CN2856419Y - 一种盾构隧道的进洞防水装置 - Google Patents
一种盾构隧道的进洞防水装置 Download PDFInfo
- Publication number
- CN2856419Y CN2856419Y CN 200520048061 CN200520048061U CN2856419Y CN 2856419 Y CN2856419 Y CN 2856419Y CN 200520048061 CN200520048061 CN 200520048061 CN 200520048061 U CN200520048061 U CN 200520048061U CN 2856419 Y CN2856419 Y CN 2856419Y
- Authority
- CN
- China
- Prior art keywords
- spring plate
- steel spring
- walling crib
- appts
- shield
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及防水装置类,具体是涉及一种用于盾构隧道的进洞防水装置,该装置在井圈进口处设置橡胶板,并通过气囊和弹簧钢板对其的压合,以满足盾构进洞时的水密要求,其优点是,当盾构进洞时,气囊充气膨胀,将橡胶板紧密包裹于盾构或衬砌外表面,使盾构与井圈之间间隙处具有很好的水密性,避免了可能产生的泥水渗漏,改变了以往盾构进洞仅靠土体加固的单一措施,提高了盾构进洞的安全系数。
Description
技术领域
本实用新型涉及防水装置类,具体的讲是涉及一种用于地下结构盾构隧道的进洞防水装置。
背景技术
现有盾构隧道的进洞防水是通过土体加固方式来进行的,一般主要是在进洞口周边地区采用搅拌桩、旋喷桩或者是冻结法等土体加工方式施工,搅拌桩、旋喷桩主要施工原理是在进洞口一定范围内的土体里形成连续的止水帷幕,结合井点降水方法以保证盾构进洞开挖面的安全;冻结法主要施工原理是在进洞口采用冻结设备,使一定范围内的土体冻结变硬,保证了盾构进洞开挖面的安全。其缺点在于土体加固范围较大,要保证加固的均质性很困难,现场虽然可取样检测,但取样点有限,无法保证整个土体皆达到设计要求。
发明内容
本实用新型的目的是根据上述现有技术的不足之处,提供一种盾构隧道的进洞防水装置,该装置在井圈进口处设置橡胶板,并通过气囊和弹簧钢板对其的压合,以满足盾构进洞时的水密要求。
本实用新型目的实现由以下技术方案完成:
一种盾构隧道的进洞防水装置,包括井圈、衬砌管片,其特征在于该装置由橡胶板、弹簧钢板、气囊及其充气管构成,其中橡胶板的一端固定在井圈内壁上,另一端紧紧包裹于衬砌管片外壁,弹簧钢板的一端与井圈内壁固定连接,另一端紧贴橡胶板包裹于衬砌管片外壁,气囊位于井圈内壁和弹簧钢板之间,其充气管预埋在井圈中。
弹簧钢板与橡胶板贴合,形状匹配,二者的一端与井圈内壁螺栓固定,另一端弹簧钢板通过橡胶板紧紧包裹于衬砌管片外壁。
弹簧钢板位置交叉处设置有弧状弹簧钢板,该板的一端与井圈内壁固定连接,另一端部呈圆弧状,该圆弧状端部在充气后的气囊作用下与弹簧钢板接触,并对其产生压力,压力的大小取决于气囊充气量的多少。
气囊数量可以为两个,二者依次排放,充气后一个接触压迫弹簧钢板,另一个接触压迫弧状弹簧钢板。
本实用新型的优点是,当盾构进洞时,气囊充气膨胀,将橡胶板紧密包裹于盾构或衬砌外表面,使盾构与井圈之间间隙处具有很好的水密性,避免了可能产生的泥水渗漏,改变了以往盾构进洞仅靠土体加固的单一措施,提高了盾构进洞的安全系数。
附图概述
附图1为盾构进洞土体加固图;
附图2为本实用新型结构示意图;
具体技术方案
以下结合附图通过实施例对本实用新型特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-2所示,标号1-21分别表示:盖形螺母1、三通接头2、井圈3、垫圈4、螺栓5、压块6、气囊7、帘布橡胶板8、弹簧钢板9、弧状弹簧钢板10、衬砌管片外壁11、充气管12、井圈钢板13、盖形螺母14、弧状弹簧钢板10的圆弧状端部15、盾构推进方向16、经加固过的土体17、围护结构18、内衬19、预埋钢环20、环形钢筋混凝土保护圈21。
本实施例包括井圈3、衬砌管片11、帘布橡胶板8、弹簧钢板9、弧状弹簧钢板10、气囊7及其充气管12,其中橡胶板8的一端螺栓固定在井圈钢板13内壁上,另一端紧紧包裹于衬砌管片外壁11,弹簧钢板9的一端与井圈钢板13内壁螺栓固定连接,另一端紧贴橡胶板8包裹于衬砌管片外壁11,弹簧钢板9与橡胶板8贴合,形状匹配,二者的设置角度是与水平方向呈45°角。位于井圈钢板13内壁和弹簧钢板9之间设置气囊7,气囊7的充气管12预埋在井圈3中。在与弹簧钢板9位置交叉处设置有弧状弹簧钢板10,该板10的一端与井圈钢板13内壁螺栓固定连接,另一端部呈圆弧状,该圆弧状端部15在充气后的气囊7作用下与弹簧钢板9接触,并对其产生压力,压力的大小取决于气囊7充气量的多少。
