladeur train and comprise upper slide, top shoe, oil cylinder-wire rope propulsive mechanism, hammer drill is contained on the top shoe of balladeur train, top shoe is contained on the upper slide again, the cylinder block of oil cylinder-wire rope propulsive mechanism is fixed on the upper slide, top shoe links to each other with the oil cylinder piston bar by the wire rope pulley combination, the downslide chord position is below last balladeur train, following balladeur train comprises lower skateboard, the two pairs of sliding blocks and oil cylinder propulsive mechanism, sliding block has chute to cooperate with the slideway of slide plate up and down respectively, last sliding block is fixed on the upper slide, the a pair of sliding block in back is fixed on the lower skateboard, the cylinder block end of oil cylinder propulsive mechanism is hinged on the lower skateboard, and piston rod head is hinged on the upper slide.Last balladeur train can carry out relative motion by following oil cylinder propulsive mechanism with following balladeur train, and hammer drill is promoted by the oil cylinder in the last balladeur train-wire rope propulsive mechanism.
Design by double-deck balladeur train, increased the propelling stroke scope of hammer drill, double-deck balladeur train has increased the propelling stroke of hammer drill when staggering, can adapt to the requirement of beating darker shot hole, shortened the propeller length overall when closing up, can adapt in narrow tunnel propeller and overturn and upwards to play the requirement of bolthole.The more former propeller of propelling length of hammer drill has increased about 1.5 times.Reduce labour intensity and operating personnel's quantity of the artificial Drilling bolthole of workman, can significantly reduce personal casualty rate.
Four. description of drawings:
The utility model is described in further detail below in conjunction with accompanying drawing;
Accompanying drawing 1 is the utility model general assembly schematic diagram;
Accompanying drawing 2 is the utility model B-B sectional views;
Five. the specific embodiment;
This propeller comprises balladeur train, following balladeur train, hammer drill 6, wherein go up balladeur train and comprise upper slide 4, top shoe 5, oil cylinder-wire rope propulsive mechanism 3, hammer drill 6 is contained on the top shoe 5 of balladeur train, top shoe 5 is contained in again on the upper slide 4, the cylinder block of oil cylinder-wire rope propulsive mechanism 3 is fixed on the upper slide 4, top shoe 5 links to each other with the oil cylinder piston bar by the wire rope pulley combination, the downslide chord position is below last balladeur train, following balladeur train comprises lower skateboard 2, the two pairs of sliding blocks 1 and oil cylinder propulsive mechanism 7, sliding block 1 has chute to cooperate with the slideway of slide plate up and down respectively, last sliding block is fixed on the upper slide 4, the a pair of sliding block in back is fixed on the lower skateboard 2, the cylinder block end of oil cylinder propulsive mechanism 7 is hinged on the lower skateboard 2, and tailpiece of the piston rod is hinged on the upper slide 4.Last balladeur train can carry out relative motion by oil cylinder propulsive mechanism 7 with following balladeur train, and hammer drill 6 is promoted by the oil cylinder in the last balladeur train-wire rope propulsive mechanism 3.
When forward medium-length hole of Drilling, initial position is that sledge position is to stagger up and down, hammer drill 6 is positioned at the end of upper slide 4, at first advance upper slide 4 is pushed ahead by following oil cylinder propulsion system 7, after slide plate closes up up and down, oil cylinder-wire rope propulsion system 3 in the last balladeur train is moved hammer drill 6 is continued to push ahead, and finishes until boring.

Claims (1)

1. double-deck carriage mover of drill carriage, include balladeur train, following balladeur train, hammer drill, wherein go up balladeur train and comprise upper slide (4), top shoe (5), oil cylinder one wire rope propulsive mechanism (3), hammer drill (6) is contained on the top shoe (5) of balladeur train, top shoe (5) is contained in again on the upper slide (4), the cylinder block end of oil cylinder one wire rope propulsive mechanism (3) is fixed on the upper slide (4), top shoe (5) links to each other with the oil cylinder piston bar by the wire rope pulley combination, it is characterized in that gliding chord position below last balladeur train, following balladeur train comprises lower skateboard (2), two pairs of sliding blocks (1) and oil cylinder propulsive mechanism (7), sliding block (1) has chute to cooperate with the slideway of slide plate up and down respectively, last sliding block is fixed on the upper slide (4), the a pair of sliding block in back is fixed on the lower skateboard (2), the cylinder block end of oil cylinder propulsive mechanism (7) is hinged on the lower skateboard (2), and tailpiece of the piston rod is hinged on the upper slide (4).
CN 200620008537 2006-03-20 2006-03-20 Double layer slide frame propeller for drill vehicle Expired - Lifetime CN2900754Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620008537 CN2900754Y (en) 2006-03-20 2006-03-20 Double layer slide frame propeller for drill vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620008537 CN2900754Y (en) 2006-03-20 2006-03-20 Double layer slide frame propeller for drill vehicle

