CN2756706Y - Pile bottom pust filling prestress pipe pile - Google Patents

Pile bottom pust filling prestress pipe pile Download PDF

Info

Publication number
CN2756706Y
CN2756706Y CN 200420109630 CN200420109630U CN2756706Y CN 2756706 Y CN2756706 Y CN 2756706Y CN 200420109630 CN200420109630 CN 200420109630 CN 200420109630 U CN200420109630 U CN 200420109630U CN 2756706 Y CN2756706 Y CN 2756706Y
Authority
CN
China
Prior art keywords
pile
grouting
pipe
steel plate
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420109630
Other languages
Chinese (zh)
Inventor
吴才德
沈俊杰
陈忠
孔清华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO CITY DESIGN INST OF ELECTROMECHANICAL INDUSTRY
Original Assignee
NINGBO CITY DESIGN INST OF ELECTROMECHANICAL INDUSTRY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO CITY DESIGN INST OF ELECTROMECHANICAL INDUSTRY filed Critical NINGBO CITY DESIGN INST OF ELECTROMECHANICAL INDUSTRY
Priority to CN 200420109630 priority Critical patent/CN2756706Y/en
Application granted granted Critical
Publication of CN2756706Y publication Critical patent/CN2756706Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A pile bottom post grouting pre-stress pipe pile is equipped with a grouting pipe with a pre-prepared grout outlet hole inside a pile cutoff. The bottom of the pile cutoff is fixedly provided with a tip ironware which is fixed with a sub-seal steel plate. The grouting pipe extends downwards via the sub-seal steel plate. The extension segment is equipped with a rubber sleeve, with a guard tube plate fixedly connected to the bottom of the extension segment. A floor is connected between the guard tube plate and the sub-seal steel plate. The utility model improves the structure of the bottom of the pipe pile and reinforces the bearing layer of the tip viathe post grouting technology, which is a new pile of a single pre-stressed pipe pile technique which brings in grouting technology for the bottom of the pile. The resistance of the bottom of the new pipe pile is greatly increased to effectively perform the resistance of the round of the pipe pile so as to greatly improve the bearing capacity of the pile and obtain the goal of reducing the construction cost, decreasing density of the pile, and reducing effect of earth-squeeze on the surrounding. And new species of pre-stress pipe piles of industrial product are added.

