CN2754768Y - Loader - Google Patents

Loader Download PDF

Info

Publication number
CN2754768Y
CN2754768Y CN 200420079841 CN200420079841U CN2754768Y CN 2754768 Y CN2754768 Y CN 2754768Y CN 200420079841 CN200420079841 CN 200420079841 CN 200420079841 U CN200420079841 U CN 200420079841U CN 2754768 Y CN2754768 Y CN 2754768Y
Authority
CN
China
Prior art keywords
assembly
cam
links
vertical promotion
rocking arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420079841
Other languages
Chinese (zh)
Inventor
史正来
史德海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420079841 priority Critical patent/CN2754768Y/en
Application granted granted Critical
Publication of CN2754768Y publication Critical patent/CN2754768Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forming Counted Batches (AREA)

Abstract

The utility model discloses a loader, which comprises a machine frame (1), a driving motor (2), and a vacuum pump (3). The utility model is characterized in that a gas supplying and sucking mouth support frame assembly (39), a metal band feeding device (24) and a cutting knife assembly (25) are arranged on the machine frame (1). The lower part of the machine frame (1) is provided with a cam assembly (40), a vertical promotion assembly (13), an upper promotion assembly (41) and a transverse movement assembly (12), wherein the upper promotion assembly (41) is connected with the transverse movement assembly (12) and the gas supplying and sucking mouth support frame assembly (39) and is supported on the vertical promotion assembly (13). The vertical promotion assembly (13) moves upwards and downwards under the action of a cam, and the transverse movement assembly (12) moves forwards and backwards under the action of a rocker arm (14). The metal band feeding device (24) and the cutting knife assembly (25) are connected with the cam assembly (40) to complete the feeding and cutting actions, so the loading quality and efficiency can be ensured. People can be also released from onerous, monotonic and repeated labor.

Description

Loading machine
Technical field
The utility model relates to a kind of metal forming manufacturing equipment, especially a kind ofly the strip metal sheet can be stacked the plant equipment of automatic job, specifically a kind of loading machine continuously by fixed ruler cutting and according to the order of putting a slice sheet metal on one deck coal paper.
Background technology
The metal forming goods are traditional handicraft products of China, and the manufacturing of metal forming is the basis of metal forming goods, and metal forming generally is to be beaten repeatedly by sheet metal (copper sheet, aluminium flake or gold plaque) to form.Its manufacturing process is generally: (being generally 190 * 190mm) centre places a small size and (is generally 50 * 50 * 0.01mm) sheet metal in a large-sized coal paper, and then on sheet metal, place a big size coal paper, layer of metal sheet like this, one deck coal paper, until the required number of plies (among the people is one " work " with 2304 layers generally), beat then, thereby with the hammer of the sheet metal in the middle of coal paper foliate shape, one deck then, one deck is thrown off coal paper, take out metal forming, use the also reusable several times of coal paper for making the metal forming goods.The process that stacks sheet metal and coal paper wherein is known as dress and accounts for.Existing dress accounts for process and all adopts manual operations, by manually sheet metal and coal paper layering being stacked, wherein the placement of sheet metal is difficult to accurately put between two parties, therefore can occur every layer of sheet metal in the actual production and be not taking back, be exactly to take over, not on the upper side, be exactly on the lower side, perhaps make the sideline of the sideline of sheet metal and coal paper not parallel, error can reach about 10mm when maximum.When next procedure was beaten like this, became uneven can appear in the metal forming of being got, and is half of thick, a half of book or a thick angle, three angles are thin, even the phenomenon that coal paper is broken can appear, and having influence on product quality, finished product is low, correspondingly cost is just big, simultaneously, manually-operated labour intensity is big, efficient is low, therefore, dress accounts for that difficulty, efficient are low, unstable product quality is one of key issue of puzzlement metal forming manufacturing firm always, also is a difficult problem can't more getting in the traditional handicraft.
Summary of the invention
The purpose of this utility model is a kind of loading machine of design, it can guarantee that dress accounts for quality, people can be solved from heavy, the dull duplication of labour again, can beat operation for following road provides high-quality " work ", helps improving the quality and the output of metal forming.
The technical solution of the utility model is:
A kind of loading machine, comprise frame 1, drive motors 2, vavuum pump 3, drive motors 2, vavuum pump 3 is installed on the gantry base 4, it is characterized in that being equipped with on the frame 1 air feed and suction nozzle bracket assembly 39, metal tape pay-off 24, cutter assembly 25, cutter assembly 25 is between air feed and suction nozzle bracket assembly 39 and metal tape pay-off 24 and adjacent with metal tape pay-off 24, the bottom of frame 1 is equipped with Cam set assembly 40, Cam set assembly 40 is driven by drive motors 2, in frame 1, the top of Cam set assembly 40 is equipped with vertical promotion assembly 13, last lifting assembly 41, horizontal mobile assembly 12, link to each other with air feed and suction nozzle bracket assembly 39 when last lifting assembly 41 links to each other with horizontal mobile assembly 12, and be bearing on the vertical promotion assembly 13 by guide shaft 37; Vertical promotion assembly 13 links to each other with corresponding vertical promotion cam 21 in the Cam set assembly 40 by vertical promotion rocking arm 20, and under the drive of vertical promotion cam 21 and vertical promotion rocking arm 20, move up and down, lifting assembly 41 and horizontal mobile assembly 12 move up and down in the drive; Horizontal mobile assembly 12 links to each other with rocking arm 14, and rocking arm 14 links to each other with corresponding cam on the Cam set assembly 40.This cam rotating band shakes arm 14 rotates, and the rocking arm 14 horizontal mobile assemblies 14 of drive and go up lifting assembly 41, air feed and the suction nozzle bracket assembly 39 that are attached thereto move laterally.Metal tape pay-off 24, cutter assembly 25 link to each other with corresponding cam on the Cam set assembly 40 by corresponding connecting rod or rocking arm respectively.
The utility model has also been taked following technical measures:
Air feed and suction nozzle bracket assembly 39 comprise that dress accounts for pallet 5, coal paper pallet 6, sheet metal sucker 9, coal paper sucker 10, air-breathing stay pipe 7,8 movably, air-breathing stay pipe 7,8 is installed in the top that dress accounts for pallet 5 and coal paper pallet 6 respectively, its inlet end links to each other with vavuum pump 3, sheet metal sucker 9 and coal paper sucker 10 link to each other with corresponding air-breathing stay pipe 7,8 respectively and are positioned at the top that dress accounts for pallet 5, coal paper pallet 6, link to each other by link 11 between the air-breathing stay pipe 7,8, link 11 links to each other with horizontal mobile assembly 12.
Cam set assembly 40 mainly comprises camshaft 16, horizontal mobile cam ring 15, vertical promotion cam 21, cuts cam 27, feeding regulating wheel 22, and an end of camshaft 16 links to each other with drive motors 2 by speed reduction gearing 17; Horizontal mobile cam ring 15 and horizontal mobile rocking arm 14, horizontal mobile rocking arm 14 links to each other with horizontal mobile assembly 12, vertical promotion cam 21 links to each other with vertical promotion rocking arm 20, vertical promotion rocking arm 20 links to each other with vertical promotion assembly 13 by promoting connecting rod 19 down, cut cam 27 and link to each other with last movable blades 38 in the cutter assembly 25 by connecting rod 26, feeding regulating wheel 22 links to each other with metal tape pay-off 24 by feeding adjusting yoke 23.