Publications (1)

Publication Number Publication Date
CN2900754Y true CN2900754Y (en) 2007-05-16

Family

ID=38084919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620008537 Expired - Lifetime CN2900754Y (en) 2006-03-20 2006-03-20 Double layer slide frame propeller for drill vehicle

Country Status (1)

Country Link
CN (1) CN2900754Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397894A (en) * 2013-07-29 2013-11-20 三一重型装备有限公司 Anchor mechanism and engineering machinery with same
CN103485714A (en) * 2013-09-06 2014-01-01 三一重型装备有限公司 Drilling mechanism and drill loader
CN103498682A (en) * 2013-10-24 2014-01-08 中铁隧道集团有限公司 Hauling mechanism for drill jumbo to pull drilling machine to walk
CN105421998A (en) * 2015-11-27 2016-03-23 湖南恒至凿岩科技股份有限公司 Hydraulic drill wagon for coal mine
CN107476768A (en) * 2017-09-18 2017-12-15 阿特拉斯科普柯(南京)建筑矿山设备有限公司 A kind of rock drill propulsive mechanism
CN110306935A (en) * 2019-06-28 2019-10-08 三峡大学 The sliding mounting base of rock drill principal arm

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397894A (en) * 2013-07-29 2013-11-20 三一重型装备有限公司 Anchor mechanism and engineering machinery with same
CN103397894B (en) * 2013-07-29 2015-05-13 三一重型装备有限公司 Anchor mechanism and engineering machinery with same
CN103485714A (en) * 2013-09-06 2014-01-01 三一重型装备有限公司 Drilling mechanism and drill loader
CN103485714B (en) * 2013-09-06 2016-08-24 三一重型装备有限公司 A kind of drilling mechanism and drill loader
CN103498682A (en) * 2013-10-24 2014-01-08 中铁隧道集团有限公司 Hauling mechanism for drill jumbo to pull drilling machine to walk
CN103498682B (en) * 2013-10-24 2015-10-28 中铁隧道集团有限公司 The haulage gear of jumbo traction rig walking
CN105421998A (en) * 2015-11-27 2016-03-23 湖南恒至凿岩科技股份有限公司 Hydraulic drill wagon for coal mine
CN107476768A (en) * 2017-09-18 2017-12-15 阿特拉斯科普柯(南京)建筑矿山设备有限公司 A kind of rock drill propulsive mechanism
CN107476768B (en) * 2017-09-18 2024-03-29 安百拓(南京)建筑矿山设备有限公司 Rock drill advancing mechanism
CN110306935A (en) * 2019-06-28 2019-10-08 三峡大学 The sliding mounting base of rock drill principal arm

Similar Documents

Publication Publication Date Title
CN2900754Y (en) Double layer slide frame propeller for drill vehicle
CN104612586B (en) Tunneling boring rapid drilling drill carriage for the big emptying aperture parallel cut blasting in tunnel
CN108590518B (en) Adjustable anchor rod drilling machine for high slope anchoring
CN104695871A (en) Drilling boom device of two-boom hydraulic rock bolt drilling carriage
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN105822225B (en) A kind of two Drilling rock jib structure of an arm
CN201460729U (en) Excavation machine onboard jumbolter
CN101343981A (en) Integrated drill rig
CN105887907B (en) Native machine is taken for Soft Soil well sinking
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
CN101812974A (en) Lifting platform of construction vehicle
CN111485900A (en) Rock tunnel boring machine
CN109026048A (en) A kind of climbing control method of high inclination-angle development machine
CN201367911Y (en) Crawler walking type hydraulic support
CN201273140Y (en) Integrated drill rig
CN104763327A (en) Pneumatic-hydraulic hybrid type laneway excavating drill jambo
CN104612735B (en) Temporary support for drivage face hydraulic support
CN205135410U (en) Balladeur train telescopic drill jumbo propeller
CN101082263A (en) Anchor rod driller multiplication propulsion unit
CN200975211Y (en) Telescopic thruster for digging drill carriage
CN102383793B (en) Dual function machine for drilling and loading in tunnel
CN101598002A (en) A kind of gantry type rig
CN205558804U (en) Dig and change down -hole drill
CN203640602U (en) Pneumatic and hydraulic hybrid roadway construction drilling jumbo
CN102425415A (en) Gangue racking machine for half-coal rock roadway blasting driving

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20070516

EXPY Termination of patent right or utility model