Description

The pile bottom post-grouting pile for prestressed pipe
Technical field
The utility model relates to the pile for prestressed pipe of steel bar concrete pile tube technology, the especially pile bottom post-grouting of building in the civil construction project.
Background technology
Pile for prestressed pipe is the commodity stake of millwork large-scale production, is a kind of stake type commonly used that reliable quality guarantees that has, and is a kind ofly to adopt that centrifugal high pressure is built, the concrete piles compactness reaches 100% high strength concrete stake.But concerning coastal deep soft soil, with all be Piles for Friction Piles, stake must be pressed into soil layer as pile foundation and support upper load, and the pile tube perisporium that buries is poor with all native associativities of stake, the sidewall frictional resistance can not effectively be brought into play, the load-carrying properties of stake are obviously reduced, only prevent that the stake end from thrusting distortion, reinforce bearing stratum, improve the end bearing value, then Zhuan sidewall frictional resistance just can recover to increase gradually, the bearing capacity value of stake is increased substantially, thereby reduce the stake number and reduce construction costs, reduce the density that lays out pile, reduce soil compaction to adjacent week influence, so how strengthening the stake end intensity of pile tube is to realize the effective measure of above-mentioned target, through patent retrieval, also still there are not the effective measures that address the above problem.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of and prevents that effectively stake end from thrusting distortion, increase the sidewall frictional resistance of stake, the pile bottom post-grouting pile for prestressed pipe of the bearing capacity that increases substantially with regard to being to overcome the defective of prior art.
Embodiment of the present utility model is:
A kind of pile bottom post-grouting pile for prestressed pipe, it includes pile cutoff, it is characterized in that being provided with in the described pile cutoff along centralized positioning and be shaped on the Grouting Pipe of slurry outlet in the bottom in advance, the pile cutoff bottom is fixed with stake end ironware, the back cover steel plate fixes with it, and Grouting Pipe is passed the back cover steel plate and extended to the bottom, is set with rubber sleeve on the extension, the bottom of the extension pillar plate that is connected is connected with floor between pillar plate and back cover steel plate.
It is radially radial uniform that described floor is.
Described floor is selected 4~10 by stake footpath size.
Compared with prior art, the utility model improves pile tube stake bottom structure, but form the special stake bottom structure that batch production is produced, reinforce bearing course at pile end by post grouting process, a bottom resistance is increased substantially, thereby the collateral resistance of stake can normally be brought into play, the bearing capacity value of stake improves 40~80% after tested, can reduce a number and soil compaction to adjacent all influences, make the construction costs of stake reduce by 20~40%.
Description of drawings
Fig. 1 is the utility model broken section structure chart.
Fig. 2 is the upward view of Fig. 1.
Fig. 3 is the A-A sectional view of Fig. 2.
The specific embodiment
Embodiment is elaborated to the utility model again below with reference to accompanying drawing.
Shown in Fig. 1~3, the pile bottom post-grouting pile for prestressed pipe is determined pile length according to the bearing stratum buried depth, and pile for prestressed pipe is formed engineering piles by single-unit or more piece, and is when constructing by traditional pile sinking pile extension technology that the Grouting Pipe spreading is extremely suitable for reading.Pile for prestressed pipe according to slip casting after bearing capacity value checking computations pile body cross-sectional strength determine the hollow section stake or irritate the solid section stake of real concrete.
No matter be hollow section stake or solid section stake, what it at first buried is to save pile cutoff down, the bottom solid welding of pile cutoff 1 has stake end ironware 7, has the back cover steel plate 3 of preformed hole to be welded between two parties on the stake end ironware than the little 40~50mm of pile tube diameter, thickness 12mm, center diameter.Grouting Pipe 2 diameters that the bottom is shaped on slurry outlet 8 in advance are 25~40mm, slurry outlet stays three rows, aperture φ 8mm, be 90 ° of symmetric arrays, the reservation centre bore that Grouting Pipe is passed the back cover steel plate makes it be positioned at the center along the periphery welding, and extends 150mm to the bottom, and suit is slightly less than the rubber sleeve 6 of caliber on the extension, can utilize bicycle tube to make, then at bottom, extension solid welding steel pillar plate 5.For intensity at the bottom of strengthening, solid welding has floor 4 between pillar plate 5 and back cover steel plate 3, it is radially radial uniform that floor is, big or small by the stake footpath with 6,8 are optimal selection, and the weld that will guarantee floor and pillar plate to leave rubber sleeve external diameter distance be 5~10mm, so just finish the structure design of pile tube shoe, make the concrete of the high pressure that pours into by Grouting Pipe 2 make rubber sleeve 6 expansions form the one way valve principle through slurry outlet 8 ejections, concrete just rubber sleeve top and the bottom after expand is extruded, because of the barrier effect of rubber sleeve can not recoiled to Grouting Pipe concrete by slurry outlet, concrete just fills up the space between stake floor 4, having reinforced bearing course at pile end increases substantially end resistance, the all collateral resistances of stake are effectively brought into play, thereby the purpose that the bearing capacity value that reaches stake increases substantially, it is the novel stake that a kind of single pile for prestressed pipe technology is introduced pile bottom grouting technique, be to reduce construction costs, reduce the density that lays out pile, reduce the novel stake of soil compaction, increase new kind for the pile for prestressed pipe of plant produced simultaneously adjacent week influence.

Claims (3)

1, a kind of pile bottom post-grouting pile for prestressed pipe, it includes pile cutoff (1), it is characterized in that being provided with in the described pile cutoff along centralized positioning and be shaped on the Grouting Pipe (2) of slurry outlet (8) in the bottom in advance, the pile cutoff bottom is fixed with stake end ironware (7), back cover steel plate (3) fixes with it, Grouting Pipe (2) is passed back cover steel plate (3) and is extended to the bottom, on the extension, be set with rubber sleeve (6), the bottom of the extension pillar plate (5) that is connected is connected with floor (4) between pillar plate (5) and back cover steel plate (3).
2, pile bottom post-grouting pile for prestressed pipe according to claim 1 is characterized in that described floor (4) is radially radial uniform.
3, pile bottom post-grouting pile for prestressed pipe according to claim 1 and 2 is characterized in that described floor (4) is by 4~10 of stake footpath size selections.
CN 200420109630 2004-11-05 2004-11-05 Pile bottom pust filling prestress pipe pile Expired - Fee Related CN2756706Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420109630 CN2756706Y (en) 2004-11-05 2004-11-05 Pile bottom pust filling prestress pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420109630 CN2756706Y (en) 2004-11-05 2004-11-05 Pile bottom pust filling prestress pipe pile

Publications (1)

Publication Number Publication Date
CN2756706Y true CN2756706Y (en) 2006-02-08

Family

ID=35965092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420109630 Expired - Fee Related CN2756706Y (en) 2004-11-05 2004-11-05 Pile bottom pust filling prestress pipe pile

Country Status (1)

