CN2837381Y - Reinforced cement bonded sand composite pile - Google Patents

Reinforced cement bonded sand composite pile Download PDF

Info

Publication number
CN2837381Y
CN2837381Y CN 200520076117 CN200520076117U CN2837381Y CN 2837381 Y CN2837381 Y CN 2837381Y CN 200520076117 CN200520076117 CN 200520076117 CN 200520076117 U CN200520076117 U CN 200520076117U CN 2837381 Y CN2837381 Y CN 2837381Y
Authority
CN
China
Prior art keywords
pile
cement
sand
composite pile
reinforced cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200520076117
Other languages
Chinese (zh)
Inventor
邓亚光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520076117 priority Critical patent/CN2837381Y/en
Application granted granted Critical
Publication of CN2837381Y publication Critical patent/CN2837381Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a reinforced cement bonded sand composite pile comprising a cement body with sand grain and mud pellet inside. The reinforced cement bonded sand composite pile has a rational structure, and greatly improves the strength intensity, the stiffness, the density and the bearing capacity of the pile body. The hardness of the soft part of the bottom and the body of the composite pile is strengthened, effectively increasing the side-friction force of the pile body and resistance of the pile tip.

Description

Stiffness sand-cement composite pile
Technical field:
The utility model relates to the stake that a kind of Foundation Design is used.
Background technology:
During existing ground is handled, general cement mixing pile, the sand-gravel pile etc. of adopting, cement mixing pile (particularly powder spray piling) construction is simple, and cost is lower, has bigger stake surface area that bigger side friction and end resistance is provided, but because of intensity low, the Load Transfer degree of depth is little, generally only is 5~7D, and bearing capacity of single pile lower (especially when soft layers such as underground river creek are arranged), add that some construction team's quality lowly uses inferior materials and turns out substandard goods, accident takes place frequently.And the micro-vibration pipeline sinking pile, a lengthening hand steeredly can pass in and out the field from the hanging tractor, can form compacted sand-gravel pile, plain concrete stake and reinforced concrete pile, be characterized in easy construction, construct in the place that narrower or soft other large-scale stake machines can't be marched into the arena, cheap, vibration, noise are also less, though but sand-gravel pile has compacted and quickens the effect of soil solidifying, " because of itself being bulk solid; its effect is restricted by the passive bound of pile peripheral earth; the Load Transfer degree of depth is littler, only be 2-4D, easily swell is burst bad and the bearing capacity increase rate is less.And the higher plain concrete of rigidity is identical with other rigid pile with steel concrete mini pile, less pile side resistance and end resistance then is provided because of pile body surface is long-pending less, many states that reach capacity because of sedimentation is excessive when pile shaft material intensity is not given full play to, cause pile shaft material intensity major part to be wasted, and bearing capacity of single pile little (intensity of this type and bearing capacity are subjected to this weakness position control and bearing capacity is littler when having soft layer such as underground river creek to exist, even occur " negative friction ").
Summary of the invention:
It is a kind of rational in infrastructure that the purpose of this utility model is to provide, the stiffness sand-cement composite pile that intensity and bearing capacity are big.
Technical solution of the present utility model is:
A kind of stiffness sand-cement composite pile is characterized in that: body of cement is arranged, be furnished with sand grains in the body of cement, be furnished with the earth grain in the body of cement.
In the complex that body of cement and sand grains, grogs form, be provided with steel core.
The utility model is rational in infrastructure, has increased substantially intensity, rigidity, density and the bearing capacity of pile body.At the bottom of the composite pile stake and the weak part hardness of pile body strengthen, effectively improve pile body side-friction force and end resistance.
Description of drawings:
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the configuration diagram of embodiment 1.
Fig. 2 is the configuration diagram of embodiment 2.
The specific embodiment:
Embodiment 1:
A kind of stiffness sand-cement composite pile has body of cement 1, is furnished with sand grains 2 in the body of cement 1, is furnished with earth grain 3 in the body of cement 1.
Can adopt one of following method to carry out during construction:
1, adopt the powder spray piling job practices, during the powder spray, with sand, cement mixing, ejection is together stirred again, and grogs is stirred into, and promptly forms stiffness sand-cement composite pile.
2, adopt the powder spray piling job practices, elder generation's sandblast during the powder spray, and stir formation sand agitation pile, and carry out the cement mixing pile construction again at sand agitation pile center, promptly form stiffness sand-cement composite pile.
3, adopt the powder spray piling job practices, elder generation's spraying cement forms powder spray piling during the powder spray, carries out multiple sandblast at the powder spray piling center again, stirs grogs is stirred into, and promptly forms stiffness sand-cement composite pile.
4, employing wet shot pile construction method pumps cement mortar with mortar pump, stirs grogs is stirred into again, and promptly forms stiffness sand-cement composite pile.
Also can adopt other suitable job practicess.
Embodiment 2:
A kind of stiffness sand-cement composite pile has body of cement 4, is furnished with sand grains 5 in the body of cement 4, is furnished with earth grain 6 in the body of cement 4.In the complex that body of cement 4 and sand grains 5, grogs 6 form, be provided with steel core 7 (reinforcing bar, steel pipe or shaped steel etc.).