Metal tape pay-off 24 comprises upper glue roller 30, following steel rider 31, copper strips material axle 32, the web-like metal tape is sleeved on the copper strips material axle 32, metal tape passes the contact-making surface of upper glue roller 30 and following steel rider 31, and following steel rider 31 links to each other with feeding adjusting yoke 23 by directional overrunning clutch 33.Feeding regulating wheel 22 rotates under the drive of camshaft 16 and drives feeding adjusting yoke 23 and moves up and down, feeding adjusting yoke 23 drives steel rider 31 rotating certain angle down by directional overrunning clutch 33 again, and it is to be cut to cutter assembly 25 places to move forward a scale under the clamping at steel rider 31 and upper glue roller 30 down of the metal tape between the steel rider 31 down.
Cutter assembly 25 comprises movable blades (38) and bottom knife 42, and last movable blades 38 links to each other with the cam 27 that cuts on being installed in camshaft 16 by connecting rod 26, and bottom knife is fixedly mounted on the tool rest 43 that links to each other with frame 1.
Vertical promotion assembly 13 comprises down riser 18, following riser 18 with promote connecting rod 19 down and link to each other following liftings connecting rod 1) link to each other with following lifting rocking arm 20, the following rocking arm 20 that promotes links to each other with vertical promotion cam 21 on being installed in camshaft 16.
Two ends of following riser 18 all are connected with extension spring 28, and the other end of extension spring 28 links to each other with housiung separator 29.The effect of extension spring 28 is to guarantee in time and accurately resetting of riser 18 down.
The steam supply valve cam 34 of control the advancing of air-breathing stay pipe 7,8, deflation sequences is installed on the camshaft 16.In addition, the advancing of air-breathing stay pipe 7,8, deflation sequences also can be realized by electrical control.
The beneficial effects of the utility model:
Can reduce operating personnel, reduce cost of labor, reduce labour intensity greatly.The centering of sheet metal is accurate, can be next procedure high-quality " work " is provided, and then the metal forming thickness that final production is come out is even, and the yield rate height also can prolong the access times of coal paper.The automated procedures height, production efficiency is significantly improved, and an equipment can carry out at least four simultaneously and pretend process.
Description of drawings
Fig. 1 is a main TV structure schematic diagram of the present utility model.
Fig. 2 is the right TV structure schematic diagram of Fig. 1.
Fig. 3 is the structural representation of overlooking of Fig. 1 and air feed and suction nozzle bracket assembly 39, metal tape pay-off 24.
Fig. 4 is horizontal mobile assembly 12 of the present utility model and drive mechanism schematic diagram thereof.44 is horizontal mobile guide shaft among the figure, and 45 is that horizontal displacement is regulated bolt, and 47 are the lifting guide shaft, and 48 is cam ring.
Fig. 5 is vertical promotion assembly 13 of the present utility model and goes up the structural representation that promotes assembly 41.46 is rocker arm shaft among the figure.
Fig. 6 is the left TV structure schematic diagram of Fig. 5.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described.
Shown in Fig. 1~6.
A kind of loading machine, comprise frame 1, drive motors 2, vavuum pump 3, drive motors 2, vavuum pump 3 is installed on the gantry base 4, it is characterized in that being equipped with on the frame 1 air feed and suction nozzle bracket assembly 39 (as Fig. 3), metal tape pay-off 24 (as Fig. 3), cutter assembly 25 (as Fig. 1), cutter assembly 25 is between air feed and suction nozzle bracket assembly 39 and metal tape pay-off 24 and adjacent with metal tape pay-off 24, the bottom of frame 1 is equipped with Cam set assembly 40, Cam set assembly 40 is driven by drive motors 2, in frame 1, the top of Cam set assembly 40 is equipped with vertical promotion assembly 13 (as Fig. 5,6), last lifting assembly 41 is (as Fig. 5,6), horizontal mobile assembly 12 is (as Fig. 5,6), link to each other with air feed and suction nozzle bracket assembly 39 when last lifting assembly 41 links to each other with horizontal mobile assembly 12, and be bearing on the vertical promotion assembly 13 by guide shaft 37; Vertical promotion assembly 13 links to each other with corresponding vertical promotion cam 21 in the Cam set assembly 40 by vertical promotion rocking arm 20, and under the drive of vertical promotion cam 21 and vertical promotion rocking arm 20, move up and down, lifting assembly 41 and horizontal mobile assembly 12 move up and down in the drive; Horizontal mobile assembly 12 links to each other with rocking arm 14, and rocking arm 14 links to each other with corresponding cam on the Cam set assembly 40.This cam rotating band shakes arm 14 rotates, and the rocking arm 14 horizontal mobile assemblies 14 of drive and go up lifting assembly 41, air feed and the suction nozzle bracket assembly 39 that are attached thereto move laterally.Metal tape pay-off 24, cutter assembly 25 link to each other with corresponding cam on the Cam set assembly 40 by corresponding connecting rod or rocking arm respectively.
Wherein:
Air feed and suction nozzle bracket assembly 39 (as shown in Figure 3) comprise that dress accounts for pallet 5, coal paper pallet 6, sheet metal sucker 9, coal paper sucker 10, air-breathing stay pipe 7,8 movably, air-breathing stay pipe 7,8 is installed in the top that dress accounts for pallet 5 and coal paper pallet 6 respectively, its inlet end links to each other with vavuum pump 3, sheet metal sucker 9 and coal paper sucker 10 link to each other with corresponding air-breathing stay pipe 7,8 respectively and are positioned at the top that dress accounts for pallet 5, coal paper pallet 6, link to each other by link 11 between the air-breathing stay pipe 7,8, link 11 links to each other with horizontal mobile assembly 12.
Cam set assembly 40 (as shown in Figure 1) mainly comprises camshaft 16, horizontal mobile cam ring 15, vertical promotion cam 21, cuts cam 27, feeding regulating wheel 22, and an end of camshaft 16 links to each other with drive motors 2 by speed reduction gearing 17; Horizontal mobile cam ring 15 and horizontal mobile rocking arm 14, horizontal mobile rocking arm 14 links to each other with horizontal mobile assembly 12, vertical promotion cam 21 links to each other with vertical promotion rocking arm 20, vertical promotion rocking arm 20 links to each other with vertical promotion assembly 13 by promoting connecting rod 19 down, cut cam 27 and link to each other with last movable blades 38 in the cutter assembly 25 by connecting rod 26, feeding regulating wheel 22 links to each other with metal tape pay-off 24 by feeding adjusting yoke 23.
Metal tape pay-off 24 (shown in Fig. 2,3) comprises upper glue roller 30, following steel rider 31, copper strips material axle 32, the web-like metal tape is sleeved on the copper strips material axle 32, metal tape passes the contact-making surface of upper glue roller 30 and following steel rider 31, and following steel rider 31 links to each other with feeding adjusting yoke 23 by directional overrunning clutch 33.Feeding regulating wheel 22 rotates under the drive of camshaft 16 and drives feeding adjusting yoke 23 and moves up and down, feeding adjusting yoke 23 drives steel rider 31 rotating certain angle down by directional overrunning clutch 33 again, and it is to be cut to cutter assembly 25 places to move forward a scale under the clamping at steel rider 31 and upper glue roller 30 down of the metal tape between the steel rider 31 down.
Cutter assembly 25 (as shown in Figure 1, 2) comprises movable blades (38) and bottom knife 42, and last movable blades 38 links to each other with the cam 27 that cuts on being installed in camshaft 16 by connecting rod 26, and bottom knife is fixedly mounted on the tool rest 43 that links to each other with frame 1.
Vertical promotion assembly 13 (shown in Fig. 5,6) comprises down riser 18, following riser 18 with promote connecting rod 19 down and link to each other following liftings connecting rod 1) link to each other with following lifting rocking arm 20, the following rocking arm 20 that promotes links to each other with vertical promotion cam 21 on being installed in camshaft 16.
Two ends of following riser 18 all are connected with extension spring 28, and the other end of extension spring 28 links to each other with housiung separator 29.The effect of extension spring 28 is to guarantee in time and accurately resetting of riser 18 down.
The steam supply valve cam 34 of control the advancing of air-breathing stay pipe 7,8, deflation sequences is installed on the camshaft 16.In addition, the advancing of air-breathing stay pipe 7,8, deflation sequences also can be realized by electrical control.
The concrete annexation of present embodiment is:
Drive motors 2, vavuum pump 3 is installed on the gantry base 4, dress is installed on the upper brace of frame 1 accounts for pallet 5 and coal paper pallet 6, the top that dress accounts for pallet 5 and coal paper pallet 6 is separately installed with movably air-breathing stay pipe 7,8, air-breathing stay pipe 7,8 link to each other with coal paper sucker 10 with vavuum pump 3 and corresponding sheet metal sucker 9 respectively, air-breathing stay pipe 7, link to each other by link 11 between 8, link 11 links to each other with horizontal mobile assembly 12, horizontal mobile assembly 12 links to each other with horizontal mobile rocking arm 14 with vertical promotion assembly 13 respectively, vertical promotion assembly 13 and horizontal mobile assembly 12 drive link 11 respectively and rise, move and decline, moving movement, horizontal mobile rocking arm 14 links to each other with horizontal mobile cam ring 15, horizontal mobile cam ring 15 is installed on the camshaft 16, and an end of camshaft 16 links to each other with drive motors 2 by speed reduction gearing 17; Vertical promotion assembly 13 is bearing in down on the riser 18 by guide shaft 37, following riser 18 links to each other with the following connecting rod 19 that promotes, two ends of following riser 18 are connected with extension spring 28, and the other end of extension spring 28 links to each other with housiung separator 29, and the effect of extension spring 28 is to guarantee in time and accurately resetting of riser 18 down.Under promote connecting rod 19 and promote down rocking arm 20 and link to each other, the following rocking arm 20 that promotes links to each other with vertical promotion cam 21 on being installed in camshaft 16; The other end at camshaft 16 is equipped with feeding regulating wheel 22, feeding regulating wheel 22 links to each other with metal tape pay-off 24 by feeding adjusting yoke 23, metal tape pay-off 24 is fixed on to be positioned to adorn and accounts on the frame 1 of pallet 5 one sides, metal tape pay-off 24 comprises upper glue roller 30, following steel rider 31, copper strips material axle 32, the web-like metal tape is sleeved on the copper strips material axle 32, metal tape passes the contact-making surface of upper glue roller 30 and following steel rider 31, and following steel rider 31 links to each other with feeding adjusting yoke 23 by directional overrunning clutch 33.Feeding regulating wheel 22 rotates under the drive of camshaft 16 and drives feeding adjusting yoke 23 and moves up and down, feeding adjusting yoke 23 drives steel rider 31 rotating certain angle down by directional overrunning clutch 33 again, and it is to be cut to the cutter assembly place to move forward a scale under the clamping at steel rider 31 and upper glue roller 30 down of the metal tape between the steel rider 31 down.Cutter assembly 25 is installed in metal tape pay-off 24 and adorns on the frame 1 that accounts between the pallet 5, last movable blades 38 in the cutter assembly 25 links to each other with the cam 27 that cuts on being installed in camshaft 16 by connecting rod 26, and the bottom knife in the cutter assembly 25 is installed on the tool rest that is fixedly linked with frame 1.The steam supply valve cam 34 of control the advancing of air-breathing stay pipe 7,8, deflation sequences is installed on the camshaft 16.As shown in Figure 1, 2.
During concrete enforcement, the loading machine frame 1 of every playscript with stage directions utility model can be installed four assemblings simultaneously and be accounted for pallet 5, coal paper pallet 6, cutter assembly 25, metal tape pay-off 24, as shown in Figure 3.Wherein cutter assembly 25 can be driven by same connecting rod 26, and four groups of cutter assemblies 25 drive by a couple axle that links to each other with connecting rod 26 35, realize turned off in synchronization.Four assemblings account for pallet 5 and coal paper pallet 6 respectively by corresponding air-breathing stay pipe 7,8 air feed, and are driven by same vertical promotion cam 21 and horizontal mobile assembly 12 and to do to rise, to move and decline, moving movement.Following steel rider 32 in four groups of metal tape pay-offs 24 can be realized rotating synchronously by same by same couple axle 36.
The camshaft 16 of present embodiment can link to each other with deceleration device by sprocket wheel, deceleration device links to each other with motor 2, motor 2 high speed rotating, after the deceleration device deceleration, deceleration device drives the sprocket rotation that is installed on the camshaft 16 by chain, sprocket wheel drives camshaft 16 and rotates, and rotates thereby drive each cam that is installed on the camshaft 16, realizes relevant action.
The electric control system of present embodiment is fairly simple, and general engineers and technicians need not creative work and can realize.In order in time to grasp coal paper pallet 6 numbers of plies that account for of adorning; can adopt the method that counter is installed on camshaft 16 or horizontal mobile assembly 12 to be controlled during specific implementation; operating personnel are by observing the numeral in the counter; promptly know the progress of work; in the time of also can being designed to reach the count value of setting, outage automatically, shutdown.
The course of work of the present utility model is:
At first adjust charging length to required size (as 50mm) by feeding regulating wheel 22.Deliver to down between steel rider 31 and the upper glue roller 30 for one with metal tape; after motor 2 starts; camshaft 16 rotates and drives 22 rotations of feeding regulating wheel; feeding regulating wheel 22 drives down by feeding adjusting yoke 23, and steel rider 31 rotates; when following steel rider 31 and upper glue roller 30 are done relative motion the metal tape material is delivered to cutter assembly 25 places forward; last movable blades 38 in the cutter assembly 25 is finished under the effect of the connecting rod 26 that cuts cam 27 and be attached thereto and is cut action; meanwhile; coal paper sucker 10 has been finished the paper process of inhaling; suction has the coal paper sucker 10 of coal paper and sheet metal sucker 9 and link 11 to lift on the whole under vertical promotion rocking arm 20 and the corresponding effect that promotes connecting rod 19; and under the drive of horizontal mobile rocking arm 14, move to the sheet metal position of having downcut; vertical promotion rocking arm 20 is rotated further down position under the effect of vertical promotion cam 21; coal paper sucker 10 and sheet metal sucker 9 fall simultaneously; and coal paper sucker 10 venting is placed on dress with the coal paper of being inhaled and accounts in the pallet 5; simultaneously; sheet metal sucker 9 picks up sheet metal under the effect of negative pressure; vertical promotion cam 21 is rotated further; coal paper sucker 10 and sheet metal sucker 9 and link 11 are lifted under the effect of vertical promotion rocking arm 20 and corresponding lifting connecting rod 19 once more on the whole; and after getting back to original position under the drive of horizontal mobile rocking arm 14, descend once more; this moment, coal paper sucker 10 picked up next coal paper under the effect of negative pressure; account in the pallet 5 and just in time the sheet metal of being inhaled is placed on dress after 9 venting of sheet metal sucker; finish one-period; so circulation; the dress of realizing one deck coal paper layer of metal sheet accounts for process; when the dress that reaches setting accounts for quantity; then automatic or manual (relevant with automatically controlled part) shuts down, and can will overlay dress and account for one in the pallet 5 and do to take out for next procedure and beat into metal forming.
In entire work process, alternately air-breathing under the control of intake valve, the venting of air-breathing stay pipe 7,8, the switch of intake valve can be controlled by the steam supply valve cam 34 that is installed on the camshaft 16.
Whole process can not produce misoperation by cam and connecting rod realization order interlock, thereby safe and reliable, and the quality that dress accounts for can be guaranteed.If adopt advanced control technology to be controlled to electric part, can realize full-automatic operation.Can be during concrete enforcement by increasing common functions such as sensor, counter, sound and light alarm.

