CN2828146Y - Flushing gas-lift pile sinking construction equipment - Google Patents

Flushing gas-lift pile sinking construction equipment Download PDF

Info

Publication number
CN2828146Y
CN2828146Y CN 200520111505 CN200520111505U CN2828146Y CN 2828146 Y CN2828146 Y CN 2828146Y CN 200520111505 CN200520111505 CN 200520111505 CN 200520111505 U CN200520111505 U CN 200520111505U CN 2828146 Y CN2828146 Y CN 2828146Y
Authority
CN
China
Prior art keywords
crane
pile
utility
model
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520111505
Other languages
Chinese (zh)
Inventor
吴金水
吴建华
陈知奋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200520111505 priority Critical patent/CN2828146Y/en
Application granted granted Critical
Publication of CN2828146Y publication Critical patent/CN2828146Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a flushing gas lift pile sinking construction device which has the technical scheme that the utility model is composed of a crane and a static pile press provided with a pipe pile clamp. The utility model has the improvement that a lift hook on the crane is lifted with a gas flushing pipe and a water flushing pipe, wherein one end of the gas flushing pipe and one end of the water flushing pipe are respectively connected with an air compressor and a centrifugal pump; the other end of the gas flushing pipe and the other end of the water flushing pipe are arranged in a through hole of a prefabricating pipe pile. In addition, the air compressor is connected with a gas storage tank and the centrifugal pump is connected with a water reservoir. The utility model has the advantages that an original static pressure method construction device is improved to be suitable for the flushing gas lift method auxiliary pile sinking technology adopted in the construction at present, the adaptability of the static pressure method construction for geology is improved and the work efficiency is improved.

Description

Piling construction equipment is lifted in the water qi of chong channel ascending adversely
Technical field
The utility model relates to Foundation Design, especially belongs to the construction equipment of pile tube pile sinking in the foundation construction process.
Background technology
In current industrial, in the civilian construction, prestressed high-strength concrete pile is widely adopted, it has the bearing capacity height, anti-bending strength is good, good endurance, the construction early-stage preparations time is short, many advantages such as speed of application is fast, obtained using widely in the most of area of China in recent years, at riverine extra large soft clay area dominate more, the prestressed high-strength concrete pile main construction method is a static pressure method at present, there is obvious weakness in the static pressure construction prestressed high-strength concrete pile aspect the geology applicability, be exactly that it is thicker in sand content, pile sinking poor performance in the higher sandy soil layer of density, and design requires to penetrate this layer, to guarantee the requirement of bearing capacity.For solving the static pressure construction prestressed high-strength concrete pile in the obvious weakness that exists aspect the geology applicability.The improvement that the utility model carries out former static pressure construction equipment is so that be applicable to that the water that adopts in the present construction is towards gas lift method auxiliary pile sinking technology.
Summary of the invention
The purpose of this utility model is to make it the improvement undertaken by to former static pressure construction equipment to be applicable to the water that adopts in the present construction towards gas lift method auxiliary pile sinking technology, and improved the compliance of static pressure construction to geology greatly, has improved operating efficiency.
Technical solution adopted in the utility model is: it is made up of crane and the static pile press that has the pile tube anchor clamps, its improvements are, suspension hook on the crane is lifted with qi of chong channel ascending adversely pipe and the jet water spout that an end is connected with centrifugal pump with air compressor respectively, the other end of qi of chong channel ascending adversely pipe and jet water spout is contained in the through hole of prefabricated tubular pile, in addition, air compressor links to each other with gasholder, and centrifugal pump links to each other with reservoir.
Description of drawings
Fig. 1 is the utility model schematic diagram
Wherein: 1, crane 2, static pile press 3, prefabricated tubular pile 4, jet water spout 5, qi of chong channel ascending adversely pipe 6, centrifugal pump 7, reservoir 8, air compressor 9 gasholder 10, special-purpose tip 11, suspension hook 12, pile tube anchor clamps 13, through hole
The specific embodiment
Further set forth specific embodiments of the present utility model below in conjunction with accompanying drawing, as shown in Figure 1, the utility model is made up of crane 1 and the static pile press 2 that has pile tube anchor clamps 12, wherein pile tube anchor clamps 12 are used to clamp prefabricated tubular pile 3, in the utility model, suspension hook 11 on the crane 1 is lifted with qi of chong channel ascending adversely pipe 5 and jet water spout 4, one end of qi of chong channel ascending adversely pipe 5 and jet water spout 4 is connected with centrifugal pump 6 with air compressor 8 respectively, and the other end of qi of chong channel ascending adversely pipe 5 and jet water spout 4 is contained in the through hole 13 of prefabricated tubular pile 3, in addition, air compressor 8 links to each other with gasholder 9, and centrifugal pump 6 links to each other with reservoir 7.Crane 1 adopts tracklaying crane, truck mounted crane, wheeled crane in the utility model.
Operating principle of the present utility model is, pile tube anchor clamps 12 of prefabricated tubular pile 3 being sling and being put into static pile press 2 with crane 1 at first, and be pressed into underground gradually, sling qi of chong channel ascending adversely pipe 5 and jet water spout 4 of suspension hook 11 then, and an end of qi of chong channel ascending adversely pipe 5 and jet water spout 4 packed in the through hole 13 of prefabricated tubular pile 3, when static pile press 2 is pressed into prefabricated tubular pile 3 when underground gradually, air compressor 8 and centrifugal pump 6 will have the gas of pressure and water by qi of chong channel ascending adversely pipe 5 and jet water spout 4 through hole 13 along prefabricated tubular pile 3, pour the layer of sand of 10 ends of the special-purpose tip of underground direct impact via special-purpose tip 10, utilize backwater, the sand effect of taking of return-air, take away an end sub-sand, little gravel, thereby reduce the compactness of soil layer, reduce end resistance, to reach the purpose of pile sinking.
Of the present utility model implement to make on the one hand originally must design alteration be that the design of high cost stake type such as drill hole pouring pile need not to change, and saved investment, avoided construction delay.Also expanded the static pressure construction scope of application on the other hand, for Construction unit and designer have increased a not only selection of economy but also safety.

