CN106245642A - A kind of pre-stressed concrete pipe pile foundation and construction method thereof - Google Patents

A kind of pre-stressed concrete pipe pile foundation and construction method thereof Download PDF

Info

Publication number
CN106245642A
CN106245642A CN201610605624.5A CN201610605624A CN106245642A CN 106245642 A CN106245642 A CN 106245642A CN 201610605624 A CN201610605624 A CN 201610605624A CN 106245642 A CN106245642 A CN 106245642A
Authority
CN
China
Prior art keywords
concrete
pipe pile
pile foundation
stressed
stanchion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610605624.5A
Other languages
Chinese (zh)
Inventor
田大年
竹影
姚云龙
陈维健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin Consulting Co Ltd
Original Assignee
Huaxin Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxin Consulting Co Ltd filed Critical Huaxin Consulting Co Ltd
Priority to CN201610605624.5A priority Critical patent/CN106245642A/en
Publication of CN106245642A publication Critical patent/CN106245642A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of pre-stressed concrete pipe pile foundation and construction method thereof, aim to provide one not only short construction period, construction site requires little, can effectively solve that steel-pipe pile is perishable, the problem of difficult maintenance, and mounting stability is good, and beneficially shaft tower install pre-stressed concrete pipe pile foundation and construction method.Pre-stressed concrete pipe pile foundation includes solid concrete stanchion and is positioned at the concrete tubular pile below solid concrete stanchion, described concrete tubular pile is in a tubular form, the upper end of concrete tubular pile is connected with the lower end of solid concrete stanchion, the lower ending opening of concrete tubular pile.The construction method of pre-stressed concrete pipe pile foundation comprises the following steps successively: first, is sling by pre-stressed concrete pipe pile foundation and is placed into the appointment position on earth's surface;Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.

