CN103850482B - The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area - Google Patents
The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area Download PDFInfo
- Publication number
- CN103850482B CN103850482B CN201210496015.2A CN201210496015A CN103850482B CN 103850482 B CN103850482 B CN 103850482B CN 201210496015 A CN201210496015 A CN 201210496015A CN 103850482 B CN103850482 B CN 103850482B
- Authority
- CN
- China
- Prior art keywords
- workshop
- railway
- servicing
- mining area
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Propulsion And Braking For Vehicles (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses the collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area, servicing shop is arranged on one end of on-site railway siding, and between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be all arranged in servicing shop; In workshop, corner, railway side arranges sand storage tank; In workshop, in the middle of railway, inspection pit is set.Compact in design of the present invention, reduces the transportation range between operation, improves and repairs environment, improves repair capability, ensures repairing quality, shortens the repairing time.The present invention is particularly useful for large-scale aluminium manufacturer and alum clay mining area standard gage railway diesel locomotive stops and servicing work.
Description
Technical field
The invention discloses a kind of collocation method of locomotive servicing workshop.Be applicable to the large-scale aluminium manufacturer and the mining area that there is special purpose railroad and provide locomotive for oneself.
Background technology
In each large-scale aluminium manufacturer and alum clay mining area, the transport of product and raw material, is equipped with special purpose railroad and provides locomotive for oneself for convenience.Locomotive, as rapid transit equipment, carries out in good time maintenance to it and maintenance is very necessary.Because of particularity and the complexity of locomotive itself, determine the process of its maintenance and maintenance, there is extremely strong professional and complexity, therefore, rational subregion is carried out to space for maintenance and layout is necessary.
In the past due to each aluminium manufacturer and mining area production capacity less, provide number of locomotives for oneself less, the maintenance of some enterprise self-owned locomotives and maintenance facility is comparatively simple and crude and dispersion, that have or even outdoorly to carry out.Along with the production-scale continuous expansion of each large-scale aluminium manufacturer and alum clay mining area, the quantity providing locomotive for oneself, also in increase, is therefore taked advanced locomotive inspection and repair technique, is arranged and reasonably overhaul facility, carry out rational subregion to space for maintenance and layout becomes inexorable trend.
Summary of the invention
The object of the present invention is to provide the collocation method in a kind of large-scale aluminium manufacturer and the parking of alum clay mining area standard gage railway diesel locomotive and servicing work workshop.The method both can solve enterprise and have locomotive parking problem by oneself, also can improve repairing environment simultaneously, improved repair capability, ensured repairing quality.Concrete scheme is as follows:
The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area, servicing shop is arranged on one end of on-site railway siding, and between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be successively set in servicing shop; In workshop, corner, railway side arranges sand storage tank; In workshop, in the middle of railway, inspection pit is set.
Described sand storage tank is separately in side.
Between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be all arranged on the same side in workshop.
Factory building is arranged to main span add secondary across form, inspection pit and sand storage tank are arranged in main span, by between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be successively set on secondary across interior.
Advantage of the present invention is: compact in design, reduces the transportation range between operation, improves and repairs environment, improves repair capability, ensures repairing quality, shortens the repairing time.The present invention is particularly useful for large-scale aluminium manufacturer and alum clay mining area standard gage railway diesel locomotive stops and servicing work.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention.
In figure, 1 main span, 2 pairs across, 3 inspection pits, 4 sand storage tanks, between 5 batteries, 6 charging zones, 7 offices, 8 softening pools, 9 material depots, 10 tool storage rooms, 11 maintenance and trial zones.
Detailed description of the invention
The present invention is illustrated below in conjunction with accompanying drawing, as shown in Figure 1, servicing shop is arranged on one end of on-site railway siding, and between battery 5, charging zone 6, office 7, softening pool 8, material depot 9, tool storage room 10, maintenance and trial zone 11 be successively set in servicing shop; In workshop, corner, railway side arranges sand storage tank 4; In workshop, in the middle of railway, inspection pit 3 is set.
Described sand storage tank 4 is separately in side.
Between battery 5, charging zone 6, office 7, softening pool 8, material depot 9, tool storage room 10, maintenance and trial zone 11 be all arranged on the same side in workshop.
Consider its functional and practicality, factory building is arranged to main span 1 add secondary across 2 form, inspection pit 3 and sand storage tank 4 are arranged in main span 1, by between battery 5, charging zone 6, office 7, softening pool 8, material depot 9, tool storage room 10, maintenance and trial zone 11 be all arranged on secondary across in 2.
Claims (3)
1. the collocation method in a large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area, it is characterized in that: servicing shop is arranged on one end of on-site railway siding, between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be successively set in servicing shop; In workshop, corner, railway side arranges sand storage tank; In workshop, in the middle of railway, inspection pit is set; Factory building be arranged to main span add secondary across form, inspection pit and sand storage tank are arranged in main span, and between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be successively set on secondary across interior.
2. method according to claim 1, is characterized in that: described sand storage tank is separately in side.
