CN2809101Y - Arrangement structure for raw materials storehouse, processing plant and finished products yard - Google Patents

Arrangement structure for raw materials storehouse, processing plant and finished products yard Download PDF

Info

Publication number
CN2809101Y
CN2809101Y CN 200520200571 CN200520200571U CN2809101Y CN 2809101 Y CN2809101 Y CN 2809101Y CN 200520200571 CN200520200571 CN 200520200571 CN 200520200571 U CN200520200571 U CN 200520200571U CN 2809101 Y CN2809101 Y CN 2809101Y
Authority
CN
China
Prior art keywords
raw material
processing plant
material storage
finished products
yard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520200571
Other languages
Chinese (zh)
Inventor
王时芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200520200571 priority Critical patent/CN2809101Y/en
Application granted granted Critical
Publication of CN2809101Y publication Critical patent/CN2809101Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses an arrangement structure for a raw material storehouse, a processing plant and a finished products yard; the utility model comprises a raw material storehouse and a railway, wherein the raw material storehouse is arranged on one side of the railway; the side of the raw material storage is provided with the processing plant and the finished products yard, the processing plant and the finished products yard are arranged on one side of the railway, a crane is arranged in the raw material storage and a track of the crane is extended to the finished products yard. The utility model constructs the raw material storage, the processing plant and the finished products yard into an integral body, the crane of the raw material storage comprises the raw material unloading and the finished products loading and a train cover for transporting the raw material can be simultaneously used as the train cover of the finished products for outside transport. The arrangement structure for a raw materials storehouse, a processing plant and a finished products yard has the advantages that loading and unloading transport devices can be reduced, the railway transportation line can be shortened, the capital construction investment can be reduced and the production and the operation cost can be reduced.

Description

The configuration structure in raw material storage and processing plant and finished product stockyard
Technical field:
The utility model relates to the configuration structure in a kind of raw material storage and processing plant and finished product stockyard, belongs to industrial enterprise's factory building configuration structure technical field.
Background technology:
In many industries, particularly in the construction of metallurgy industry, raw material usually adopt railway transportation, raw-materially store up need be very big one and store up the warehouse, generally need in the warehouse dispose a certain amount of crane according to warehouse length, are used for raw material and unload.Railway transportation is also generally adopted in the outward transport of finished product, needs a certain amount of crane of configuration equally, is used for product car-loading.Generally, transporting raw-material train cover empty wagons after unsnatching car returns.Be transported to plant area from raw material and dispatch from the factory, because the loading and unloading link of material is more, have workshop section's complex management, conevying efficiency is low, operation cost is high to Product transport, and capital investment height problems such as (raw material handling facilities and finished product handling facilities can not be shared).The factory and enterprise capital investment is increased and the rising of production and operation cost.
Summary of the invention:
The purpose of this utility model is: provide a kind of configuration structure that can reduce capital investment, raising conevying efficiency, the raw material storage that cuts operating costs and processing plant and finished product stockyard, to overcome the deficiencies in the prior art.
The utility model is to constitute like this: it comprises raw material storage (1) and railway (4), raw material storage (1) is located at a side of railway (4), be provided with processing plant (2) and finished product stockyard (5) on raw material storage (1) next door, processing plant (2) and finished product stockyard (5) are located at a side of railway (4), be provided with crane (3) in raw material storage (1), the track of crane (3) extends to finished product stockyard (5); Raw material storage (1), processing plant (2) and finished product stockyard (5) three become yi word pattern to be arranged in a side of railway (4); Raw material storage (1), processing plant (2) and finished product stockyard (5) three become a Chinese character pin-shaped side that is arranged in railway (4).
Owing to adopted such scheme, the utility model is in the same place raw material storage, processing plant and the construction of finished product stockyard, the crane of raw material storage can be taken into account raw-material unloading and product car-loading, transports the train cover that raw-material train cover can be transported outward as finished product simultaneously.Therefore the utlity model has the advantage that reduces handling equipment, shortening rail transportation circuit, reduces capital investment and reduction production and operation Cheng Mu.
Description of drawings:
Accompanying drawing 1 becomes Chinese character pin-shaped structure arranged schematic diagram for raw material storage of the present utility model, processing plant with finished product stockyard three;
Accompanying drawing 2 becomes yi word pattern structure arranged schematic diagram for raw material storage of the present utility model, processing plant with finished product stockyard three.
The specific embodiment:
Embodiment 1 of the present utility model: as shown in Figure 1, can arrange raw material storage (1) along the industrial railway line, raw material storage (1) striden build on the railway (4), erection crane (3) in raw material storage (1), the confession raw material is unloaded and finished product uses outward, build processing plant (2) on raw material storage (1) next door, build finished product stockyard (5) in processing plant (2) by a side of railway (4), the track of crane (3) is extended to finished product stockyard (5), make raw material storage (1), processing plant (2) becomes a Chinese character pin-shaped side that is arranged in railway (4) with finished product stockyard (5) three.When using the utility model, after train cover transportation raw material enter plant area, utilize crane (3) that raw material are unloaded and be transported to raw material storage (1), and then finished product is loaded into the train cover from finished product stockyard (5) with crane (3) and gets final product.And the finished product that processing plant (2) produces also can directly send finished product stockyard (5) to deposit.
Embodiment 2 of the present utility model: with the side of raw material storage (1) construction at railway (4), build processing plant (2) and finished product stockyard (5) on raw material storage (1) next door, make raw material storage (1), processing plant (2) and finished product stockyard (5) three become yi word pattern to be arranged in a side of railway (4), in raw material storage (1), install crane (3), and make the track of crane (3) extend to the finished product stockyard (5).