Country Link
CN (1) CN2756706Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100432341C (en) * 2006-06-26 2008-11-12 钱勇 After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process
CN101793027A (en) * 2010-04-02 2010-08-04 孔超 Core-grouted static pressure anchor rod pile
CN101899838A (en) * 2010-04-27 2010-12-01 河海大学 Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method
CN102286970A (en) * 2011-06-24 2011-12-21 毕建东 Whole process construction method of driven cast-in-place piles and special device for same
CN102660946A (en) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 Grouting pile head of tubular pile and application method thereof
CN104594357A (en) * 2015-01-19 2015-05-06 赵连平 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN105464105A (en) * 2015-12-31 2016-04-06 石家庄铁道大学 Pile forming structure and method of zero-friction pile
CN110004946A (en) * 2019-03-27 2019-07-12 河海大学 The pile top and its soil-slope rapid rescue ruggedized construction, construction method of grouting behind shaft or drift lining miniature steel pipe pile
CN113186903A (en) * 2021-06-10 2021-07-30 河南中城建设集团股份有限公司 Combined pile structure and construction method for treating insufficient bearing capacity of deep foundation pit construction pile by adopting combined pile structure

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100432341C (en) * 2006-06-26 2008-11-12 钱勇 After-grouting self-guiding hole PHC tubular pole tip anti-rusting cap construction device and construction process
CN101793027B (en) * 2010-04-02 2015-02-25 孔超 Core-grouted static pressure anchor rod pile
CN101793027A (en) * 2010-04-02 2010-08-04 孔超 Core-grouted static pressure anchor rod pile
CN101899838A (en) * 2010-04-27 2010-12-01 河海大学 Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method
CN101899838B (en) * 2010-04-27 2012-02-01 河海大学 Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method
CN102286970A (en) * 2011-06-24 2011-12-21 毕建东 Whole process construction method of driven cast-in-place piles and special device for same
CN102286970B (en) * 2011-06-24 2016-07-27 毕建东 Whole process construction method of driven cast-in-place piles and special purpose device thereof
CN102660946A (en) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 Grouting pile head of tubular pile and application method thereof
CN104594357A (en) * 2015-01-19 2015-05-06 赵连平 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN105464105A (en) * 2015-12-31 2016-04-06 石家庄铁道大学 Pile forming structure and method of zero-friction pile
CN105464105B (en) * 2015-12-31 2017-06-06 石家庄铁道大学 One kind is without friction pile pile making method
CN110004946A (en) * 2019-03-27 2019-07-12 河海大学 The pile top and its soil-slope rapid rescue ruggedized construction, construction method of grouting behind shaft or drift lining miniature steel pipe pile
CN113186903A (en) * 2021-06-10 2021-07-30 河南中城建设集团股份有限公司 Combined pile structure and construction method for treating insufficient bearing capacity of deep foundation pit construction pile by adopting combined pile structure

Similar Documents

Publication Publication Date Title
CN108842791B (en) Detachable load pile anchor multistage supporting structure and construction method
CN100567659C (en) The base configuration of iron tower
CN108487256B (en) Reinforced structure and method for deepening and super-digging foundation pit
CN2756706Y (en) Pile bottom pust filling prestress pipe pile
CN205954656U (en) Double -layer steel manages cement pipe column foundation
CN106245642A (en) A kind of pre-stressed concrete pipe pile foundation and construction method thereof
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN107489144B (en) Reinforcing tubular pile
CN210066722U (en) Pretensioning prestressed spiral concrete multi-thorn precast tubular pile
CN108842792B (en) Layered lifting and unloading type ground pulling anchor rod and construction method
CN104032738B (en) Pre-stressed anchor rod and construction method using same
CN202865827U (en) Multi-hole type hollow pile easy to sink
CN2730940Y (en) Cast in situ pile of prefabricated reinforced concrete
CN114439015A (en) Construction method for improving rock-socketed depth of large-diameter cast-in-place pile
CN213897088U (en) PSB finish rolling screw-thread steel prestressed concrete fender pile structure
CN105064355B (en) A kind of anchor cable composite pile structure and its construction method as agent structure column
CN210421096U (en) Precast pile static pressure construction positioner
CN211006645U (en) Drilling bored concrete pile reinforced structure
CN106703023A (en) Hydraulic hammering type four-wing prefabricated pile and construction method thereof
CN112177016A (en) Composite steel pipe pile foundation pit supporting structure and construction method thereof
CN207193949U (en) A kind of pile for prestressed pipe of convenient construction
CN206956724U (en) A kind of anti-float roof bolt stump
CN215105252U (en) Pile bottom post-grouting reinforced concrete pre-tensioning method prestressed hollow square pile capable of being constructed in sections
CN216973387U (en) High-pressure jet inserting core combined pile
CN219908975U (en) Hidden supporting system of foundation pit gravity dam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060208

Termination date: 20091207