CN2778933Y - Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor - Google Patents

Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor Download PDF

Info

Publication number
CN2778933Y
CN2778933Y CN 200320127211 CN200320127211U CN2778933Y CN 2778933 Y CN2778933 Y CN 2778933Y CN 200320127211 CN200320127211 CN 200320127211 CN 200320127211 U CN200320127211 U CN 200320127211U CN 2778933 Y CN2778933 Y CN 2778933Y
Authority
CN
China
Prior art keywords
brick
building block
hole
building
soon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200320127211
Other languages
Chinese (zh)
Inventor
史世英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200320127211 priority Critical patent/CN2778933Y/en
Application granted granted Critical
Publication of CN2778933Y publication Critical patent/CN2778933Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a multifunctional energy-saving brick (or block) for rapid construction and a die thereof. Blind holes or half brick blind holes are staggered and arranged on a brick (block) body, and the upper end surface of the brick (block) body, namely the seal top surface of the blind holes or the half brick blind holes, is provided with concave points. The die comprises an upper swage die, a lower swage die and an actuating cylinder, wherein the upper swage die is connected with a connecting plate of an upper guide rod, and a transmission rod of an oil cylinder is vertically arranged on a main top plate, and is respectively connected with a transition plate and the main top plate. A spring transmission rod is arranged on the transition plate, and a spring is arranged on a die frame. Both ends of the spring are respectively connected with a panel of the die frame and the spring transmission rod, and an auxiliary top plate is installed between the main top plate and the transition plate. A connecting rod of the lower swage die is respectively connected with an auxiliary top plate and the lower swage die, and both ends of the die are provided with die guide rods which are orderly sheathed on the connecting plate of the guide rod, the panel of the die frame, a connecting plate of a core column, the transition plate, the auxiliary top plate, the main top plate and both ends of the connecting plate of the lower guide rod.

Description

Multi-functional energy-conservation brick (building block) and the mould thereof built soon
Technical field
The utility model relates to the building unit of block or other shape in a kind of building component, especially relates to a kind of multi-functional energy-conservation brick (building block) of building soon.
Background technology
Existing brick (building block) entity structures that adopt more, some adopts cavernous structure, also is through-hole structure, each hole proper alignment, hole count can only be less than 4 rows, all can not realize greater than 5 rows, when being used to build building by laying bricks or stones, because being arranged as neatly row of hole, the endoporus in hole also for straight-through, makes air flow property good, be unfavorable for heat-insulation and heat-preservation, soundproof effect is also poor, all can't realize when being used for masonry panel, bank protection, embankment simultaneously vertically planting the nursery stock flowers and plants, does not have greening function.
Summary of the invention
The purpose of this utility model is.At the problem of above-mentioned existence, a kind of have multipurpose antidetonation, the energy-conservation multi-functional energy-conservation brick (building block) of building have soon been proposed.
The purpose of this utility model is to realize by following technical solution:
A kind of multi-functional energy-conservation brick (building block) of building soon, it includes brick (building block) body, it is characterized in that being provided with blind hole or the half Brick with blind hole hole that dislocation is arranged on building block (brick) body, is that the face of binding in blind hole or half Brick with blind hole hole is provided with concave point in brick (building block) body upper surface.
A kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon, it includes top swage, anvil swage, driving oil cylinder, top swage is connected with the top guide bar junction plate, it is characterized in that driving oil cylinder is connected with main roof, on main roof, vertically be provided with the oil cylinder dowel bar, oil cylinder dowel bar upper end is connected with rebound, oil cylinder dowel bar lower end is connected with main roof, on rebound, be provided with the spring dowel bar, the spring dowel bar other end passes the stem stem junction plate and is connected with the spring lower end that is located on framed, spring upper end is connected with framed panel, between main roof and rebound, be provided with secondary top board, anvil swage connecting rod one end is connected with secondary top board, the other end with pass rebound and lean on junction plate with core and be connected with anvil swage, be provided with the mould guide rod at the two ends of mould, the mould guide rod is sleeved on the guide rod junction plate from top to bottom in regular turn, framed panel, the stem stem junction plate, rebound, secondary top board, the two ends of main roof and lower guide rod junction plate.
The purpose of this utility model also can be advanced with the step realization by following technical measures
The aforesaid multi-functional energy-conservation brick (building block) of building soon wherein saidly is provided with the steel pipe through hole on brick (building block) body, the two ends of steel pipe through hole are concavo-convex tenon mouth, and each building block (building block) body is between the upper and lower by concavo-convex tenon mouth engagement.
The aforesaid multi-functional energy-conservation brick (building block) of building soon wherein saidly is inserted with insulation layer in the half-blindness hole in brick (building block) body, insulation layer is divided into two blind cavity with half-blindness hole inner chamber.
The aforesaid multi-functional energy-conservation brick (building block) of building soon is provided with steel pipe in the wherein said steel pipe through hole in brick (building block) body, and steel pipe walls is provided with spillage hole, many places.
The aforesaid multi-functional energy-conservation brick (building block) of building soon, wherein said in brick (building block) body each blind hole or the half-blindness hole wall between constitute dispersion shape or criss-cross internal-rib, the steel pipe through hole in brick (building block) body is located at the intersection of dispersion shape or criss-cross internal-rib.
The aforesaid multi-functional energy-conservation brick (building block) of building soon, wherein said in brick (building block) body each blind hole or the shape of cross section in half-blindness hole be circle, polygon, L shaped or various variation shape and combination thereof.
The aforesaid multi-functional energy-conservation brick (building block) of building soon, wherein said when brick (building block) body length is 240mm, be provided with 12-42 blind hole of six to nine rows, half-blindness hole in brick (building block) body; When described brick (building block) body length is 240-380mm, is provided with nine in brick (building block) body and drains into 28 to 58 blind holes of 15 rows, half-blindness hole; Blind hole, half-blindness hole are rectangle blind hole, half-blindness hole, or rectangular opening and the cross arrangement of T shape, or rectangular opening and T word, the hole cross arrangement of L font.
The aforesaid multi-functional energy-conservation brick (building block) of building soon, the wherein said upper end of leaning on one of upper end-face edge to arrange half-blindness hole aperture at brick (building block) body can be provided with in aperture chimb, the chimb and be provided with breeder tube, is provided with the ventilation inclined hole that is communicated with breeder tube on the outer wall of wall segment piece.
Aforesaid a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon is being provided with demoulding hook described in it is characterized in that between stem stem junction plate and rebound on the frame.
Aforesaid a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon wherein saidly is provided with cushion block between main roof and secondary top board.
Aforesaid a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon, the profile of wherein said top swage is provided with salient point or mark.
Aforesaid a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon, wherein said neighboring and each hole inner ring at upper and lower pattern is equipped with chimb by the profile place.
Aforesaid a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon wherein saidly is connected with top swage driving master cylinder, links up with to be connected with the mould guide rod, and the driving small oil tank is located in the main roof, and its plunger rod is connected with rebound.
Advantage of the present utility model is to have improved the heat-insulating property of building owing to adopt blind hole or half-blindness hole, utilizes that the steel pipe circular hole can be realized building soon, the performance of antivibration, and the hollow rate height also can improve the noise resistance performance of building.Can build environmental steel pipe concrete earthquake-resistant energy-saving house by laying bricks or stones, two-sided greening flower enclosure wall and step or many a few nodular greening altars, post, even can utilize the reducing energy consumption of old room exterior wall and existed buildings such as, flat, pitched roof and electric pole viaduct, overpass bridge post are afforested; The anti-wave of steel pipe concrete greening type high strength, the flood protection wall of sea, river levee bank have also been can be used for building by laying bricks or stones.Can be used for building by laying bricks or stones: the reducing energy consumption of ecological energy-saving house, old room greening exterior wall, flat roof adds layer, prefabricated house and greening enclosure wall and bank protection, flood wall revetment, highway greening isolation strip, sound barrier wall, even can be used as the multi-functional energy-conservation interlocking brick (building block) of building soon of the buildings such as vertical planting, ornament etc. of style, flower bed peace, domatic roofing.
Description of drawings
The utility model will be further described below in conjunction with accompanying drawing.
Fig. 1 is that the utility model dispersion shape internal-rib intersection is provided with steel pipe borehole structure schematic top plan view.
Fig. 2 is the rectangle blind hole structure elevational schematic view that the utility model is provided with seven row's cylindrical voids.
Fig. 3 is that the utility model is provided with T font L font blind hole structure elevational schematic view.
Fig. 4 is that the utility model block width is 190MM five round energy-saving wall block structure elevational schematic view.
Fig. 5 has seven round energy-saving wall bricks of T shape insulation sheet and bleed, ventilation to look up structural representation in the utility model brick.
Fig. 6 is the sectional view of Fig. 5.
Fig. 7 is another structure schematic top plan view of the utility model.
Fig. 8 is the sectional view of Fig. 7.
Fig. 9 is a user mode structural representation of the present utility model.
Figure 10 has the structural representation of looking up of decorative cover piece for the utility model.
Figure 11 is a mould structure schematic diagram of the present utility model.
Figure 12 is the top swage structural representation of seven round bricks of the present utility model.
Figure 13 is the sectional view of Figure 12.
Figure 14 is the anvil swage structural representation of seven round bricks of the present utility model.
Figure 15 is the sectional view of Figure 14.
Figure 16 is the anvil swage structural representation of decoration convex surface brick of the present utility model.
Figure 17 is the sectional view of Figure 12.
The specific embodiment
As Fig. 1-shown in Figure 10, it includes brick (building block) body 1 the utility model, is provided with blind hole or half Brick with blind hole hole 2 that dislocation is arranged on brick (building block) body 1, is that the face of binding in blind hole or half Brick with blind hole hole is provided with concave point 14 in brick (building block) body upper surface.This concave point 14 also can become the tenon chalaza, constitutes dispersion shape or criss-cross internal-rib 3 between each blind hole in brick (building block) body 1 or half-blindness hole 2 walls.Two side ends at brick (building block) is provided with concavo-convex tenon mouth 4, meshes by concavo-convex tenon mouth between two ends, each brick (building block) body left and right sides.Be provided with steel pipe through hole 5 on brick (building block) body 1, the two ends of steel pipe through hole 5 are concavo-convex tenon mouth 6, and brick (building block) body 1 is between the upper and lower by 6 engagements of concavo-convex tenon mouth.Steel pipe through hole 4 in brick (building block) body 1 is located at the intersection of dispersion shape or criss-cross internal-rib 3.As Fig. 1, shown in Figure 4, in brick (building block) body 1, be provided with insulation layer 7, in brick (building block) body, be inserted with insulation layer 7 in the half-blindness hole, insulation layer is divided into two blind cavity 2 with half-blindness hole inner chamber.Be provided with steel pipe 8 in the steel pipe through hole 5 in brick (building block) body 1, steel pipe 8 walls are provided with cement paste spillage hole, many places 9.Steel pipe 8 is multi-section types, every joint steel pipe two is provided with, following docking port groove, screw thread, or establish special-purpose tube head and connect, the dedicated pipe joint divides in-line, cross, plurality of specifications such as T font and corner, in-line establish that two interfaces are used to connect up and down or about straight-through steel pipe, on the T font joint, down, a left side, five interfaces such as the right side, be used for the T shape contact place of body of wall in length and breadth, pipe cross is provided with four interfaces, be used for being located at the vertical stem stem steel pipe of circular hole 5 and the intersection contact of horizontal collar tie beam steel pipe, the corner union is provided with, down and about four interfaces such as turn to, each union interface can be provided with interior or external screw thread according to the steel pipe correspondence, be provided with the same big chimb of a circle with steel tube inner hole or external diameter in the inside of each interface thread section.Each blind hole in brick (building block) body 1 or the shape of cross section in half-blindness hole are circle, polygon, L shaped or various variation shape and combination thereof.As shown in Figure 2, when brick (building block) body length is 240mm, be provided with 12-42 blind hole of six to nine rows, half-blindness hole in brick (building block) body; When described brick (building block) body length is 240-380mm, is provided with nine in brick (building block) body and drains into 28 to 58 blind holes of 15 rows, half-blindness hole; Blind hole, half-blindness hole are rectangle blind hole, half-blindness hole, or rectangular opening and the cross arrangement of T shape, or rectangular opening and T word, the hole cross arrangement of L font.Top, hole thinnest part only is blind hole or the half-blindness hole porous brick of 1-4mm, and hollow rate is 30-62%.As shown in Figure 4, in the upper end of arranging half-blindness hole aperture 2 by one of upper end-face edge aperture chimb 10 can be set, be provided with breeder tube 11 in the chimb 10, on the outer wall of wall segment piece, be provided with the ventilation inclined hole 12 that is communicated with breeder tube 11, heat shield and block wall rib are close to the molecule heat-transferring method that contacts to be changed into hot-fluid and needs that air layer in aperture is auxilliary penetrates measure such as lead, building block has been fallen at the end significantly, the heat of brick, the humidity conduction efficiency, in wall on the pore 11 of up/down perforation and the body of wall, on being provided with on the lower wall, after the percolation-proof gravity vent 12 that has a down dip was linked up, air-flow made the body of wall outside wall surface have heat radiation therebetween, the hydrofuge function.A side of outer wall is provided with the decoration convex surface 13 of area less than homonymy brick (building block) bulk area on brick (building block) body, in use this convex surface is independent of metope, ventilating heat dissipating hole is arranged above, do not build within the walls, concavo-convex decoration line is set in the front of building block, brick, its surface is provided with copper, zinc or aluminum metal finish coat, or the spary color coating layer, plays the function of beautifying.Be located at the interlocking tenon of location about all can be used as when various steel pipe circular holes 5 in the type are built a wall, the interlocking tenon of wall block also can be located at the upper end of blind hole 2, its using method is: will go up, the wrong honeybee of lower floor's wall piece is taken block, make in the upper strata circular hole 5 separately tenon go in the steel pipe circular hole 5 of lower floor's brick, the right special-purpose concrete oar material formation stem stem that directly injects the concrete mortar or be mixed with fibre resin in the steel pipe circular hole 5 of ganging up up and down, or in the steel pipe circular hole 5 that body of wall is ganged up, insert the smaller stem stem steel pipe of diameter, every section steel pipe walls is provided with that the spillage hole connects and two connects concavo-convex interface or screw thread.Upper and lower side at wall is provided with collar tie beam steel pipe or special-purpose bottom plate, be connected with steel pipe or rod iron two ends respectively, on the tube wall of collar tie beam steel pipe (being horizontally set in the body of wall), except that being provided with the spillage hole, also can set up the injected hole that the hole can be bigger, at injected hole and when passing the special-purpose concrete slurry of the steel pipe injection suitable for reading of steel pipe circular hole 5 partly slurry can ooze out by the spillage hole on the tube wall, be filled in the space of outer wall of steel pipe and circular hole 5, realize that no template is watered fast to build up steel pipe concrete high-strength anti-seismic beam, post.Can be in the building block of using at positions such as body of wall intersection, corners in the higher place of shockproof requirements, the brick with steel pipe circular hole 5, make thicker steel pipe concrete notes, beam, with the bearing wall that is located at the steel pipe concrete stem stem in the longitudinal and transverse wall building block steel pipe circular hole 5 and finishes synchronously at interval, be combined into the greening of steel pipe concrete earthquake-proof energy-saving, the ecotecture thing of low-cost and high-performance.Mortar building is built soon when not having with this building block, during prefabricated house, need not pour into the concrete slurry in the steel pipe hole as beam, post, do not have with this building block that mortar building is built soon, two perps of building block and auxilliary special-purpose reclaimed rubber or soft sheet, the bar moulded established in every layer of block upper end of horizontal joint during prefabricated house, also can dispatching from the factory before, will be bonded on the brick according to pad, the bar that the piece type customizes.The high-quality building block of aforementioned feature, brick, but independent groups is built into place's class building.The concrete that can adopt gluings such as cement, resin, gypsum and sandstone aggregate and fortifying fibre etc. to be made into, make by special-purpose casting such as bidirectional hydraulic make-up machines, also available clay, flyash are made sintering and are made, even be processed into method such as light-duty with waste or used plastics and carry out standardized production, realize that batch production makes environmental earthquake-proof energy-saving day building.
Shown in Figure 11-17, a kind of multi-functional particular manufacturing craft of building energy-conservation interlocking brick (building block) soon of the utility model, it includes top swage 15, anvil swage 16, driving oil cylinder 17, on the profile of top swage 15, be provided with salient point 18 or mark, be equipped with chimb 19 by the profile place in the neighboring of upper and lower pattern and each hole inner ring.Have anvil swage 16 1 sides of decorating convex surface and be decoration chimb 20, between stem stem junction plate 22 and rebound 23, be provided with demoulding hook 24 on the frame 21.Between main roof 25 and secondary top board 26, be provided with cushion block 27.Top swage 15 is connected with top guide bar junction plate 28, driving oil cylinder 17 is connected with main roof 25, on main roof 25, vertically be provided with oil cylinder dowel bar 29, oil cylinder dowel bar 29 upper ends are connected with rebound 23, oil cylinder dowel bar 29 lower ends are connected with main roof 25, on rebound 23, be provided with spring dowel bar 30, spring dowel bar 30 other ends pass stem stem junction plate 22 and are connected with spring 32 lower ends that are located on framed 31, spring 32 upper ends are connected with framed 31 panel 35, be provided with secondary top board 26 at main roof 25 and 23 of rebounds, anvil swage connecting rod 33 1 ends are connected with secondary top board 26, the other end with pass rebound 23 and lean on junction plate 22 with core and be connected with anvil swage 16, be provided with mould guide rod 34 at the two ends of mould, mould guide rod 34 is sleeved on top guide bar junction plate 28 from top to bottom in regular turn, framed panel 35, stem stem junction plate 22, rebound 23, secondary top board 26, the two ends of main roof 25 and lower guide rod junction plate 36.Between stem stem junction plate 22 and rebound 23, be provided with demoulding hook 24 on the frame 21.Between main roof 25 and secondary top board 26, be provided with cushion block 27.
This mould is when using, during oil cylinder 17 work, F.F. makes framed panel 35 deliver to the top swage position, top swage 15 parts enter die cavity, oil cylinder 17 continues pressurization, by cushion block 27 pushing tows, secondary top board 26 makes on the anvil swage push rod and moves, and presses on the pushing tow anvil swage 16, make, anvil swage puts the material extruding in place simultaneously, at this moment, enter demoulding hook 24 below the secondary top board 26, the oil cylinder backhaul drives stem stem junction plate 22 by the oil cylinder dowel bar and moves down, realization is loosed core, and realize the demoulding by the active pull rod pattern frame of leaving behind, finish a course of work, when machine enters second circulation time, by feed system mould brick is pushed away anvil swage, and drive and to open hook mechanism with opening of hook, anvil swage is followed secondary top board and is hurtled down to charging bit, begins the new course of work.
When using this mould; driving oil cylinder 17 also can be connected with top swage 15; hook 24 is connected with mould guide rod 34; also can be located in the main roof 25 driving small oil tank 38; its plunger rod 39 is connected (can save hook and oil cylinder drive link) with rebound, cushion block 27 rises soon at small oil tank 38 on the main roof 25, and secondary top board 26 slips under the secondary top board after push rod promotes with anvil swage 16; drive the master cylinder pressurization and put in place, small oil tank finish after the demoulding by feed system with cushion block pull out, anvil swage falls after rise.
The advantage of this mould is that the demoulding does not need power, and nothing takes time, and borrows the oil cylinder backhaul fully.

Claims (15)

1. multi-functional energy-conservation brick (building block) of building soon of three-dimensional, it includes brick body or building block body, it is characterized in that being provided with on brick body or building block body blind hole or half Brick with blind hole hole that dislocation is arranged, is that the face of binding in blind hole or half Brick with blind hole hole is provided with concave point in brick body or building block body upper surface.
2. the multi-functional energy-conservation brick (building block) of building soon of three-dimensional according to claim 1 is characterized in that being provided with the steel pipe through hole on brick body or building block body, the two ends of steel pipe through hole are concavo-convex tenon mouth, and each brick body or building block body are between the upper and lower by concavo-convex tenon mouth engagement.
3. the multi-functional energy-conservation brick (building block) of building soon of three-dimensional according to claim 1 and 2 is characterized in that being inserted with insulation layer in the half-blindness hole in brick body or building block body, and insulation layer is divided into two blind cavity with half-blindness hole inner chamber.
4. the multi-functional interlocking brick (building block) of building soon of three-dimensional according to claim 1 is characterized in that being provided with steel pipe in the steel pipe through hole in brick body or building block body, and steel pipe walls is provided with spillage hole, many places.
5. the multi-functional energy-conservation brick (building block) of building soon of three-dimensional according to claim 4, it is characterized in that constituting dispersion shape or criss-cross internal-rib between each blind hole in brick body or the building block body or half-blindness hole wall, the steel pipe through hole in brick (building block) body is located at the intersection of dispersion shape or criss-cross internal-rib.
6. the multi-functional energy-conservation brick (building block) of building soon of three-dimensional according to claim 1 is characterized in that each blind hole in brick body or the building block body or the shape of cross section in half-blindness hole are circle, polygon, L shaped or various variation shape and combination thereof.
7. the multi-functional energy-conservation brick (building block) of building soon according to claim 1 is characterized in that: when described brick body or building block body length are 240mm, be provided with 12-42 blind hole of six to nine rows, half-blindness hole in brick body or the building block body; When described brick body or building block body length are 240-380mm, are provided with nine in brick body or the building block body and drain into 28 to 58 blind holes of 15 rows, half-blindness hole; Blind hole, half-blindness hole are rectangle blind hole, half-blindness hole, or rectangular opening and the cross arrangement of T shape, or rectangular opening and T word, the hole cross arrangement of L font.
8. the multi-functional energy-conservation brick (building block) of building soon according to claim 1, it is characterized in that to be provided with in aperture chimb, the chimb and be provided with breeder tube, on the outer wall of wall segment piece, be provided with the ventilation inclined hole that is communicated with breeder tube in upper end by a row half-blindness hole aperture of upper end-face edge.
9. the multi-functional energy-conservation brick (building block) of building soon according to claim 1 is characterized in that a side of outer wall is provided with the decoration convex surface of area less than homonymy brick body or building block body area on brick body or building block body, which is provided with the hole.
10. multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon, it includes top swage, anvil swage, driving oil cylinder, up mould is connected with the top guide bar junction plate, it is characterized in that driving oil cylinder is connected with main roof, on main roof, vertically be provided with the oil cylinder dowel bar, oil cylinder dowel bar upper end is connected with rebound, oil cylinder dowel bar lower end is connected with main roof, on rebound, be provided with the spring dowel bar, the spring dowel bar other end passes the stem stem junction plate and is connected with the spring lower end that is located on framed, spring upper end is connected with framed panel, between main roof and rebound, be provided with secondary top board, anvil swage connecting rod one end is connected with secondary top board, the other end with pass rebound and lean on junction plate with core and be connected with anvil swage, be provided with the mould guide rod at the two ends of mould, the mould guide rod is sleeved on the guide rod junction plate from top to bottom in regular turn, framed panel, the stem stem junction plate, rebound, secondary top board, the two ends of main roof and lower guide rod junction plate.
11. a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon according to claim 10 is characterized in that being provided with demoulding hook on the frame between stem stem junction plate and rebound.
12. a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon according to claim 10 is characterized in that being provided with cushion block between main roof and secondary top board.
13. a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon according to claim 10 is characterized in that being provided with salient point or mark on the profile of top swage.
14. a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon according to claim 10 is characterized in that being equipped with chimb at neighboring and each hole inner ring of upper and lower pattern by the profile place.
15. a kind of multi-functional particular manufacturing craft of building energy-conservation brick (building block) soon according to claim 10, it is characterized in that being connected with top swage at the driving master cylinder, hook is connected with the mould guide rod, drives small oil tank and is located in the main roof, and its plunger rod is connected with rebound.
CN 200320127211 2002-11-28 2003-11-28 Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor Expired - Fee Related CN2778933Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200320127211 CN2778933Y (en) 2002-11-28 2003-11-28 Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN02150795.3 2002-11-28
CN02150795 2002-11-28
CN 200320127211 CN2778933Y (en) 2002-11-28 2003-11-28 Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor

Publications (1)

Publication Number Publication Date
CN2778933Y true CN2778933Y (en) 2006-05-10

Family

ID=36753022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200320127211 Expired - Fee Related CN2778933Y (en) 2002-11-28 2003-11-28 Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor

Country Status (1)

Country Link
CN (1) CN2778933Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103964806A (en) * 2014-05-29 2014-08-06 魏庆业 Refractory insulating brick with solid waste concave-convex core column
CN107614813A (en) * 2015-04-25 2018-01-19 李光富 Cast-in-place wall core building block and mould, manufacture method and building method, connect muscle pipe, bent bottom line box

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103964806A (en) * 2014-05-29 2014-08-06 魏庆业 Refractory insulating brick with solid waste concave-convex core column
CN107614813A (en) * 2015-04-25 2018-01-19 李光富 Cast-in-place wall core building block and mould, manufacture method and building method, connect muscle pipe, bent bottom line box
CN107614813B (en) * 2015-04-25 2019-10-29 李光富 The building block of cast-in-place wall core and mold, manufacturing method and building method connect muscle pipe, bent baseline box

Similar Documents

Publication Publication Date Title
CN102182265B (en) A kind of Multifunctional die wallboard structural system for fast house building
CN201003216Y (en) Serial energy-saving heat preservation seepage control shearing wall interlocking concrete hollow building block
CN204356976U (en) A kind of lightweight wall block
CN104775554A (en) Die plate dismantling-free cast-in-place concrete partition wall and construction method thereof
CN203755528U (en) Wall unit board for building
CN202090469U (en) Multifunctional die wallboard structural system for fast house building
CN1070711A (en) Anti-seismic heat-preservation building blocks and manufacturing thereof
CN100363574C (en) Multifunctional fast construction energy conservation bricks (building blocks) and dies therefor
CN105019593B (en) Building heat preservation prefabricated section and modular arrangement of reinforcement cast-in-place method construction method thereof
CN2778933Y (en) Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor
CN103419281B (en) A kind of light cellular partition board production line
CN201214848Y (en) Steel mesh enhanced high strength baffle wall ribbon board
CN201040888Y (en) Exterior thermal insulation wall for double-teeming heat-insulating material between walls
CN216446326U (en) Aluminum alloy keel embedded grass brick composite gypsum prefabricated wallboard
CN201103186Y (en) Energy-saving hollow block of desulfurized gypsum
CN2641186Y (en) Concrete and double hole type hollow building block able to be placed ontis right position
CN203222923U (en) Building block
CN2869183Y (en) Special non-straight-seam concrete thermal insulating exposed wall block
CN2329717Y (en) Inserted hollow brick
CN213015733U (en) Archaize enclosure eave plate structure
CN111411732A (en) Construction process for assembling vertical hole grouting type building blocks in flush joint mode
CN2391934Y (en) Light wt. partition with reinforced bar
CN201078028Y (en) House building structure chiefly using steel construction
CN1111237C (en) Hollow concrete building block and its productive method and apparatus
CN217974923U (en) Energy-saving building outer wall structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060510