Claims (8)

1, a kind of loading machine, comprise frame (1), drive motors (2), vavuum pump (3), drive motors (2), vavuum pump (3) is installed on the gantry base (4), it is characterized in that being equipped with on the frame (1) air feed and suction nozzle bracket assembly (39), metal tape pay-off (24), cutter assembly (25), cutter assembly (25) is positioned between air feed and suction nozzle bracket assembly (39) and the metal tape pay-off (24) and is adjacent with metal tape pay-off (24), the bottom of frame (1) is equipped with Cam set assembly (40), Cam set assembly (40) is driven by drive motors (2), in frame (1), the top of Cam set assembly (40) is equipped with vertical promotion assembly (13), last lifting assembly (41), horizontal mobile assembly (12), last lifting assembly (41) links to each other with air feed and suction nozzle bracket assembly (39) when linking to each other with horizontal mobile assembly (12), and is bearing on the vertical promotion assembly (13) by guide shaft (37); Vertical promotion assembly (13) links to each other with corresponding vertical promotion cam 21 in the Cam set assembly (40) by vertical promotion rocking arm 20; Horizontal mobile assembly (12) links to each other with rocking arm (14), and rocking arm (14) is gone up corresponding cam with Cam set assembly (40) and linked to each other; Metal tape pay-off (24), cutter assembly (25) are gone up corresponding cam by corresponding connecting rod or rocking arm with Cam set assembly (40) respectively and are linked to each other.
2, loading machine according to claim 1, it is characterized in that air feed and suction nozzle bracket assembly (39) comprise that dress accounts for pallet (5), coal paper pallet (6), sheet metal sucker (9), coal paper sucker (10), movably air-breathing stay pipe (7), (8), air-breathing stay pipe (7), (8) be installed in the top that dress accounts for pallet (5) and coal paper pallet (6) respectively, its inlet end links to each other with vavuum pump (3), sheet metal sucker (9) and coal paper sucker (10) respectively with corresponding air-breathing stay pipe (7), (8) link to each other and be positioned at dress and account for pallet (5), the top of coal paper pallet (6), air-breathing stay pipe (7), (8) link to each other by link (11) between, link (11) links to each other with horizontal mobile assembly (12).
3, loading machine according to claim 1, it is characterized in that Cam set assembly (40) comprises camshaft (16), horizontal mobile cam ring (15), vertical promotion cam (21), cuts cam (27), feeding regulating wheel (22), an end of camshaft (16) links to each other with drive motors (2) by speed reduction gearing (17); Horizontal mobile cam ring (15) and horizontal mobile rocking arm (14), horizontal mobile rocking arm (14) links to each other with horizontal mobile assembly (12), vertical promotion cam (21) links to each other with vertical promotion rocking arm (20), vertical promotion rocking arm (20) links to each other with vertical promotion assembly (13) by promoting connecting rod (19) down, cut cam (27) and link to each other with last movable blades (38) in the cutter assembly (25) by connecting rod (26), feeding regulating wheel (22) links to each other with metal tape pay-off (24) by feeding adjusting yoke (23).
4, loading machine according to claim 1, it is characterized in that described metal tape pay-off (24) comprises upper glue roller (30), following steel rider (31), copper strips material axle (32), the web-like metal tape is sleeved on the copper strips material axle (32), metal tape passes the contact-making surface of upper glue roller (30) and following steel rider (31), following steel rider (31) links to each other with feeding adjusting yoke (23) by directional overrunning clutch (33), and feeding adjusting yoke (23) links to each other with feeding regulating wheel (23) in the Cam set assembly (40).
5, loading machine according to claim 1, it is characterized in that cutter assembly (25) comprises movable blades (38) and bottom knife (42), last movable blades (38) links to each other with the cam (27) that cuts on being installed in camshaft (16) by connecting rod (26), and bottom knife is fixedly mounted on the tool rest (43) that links to each other with frame (1).
6, loading machine according to claim 1, it is characterized in that vertical promotion assembly (13) comprises riser (18) down, following riser (18) links to each other with the following connecting rod (19) that promotes, under promote connecting rod (19) and promote down rocking arm (20) and link to each other, the following rocking arm (20) that promotes links to each other with vertical promotion cam (21) on being installed in camshaft (16).
7, loading machine according to claim 1 is characterized in that two ends of riser (18) all are connected with extension spring (28) down, and the other end of extension spring (28) links to each other with housiung separator (29).
8, loading machine according to claim 1 is characterized in that being equipped with on the camshaft (16) control air feed steam supply valve cam (34) in proper order.
CN 200420079841 2004-09-28 2004-09-28 Loader Expired - Lifetime CN2754768Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420079841 CN2754768Y (en) 2004-09-28 2004-09-28 Loader

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420079841 CN2754768Y (en) 2004-09-28 2004-09-28 Loader

Publications (1)

Publication Number Publication Date
CN2754768Y true CN2754768Y (en) 2006-02-01

Family

ID=35928403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420079841 Expired - Lifetime CN2754768Y (en) 2004-09-28 2004-09-28 Loader

Country Status (1)

Country Link
CN (1) CN2754768Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111302131A (en) * 2020-03-18 2020-06-19 三江学院 Occupation machine equipment
CN111468671A (en) * 2020-05-07 2020-07-31 三江学院 Light-load occupying machine equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111302131A (en) * 2020-03-18 2020-06-19 三江学院 Occupation machine equipment
CN111468671A (en) * 2020-05-07 2020-07-31 三江学院 Light-load occupying machine equipment

Similar Documents

Publication Publication Date Title
CN205023496U (en) Wood -based plate banding adsorbs material feeding unit
CN2832474Y (en) Automatic cutting apparatus for wooden plate blank
CN1899719A (en) Automatic sawing, cutting and stacking machine for aluminum alloy bar
CN111002427B (en) 3D printing forming device and method for laminated ceramic matrix composite based on photocuring technology
CN114043615B (en) Full-automatic cushion block production line
CN210308371U (en) Automatic processing equipment for green bricks
CN208377921U (en) Automatic change panel flip structure on production line
CN111687547A (en) Laser cutting production line
CN205613908U (en) Full -automatic intelligent production system of punching press based on remote control
CN2754768Y (en) Loader
CN204019716U (en) A kind of brick equipment of special form brick
CN102225727B (en) Miniature A4 paper cutting machine
CN214934268U (en) Bent pond is with scraping material and tectorial membrane device
CN1290640C (en) Loading machine
CN214212443U (en) Parallel feeding device for aluminum plate
CN212241314U (en) Flat pressing die cutting equipment
CN202007044U (en) Small-sized A4 paper cutter
CN208994701U (en) Auto-reversal Machine's
CN117067287A (en) Cutting device of glass fiber reinforced plastic grille
CN218224846U (en) Double-station edge trimmer
CN218024235U (en) Film stretching machine feeding device
CN203064722U (en) Automatic brick setting machine
CN2566426Y (en) Crystal chip resistance strip stripping arrangement machine
CN210998880U (en) Artificial christmas tree leaf cutting device
CN203210463U (en) Edge cutting machine for boards

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Effective date of abandoning: 20040928

C25 Abandonment of patent right or utility model to avoid double patenting