Claims (3)

1. the configuration structure in a raw material storage and processing plant and finished product stockyard, it comprises raw material storage (1) and railway (4), raw material storage (1) is located at a side of railway (4), it is characterized in that: be provided with processing plant (2) and finished product stockyard (5) on raw material storage (1) next door, processing plant (2) and finished product stockyard (5) are located at a side of railway (4), be provided with crane (3) in raw material storage (1), the track of crane (3) extends to finished product stockyard (5).
2. according to the configuration structure in the described raw material storage of claim 1 and processing plant and finished product stockyard, it is characterized in that: raw material storage (1), processing plant (2) and finished product stockyard (5) three become yi word pattern to be arranged in a side of railway (4).
3. according to the configuration structure in the described raw material storage of claim 1 and processing plant and finished product stockyard, it is characterized in that: raw material storage (1), processing plant (2) and finished product stockyard (5) three become a Chinese character pin-shaped side that is arranged in railway (4).
CN 200520200571 2005-08-08 2005-08-08 Arrangement structure for raw materials storehouse, processing plant and finished products yard Expired - Fee Related CN2809101Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520200571 CN2809101Y (en) 2005-08-08 2005-08-08 Arrangement structure for raw materials storehouse, processing plant and finished products yard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520200571 CN2809101Y (en) 2005-08-08 2005-08-08 Arrangement structure for raw materials storehouse, processing plant and finished products yard

Publications (1)

Publication Number Publication Date
CN2809101Y true CN2809101Y (en) 2006-08-23

Family

ID=36925285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520200571 Expired - Fee Related CN2809101Y (en) 2005-08-08 2005-08-08 Arrangement structure for raw materials storehouse, processing plant and finished products yard

Country Status (1)

