CN106245642A - A kind of pre-stressed concrete pipe pile foundation and construction method thereof - Google Patents
A kind of pre-stressed concrete pipe pile foundation and construction method thereof Download PDFInfo
- Publication number
- CN106245642A CN106245642A CN201610605624.5A CN201610605624A CN106245642A CN 106245642 A CN106245642 A CN 106245642A CN 201610605624 A CN201610605624 A CN 201610605624A CN 106245642 A CN106245642 A CN 106245642A
- Authority
- CN
- China
- Prior art keywords
- concrete
- pipe pile
- pile foundation
- stressed
- stanchion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/58—Prestressed concrete piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of pre-stressed concrete pipe pile foundation and construction method thereof, aim to provide one not only short construction period, construction site requires little, can effectively solve that steel-pipe pile is perishable, the problem of difficult maintenance, and mounting stability is good, and beneficially shaft tower install pre-stressed concrete pipe pile foundation and construction method.Pre-stressed concrete pipe pile foundation includes solid concrete stanchion and is positioned at the concrete tubular pile below solid concrete stanchion, described concrete tubular pile is in a tubular form, the upper end of concrete tubular pile is connected with the lower end of solid concrete stanchion, the lower ending opening of concrete tubular pile.The construction method of pre-stressed concrete pipe pile foundation comprises the following steps successively: first, is sling by pre-stressed concrete pipe pile foundation and is placed into the appointment position on earth's surface;Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.
Description
Technical field
The present invention relates to a kind of base structure for installing shaft tower, be specifically related to a kind of pre-stressed concrete pipe pile foundation
And construction method.
Background technology
The installation foundation form of the shaft tower such as shaft tower, electric force pole tower of communicating at present generally includes the pile tube of filling concrete form
Basis and the pipe pile foundation of steel-pipe pile form.Wherein the construction site of the pipe pile foundation of filling concrete form requires big, construction
Cycle is long, is not suitable for the region constructions such as both sides, urban road, scenic spot, park, square;Steel-pipe pile uses static pressure mode directly to press
Entering the end, ground, although it has short construction period, construction site requires little feature, but steel-pipe pile exists maintenance perishable, difficult
Problem.
Summary of the invention
The invention aims to overcome the deficiencies in the prior art, it is provided that one not only short construction period, execute
Work site requirements is little, can effectively solve that steel-pipe pile is perishable, the problem of difficult maintenance, and mounting stability is good, and beneficially bar
The pre-stressed concrete pipe pile foundation of tower installation and construction method thereof.
The technical scheme is that
A kind of pre-stressed concrete pipe pile foundation, including solid concrete stanchion and be positioned at the coagulation below solid concrete stanchion
Soil pile tube, in a tubular form, the upper end of concrete tubular pile is connected described concrete tubular pile with the lower end of solid concrete stanchion, coagulation
The lower ending opening of soil pile tube.
The pre-stressed concrete pipe pile foundation of this programme uses static pressure or the mode beaten to be pressed into the end, ground and is formed for installing
The base structure of shaft tower, its short construction period, construction site require little, and concrete tubular pile can effectively to solve steel-pipe pile perishable
Erosion, the difficult problem safeguarded.
On the other hand, owing to pre-stressed concrete pipe pile foundation top is solid concrete stanchion, so it is not only convenient for peace
Dress shaft tower, prior, when, due to the extruding of solid concrete stanchion at the press-in end, ground in pre-stressed concrete pipe pile foundation,
Soil layer immediately below solid concrete stanchion will be compressed to form more densely cross-linked support soil layer, the simultaneously soil in concrete tubular pile
Layer is compressed to form more densely cross-linked support soil layer too, thus the installation being effectively improved pre-stressed concrete pipe pile foundation is steady
Qualitative, it is to avoid pre-stressed concrete pipe pile foundation sinks.
As preferably, being provided with lower framework of steel reinforcement in concrete tubular pile, lower framework of steel reinforcement includes being arranged on concrete tubular pile
Doughnut-shaped steel plate on lower surface, some lower steel hoops being sequentially distributed from bottom to top in concrete tubular pile and some downward
The vertical prestressed reinforcement stretched, the lower end of described vertical prestressed reinforcement is connected with doughnut-shaped steel plate, vertical prestressed reinforcement
Upper end up extends in solid concrete stanchion.The vertical prestressed reinforcement of this programme is subject at pre-stressed concrete pipe pile foundation
The pressure of part can be offset during pressure, postpone the appearance in concrete tubular pile crack and carry out, being conducive to improving pipe of concrete
Crack resistance, rigidity and the impermeability of stake.
As preferably, being provided with framework of steel reinforcement in solid concrete stanchion, upper framework of steel reinforcement includes some depending on from bottom to top
The secondary upper steel hoop being distributed in solid concrete stanchion and some upper vertical reinforcements extended up and down.
As preferably, in the middle part of solid concrete stanchion, it is provided with the ventilative row of the both ends of the surface up and down running through solid concrete stanchion
Mud hole.Due to the setting of ventilative mudhole, during pre-stressed concrete pipe pile foundation is pressed in soil in concrete tubular pile
Air and mud can be discharged by ventilative mudhole, it is to avoid form pore in concrete tubular pile, it is ensured that in concrete tubular pile
The density of soil layer, thus improve the stability of pre-stressed concrete pipe pile foundation.
As preferably, solid concrete stanchion upper surface is embedded with some foundation bolts, and the upper end of foundation bolt in advance
It is positioned at the top of the upper surface of solid concrete stanchion.The installation of shaft tower is easy in the setting of foundation bolt.
As preferably, the side of solid concrete stanchion is embedded with suspension ring in advance.The setting of suspension ring is easy to loop wheel machine and will be answered in advance
Power concrete pipe pile foundation is sling.
As preferably, the lower surface of concrete tubular pile is provided with the annular pile top sheath of metal material, annular pile top sheath
Thickness be gradually reduced from top to bottom.Annular pile top sheath is possible not only to protect concrete tubular pile not damaged during pressure down
Bad, and press in soil layer owing to protecting concrete tubular pile.
The construction method of a kind of pre-stressed concrete pipe pile foundation, the lower surface of concrete tubular pile is provided with the ring of metal material
Shape tooth set, the lower surface of annular tooth set is the flank of tooth, and this flank of tooth has the double wedge of some continuous distribution;Prestressed concrete pipe pile base
The construction method of plinth comprises the following steps successively:
First, pre-stressed concrete pipe pile foundation sling and be placed into the appointment position on earth's surface;
Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.
During the pre-stressed concrete pipe pile foundation press-in end, ground, if run into gravel layer or hard weathered rock formation,
Then pre-stressed concrete pipe pile foundation will press construction under being obstructed and being difficult to.This programme improves for this problem, effectively solves
This problem.
This programme arranges annular tooth set in the lower surface of concrete tubular pile, and uses the mode beaten by prestressed concrete
Pipe pile foundation is gradually beaten in underground layer;At piling machine, pre-stressed concrete pipe pile foundation gradually beaten the process in underground layer
In, if running into gravel layer or time be obstructed in hard weathered rock formation, the pile monkey at piling machine clashes into pre-stressed concrete pipe pile foundation also
Mention this in a flash, owing to the flank of tooth of annular tooth set has the double wedge of some continuous distribution, at the flank of tooth of double wedge, (flank of tooth is oblique
Face) with under the gravel effect of gravel layer, pre-stressed concrete pipe pile foundation often produces a certain amount of skew and rotation, thus
Abolish gravel layer or the stop of hard weathered rock formation, make pre-stressed concrete pipe pile foundation to be beaten into appointment smoothly deep
In the soil layer of degree.
The invention has the beneficial effects as follows: not only short construction period, construction site require little, can effectively solve steel-pipe pile perishable
Erosion, the difficult problem safeguarded, and mounting stability is good, and beneficially shaft tower is installed.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the pre-stressed concrete pipe pile foundation of embodiments of the invention 1.
Fig. 2 is the cross-sectional view in Fig. 1 at A-A.
Fig. 3 is the cross-sectional view in Fig. 1 at B-B.
Fig. 4 is a kind of structural representation of the pre-stressed concrete pipe pile foundation of embodiments of the invention 2.
In figure: solid concrete stanchion 1, concrete tubular pile 2, annular pile top sheath 3, lower framework of steel reinforcement 4, lower steel hoop
41, vertical prestressed reinforcement 42, doughnut-shaped steel plate 43, upper framework of steel reinforcement 6, upper steel hoop 61, upper vertical reinforcement 62, earthing member 7,
Ventilative mudhole 8, suspension ring 9, foundation bolt 10, annular tooth set 11.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings:
Embodiment 1: as shown in Figure 1, Figure 2, Figure 3 shows, a kind of pre-stressed concrete pipe pile foundation includes solid concrete stanchion 1 and position
Concrete tubular pile 2 below solid concrete stanchion.Concrete tubular pile is in a tubular form.Solid concrete stanchion and concrete tubular pile
Circular in cross-section.The upper end of concrete tubular pile is connected with the lower end of solid concrete stanchion.The lower end of concrete tubular pile is opened
Mouthful.The ventilative mudhole 8 of the both ends of the surface up and down running through solid concrete stanchion it is provided with in the middle part of solid concrete stanchion.
It is embedded with some foundation bolts 10 on solid concrete stanchion upper surface in advance, and the upper end of foundation bolt is positioned at solid
The top of the upper surface of concrete stanchion.Suspension ring 9 it are embedded with in advance on the side of solid concrete stanchion.
Framework of steel reinforcement 6 it is provided with in solid concrete stanchion.Upper framework of steel reinforcement includes some being sequentially distributed from bottom to top
Upper steel hoop 61 in solid concrete stanchion and some upper vertical reinforcements 62 extended up and down.Solid concrete stanchion top
The density of upper steel hoop more than the density of upper steel hoop of solid concrete stanchion middle and lower part.Solid concrete stanchion
Side is provided with the earthing member 7 being connected with upper framework of steel reinforcement.
Lower framework of steel reinforcement 4 it is provided with in concrete tubular pile.Lower framework of steel reinforcement includes being arranged on the lower surface of concrete tubular pile
Doughnut-shaped steel plate 43, some lower steel hoops 41 being sequentially distributed from bottom to top in concrete tubular pile and some extend up and down
Vertical prestressed reinforcement 42.The lower end of vertical prestressed reinforcement is connected with doughnut-shaped steel plate, and the upper end of vertical prestressed reinforcement is past
On extend in solid concrete stanchion.
The lower surface of concrete tubular pile is provided with the annular pile top sheath 3 of metal material.Annular pile top sheath is positioned at annular
Below steel plate, and annular pile top sheath is weldingly connected with doughnut-shaped steel plate.The thickness of annular pile top sheath is gradually reduced from top to bottom.
The pre-stressed concrete pipe pile foundation of the present embodiment uses static pressure or the mode beaten to be pressed into the ground end (solid concrete
The end face of stanchion is substantially flush with earth's surface) base structure for installing shaft tower, its short construction period, construction site can be formed
Require little, and concrete tubular pile can effectively solve, and steel-pipe pile is perishable, the problem of difficult maintenance.
Embodiment 2, remaining structure of the present embodiment is with reference to embodiment 1, and its difference is:
As shown in Figure 4, the lower surface of concrete tubular pile is provided with annular tooth set 11(the present embodiment employing annular tooth set of metal material
Replace annular pile top sheath).Annular tooth set is positioned at below doughnut-shaped steel plate, and phase is welded with doughnut-shaped steel plate in the upper end of annular tooth set
Even.The lower surface of annular tooth set is the flank of tooth.This flank of tooth has the double wedge of some continuous distribution.
Embodiment 3, the construction method of a kind of pre-stressed concrete pipe pile foundation, comprise the following steps (the present embodiment successively
The concrete structure of prestressed concrete pipe pile foundation with reference to embodiment 2):
First, pre-stressed concrete pipe pile foundation sling and be placed into the appointment position on earth's surface;
Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.
Claims (8)
1. a pre-stressed concrete pipe pile foundation, is characterized in that, including solid concrete stanchion and be positioned at solid concrete post
Concrete tubular pile below Zhuan, described concrete tubular pile in a tubular form, under the upper end of concrete tubular pile and solid concrete stanchion
End is connected, the lower ending opening of concrete tubular pile.
A kind of pre-stressed concrete pipe pile foundation the most according to claim 1, is characterized in that, set in described concrete tubular pile
Have doughnut-shaped steel plate that lower framework of steel reinforcement, lower framework of steel reinforcement include being arranged on the lower surface of concrete tubular pile, some from bottom to top
The lower steel hoop being sequentially distributed in concrete tubular pile and some vertical prestressed reinforcement extended up and down, described vertical in advance should
The lower end of power reinforcing bar is connected with doughnut-shaped steel plate, and the upper end of vertical prestressed reinforcement up extends in solid concrete stanchion.
A kind of pre-stressed concrete pipe pile foundation the most according to claim 1, is characterized in that, described solid concrete stanchion
Inside being provided with framework of steel reinforcement, upper framework of steel reinforcement includes some upper annulars being sequentially distributed from bottom to top in solid concrete stanchion
Reinforcing bar and some upper vertical reinforcements extended up and down.
4., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described solid coagulation
The ventilative mudhole of the both ends of the surface up and down running through solid concrete stanchion it is provided with in the middle part of earth pillar stake.
5., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described solid coagulation
It is embedded with some foundation bolts on earth pillar stake upper surface in advance, and the upper end of foundation bolt is positioned at the upper surface of solid concrete stanchion
Top.
6., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described solid coagulation
Suspension ring it are embedded with in advance on the side of earth pillar stake.
7., according to a kind of pre-stressed concrete pipe pile foundation described in claim 1 or 2 or 3, it is characterized in that, described pipe of concrete
The lower surface of stake is provided with the annular pile top sheath of metal material, and the thickness of annular pile top sheath is gradually reduced from top to bottom.
8. a construction method for the pre-stressed concrete pipe pile foundation described in claim 1, is characterized in that, described pipe of concrete
The lower surface of stake is provided with the annular tooth set of metal material, and the lower surface of annular tooth set is the flank of tooth, and this flank of tooth has some continuous point
The double wedge of cloth;
The construction method of pre-stressed concrete pipe pile foundation comprises the following steps successively:
First, pre-stressed concrete pipe pile foundation sling and be placed into the appointment position on earth's surface;
Then, piling machine is used gradually to be beaten in underground layer by pre-stressed concrete pipe pile foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610605624.5A CN106245642A (en) | 2016-07-27 | 2016-07-27 | A kind of pre-stressed concrete pipe pile foundation and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610605624.5A CN106245642A (en) | 2016-07-27 | 2016-07-27 | A kind of pre-stressed concrete pipe pile foundation and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106245642A true CN106245642A (en) | 2016-12-21 |
Family
ID=57604872
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610605624.5A Pending CN106245642A (en) | 2016-07-27 | 2016-07-27 | A kind of pre-stressed concrete pipe pile foundation and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245642A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107513999A (en) * | 2017-08-22 | 2017-12-26 | 苏交科集团股份有限公司 | A kind of quick piling equipment |
CN111172976A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
CN111172974A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
CN111172975A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
CN111206573A (en) * | 2020-02-28 | 2020-05-29 | 许顺良 | Prefabricated building structure |
CN111827270A (en) * | 2020-07-20 | 2020-10-27 | 国网山东省电力公司潍坊供电公司 | Direct-connection hollow PHC pipe pile mechanism, pole tower construction method and manufacturing method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1598169A (en) * | 2004-09-16 | 2005-03-23 | 颜小荣 | High strength hollow high-efficient pile tip |
CN101255694A (en) * | 2008-04-14 | 2008-09-03 | 河南国基建设集团有限公司 | High-strength prestressed concrete pipe pile construction method |
CN201686984U (en) * | 2010-03-12 | 2010-12-29 | 李慧莹 | Tubular pile |
KR20110038443A (en) * | 2009-10-08 | 2011-04-14 | 주식회사 스마텍엔지니어링 | Connecting method and connecting structure between footing and prestressed precast concrete pile |
CN202466569U (en) * | 2012-02-28 | 2012-10-03 | 上海中技桩业股份有限公司 | Integrated solid-hollow concrete pile |
CN104594343A (en) * | 2014-11-28 | 2015-05-06 | 天津大学建筑设计研究院 | Fabricated pile and construction method thereof |
-
2016
- 2016-07-27 CN CN201610605624.5A patent/CN106245642A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1598169A (en) * | 2004-09-16 | 2005-03-23 | 颜小荣 | High strength hollow high-efficient pile tip |
CN101255694A (en) * | 2008-04-14 | 2008-09-03 | 河南国基建设集团有限公司 | High-strength prestressed concrete pipe pile construction method |
KR20110038443A (en) * | 2009-10-08 | 2011-04-14 | 주식회사 스마텍엔지니어링 | Connecting method and connecting structure between footing and prestressed precast concrete pile |
CN201686984U (en) * | 2010-03-12 | 2010-12-29 | 李慧莹 | Tubular pile |
CN202466569U (en) * | 2012-02-28 | 2012-10-03 | 上海中技桩业股份有限公司 | Integrated solid-hollow concrete pile |
CN104594343A (en) * | 2014-11-28 | 2015-05-06 | 天津大学建筑设计研究院 | Fabricated pile and construction method thereof |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107513999A (en) * | 2017-08-22 | 2017-12-26 | 苏交科集团股份有限公司 | A kind of quick piling equipment |
CN107513999B (en) * | 2017-08-22 | 2024-02-23 | 苏交科集团股份有限公司 | Quick pile driver |
CN111172976A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
CN111172974A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
CN111172975A (en) * | 2020-01-21 | 2020-05-19 | 许顺良 | Prefabricated building structure |
CN111206573A (en) * | 2020-02-28 | 2020-05-29 | 许顺良 | Prefabricated building structure |
CN111827270A (en) * | 2020-07-20 | 2020-10-27 | 国网山东省电力公司潍坊供电公司 | Direct-connection hollow PHC pipe pile mechanism, pole tower construction method and manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106245642A (en) | A kind of pre-stressed concrete pipe pile foundation and construction method thereof | |
CN103526770A (en) | High-impermeable anti-floating pile raft structure and construction method | |
CN201546227U (en) | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall | |
CN102162258B (en) | Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof | |
CN106759448A (en) | A kind of sunk type agricultural greenhouse photovoltaic bracket foundation structure and its construction method | |
CN206438500U (en) | A kind of bridge pile foundation steel reinforcement cage space positioning system | |
CN203222809U (en) | Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line | |
CN102330436B (en) | Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank | |
CN1067453C (en) | Supporting and protecting method for base pit, side slope, flat anchor and spray net | |
CN201172830Y (en) | Anchor rod static-pressing pile foundation in tower crane | |
CN1167857C (en) | Foundation pit side-wall flexible support method | |
CN203594041U (en) | Piled raft structure with good resistance to seepage and buoyancy | |
CN101294388B (en) | Construction method for support part to early dismount for super large area deep foundation pit | |
CN204825867U (en) | As composite pile structure of secretly digging garage stand | |
CN116856932B (en) | Large-diameter prestress assembly vertical shaft structure containing glass fiber rib part and construction method | |
CN105821962A (en) | Assembled integrated connection structure for prefabricated prestressed reinforced concrete beam and frame columns | |
CN113737845A (en) | Assembled precast concrete retaining wall and construction method | |
CN113863294B (en) | PHC pipe pile internally provided with pile end grouting device and construction process thereof | |
CN206368375U (en) | A kind of electric power pylon basis | |
CN112575771B (en) | Environment-friendly construction method for vertical support system of reverse-acting underground engineering steel concrete with piles and columns | |
CN213625676U (en) | Combined anti-scour beach fan foundation | |
CN210049264U (en) | Assembled foundation | |
CN109989415B (en) | Construction method of fabricated foundation | |
CN206396764U (en) | A kind of supporting pile column of deep basal pit | |
CN209429119U (en) | A kind of cast-in-place concrete pile for mortar depositing construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161221 |