CN201686984U - Tubular pile - Google Patents

Tubular pile Download PDF

Info

Publication number
CN201686984U
CN201686984U CN2010201331757U CN201020133175U CN201686984U CN 201686984 U CN201686984 U CN 201686984U CN 2010201331757 U CN2010201331757 U CN 2010201331757U CN 201020133175 U CN201020133175 U CN 201020133175U CN 201686984 U CN201686984 U CN 201686984U
Authority
CN
China
Prior art keywords
pile
soil
stake
tube
stake point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201331757U
Other languages
Chinese (zh)
Inventor
赖惠清
邓迎芳
李慧莹
徐晓博
赵自亮
苏剑良
陈卫文
曾佳
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hengsheng Construction Engineering Co., Ltd.
Original Assignee
Guangzhou Hengsheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hengsheng Construction Engineering Co Ltd filed Critical Guangzhou Hengsheng Construction Engineering Co Ltd
Priority to CN2010201331757U priority Critical patent/CN201686984U/en
Application granted granted Critical
Publication of CN201686984U publication Critical patent/CN201686984U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tubular pile which is used for constructing the tubular pile of soft soil foundation. The tubular pile comprises a cylinder-shaped pile body with an empty chamber, and a pile sharp which is welded with the pile body into a whole body, wherein one end of the pile sharp is provided with a saw tooth-shaped opening, the other end of the pile sharp is a flat end which is welded with the pile body, and the opening is communicated with the empty chamber in the pile body. By adopting the technical scheme, the saw tooth-shaped pile sharp is better for breaking the rock and entering into the soil, so that the tubular pile can directly cut the soil body rather than discharging the soil, improve the soil-returning quantity of a pile core, and effectively reduces the weak soil-extruding effect.

Description

A kind of pile tube
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of pile tube that is applicable to soft soil foundation construction,, improve the bearing capacity of ground by to the intensive pile tube that is covered with of soft foundation large tracts of land.
Background technology
Pearl River Delta area is the same with China other coastal areas, the forward position that belongs to reform and development, urgent development is very fast, in recent years, mega projects such as various places factory building are constantly built, this intermediate item terrace requirement for bearing capacity height, but because the coastal area mud is generally thicker, so the bearing capacity deficiency of ground is except that the main body frame basis, terrace adopts the intensive pipe pile foundation of large tracts of land in design, guarantee it at load supporting ability of ground, but adopt the intensive tube pile construction of large tracts of land, soil compaction effect very easily occurs, i.e. back piling causes the skew of first piling to the extruding of first piling, tilt and protuberance.In construction, the construction access road by the design pile tube and the influence that soil compaction effect could be avoided or reduce to the pressure release ditch is set, the stake point of different pile tubes is also owing to have the different soil amounts of returning in addition, and causes different soil compaction effects.
For reducing soil compaction effect, in the construction of existing prefabricated reinforced concrete pipe pile,, adopt as shown in Figure 1 cross piling bar point (a) or standard openings shaped steel stake point (b) generally by standard collective drawings " prestressed concrete pipe pile " requirement (03SG409).Cross piling bar point adopts two block plates that weldering " ten " word intersects on the block plate, use the sharp pile tube of cross stake in the process of burying, not have the soil of returning and enter pile tube stake in-core, the circular bottom plate of cross stake point has stopped entering of soil, and is obvious to peripheral soil compaction effect when making a large amount of tube pile construction; Standard openings type stake point adopts with 6 trapezoidal floors of one section steel cylinder outside weld, and the tube limit floor of standard openings type stake point is outwards to break ground, and makes that entering a core soil reduces; And steel cylinder bottom be a planar rings, and the resistance that broken rock buries is all bigger, and the soil amount that enters pile tube stake core when using the pile tube of standard openings type stake point to bury is less, and comparatively difficult in argillic horizon, rock stratum, makes that tube pile construction speed is lower.In addition, above-mentioned two class stake points combine by the polylith steel plate, need welding fabrication, and weld seam etc. are more, so make comparatively complicated.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of pile tube, be applied to the tube pile construction of soft foundation, the broken rock of tube pile construction buries more effective, has bigger stake core and return the soil amount in pile tube buries process.
To achieve these goals, the present invention adopts following technical scheme: a kind of pile tube, be applied to the tube pile construction of soft foundation, the stake point that described pile tube comprises the tubular pile body that has hollow cavity, is welded as a whole with described pile body, one end of described stake point is provided with the sawtooth pattern opening, the other end is the flush end with pile body welding, and the interior cavity of described opening and pile body communicates.
Adopt the beneficial effect of technique scheme to be: at the bottom of the flat ring with respect to the plectane back cover of cross stake point and open-type stake point, sawtooth pattern stake point can be more favourable broken rock bury, and efflux for the vertical cut soil body rather than with the soil body, can increase the soil amount of returning of a core, effectively weaken soil compaction effect.
As improvement of the technical scheme, the oblique angle of described sawtooth both sides is 40 °~50 °.
As further improvement in the technical proposal, described stake point is made through cutting and welding procedure by steel plate materials.Stake point is made and is only used a block length shape steel plate, and therefrom sawtooth pattern is cut, and then two block plates is rolled into cylinder separately, get final product two stake points, then with stake point and pile body by being welded as a whole, promptly obtain used pile tube in the construction.Simple, weld seam minimizing that the sharp manufacture craft of stake is made: the sharp stack shell of whole stake is a block plate, has only a weld seam (reel weld seam) and an otch (the profile of tooth cutting during steel plate).
Description of drawings
Fig. 1 is the structural representation of existing cross piling bar point (a) or standard openings shaped steel stake point (b);
Fig. 2 is the structural representation of a kind of embodiment of a kind of pile tube of the utility model;
Fig. 3 is the structural representation of the stake point among Fig. 2 embodiment.
The specific embodiment
For making the present invention easier to understand,, further set forth the present invention below in conjunction with specific embodiment.
Please refer to signal a kind of embodiment shown in Figure 2, a kind of pile tube, be applied to the tube pile construction of soft foundation, the stake point 2 that described pile tube comprises the tubular pile body 1 that has hollow cavity, is welded as a whole with described pile body, as shown in Figure 3, an end of described stake point 2 is provided with the sawtooth pattern opening, and the oblique angle of sawtooth 20 both sides is 45 °, the length of stake point 2 is 150mm, and the facewidth of sawtooth 20 is 40mm.The other end of stake point 2 be the flush end with pile body 1 welding, and described opening 22 and pile body 1 interior cavity 10 communicates.
Adopt the beneficial effect of technique scheme to be: at the bottom of the flat ring with respect to the plectane back cover of cross stake point and open-type stake point, the oblique angle of sawtooth both sides is 45 °, this sawtooth pattern stake point can be more favourable broken rock bury, the vertical cut soil body, and the cavity in opening and the pile body communicates, pile tube is not that the soil body is effluxed, thereby can increase the soil amount of returning of a core, effectively weakens soil compaction effect.
In the present embodiment, described stake point is made through cutting and welding procedure by steel plate materials.Stake point is made and is only used a block length shape steel plate, and therefrom sawtooth pattern is cut, and then two block plates is rolled into cylinder separately, get final product two stake points, then with stake point and pile body by being welded as a whole, promptly obtain used pile tube in the construction.Simple, weld seam minimizing that the sharp manufacture craft of stake is made: the sharp stack shell of whole stake is a block plate, the otch that the profile of tooth cutting when having only a reel weld seam and steel plate produces.
Be that the pile tube of 30m is an example with pile tube length below, with cross piling bar point, the stake of standard openings type point and embodiment illustrated in fig. 2 in sawtooth pattern stake point return the test of soil amount respectively, control piling speed is the same, native value is returned in measurement, obtain the soil amount of the returning average of above three types of stake points, and calculate and return native length ratio, wherein, return native length and compare=on average return soil amount ÷ pile tube length, result of the test is as shown in table 1 below:
Soil amount average is returned in the test of table 1 all kinds stake point
The sharp type of stake On average return soil amount (m) Return native length ratio
Standard openings type stake point 3.9? 0.13?
Cross piling bar point 0? 0?
Sawtooth pattern stake point 8.3? 0.27?
Result of the test shows: under the identical condition of piling speed, it is maximum that sawtooth pattern opening stake point returns the soil amount, returns native length than high, and in application in practice, the soil compaction effect of generation is also the most weak, is suitable for the tube pile construction of soft foundation.
Last institute should be noted that; above embodiment is only in order to illustrate the technical solution of the utility model but not limiting the scope of the invention; although the present invention has been done detailed description with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can make amendment or be equal to replacement technical scheme of the present invention, and not break away from the essence and the scope of technical solution of the present invention.