3. method according to claim 1, is characterized in that: between battery, charging zone, office, softening pool, material depot, tool storage room, maintenance and trial zone be all arranged on the same side in workshop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210496015.2A CN103850482B (en) | 2012-11-28 | 2012-11-28 | The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210496015.2A CN103850482B (en) | 2012-11-28 | 2012-11-28 | The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103850482A CN103850482A (en) | 2014-06-11 |
CN103850482B true CN103850482B (en) | 2016-02-10 |
Family
ID=50858589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210496015.2A Active CN103850482B (en) | 2012-11-28 | 2012-11-28 | The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103850482B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4713161A (en) * | 1985-06-05 | 1987-12-15 | Aluminium Pechiney | Device for connection between very high intensity electrolysis cells for the production of aluminium comprising a supply circuit and an independent circuit for correcting the magnetic field |
CN1419611A (en) * | 2000-03-24 | 2003-05-21 | 皮奇尼铝公司 | Implantation of installations of an electrolysis plant for producing aluminium |
CN1724376A (en) * | 2005-07-04 | 2006-01-25 | 贵阳铝镁设计研究院 | Method for distributing of seriation distribution of aluminium oxide plant |
CN1775605A (en) * | 2005-11-18 | 2006-05-24 | 宝钢集团上海梅山有限公司 | Underground ore transport train overhaul method |
CN2809101Y (en) * | 2005-08-08 | 2006-08-23 | 贵阳铝镁设计研究院 | Arrangement structure for raw materials storehouse, processing plant and finished products yard |
CN101392604A (en) * | 2007-09-20 | 2009-03-25 | 贵阳铝镁设计研究院 | Electrolytic aluminum plant collocation form of series layout |
CN101463662A (en) * | 2007-12-17 | 2009-06-24 | 贵阳铝镁设计研究院 | In-warehouse stacking pit and railway combined arranging mode |
CN101775620A (en) * | 2009-01-08 | 2010-07-14 | 贵阳铝镁设计研究院 | Partitioned allocation method of electrolytic cell overhaul workshop and structure |
-
2012
- 2012-11-28 CN CN201210496015.2A patent/CN103850482B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4713161A (en) * | 1985-06-05 | 1987-12-15 | Aluminium Pechiney | Device for connection between very high intensity electrolysis cells for the production of aluminium comprising a supply circuit and an independent circuit for correcting the magnetic field |
CN1419611A (en) * | 2000-03-24 | 2003-05-21 | 皮奇尼铝公司 | Implantation of installations of an electrolysis plant for producing aluminium |
CN1724376A (en) * | 2005-07-04 | 2006-01-25 | 贵阳铝镁设计研究院 | Method for distributing of seriation distribution of aluminium oxide plant |
CN2809101Y (en) * | 2005-08-08 | 2006-08-23 | 贵阳铝镁设计研究院 | Arrangement structure for raw materials storehouse, processing plant and finished products yard |
CN1775605A (en) * | 2005-11-18 | 2006-05-24 | 宝钢集团上海梅山有限公司 | Underground ore transport train overhaul method |
CN101392604A (en) * | 2007-09-20 | 2009-03-25 | 贵阳铝镁设计研究院 | Electrolytic aluminum plant collocation form of series layout |
CN101463662A (en) * | 2007-12-17 | 2009-06-24 | 贵阳铝镁设计研究院 | In-warehouse stacking pit and railway combined arranging mode |
CN101775620A (en) * | 2009-01-08 | 2010-07-14 | 贵阳铝镁设计研究院 | Partitioned allocation method of electrolytic cell overhaul workshop and structure |
Also Published As
Publication number | Publication date |
---|---|
CN103850482A (en) | 2014-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103464817B (en) | The method of arc square hole cutting apparatus and processing arc square hole | |
CN102060241A (en) | Universal crane for construction process of high-speed railway sound barrier | |
CN103850482B (en) | The collocation method in a kind of large-scale aluminium manufacturer and locomotive servicing workshop, alum clay mining area | |
CN202963036U (en) | Aluminium foil mill working roll bearing box assembly and disassembly equipment | |
CN205765782U (en) | Steel pipe's production clamping device | |
CN204139000U (en) | Be applicable to the prefabricated switch structure of modern tram bottle-neck section | |
CN103317456A (en) | Roof steel structure pairing device in railway vehicle | |
CN203816703U (en) | Grinding bowl lining plate of bowl-type medium-speed coal mill | |
CN202899161U (en) | General type main transformer foundation | |
CN103949307A (en) | Mill bowl lining plate of bowl-type medium-speed coal mill | |
CN203316989U (en) | Rail vehicle middle roof steel structure pairing device | |
CN203621841U (en) | Tubular bus welding platform | |
CN203392823U (en) | In-shop turnover structure for large box components | |
CN102921737A (en) | Disassembly and assembly equipment for bearing box of working roll of aluminum foil mill | |
CN204875462U (en) | Cold regenerative rut repairing machine | |
CN203238506U (en) | Movable transportation trolley for laying of modern tram groove-type rail tracks | |
CN204506853U (en) | A kind of vehicle of Subway Tunnel stops the section of repairing | |
CN204357165U (en) | With the fixing inspection platform of safety device | |
CN205046471U (en) | Iron road bridge roof beam overhauls equipment | |
CN203439040U (en) | Integral type end wall plate of railway vehicle | |
CN103422437B (en) | Wavelike steel webplate bridge step construction technology | |
CN201723162U (en) | Complete equipment for rolling and restoring sucker rod | |
CN206351318U (en) | A kind of engineering machinery oil tank welding tooling | |
CN203393739U (en) | Forming mold for reserved holes of equipment foundations | |
Zheng et al. | Research on plasma disassembly technology of scrapped railway wagons for green manufacturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |