CN203222923U - Building block - Google Patents

Building block Download PDF

Info

Publication number
CN203222923U
CN203222923U CN 201320099653 CN201320099653U CN203222923U CN 203222923 U CN203222923 U CN 203222923U CN 201320099653 CN201320099653 CN 201320099653 CN 201320099653 U CN201320099653 U CN 201320099653U CN 203222923 U CN203222923 U CN 203222923U
Authority
CN
China
Prior art keywords
die
building block
mother
son
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320099653
Other languages
Chinese (zh)
Inventor
施红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320099653 priority Critical patent/CN203222923U/en
Application granted granted Critical
Publication of CN203222923U publication Critical patent/CN203222923U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a T-shaped building block provided with longitudinal and transverse grooves. A plurality of metal strips are arranged inside a mother die formed by welding three layers of metal plates; after the grooves are formed in the bottom end of the mother die, the mother die is movably connected with another mother die formed by a metal plate in an up and down manner; a mixture consisting of glass fiber nets, textured stones doped with glass fragments and cement mortar and a mixture consisting of a T-shaped metal net, ore slag and cement glue are sequentially added into the mother dies; a son die is in a shape of Chinese character qie formed by welding a metal plate; a plurality of groove metal strips are fixed around the son die; four openings are formed in the middle of the son die; a T-shaped metal plate is inserted into the four openings, and then the metal strips and springs are fixed; the mother dies and the son die are fixed by a bracket capable of moving up and down; after a hydraulic press presses down the son die, the building block is manufactured and is firm, attractive and low in cost; and a wall surface constructed by the building block is not required to be painted.