Claims (3)

1. pile tube, be applied to the tube pile construction of soft foundation, the stake point that described pile tube comprises the tubular pile body that has hollow cavity, is welded as a whole with described pile body, it is characterized in that: an end of described stake point is provided with the sawtooth pattern opening, the other end is the flush end with pile body welding, and the interior cavity of described opening and pile body communicates.
2. pile tube according to claim 1 is characterized in that: the oblique angle of described sawtooth both sides is 40 °~50 °.
3. according to claim 1 or 2 arbitrary described pile tubes, it is characterized in that: described stake point is made through cutting and welding procedure by steel plate materials.
CN2010201331757U 2010-03-12 2010-03-12 Tubular pile Expired - Fee Related CN201686984U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201331757U CN201686984U (en) 2010-03-12 2010-03-12 Tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201331757U CN201686984U (en) 2010-03-12 2010-03-12 Tubular pile

Publications (1)

Publication Number Publication Date
CN201686984U true CN201686984U (en) 2010-12-29

Family

ID=43375269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201331757U Expired - Fee Related CN201686984U (en) 2010-03-12 2010-03-12 Tubular pile

Country Status (1)

Country Link
CN (1) CN201686984U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155583A (en) * 2011-04-12 2011-08-17 中国十九冶集团有限公司 Method and structure for laying ore pulp pipelines in sliding masses, collapse bodies and debris flow areas
CN106245642A (en) * 2016-07-27 2016-12-21 华信咨询设计研究院有限公司 A kind of pre-stressed concrete pipe pile foundation and construction method thereof
CN108149677A (en) * 2017-12-29 2018-06-12 中交路桥北方工程有限公司 A kind of underwater anti-rock burst hardened system
CN110284494A (en) * 2019-06-24 2019-09-27 中铁大桥勘测设计院集团有限公司 It is a kind of for abolishing the steel-pipe pile and its construction method on coral rock stratum
CN111910620A (en) * 2020-08-10 2020-11-10 兰州大学 Internal spiral steel pile
CN112081098A (en) * 2020-09-14 2020-12-15 重庆大学 Rock breaking steel pipe pile for temporary support

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155583A (en) * 2011-04-12 2011-08-17 中国十九冶集团有限公司 Method and structure for laying ore pulp pipelines in sliding masses, collapse bodies and debris flow areas
CN102155583B (en) * 2011-04-12 2012-12-05 中国十九冶集团有限公司 Method and structure for laying ore pulp pipelines in sliding masses, collapse bodies and debris flow areas
CN106245642A (en) * 2016-07-27 2016-12-21 华信咨询设计研究院有限公司 A kind of pre-stressed concrete pipe pile foundation and construction method thereof
CN108149677A (en) * 2017-12-29 2018-06-12 中交路桥北方工程有限公司 A kind of underwater anti-rock burst hardened system
CN110284494A (en) * 2019-06-24 2019-09-27 中铁大桥勘测设计院集团有限公司 It is a kind of for abolishing the steel-pipe pile and its construction method on coral rock stratum
CN110284494B (en) * 2019-06-24 2021-04-06 中铁大桥勘测设计院集团有限公司 Steel pipe pile for breaking reef limestone stratum and construction method thereof
CN111910620A (en) * 2020-08-10 2020-11-10 兰州大学 Internal spiral steel pile
CN112081098A (en) * 2020-09-14 2020-12-15 重庆大学 Rock breaking steel pipe pile for temporary support

Similar Documents

Publication Publication Date Title
CN201686984U (en) Tubular pile
CN101220593A (en) Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN202689008U (en) Supporting structure for double-row prefabricated high-strength concrete thin-walled steel pipe pile foundation pit
CN103603358A (en) Multi-platform retaining structure and construction method
CN202787234U (en) Novel steel pipe pile composite wall
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN207159990U (en) One kind combination steel construction support pile
CN102051887A (en) Construction method for T-shaped rigid composite pile composite foundation of saturated soft clay regions
CN111593739A (en) Cement mixing pile enclosure wall-profile steel cantilever type combined support
CN201850557U (en) Discontinuous flange type screw pile foundation
CN204645058U (en) A kind ofly be provided with the H type Double-row-piles Structure adding core rotary churning pile
CN205024712U (en) Modular tower crane basis
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN104762975B (en) A kind of H type Double-row-piles Structure that adds core rotary churning pile that is provided with
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN204825936U (en) Lock catch type steel -pipe pile is used in cofferdam
CN204370378U (en) A kind of flexible blocking slag dam structure
CN203256675U (en) Wall pile framework structure
CN103981858A (en) Anti-tilt pipe piles protected by latticed cement-soil continuous walls and construction method thereof
CN202969406U (en) Wind power generation tower foundation combining reverse frustum with free-standing column
CN103276691A (en) Wall pile frame structure
CN212742557U (en) Cement mixing pile enclosure wall-profile steel cantilever type combined support
CN211340683U (en) A add muscle roll-compaction formula earth and rockfill dam for landfill
CN204849850U (en) Subduct ground bearing stress's structure
CN218813739U (en) Batter pile supporting system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUANGZHOU HENGSHENG CONSTRUCTION ENGINEERING CO.,

Free format text: FORMER OWNER: LI HUIYING

Effective date: 20110214

Free format text: FORMER OWNER: GUANGZHOU HENGSHENG CONSTRUCTION ENGINEERING CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110214

Address after: 9, building 4, No. 510030, Canton Road, Guangdong, Guangzhou

Patentee after: Guangzhou Hengsheng Construction Engineering Co., Ltd.

Address before: 9, building 4, No. 510030, Canton Road, Guangdong, Guangzhou

Co-patentee before: Guangzhou Hengsheng Construction Engineering Co., Ltd.

Patentee before: Li Huiying

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lai Huiqing

Inventor after: Li Ming

Inventor after: Li Junyao

Inventor after: Deng Yingfang

Inventor after: Li Huiying

Inventor after: Xu Xiaobo

Inventor after: Zhao Ziliang

Inventor after: Su Jianliang

Inventor after: Chen Weiwen

Inventor after: Zeng Jia

Inventor before: Lai Huiqing

Inventor before: Deng Yingfang

Inventor before: Li Huiying

Inventor before: Xu Xiaobo

Inventor before: Zhao Ziliang

Inventor before: Su Jianliang

Inventor before: Chen Weiwen

Inventor before: Zeng Jia

Inventor before: Li Ming

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LAI HUIQING DENG YINGFANG LI HUIYING XU XIAOBO ZHAO ZILIANG SU JIANLIANG CHEN WEIWEN ZENG JIA LI MING TO: LAI HUIQING LI JUNYAO DENG YINGFANG LI HUIYING XU XIAOBO ZHAO ZILIANG SU JIANLIANG CHEN WEIWEN ZENG JIA LI MING

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101229

Termination date: 20130312