气囊7数量为两个,呈环形,且二者依次排放,充气后一个接触压迫弹簧钢板9,另一个接触压迫弧状弹簧钢板10。充气管12连接有三通接头2,一通接井圈3外端,另两头分别接气囊7。
在本实施例中弹簧钢板9和弧状弹簧钢板10以及气囊7均是沿井圈内壁圆周方向呈环形设置。显然本领域技术人员可以认识到气囊7的的设置也可以是沿圆周方向均匀分段设置,只要是能够实现对钢板9、10均匀施力即可。
本实施例在浇注隧道井圈混凝土前,预埋盖形螺母1、14于井圈钢板上,同时预埋两根充气管12,充气管12以三通接头2相连接,盾构进洞前,安装帘布橡胶板8和弹簧钢板9、弧状弹簧钢板10、气囊7,弹簧钢板9和帘布橡胶板8采用压块6固定于预埋盖形螺母1处,弧状弹簧钢板10采用螺栓固定于预埋盖形螺母14处。盾构进洞时,气囊7充气膨胀,推动弹簧钢板9、弧状弹簧钢板10作用于帘布橡胶板8,使橡胶板8紧密包裹于盾构或衬砌管片外壁11,达到水密要求。
Claims (7)
1、一种盾构隧道的进洞防水装置,包括井圈、衬砌管片,其特征在于该装置由橡胶板、弹簧钢板、气囊及其充气管构成,其中橡胶板的一端固定在井圈内壁上,另一端紧紧包裹于衬砌管片外壁,弹簧钢板的一端与井圈内壁固定连接,另一端紧贴橡胶板包裹于衬砌管片外壁,气囊位于井圈内壁和弹簧钢板之间,其充气管预埋在井圈中。
2、根据权利要求1所述的一种盾构隧道的进洞防水装置,其特征在于所述弹簧钢板与橡胶板贴合,形状匹配,二者的一端与井圈内壁螺栓固定,另一端弹簧钢板通过橡胶板紧紧包裹于衬砌管片外壁。
3、根据权利要求1或2所述的一种盾构隧道的进洞防水装置,其特征在于所述的弹簧钢板与橡胶板的设置角度是与水平方向呈45°角。
4、根据权利要求1所述的一种盾构隧道的进洞防水装置,其特征在于与所述的弹簧钢板位置交叉处设置有弧状弹簧钢板,该板的一端与井圈内壁固定连接,另一端部呈圆弧状,该圆弧状端部在充气后的气囊作用下与弹簧钢板接触,并对其产生压力,压力的大小取决于气囊充气量的多少。
5、根据权利要求1所述的一种盾构隧道的进洞防水装置,其特征在于所述的气囊数量为两个,二者依次排放,充气后一个接触压迫弹簧钢板,另一个接触压迫弧状弹簧板。
6、根据权利要求1或4所述的一种盾构隧道的进洞防水装置,其特征在于所述的固定连接指的是螺栓连接,该连接是将盖形螺母预埋在井圈中,再通过螺栓固定。
7、根据权利要求1所述的一种盾构隧道的进洞防水装置,其特征在于所述的充气管连接有三通接头,一头接井圈外端,另两头分别接气囊。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520048061 CN2856419Y (zh) | 2005-12-27 | 2005-12-27 | 一种盾构隧道的进洞防水装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520048061 CN2856419Y (zh) | 2005-12-27 | 2005-12-27 | 一种盾构隧道的进洞防水装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2856419Y true CN2856419Y (zh) | 2007-01-10 |
Family
ID=37599727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520048061 Expired - Lifetime CN2856419Y (zh) | 2005-12-27 | 2005-12-27 | 一种盾构隧道的进洞防水装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2856419Y (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100419210C (zh) * | 2005-12-27 | 2008-09-17 | 上海市隧道工程轨道交通设计研究院 | 盾构隧道的进洞防水装置 |
CN102345465A (zh) * | 2011-06-21 | 2012-02-08 | 上海隧道工程股份有限公司 | 盾构到达箍紧密封装置 |
CN102678133A (zh) * | 2012-06-06 | 2012-09-19 | 陈建波 | 掘进设备进入接收井时的止水装置及方法 |