Description

A kind of building block
Technical field
The utility model relates to building material field, especially a kind of tongue and groove of existing vertical and horizontal, the building block that terrazzo concrete and common building block are integrally combined again.
Background technology
The metope that present known building block is built into does not have excellent adhesive power, and cement mortar is whitewashed on metope, perhaps behind the sticking brick, hollowing and the phenomenon that comes off takes place easily year in and year out; Wall face is coarse not firm, must whitewash cement mortar after, be coated with exterior wall coating material or sticking brick again.
Summary of the invention
In order to overcome metope that existing building block is built into after whitewashing cement mortar, the deficiency that hollowing takes place easily and come off; Wall face is coarse not firmly must to whitewash cement mortar, be coated with exterior wall coating material again, perhaps sticking brick, the deficiency that wastes time and energy, the utility model provide a kind of terrazzo concrete building block, and it is terrazzo concrete and existing building block integrator, and the groove of vertical and horizontal arranged, because the not only firm attractive in appearance but also waterproof of metope that terrazzo concrete forms, whitewash cement mortar and be coated with exterior wall coating material again so just saved wall face, perhaps the operation of sticking brick.
The technical scheme that its technical problem that solves the utility model adopts is: the up and down connection of the master tooling of two square building blocks, above suitably higher square master tooling be that metal sheet with three layers of suitable thickness welds together and is made, four vertical faces at its inside one circle metal sheet arrange the tongue that some top and bottom are circular arc bonding jumpers, make it to have formed the gear ring shape, arrange the bottom of a middle circle metal sheet suitably shortlyer, so just formed a circle groove, the outwards suitable perk in bottom of outside one circle metal sheet is circular shape, and after several screw holes are set, the screw of handle is arranged in several screw hole the inside precessions; Make a master tooling that highly suitably hangs down any with the metal sheet of one deck suitable thickness again, around outside the master tooling that highly suitably a bit low and area is suitable bigger, screw thread is set, and the groove the inside of inserting top master tooling, after screwing the handle key screw being arranged their connect of top master tooling bottom, being placed on an one side has above the plastic plate of vertical and horizontal bonding jumper reinforcing, put into a glass fiber net in the master tooling the inside that highly suitably a bit low and area is suitable bigger, above the mixture of the colored stone of doped-glass fragment and cement mortar is poured on, again the wire lath of " T " word shape is reversed and put into, the glass fiber net that sky is exposed outside covers above the wire lath of " T " word shape, after pouring an amount of cement mortar into, the groove the inside of master tooling above its is inserted, what screw top master tooling has the handle key screw they is fixed; The submodule tool be " and " metal sheet of word shape and suitably the metal sheet of higher " T " word shape combine, at first metal sheet is welded into " and " word shape, after around four blocks of transverse metal plates several breach being set, vertically connect breach with groove shape bonding jumper, coincide mutually with the top suitably tongue of several bonding jumpers of higher master tooling the inside, " and " centre of four blocks of transverse metal plates of word shape metal sheet respectively cuts horizontal openning one, than " and " the word shape metal sheet suitably higher " T " word shape metal sheet insert opennings the inside, four roads, the suitably lower end of higher " T " word shape metal sheet insertion " and " the horizontal openning in word shape metal sheet lower end, after not stretching out openning formation plane, " and " word shape metal sheet upper end laterally bores several circular holes above the metal sheet of " T " word shape of face position under the openning, two bonding jumpers that are drilled with circular hole are clipped in the position of the metal sheet circular hole of " T " word shape, with screw and fixed by nut, after a circular hole is respectively opened on the both sides of the upper end transverse metal plate of " T " word shape metal sheet, each fixes a spring support with support above the circular hole at two, the submodule tool that combines and the master tooling that couples together are fixed on above the support that can move up and down, fixed hydraulic device on the submodule tool that combines, at the both sides of master tooling fixed hydraulic device, after the master tooling the inside that couples together adds the mixture of ore slag and cement glue, the submodule tool hydraulic pressure that combines is got off and vibrate, mention two interconnected master toolings with hydraulic means again, unclamp above the master tooling several screw of handle is arranged, unload highly low a bit and area suitably bigger master tooling continue again to operate, the brick of making of building a wall is to be " T " word shape, the horizontal groove in its bottom surface is pressed into by the metal sheet of " T " word shape, on middle four vertical faces some longitudinally groove be pressed into by the top suitably tongue of some strip metal bars of higher master tooling the inside, end face suitably bigger terrazzo concrete face is that suitably some are pressed into the master tooling the inside of highly hanging down any greatly at area, after waiting this building block to solidify to parch, use the levigator water mill, also can get up a plurality of submodule tools side by side and the operation of getting up side by side together of a plurality of master toolings.
The beneficial effects of the utility model are: can be wrapped in the mixture of the colored stone of doped-glass fragment and cement mortar above the wire lath that is fixed on " T " word shape with the glass fiber net, and with the mixture integrator of ore slag and cement glue, the building block of being somebody's turn to do " T " word shape is both firmly attractive in appearance, cheap again, and the groove of vertical and horizontal is arranged, more can increase the adhesive power of cement mortar.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Accompanying drawing is elevation of the present utility model
1 is suitable higher square master tooling among the figure, the 2nd, the tongue that some strip metal bars are made, the 3rd, groove, the 4th, the screw of handle is arranged, the 5th, highly hang down a bit and the suitable bigger master tooling of area, the 6th, one side is reinforced the plastic plate of vertical and horizontal bonding jumper, the 7th, glass fiber net, the 8th, the colored stone of doped-glass fragment and the mixture of cement mortar, the 9th, the wire gauze of " T " word shape, the 10th, " and " metal sheet of word shape, the 11st, the metal sheet of " T " word shape, the 12nd, some groove bonding jumpers, the 13rd, be drilled with the bonding jumper of circular hole, the 14th, screw and nut, the 15th, spring, the 16th, the support that can allow mould move up and down, the 17th, hydraulic means, the 18th, the mixture of ore slag and cement glue, the 19th, the building block of " T " word shape.
The specific embodiment
The up and down connection of the master tooling of two square building blocks, above suitably higher square master tooling 1 be that metal sheet with three layers of suitable thickness welds together and is made, four vertical faces at its inside one circle metal sheet arrange the tongue 2 that some top and bottom are bonding jumpers of circular arc, make it to have formed the gear ring shape, arrange the bottom of a middle circle metal sheet suitably shortlyer, so just formed a circle groove 3, the outwards suitable perk in bottom of outside one circle metal sheet is circular shape, and after several screw holes are set, the screw 4 of handle is arranged in several screw hole the inside precessions; Use the metal sheet of one deck suitable thickness to make a highly suitably suitable bigger master tooling 5 of a bit low and area again, after around 5 outsides screw thread being set, being placed on an one side has above the plastic plate 6 of vertical and horizontal bonding jumper reinforcing, put into a glass fiber net 7 in 5 the inside, above the mixture 8 of the colored stone of doped-glass fragment and cement mortar is poured on, again the wire lath 9 of " T " word shape is reversed and put into, the glass fiber net 7 that sky is exposed outside covers above 9, after pouring an amount of cement mortar into, groove 3 the insides of suitable higher master tooling above its is inserted, the handle screw 4 of having that screws top master tooling is fixed them; The submodule tool be " and " metal sheet of word shape 10 and suitably the metal sheet 11 of higher " T " word shape combine, at first metal sheet is welded into " and " word shape 10, after around its four blocks of transverse metal plate several breach being set, connect breach with several groove shape bonding jumpers 12, coincide mutually with the top suitably tongue 2 of several bonding jumpers of higher master tooling the inside, " and " four blocks of transverse metal plates of word shape metal sheet 10 in the middle of one horizontal openning of cutting, inserting opennings the inside, four roads than 10 suitable higher " T " word shape metal sheets 11, the horizontal openning in 10 lower ends is inserted in 11 lower end, after not stretching out openning formation plane, under the horizontal openning in 10 upper ends, bore several circular holes above 11 of the face position, two bonding jumpers 13 that are drilled with circular hole are clipped in the position of circular hole, fixing with screw and nut 14, after the both sides of 11 upper end transverse metal plates are respectively opened a circular hole, each fixes 15 supports of a spring with support above the circular hole at two, the submodule tool that combines and the master tooling that couples together are fixed on above the support that can move up and down 16, fixed hydraulic device 17 on the submodule tool, at the both sides of master tooling fixed hydraulic device 17, after the master tooling the inside that couples together adds the mixture 18 of ore slag and cement glue, the submodule tool hydraulic pressure that combines is got off and vibrate, mention two interconnected master toolings with hydraulic means 17 again, unclamp above the master tooling several screw 4 of handle is arranged, unload 5 and continue operation again, the building block of making is to be " T " word shape 19, the horizontal groove in its bottom surface is pressed into by 11, on middle four vertical faces some longitudinally groove be pressed into by 2, the bigger terrazzo concrete face of end face forms in 5 the insides, Deng building block solidify parch after, use the levigator water mill, also can get up a plurality of submodule tools side by side and the operation of getting up side by side together of a plurality of master toolings.

Claims (1)

1. building block is characterized in that: the wire lath of glass fiber net and " T " word shape is arranged on this building block the inside, and this building block is " T " word shape, and there is horizontal groove the bottom surface, and four vertical faces have groove longitudinally.
CN 201320099653 2013-03-04 2013-03-04 Building block Expired - Fee Related CN203222923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320099653 CN203222923U (en) 2013-03-04 2013-03-04 Building block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320099653 CN203222923U (en) 2013-03-04 2013-03-04 Building block

Publications (1)

Publication Number Publication Date
CN203222923U true CN203222923U (en) 2013-10-02

Family

ID=49249930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320099653 Expired - Fee Related CN203222923U (en) 2013-03-04 2013-03-04 Building block

Country Status (1)

Country Link
CN (1) CN203222923U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675005A (en) * 2013-11-28 2015-06-03 施红 Ceramic tile building block
CN105839831A (en) * 2016-03-12 2016-08-10 施红 Artificial granite lightweight building block

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675005A (en) * 2013-11-28 2015-06-03 施红 Ceramic tile building block
CN105839831A (en) * 2016-03-12 2016-08-10 施红 Artificial granite lightweight building block

Similar Documents

Publication Publication Date Title
CN204983306U (en) Amalgamation prefabricated plate
CN103266686B (en) Inflatable skeleton filling wall
CN205369689U (en) Keep warm and decorate assembled precast floor plank of integration
CN203222923U (en) Building block
CN114592741B (en) Assembled L-shaped composite wallboard self-tapping screw assembly and post-pouring strip combined connection structure and manufacturing method
CN202152508U (en) Light composite wallboard
CN101078282B (en) Honeycombed light wall plate manufacturing technique
CN103266712B (en) A kind of wall-building brick
CN201103175Y (en) Novel house wall structure
CN217602256U (en) Assembly type L-shaped composite wallboard self-tapping nail cluster and post-cast strip combined connection structure
CN203716343U (en) Plastic sheet internal mold cement mortar wall body
CN202450659U (en) Cement anti-seismic thermal insulation separating wall with hollow internal mold steel plate meshes
CN102146702B (en) Profile steel gypsum combined building structure
CN202370152U (en) Non-run-through hollow brick for resisting earthquake by shear check block
CN100363574C (en) Multifunctional fast construction energy conservation bricks (building blocks) and dies therefor
CN205012499U (en) Equipment antidetonation wall brick
CN210421631U (en) Round steel pipe column ultra-light concrete prefabricated fireproof structure
CN2858824Y (en) Wall component
CN201047126Y (en) Prefabricated building module component
CN2778933Y (en) Multifunctional energy-saving bricks (or blocks) for rapid construction and die therefor
CN210713778U (en) Can splice type and exempt from to tear open cement template
CN2455809Y (en) Thermal insulating metal blocks for complete use
CN2418173Y (en) Light partition wall-board of air-entraining high strength cement-steel mat structure
CN213143580U (en) Plate type light energy-saving building block
CN203594198U (en) Novel wall support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002

Termination date: 20160304