Claims (2)

1, piling construction equipment is lifted in a kind of water qi of chong channel ascending adversely, it is made up of crane (1) and the static pile press (2) that has pile tube anchor clamps (12), it is characterized in that: the suspension hook (11) on the crane (1) is lifted with qi of chong channel ascending adversely pipe (5) and the jet water spout (4) that an end and air compressor (8) and centrifugal pump (6) are connected respectively, the other end of qi of chong channel ascending adversely pipe (5) and jet water spout (4) is contained in the through hole (13) of prefabricated tubular pile (3), in addition, air compressor (8) links to each other with gasholder (9), and centrifugal pump (6) links to each other with reservoir (7).
2, piling construction equipment according to claim 1 is characterized in that: crane (1) is meant tracklaying crane, truck mounted crane, wheeled crane.
CN 200520111505 2005-06-15 2005-06-15 Flushing gas-lift pile sinking construction equipment Expired - Fee Related CN2828146Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520111505 CN2828146Y (en) 2005-06-15 2005-06-15 Flushing gas-lift pile sinking construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520111505 CN2828146Y (en) 2005-06-15 2005-06-15 Flushing gas-lift pile sinking construction equipment

Publications (1)

Publication Number Publication Date
CN2828146Y true CN2828146Y (en) 2006-10-18

Family

ID=37079703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520111505 Expired - Fee Related CN2828146Y (en) 2005-06-15 2005-06-15 Flushing gas-lift pile sinking construction equipment

Country Status (1)

Country Link
CN (1) CN2828146Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100591859C (en) * 2007-08-16 2010-02-24 江苏华东建设基础工程总公司 Pile pulling construction method for pile pulling machine
CN102182186A (en) * 2011-04-28 2011-09-14 中交第一航务工程局有限公司 Water-flushing sinking-assisting system and construction technical method thereof
CN106088092A (en) * 2016-06-21 2016-11-09 中国电建集团华东勘测设计研究院有限公司 There is refusing the solution of hammer situation in pile tube piling process
CN107142937A (en) * 2017-05-19 2017-09-08 浙江元本检测技术股份有限公司 Composite air pressure formula construction of Static Pressure Pile device and foundation pile static loading test method
CN107142938A (en) * 2017-05-19 2017-09-08 浙江元本检测技术股份有限公司 The method of the composite air pressure formula construction of Static Pressure Pile device and foundation pile static loading test of balance-adjustable

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100591859C (en) * 2007-08-16 2010-02-24 江苏华东建设基础工程总公司 Pile pulling construction method for pile pulling machine
CN102182186A (en) * 2011-04-28 2011-09-14 中交第一航务工程局有限公司 Water-flushing sinking-assisting system and construction technical method thereof
CN102182186B (en) * 2011-04-28 2012-12-12 中交第一航务工程局有限公司 Water-flushing sinking-assisting system and construction technical method thereof
CN106088092A (en) * 2016-06-21 2016-11-09 中国电建集团华东勘测设计研究院有限公司 There is refusing the solution of hammer situation in pile tube piling process
CN107142937A (en) * 2017-05-19 2017-09-08 浙江元本检测技术股份有限公司 Composite air pressure formula construction of Static Pressure Pile device and foundation pile static loading test method
CN107142938A (en) * 2017-05-19 2017-09-08 浙江元本检测技术股份有限公司 The method of the composite air pressure formula construction of Static Pressure Pile device and foundation pile static loading test of balance-adjustable
CN107142938B (en) * 2017-05-19 2022-06-17 浙江元本检测技术股份有限公司 Balance-adjustable composite air pressure type static pressure pile construction device and foundation pile static load test method

Similar Documents

Publication Publication Date Title
CN2828146Y (en) Flushing gas-lift pile sinking construction equipment
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN102383431A (en) Sinking device and novel sinking method of center dug prestressed centrifuge pipe pile (square pile)
CN203866716U (en) Hoop type construction device for reinforcing single-column pier with concrete filled steel tubes
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN202124863U (en) Screw anchor excavated composite foundation
CN2841769Y (en) Compound pile cover
CN205062795U (en) Slope tamping unit
CN201679009U (en) Precipitation device of manual dug pile
CN207004431U (en) Soft soil foundation exciting drilling device
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN206495205U (en) A kind of prefabricated PHC pile tubes
CN202672139U (en) Prefabricated reinforced concrete square pile
CN205369209U (en) Cubic metre of earth and stone tamping device
CN2828143Y (en) Pile shoe special for tubular pile
CN2893071Y (en) Electrified railway contact network poles foundation
CN2575155Y (en) Static pressure enlarging apparatus in operation of pipeline sinking grout enlarge piles
CN203569560U (en) Undisturbed soil sampling filling pile
CN201857607U (en) Construction casing for compacted sand pile
CN218454431U (en) Telescopic combined movable arm device of miniature multifunctional loader
CN2869134Y (en) Pumping unit simple-portable foundation
CN205475236U (en) Vibration immersed tube equipment
CN202755366U (en) Leading-in device of injection pipe
CN1472398A (en) Post-cement paste pressure filling process for end of construction foundation pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20061018

Termination date: 20140615

EXPY Termination of patent right or utility model