CN102797473A (zh) * | 2012-09-10 | 2012-11-28 | 上海市机械施工有限公司 | 盾构进站装置 |
CN105114125A (zh) * | 2015-07-29 | 2015-12-02 | 上海隧道工程有限公司 | 隧道气囊充气装置以及隧道气囊的充气方法 |
-
2005
- 2005-12-27 CN CN 200520048061 patent/CN2856419Y/zh not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100419210C (zh) * | 2005-12-27 | 2008-09-17 | 上海市隧道工程轨道交通设计研究院 | 盾构隧道的进洞防水装置 |
CN102345465A (zh) * | 2011-06-21 | 2012-02-08 | 上海隧道工程股份有限公司 | 盾构到达箍紧密封装置 |
CN102678133A (zh) * | 2012-06-06 | 2012-09-19 | 陈建波 | 掘进设备进入接收井时的止水装置及方法 |
CN102678133B (zh) * | 2012-06-06 | 2014-10-29 | 上海市基础工程集团有限公司 | 掘进设备进入接收井时的止水装置及方法 |
CN102797473A (zh) * | 2012-09-10 | 2012-11-28 | 上海市机械施工有限公司 | 盾构进站装置 |
CN105114125A (zh) * | 2015-07-29 | 2015-12-02 | 上海隧道工程有限公司 | 隧道气囊充气装置以及隧道气囊的充气方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209742914U (zh) | 一种地下工程施工背后回填注浆橡胶充气封堵装置 | |
CN109595392B (zh) | F型钢筋混凝土中继间顶管 | |
US3665717A (en) | Method and apparatus for installing elongated rods in unstable earth formations | |
CN100419210C (zh) | 盾构隧道的进洞防水装置 | |
CN205618200U (zh) | 一种充气式隧道盾构密封高压橡胶气囊 | |
CN100552186C (zh) | 盾构隧道的进洞防水方法 | |
CN110593896B (zh) | 一种防止盾构隧道不均匀沉降的结构与实施方法 | |
CN106121722A (zh) | 一种快速构筑密闭墙的方法 | |
WO2008009344A3 (de) | Befestigung von kunststoff-folie und von betonfertigteilen an ankern | |
CN2856419Y (zh) | 一种盾构隧道的进洞防水装置 | |
CN207761660U (zh) | 一种带支撑调向机构的中继顶进系统 | |
CN111827248A (zh) | 孔内气囊膨胀加压和真空-电渗复合疏干降水系统和方法 | |
CN108086986B (zh) | 一种盾构接收用钢套筒 | |
CN101705788B (zh) | 一种防喷塞掩护斜向钻孔的施工方法 | |
CN204476353U (zh) | 一种瓦斯抽采钻孔封堵装置 | |
CN210978736U (zh) | 一种适用于高水压条件曲线顶管接口止水结构 | |
CN1166852C (zh) | 全断面掘进机的施工方法 | |
CN213088005U (zh) | 一种集成化盾构始发装置 | |
CN207436048U (zh) | 一种螺旋桩 | |
CN212670545U (zh) | 侧胀挤密复合真空排水型软基加固系统 | |
CN211368692U (zh) | 一种锚固施工中的止水装置 | |
CN205206835U (zh) | 一种带持续张力的管片二次衬砌设备 | |
CN2459349Y (zh) | 桩端桩侧压浆管 | |
CN209369836U (zh) | 一种洞口与顶管之间的止水装置 | |
CN2658240Y (zh) | 牵引式气堵 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Effective date of abandoning: 20080917 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |