CN2811400Y - Steel rail type pile engine - Google Patents
Steel rail type pile engine Download PDFInfo
- Publication number
- CN2811400Y CN2811400Y CN 200520069037 CN200520069037U CN2811400Y CN 2811400 Y CN2811400 Y CN 2811400Y CN 200520069037 CN200520069037 CN 200520069037 CN 200520069037 U CN200520069037 U CN 200520069037U CN 2811400 Y CN2811400 Y CN 2811400Y
- Authority
- CN
- China
- Prior art keywords
- walking
- cart
- main frame
- frame
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a steel rail type pile engine, which comprises a main frame, a walking trolley and a walking cart. An A-shaped frame, a capstan engine and an electric control cabinet are connected with the walking trolley, the walking cart is arranged on a ground rail and the walking trolley is arranged on a trolley rail which is arranged on the walking cart. The walking trolley is connected with the lower end of the main frame through a hinge and a pin shaft, the middle part of the main frame and the rear part of the walking trolley are connected by an inclined support rod and the upper end of the main frame is connected with a pulley head. A capstan engine steel cable is connected with a vibration hammer by passing by the pulley head, and the vibration hammer is connected with the upper end of a drainage plate intubation. Therefore, a bulky portal frame is eliminated, steel consumption is reduced and manufacturing cost is lowered. The main frame can be conveniently erected without using a crane when the utility model is installed on a construction site. The utility model has the advantage of convenient and safe operation. Compared with a portal frame type pile engine, efficiency is improved by 16 times. The operation is mainly carried out on the walking cart, so working safety is improved. The utility model can be used for inserting drainage plates or arranging sandbags in areas, such as sea beach, marshland, mudflat, etc.
Description
Technical field
The utility model relates to the board-plugging device in a kind of constructional engineering machinery, and it is used for inserting band drain or packed sandbag being set to regions such as ground, sandy beach, swamp land, beach ground.
Background technology
Known board-plugging device is a gantry frame type, this machine body frame moves and leans against on gantry mobilely on the beam orbit and following beam orbit, and the width of portal frame is generally about 10 meters, body frame from gantry one end move to the other end can only plate 8, dismantle the portal frame displacement then, efficient is very low.Beam orbit generally overhead 18 meters to 20 meters (construction depth is 20 meters a stake machine) on the portal frame, the high-altitude is installed with operation very inconvenient, dangerous.
Summary of the invention
The purpose of this utility model is that a kind of efficient height, easy to operate and safe and reliable rail formula board-plugging device will be provided.
The purpose of this utility model is achieved in that this machine comprises body frame, walking dolly and walking cart, be connected with A type frame, hoist engine and electrical control cubicles above the walking dolly, the walking cart is positioned on the ground rail, walking dolly is positioned on the trolley track of walking on the cart, walking dolly links to each other with bearing pin by hinge with the body frame lower end, be connected with hound between body frame middle part and the walking dolly rear end, the body frame upper end is connected with the pulley head, the hoist engine wire rope is walked around the pulley head and is linked to each other with vibrating hammer, and vibrating hammer links to each other with band drain intubate upper end.
The utility model saves huge portal frame, and the structure that adopts walking cart and walking dolly to move has in orbit significantly reduced rolled steel dosage, has reduced manufacturing cost.The body frame bottom is connected and fixed with hinge and walking dolly front end, utilize hoist engine and A type frame that body frame is erected, utilize two pipe hounds that body frame is reinforced, when site construction is installed, the adapted crane just can be set up body frame easily again, and is easy and safe to operate reliable.
Walking cart of the present utility model vertically moves on ground rail, finishes vertically moving, and can finish 16 of construction stake positions.Walking dolly laterally moves on the track on the walking cart, finishes laterally and moves, and can finish 8 of construction stake positions.16 * 8=128 of construction stake position just finished in each location, raises the efficiency 16 times than gantry frame type board-plugging device.Need tear open when considering the displacement of gantry frame type board-plugging device again and move the time-consuming of portal frame and effort, production efficiency improves should be not less than 20 times.
Gantry frame type board-plugging device body frame moves two driving trolley by two ends about the body frame, and work high above the ground work is more, and the utility model operation is many to have improved job security at walking cart position, and convenient and reliable.
Description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the schematic top plan view of Fig. 1.
Fig. 4 is an of the present utility model frame schematic diagram.
1. pulley heads among the figure, 2. body frame, 3. vibrating hammer, 4. band drain intubate, 5. hound, 6.A type frame, 7. electrical control cubicles, 8. walking dolly, 9. walking cart, 10. ground rail, 11. sleepers, 12. hoist engines, 13. fixed pulley groups, 14. hoist engine wire rope, 15. trolley tracks, 16. cart reductors, 17. dolly reductors, 18. frame wire rope.
The specific embodiment
In Fig. 1, Fig. 2 and Fig. 3, be connected with A type frame 6, hoist engine 12 and electrical control cubicles 7 above the walking dolly 8.Walking cart 9 is positioned on the ground rail 10, and walking dolly 8 is positioned on the trolley track 15 of walking on the cart 9.Walking dolly 8 links to each other with bearing pin by hinge with body frame 2 lower ends.Be connected with hound 5 between body frame 2 middle parts and walking dolly 8 rear ends, body frame 2 upper ends are connected with pulley head 1, and hoist engine wire rope 14 is walked around pulley head 1 and linked to each other with vibrating hammer 3, and vibrating hammer 3 links to each other with band drain intubate 4 upper ends.
In Fig. 4, A type frame 6 is put into 65 ° of-70 ° of angles, hound 5 is placed on the cross-arm of A type frame 6.Play fixed pulley group 13 upper ends that frame wire rope 18 connects body frame 2 and A type frame 6 with double joint, again the lower end of hoist engine wire rope 14 with fixed pulley group 13 linked to each other.
Check hoist engine 12 braking abilities, after working well, starting hoist engine 12 is with body frame 2 pull-ups slowly.When body frame 2 rises to level at an angle of 90, the chassis that the lower end of body frame 2 is fixed on walking dolly 8 is propped up in the earhole with bearing pin.Play the frame end-of-job.Set up state for body frame 2 this moment.
After playing the frame end-of-job, hoist engine wire rope 14 terminations are taken off from the fixed pulley group 13 of A type frame 6, and through an angle pulley of body frame 2 lower ends, the assembly pulley of walking around pulley head 1 is again left behind, fasten vibrating hammer 3, and the directive wheel of vibrating hammer 3 is packed in the slideway on the body frame 2.
Start hoist engine 12, vibrating hammer 3 is risen to highest point.Stop hoist engine 12, install band drain intubate 4, insert water drainage plastics plate (observe for convenient, plastic plate does not show), pull out from band drain intubate 4 lower ends from band drain intubate 4 side openings.Start vibrating hammer 3, insert band drain intubate 4 underground.When reaching construction depth, stop vibrating hammer 3, start hoist engine 12, band drain intubate 4 is extracted ground, stay band drain, finish a stake position.
Operation electrical control cubicles 7, dolly reductor 17 drives walking dolly 8 and laterally moves on trolley track 15.Move to-individual pilespacing after, stop to move of walking dolly 8, start vibrating hammer 3, finish second stake position, move to the other end until walking dolly 8 from an end, finish walking dolly 8 transverse shifts, trolley track 15 long 10 meters is finished 8 stake positions altogether.
Behind walking dolly 8 end-of-shifts, operation electrical control cubicles 7, cart reductor 16 drives walking cart 9 and vertically moves on ground rail 10.After moving to a pilespacing, stop the mobile of cart 9 that walk.Start vibrating hammer 3, finish first stake position of second row, repeat the displacement of walking dolly 8, finish the laterally construction of stake position.
Claims (1)
1. rail formula board-plugging device, this machine comprises body frame, walking dolly and walking cart, it is characterized in that being connected with above the walking dolly A type frame, hoist engine and electrical control cubicles, the walking cart is positioned on the ground rail, walking dolly is positioned on the trolley track of walking on the cart, walking dolly links to each other with bearing pin by hinge with the body frame lower end, be connected with hound between body frame middle part and the walking dolly rear end, the body frame upper end is connected with the pulley head, the hoist engine wire rope is walked around the pulley head and is linked to each other with vibrating hammer, and vibrating hammer links to each other with band drain intubate upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520069037 CN2811400Y (en) | 2005-02-04 | 2005-02-04 | Steel rail type pile engine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520069037 CN2811400Y (en) | 2005-02-04 | 2005-02-04 | Steel rail type pile engine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2811400Y true CN2811400Y (en) | 2006-08-30 |
Family
ID=36937787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520069037 Expired - Fee Related CN2811400Y (en) | 2005-02-04 | 2005-02-04 | Steel rail type pile engine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2811400Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101985834A (en) * | 2010-11-19 | 2011-03-16 | 上海港务工程公司 | Automatic control system for plastic dewatering plate process quality |
CN106892064A (en) * | 2017-02-27 | 2017-06-27 | 广州市盛洲地基基础工程有限公司 | A kind of PVD over-water constructions special purpose ship |
-
2005
- 2005-02-04 CN CN 200520069037 patent/CN2811400Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101985834A (en) * | 2010-11-19 | 2011-03-16 | 上海港务工程公司 | Automatic control system for plastic dewatering plate process quality |
CN106892064A (en) * | 2017-02-27 | 2017-06-27 | 广州市盛洲地基基础工程有限公司 | A kind of PVD over-water constructions special purpose ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102061927B (en) | Tunnel waterproof material laying equipment and method | |
CN203412327U (en) | Rotary lift type stereo garage | |
CN201924360U (en) | Multifunctional hydraulic static pile press | |
CN104343263A (en) | Rotary lifting type three-dimensional garage | |
CN103072900B (en) | Loading frame dual-purpose vehicle under coal mine | |
CN2811400Y (en) | Steel rail type pile engine | |
CN102433868B (en) | Insert plate device capable of walking on blown-filled mud soil | |
CN102296585B (en) | Hydraulic jacking type dynamic compactor | |
CN204023597U (en) | A kind of trailer system of carrying large caisson | |
CN108643941B (en) | Gantry type arch installs trolley | |
CN203855967U (en) | Drilling and filling trolley on slope gallery | |
CN107973223A (en) | A kind of installation car for huge concrete structure | |
CN2723517Y (en) | Telescopic caterpillar electrohydraulic pile machine | |
CN208136913U (en) | A kind of bridge construction piling equipment | |
CN210216388U (en) | Crawler-type drainage plate clamping, sealing and anti-blocking spiral plate inserting machine | |
CN206942771U (en) | Excavate stand | |
CN114275684A (en) | Self-service variable-span broken line supporting leg tire type lifting beam machine | |
CN103061550B (en) | Single-side hydraulic drive type space framework parking space | |
CN200955271Y (en) | Hydraulic 3-D parking apparatus | |
CN205663389U (en) | Formula flood prevention manger plate door falls in top of two breakwater structures | |
CN2649647Y (en) | Tubular pile foundation | |
CN203033681U (en) | Dual-purpose travelling crane for object transportation and support assembly in underground coal mine | |
CN104343264A (en) | Vehicle parking garage system | |
CN202829498U (en) | Hydraulic jacking device | |
CN206801478U (en) | Hydraulic drill rig derrick with floating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060830 Termination date: 20130204 |