Claims (2)

1, a kind of stiffness sand-cement composite pile is characterized in that: body of cement is arranged, be furnished with sand grains in the body of cement, be furnished with the earth grain in the body of cement.
2, stiffness sand-cement composite pile according to claim 1 is characterized in that: be provided with steel core in the complex that body of cement and sand grains, grogs form.
CN 200520076117 2005-09-28 2005-09-28 Reinforced cement bonded sand composite pile Expired - Lifetime CN2837381Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520076117 CN2837381Y (en) 2005-09-28 2005-09-28 Reinforced cement bonded sand composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520076117 CN2837381Y (en) 2005-09-28 2005-09-28 Reinforced cement bonded sand composite pile

Publications (1)

Publication Number Publication Date
CN2837381Y true CN2837381Y (en) 2006-11-15

Family

ID=37391864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520076117 Expired - Lifetime CN2837381Y (en) 2005-09-28 2005-09-28 Reinforced cement bonded sand composite pile

Country Status (1)

Country Link
CN (1) CN2837381Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638575A (en) * 2017-01-10 2017-05-10 邓亚光 Reinforcing method of pile body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638575A (en) * 2017-01-10 2017-05-10 邓亚光 Reinforcing method of pile body

Similar Documents

Publication Publication Date Title
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN108411889B (en) Structured cemented gravel pile and construction method thereof
CN101644053A (en) Method for enhancing pulling-resistant and tensile-resistant capability of soft and weak soil layer anchor rod/anchor rope
US20170183838A1 (en) Multi-tank onsite flowable fill system and related methods
CN110984213A (en) Offshore wind power single pile-friction cone composite foundation and construction method thereof
CN104631430A (en) Method for soft soil foundation treatment through microorganism grouting sand drain
CN102505684A (en) Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN201148614Y (en) Gas assist vibration punching stone column construction equipment
CN101525880A (en) Plastic sleeve concrete pile and method thereof for reinforcing soft soil foundation
CN103410142B (en) A kind of construction method of punching bottom-enlarging filling pile and expansion end device
CN101831904A (en) Permeable concrete pile
CN2837381Y (en) Reinforced cement bonded sand composite pile
CN201843153U (en) Loader and working mechanism thereof
CN1743561A (en) Column-hammer forced tamping substitution method
CN105484230A (en) Pile and soil concreted and integrated composite pile and construction method thereof
CN208290197U (en) A kind of Multifunctional pile work vehicle
CN211898504U (en) Offshore wind power single pile-friction cone composite foundation
CN102733407A (en) Two-ring grouted single pile foundation
CN201598632U (en) Cement mortar mixing pile for reinforcing soft foundation
CN208563316U (en) A kind of large-section in-situ concrete pile pile-end sediment sediment processing unit
CN1891913A (en) Counterweight punching-expanding replacement method
CN2837382Y (en) Granular materials grouting composite pile
CN1632236A (en) Stiffening core composite pile and construction method thereof
CN201411687Y (en) Corrugated plastic sleeve pipe granule grouting pile with hole
CN1259604A (en) Cement earth reinforced composite piling method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20061115

EXPY Termination of patent right or utility model