Description

A kind of pre-stressed concrete pipe pile foundation and construction method thereof
Technical field
The present invention relates to a kind of base structure for installing shaft tower, be specifically related to a kind of pre-stressed concrete pipe pile foundation And construction method.
Background technology
The installation foundation form of the shaft tower such as shaft tower, electric force pole tower of communicating at present generally includes the pile tube of filling concrete form Basis and the pipe pile foundation of steel-pipe pile form.Wherein the construction site of the pipe pile foundation of filling concrete form requires big, construction Cycle is long, is not suitable for the region constructions such as both sides, urban road, scenic spot, park, square;Steel-pipe pile uses static pressure mode directly to press Entering the end, ground, although it has short construction period, construction site requires little feature, but steel-pipe pile exists maintenance perishable, difficult Problem.
Summary of the invention
The invention aims to overcome the deficiencies in the prior art, it is provided that one not only short construction period, execute Work site requirements is little, can effectively solve that steel-pipe pile is perishable, the problem of difficult maintenance, and mounting stability is good, and beneficially bar The pre-stressed concrete pipe pile foundation of tower installation and construction method thereof.
The technical scheme is that
A kind of pre-stressed concrete pipe pile foundation, including solid concrete stanchion and be positioned at the coagulation below solid concrete stanchion Soil pile tube, in a tubular form, the upper end of concrete tubular pile is connected described concrete tubular pile with the lower end of solid concrete stanchion, coagulation The lower ending opening of soil pile tube.
The pre-stressed concrete pipe pile foundation of this programme uses static pressure or the mode beaten to be pressed into the end, ground and is formed for installing The base structure of shaft tower, its short construction period, construction site require little, and concrete tubular pile can effectively to solve steel-pipe pile perishable Erosion, the difficult problem safeguarded.
On the other hand, owing to pre-stressed concrete pipe pile foundation top is solid concrete stanchion, so it is not only convenient for peace Dress shaft tower, prior, when, due to the extruding of solid concrete stanchion at the press-in end, ground in pre-stressed concrete pipe pile foundation, Soil layer immediately below solid concrete stanchion will be compressed to form more densely cross-linked support soil layer, the simultaneously soil in concrete tubular pile Layer is compressed to form more densely cross-linked support soil layer too, thus the installation being effectively improved pre-stressed concrete pipe pile foundation is steady Qualitative, it is to avoid pre-stressed concrete pipe pile foundation sinks.
As preferably, being provided with lower framework of steel reinforcement in concrete tubular pile, lower framework of steel reinforcement includes being arranged on concrete tubular pile Doughnut-shaped steel plate on lower surface, some lower steel hoops being sequentially distributed from bottom to top in concrete tubular pile and some downward The vertical prestressed reinforcement stretched, the lower end of described vertical prestressed reinforcement is connected with doughnut-shaped steel plate, vertical prestressed reinforcement Upper end up extends in solid concrete stanchion.The vertical prestressed reinforcement of this programme is subject at pre-stressed concrete pipe pile foundation The pressure of part can be offset during pressure, postpone the appearance in concrete tubular pile crack and carry out, being conducive to improving pipe of concrete Crack resistance, rigidity and the impermeability of stake.
As preferably, being provided with framework of steel reinforcement in solid concrete stanchion, upper framework of steel reinforcement includes some depending on from bottom to top The secondary upper steel hoop being distributed in solid concrete stanchion and some upper vertical reinforcements extended up and down.
As preferably, in the middle part of solid concrete stanchion, it is provided with the ventilative row of the both ends of the surface up and down running through solid concrete stanchion Mud hole.Due to the setting of ventilative mudhole, during pre-stressed concrete pipe pile foundation is pressed in soil in concrete tubular pile Air and mud can be discharged by ventilative mudhole, it is to avoid form pore in concrete tubular pile, it is ensured that in concrete tubular pile The density of soil layer, thus improve the stability of pre-stressed concrete pipe pile foundation.
As preferably, solid concrete stanchion upper surface is embedded with some foundation bolts, and the upper end of foundation bolt in advance It is positioned at the top of the upper surface of solid concrete stanchion.The installation of shaft tower is easy in the setting of foundation bolt.
As preferably, the side of solid concrete stanchion is embedded with suspension ring in advance.The setting of suspension ring is easy to loop wheel machine and will be answered in advance Power concrete pipe pile foundation is sling.
As preferably, the lower surface of concrete tubular pile is provided with the annular pile top sheath of metal material, annular pile top sheath Thickness be gradually reduced from top to bottom.Annular pile top sheath is possible not only to protect concrete tubular pile not damaged during pressure down Bad, and press in soil layer owing to protecting concrete tubular pile.
The construction method of a kind of pre-stressed concrete pipe pile foundation, the lower surface of concrete tubular pile is provided with the ring of metal material Shape tooth set, the lower surface of annular tooth set is the flank of tooth, and this flank of tooth has the double wedge of some continuous distribution;Prestressed concrete pipe pile base The construction method of plinth comprises the following steps successively:
First, pre-stressed concrete pipe pile foundation sling and be placed into the appointment position on earth's surface;
Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.
During the pre-stressed concrete pipe pile foundation press-in end, ground, if run into gravel layer or hard weathered rock formation, Then pre-stressed concrete pipe pile foundation will press construction under being obstructed and being difficult to.This programme improves for this problem, effectively solves This problem.
This programme arranges annular tooth set in the lower surface of concrete tubular pile, and uses the mode beaten by prestressed concrete Pipe pile foundation is gradually beaten in underground layer;At piling machine, pre-stressed concrete pipe pile foundation gradually beaten the process in underground layer In, if running into gravel layer or time be obstructed in hard weathered rock formation, the pile monkey at piling machine clashes into pre-stressed concrete pipe pile foundation also Mention this in a flash, owing to the flank of tooth of annular tooth set has the double wedge of some continuous distribution, at the flank of tooth of double wedge, (flank of tooth is oblique Face) with under the gravel effect of gravel layer, pre-stressed concrete pipe pile foundation often produces a certain amount of skew and rotation, thus Abolish gravel layer or the stop of hard weathered rock formation, make pre-stressed concrete pipe pile foundation to be beaten into appointment smoothly deep In the soil layer of degree.
The invention has the beneficial effects as follows: not only short construction period, construction site require little, can effectively solve steel-pipe pile perishable Erosion, the difficult problem safeguarded, and mounting stability is good, and beneficially shaft tower is installed.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the pre-stressed concrete pipe pile foundation of embodiments of the invention 1.
Fig. 2 is the cross-sectional view in Fig. 1 at A-A.
Fig. 3 is the cross-sectional view in Fig. 1 at B-B.
Fig. 4 is a kind of structural representation of the pre-stressed concrete pipe pile foundation of embodiments of the invention 2.
In figure: solid concrete stanchion 1, concrete tubular pile 2, annular pile top sheath 3, lower framework of steel reinforcement 4, lower steel hoop 41, vertical prestressed reinforcement 42, doughnut-shaped steel plate 43, upper framework of steel reinforcement 6, upper steel hoop 61, upper vertical reinforcement 62, earthing member 7, Ventilative mudhole 8, suspension ring 9, foundation bolt 10, annular tooth set 11.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings:
Embodiment 1: as shown in Figure 1, Figure 2, Figure 3 shows, a kind of pre-stressed concrete pipe pile foundation includes solid concrete stanchion 1 and position Concrete tubular pile 2 below solid concrete stanchion.Concrete tubular pile is in a tubular form.Solid concrete stanchion and concrete tubular pile Circular in cross-section.The upper end of concrete tubular pile is connected with the lower end of solid concrete stanchion.The lower end of concrete tubular pile is opened Mouthful.The ventilative mudhole 8 of the both ends of the surface up and down running through solid concrete stanchion it is provided with in the middle part of solid concrete stanchion.
It is embedded with some foundation bolts 10 on solid concrete stanchion upper surface in advance, and the upper end of foundation bolt is positioned at solid The top of the upper surface of concrete stanchion.Suspension ring 9 it are embedded with in advance on the side of solid concrete stanchion.
Framework of steel reinforcement 6 it is provided with in solid concrete stanchion.Upper framework of steel reinforcement includes some being sequentially distributed from bottom to top Upper steel hoop 61 in solid concrete stanchion and some upper vertical reinforcements 62 extended up and down.Solid concrete stanchion top The density of upper steel hoop more than the density of upper steel hoop of solid concrete stanchion middle and lower part.Solid concrete stanchion Side is provided with the earthing member 7 being connected with upper framework of steel reinforcement.
Lower framework of steel reinforcement 4 it is provided with in concrete tubular pile.Lower framework of steel reinforcement includes being arranged on the lower surface of concrete tubular pile Doughnut-shaped steel plate 43, some lower steel hoops 41 being sequentially distributed from bottom to top in concrete tubular pile and some extend up and down Vertical prestressed reinforcement 42.The lower end of vertical prestressed reinforcement is connected with doughnut-shaped steel plate, and the upper end of vertical prestressed reinforcement is past On extend in solid concrete stanchion.
The lower surface of concrete tubular pile is provided with the annular pile top sheath 3 of metal material.Annular pile top sheath is positioned at annular Below steel plate, and annular pile top sheath is weldingly connected with doughnut-shaped steel plate.The thickness of annular pile top sheath is gradually reduced from top to bottom.
The pre-stressed concrete pipe pile foundation of the present embodiment uses static pressure or the mode beaten to be pressed into the ground end (solid concrete The end face of stanchion is substantially flush with earth's surface) base structure for installing shaft tower, its short construction period, construction site can be formed Require little, and concrete tubular pile can effectively solve, and steel-pipe pile is perishable, the problem of difficult maintenance.
Embodiment 2, remaining structure of the present embodiment is with reference to embodiment 1, and its difference is:
As shown in Figure 4, the lower surface of concrete tubular pile is provided with annular tooth set 11(the present embodiment employing annular tooth set of metal material Replace annular pile top sheath).Annular tooth set is positioned at below doughnut-shaped steel plate, and phase is welded with doughnut-shaped steel plate in the upper end of annular tooth set Even.The lower surface of annular tooth set is the flank of tooth.This flank of tooth has the double wedge of some continuous distribution.
Embodiment 3, the construction method of a kind of pre-stressed concrete pipe pile foundation, comprise the following steps (the present embodiment successively The concrete structure of prestressed concrete pipe pile foundation with reference to embodiment 2):
First, pre-stressed concrete pipe pile foundation sling and be placed into the appointment position on earth's surface;
Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.

Claims (8)

1. a pre-stressed concrete pipe pile foundation, is characterized in that, including solid concrete stanchion and be positioned at solid concrete post Concrete tubular pile below Zhuan, described concrete tubular pile in a tubular form, under the upper end of concrete tubular pile and solid concrete stanchion End is connected, the lower ending opening of concrete tubular pile.
A kind of pre-stressed concrete pipe pile foundation the most according to claim 1, is characterized in that, set in described concrete tubular pile Have doughnut-shaped steel plate that lower framework of steel reinforcement, lower framework of steel reinforcement include being arranged on the lower surface of concrete tubular pile, some from bottom to top The lower steel hoop being sequentially distributed in concrete tubular pile and some vertical prestressed reinforcement extended up and down, described vertical in advance should The lower end of power reinforcing bar is connected with doughnut-shaped steel plate, and the upper end of vertical prestressed reinforcement up extends in solid concrete stanchion.
A kind of pre-stressed concrete pipe pile foundation the most according to claim 1, is characterized in that, described solid concrete stanchion Inside being provided with framework of steel reinforcement, upper framework of steel reinforcement includes some upper annulars being sequentially distributed from bottom to top in solid concrete stanchion Reinforcing bar and some upper vertical reinforcements extended up and down.
4., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described solid coagulation The ventilative mudhole of the both ends of the surface up and down running through solid concrete stanchion it is provided with in the middle part of earth pillar stake.
5., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described solid coagulation It is embedded with some foundation bolts on earth pillar stake upper surface in advance, and the upper end of foundation bolt is positioned at the upper surface of solid concrete stanchion Top.
6., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described solid coagulation Suspension ring it are embedded with in advance on the side of earth pillar stake.
7., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described pipe of concrete The lower surface of stake is provided with the annular pile top sheath of metal material, and the thickness of annular pile top sheath is gradually reduced from top to bottom.
8. a construction method for the pre-stressed concrete pipe pile foundation described in claim 1, is characterized in that, described pipe of concrete The lower surface of stake is provided with the annular tooth set of metal material, and the lower surface of annular tooth set is the flank of tooth, and this flank of tooth has some continuous point The double wedge of cloth;
The construction method of pre-stressed concrete pipe pile foundation comprises the following steps successively:
First, pre-stressed concrete pipe pile foundation sling and be placed into the appointment position on earth's surface;
Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.
CN201610605624.5A 2016-07-27 2016-07-27 A kind of pre-stressed concrete pipe pile foundation and construction method thereof Pending CN106245642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610605624.5A CN106245642A (en) 2016-07-27 2016-07-27 A kind of pre-stressed concrete pipe pile foundation and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610605624.5A CN106245642A (en) 2016-07-27 2016-07-27 A kind of pre-stressed concrete pipe pile foundation and construction method thereof

Publications (1)

Publication Number Publication Date
CN106245642A true CN106245642A (en) 2016-12-21

Family

ID=57604872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610605624.5A Pending CN106245642A (en) 2016-07-27 2016-07-27 A kind of pre-stressed concrete pipe pile foundation and construction method thereof

Country Status (1)