Country Link
CN (1) CN2809101Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101463662B (en) * 2007-12-17 2010-06-16 贵阳铝镁设计研究院 In-warehouse stacking pit and railway combined arranging mode
CN101433958B (en) * 2007-11-14 2011-01-26 贵阳铝镁设计研究院 Mode for configuring combination of caption foundry and railway transportation
CN102587700A (en) * 2011-01-18 2012-07-18 紫罗兰家纺科技股份有限公司 Sterile production workshop
CN103850482A (en) * 2012-11-28 2014-06-11 沈阳铝镁设计研究院有限公司 Large aluminum manufacturer and alumia mine lot locomotive servicing workshop configuration method
CN104652862A (en) * 2013-11-25 2015-05-27 贵阳铝镁设计研究院有限公司 Method for improving aluminum oxide and aluminum ingot loading efficiency and warehousing structure
CN109591993A (en) * 2017-09-30 2019-04-09 中国船舶重工集团公司第七〇九研究所 A kind of sea nuclear power self-propulsion type floating dock
CN110984638A (en) * 2019-12-12 2020-04-10 铜陵有色金属集团股份有限公司 Arrangement structure of copper smelting raw material factory building

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101433958B (en) * 2007-11-14 2011-01-26 贵阳铝镁设计研究院 Mode for configuring combination of caption foundry and railway transportation
CN101463662B (en) * 2007-12-17 2010-06-16 贵阳铝镁设计研究院 In-warehouse stacking pit and railway combined arranging mode
CN102587700A (en) * 2011-01-18 2012-07-18 紫罗兰家纺科技股份有限公司 Sterile production workshop
CN103850482A (en) * 2012-11-28 2014-06-11 沈阳铝镁设计研究院有限公司 Large aluminum manufacturer and alumia mine lot locomotive servicing workshop configuration method
CN103850482B (en) * 2012-11-28 2016-02-10 沈阳铝镁设计研究院有限公司 The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area
CN104652862A (en) * 2013-11-25 2015-05-27 贵阳铝镁设计研究院有限公司 Method for improving aluminum oxide and aluminum ingot loading efficiency and warehousing structure
CN109591993A (en) * 2017-09-30 2019-04-09 中国船舶重工集团公司第七〇九研究所 A kind of sea nuclear power self-propulsion type floating dock
CN109591993B (en) * 2017-09-30 2024-02-13 中国船舶重工集团公司第七一九研究所 Marine nuclear power self-propelled floating dock
CN110984638A (en) * 2019-12-12 2020-04-10 铜陵有色金属集团股份有限公司 Arrangement structure of copper smelting raw material factory building

Similar Documents

Publication Publication Date Title
CN2809101Y (en) Arrangement structure for raw materials storehouse, processing plant and finished products yard
CN204702146U (en) A kind of material transport cart
CN204981022U (en) Easy goods handling's hydraulic pressure platform truck
CN102285525B (en) Track transfer system for containers
CN2801723Y (en) Large span high step transport device
CN202296231U (en) Logistics trolley for engineering machinery production
CN203332997U (en) Logistics system capable of automatically unloading goods
CN209581268U (en) A kind of transfer car(buggy) of large-size box
CN203740623U (en) Novel ferry crane for quayside container handling
CN202208513U (en) Track transportation system for container
CN208883028U (en) A kind of compact single line container dumping system
CN220886197U (en) Full-automatic loading machine for bagged materials
CN201261477Y (en) Foldable flat car for conveying material
CN207347100U (en) A kind of forklift fork arm carrier and its Novel section steel of use
CN207016163U (en) Container yard
CN2528734Y (en) Container for bulk-cargo
CN206406794U (en) A kind of transport vehicle
CN206203482U (en) A kind of giant tire conveying equipment
CN213536608U (en) Cargo conveying platform for logistics engineering
CN221419520U (en) Self-unloading warehouse
CN209097509U (en) Intelligent Bulk Grain handling system
CN216548645U (en) Unloading output operation system of storage yard
CN220578317U (en) Logistics cargo transferring device
CN110027849A (en) A kind of hydraulic-driven rotary separated lift and conveyer and its application
CN201530571U (en) Building block integrated loading case

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110523

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110523

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060823

Termination date: 20140808

EXPY Termination of patent right or utility model