Country Link
CN (1) CN106245642A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107513999A (en) * 2017-08-22 2017-12-26 苏交科集团股份有限公司 A kind of quick piling equipment
CN111172976A (en) * 2020-01-21 2020-05-19 许顺良 Prefabricated building structure
CN111172974A (en) * 2020-01-21 2020-05-19 许顺良 Prefabricated building structure
CN111172975A (en) * 2020-01-21 2020-05-19 许顺良 Prefabricated building structure
CN111206573A (en) * 2020-02-28 2020-05-29 许顺良 Prefabricated building structure
CN111827270A (en) * 2020-07-20 2020-10-27 国网山东省电力公司潍坊供电公司 Direct-connection hollow PHC pipe pile mechanism, pole tower construction method and manufacturing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1598169A (en) * 2004-09-16 2005-03-23 颜小荣 High strength hollow high-efficient pile tip
CN101255694A (en) * 2008-04-14 2008-09-03 河南国基建设集团有限公司 High-strength prestressed concrete pipe pile construction method
CN201686984U (en) * 2010-03-12 2010-12-29 李慧莹 Tubular pile
KR20110038443A (en) * 2009-10-08 2011-04-14 주식회사 스마텍엔지니어링 Connecting method and connecting structure between footing and prestressed precast concrete pile
CN202466569U (en) * 2012-02-28 2012-10-03 上海中技桩业股份有限公司 Integrated solid-hollow concrete pile
CN104594343A (en) * 2014-11-28 2015-05-06 天津大学建筑设计研究院 Fabricated pile and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1598169A (en) * 2004-09-16 2005-03-23 颜小荣 High strength hollow high-efficient pile tip
CN101255694A (en) * 2008-04-14 2008-09-03 河南国基建设集团有限公司 High-strength prestressed concrete pipe pile construction method
KR20110038443A (en) * 2009-10-08 2011-04-14 주식회사 스마텍엔지니어링 Connecting method and connecting structure between footing and prestressed precast concrete pile
CN201686984U (en) * 2010-03-12 2010-12-29 李慧莹 Tubular pile
CN202466569U (en) * 2012-02-28 2012-10-03 上海中技桩业股份有限公司 Integrated solid-hollow concrete pile
CN104594343A (en) * 2014-11-28 2015-05-06 天津大学建筑设计研究院 Fabricated pile and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107513999A (en) * 2017-08-22 2017-12-26 苏交科集团股份有限公司 A kind of quick piling equipment
CN107513999B (en) * 2017-08-22 2024-02-23 苏交科集团股份有限公司 Quick pile driver
CN111172976A (en) * 2020-01-21 2020-05-19 许顺良 Prefabricated building structure
CN111172974A (en) * 2020-01-21 2020-05-19 许顺良 Prefabricated building structure
CN111172975A (en) * 2020-01-21 2020-05-19 许顺良 Prefabricated building structure
CN111206573A (en) * 2020-02-28 2020-05-29 许顺良 Prefabricated building structure
CN111827270A (en) * 2020-07-20 2020-10-27 国网山东省电力公司潍坊供电公司 Direct-connection hollow PHC pipe pile mechanism, pole tower construction method and manufacturing method

Similar Documents

Publication Publication Date Title
CN106245642A (en) A kind of pre-stressed concrete pipe pile foundation and construction method thereof
CN103526770A (en) High-impermeable anti-floating pile raft structure and construction method
CN201546227U (en) Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN106759448A (en) A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method
CN206438500U (en) A kind of bridge pile foundation steel reinforcement cage space positioning system
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN1067453C (en) Supporting and protecting method for base pit, side slope, flat anchor and spray net
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN1167857C (en) Foundation pit side-wall flexible support method
CN203594041U (en) Piled raft structure with good resistance to seepage and buoyancy
CN101294388B (en) Construction method for support part to early dismount for super large area deep foundation pit
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN116856932B (en) Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method
CN105821962A (en) Assembled integrated connection structure for prefabricated prestressed reinforced concrete beam and frame columns
CN113737845A (en) Assembled precast concrete retaining wall and construction method
CN113863294B (en) PHC pipe pile internally provided with pile end grouting device and construction process thereof
CN206368375U (en) A kind of electric power pylon basis
CN112575771B (en) Environment-friendly construction method for vertical support system of reverse-acting underground engineering steel concrete with piles and columns
CN213625676U (en) Combined anti-scour beach fan foundation
CN210049264U (en) Assembled foundation
CN109989415B (en) Construction method of fabricated foundation
CN206396764U (en) A kind of supporting pile column of deep basal pit
CN209429119U (en) A kind of cast-in-place concrete pile for mortar depositing construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221