CN2739227Y - Changeable suspension bridge anchored prestressed anchoring system - Google Patents

Changeable suspension bridge anchored prestressed anchoring system Download PDF

Info

Publication number
CN2739227Y
CN2739227Y CN 200420115180 CN200420115180U CN2739227Y CN 2739227 Y CN2739227 Y CN 2739227Y CN 200420115180 CN200420115180 CN 200420115180 CN 200420115180 U CN200420115180 U CN 200420115180U CN 2739227 Y CN2739227 Y CN 2739227Y
Authority
CN
China
Prior art keywords
anchorage
suspension bridge
anchor
anchoring
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420115180
Other languages
Chinese (zh)
Inventor
苏均
黄芳玮
徐国平
刘明虎
谢正元
杨武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou OVM Machinery Co Ltd
Original Assignee
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou OVM Machinery Co Ltd filed Critical Liuzhou OVM Machinery Co Ltd
Priority to CN 200420115180 priority Critical patent/CN2739227Y/en
Application granted granted Critical
Publication of CN2739227Y publication Critical patent/CN2739227Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a changeable suspension bridge anchored prestressed anchoring system which relates to a prestressed anchoring system, comprising an upper anchoring part, a span wire coupling part and a lower anchoring part. A boot cap, a locking device, an anchor device, a connector flat plate, a connecting cylinder, an anchoring bottom plate, a spiral bar, and a built-in steel pipe which are consecutive connected form the upper anchor. The boot cap, the locking device, the anchor device, the anchoring bottom plate, the spiral bar, and the built-in steel pipe which are consecutive connected form the lower anchor. The system is characterized in that: the built-in steel pipe (12) connects to the upper and lower anchor and forms a fully sealed cavity in which anti-corrosive oil or anti-corrosive oil and fat (13) are filled, and a changeable suspension bridge anchored prestressed anchoring system is formed by the non-adhered steel strands passing through the sealed cavity. The anchor system which has good anti-corrosive property is favorable for checking the rope force and can carry out stress adjustment or change prestressed ribs.

Description

Interchangeable suspension bridge anchorage prestress anchorage system
Technical field
The utility model relates to a kind of prestress anchorage system, particularly a kind of interchangeable suspension bridge anchorage prestress anchorage system.
Background technology
The anchorage prestress anchorage system that adopts has been generally the non-exchange form of bonding at present, the protected mode of the anticorrosion general employing pressure injection mortar of presstressed reinforcing steel, the i.e. cement mortar that perfusion can be solidified in prestress pipe, whole anchorage prestress anchorage system is consolidated; This kind mode has following shortcoming:
1, the anchorage prestress anchorage system in later stage operation process since presstressed reinforcing steel and concrete binding together presstressed reinforcing steel can't check, detect Suo Li again, can not adjust or change;
2, concrete is good far away from the performance of anticorrosion grease to the antiseptic property of presstressed reinforcing steel; And adopt that concrete mortar is anticorrosion to exist a lot of hidden danger when construction, as slurry bleeding, grouting leakiness or the like, to the construction requirement height;
In case 3, bonded prestressed tendon corrosion failure is catastrophic to main push-towing rope then, can't remedy.
For addressing the above problem, (predecessor cried the applicant: once proposed " prestressing force anchorage " (patent No.: 97219877.6) utility application Sino-foreign joint venture Liuzhou, Liuzhou Ou Weimu building machinery Co., Ltd) in 97 years, disclose a kind of presstressed reinforcing steel and adopted unbonded tendon, sealing mat is contained in the exposed end up and down of unbonded tendon respectively, make sealing mat form annular seal space between the anchor plate, carry out anticorrosion effectively by antirust oil or the anti-corrosive grease of filling with in the annular seal space to the unbonded tendon exposed part that passes in the annular seal space, but use discovery through reality, the structure that this kind is partially sealed, construction is difficulty relatively, particularly changes Suo Yihou and does not guarantee sealing performance.
The utility model content
The technical problems to be solved in the utility model is: the non-exchange presstressed reinforcing steel that existing bonded prestress anchorage exists and the problems referred to above that adopt the concrete mortar sealing to exist, and the construction that the prestressing without bondn anchorage of partially sealed structure exists is relatively more difficult, particularly change Suo Yihou and do not guarantee the problem of sealing performance, a kind of hermetic interchangeable suspension bridge anchorage prestress anchorage system is provided, this anchoring system can increase substantially the antiseptic property of whole system, and help checking, detecting Suo Li, can carry out the stress adjustment or change presstressed reinforcing steel.
The technical scheme that solves its above-mentioned technical problem is: a kind of interchangeable suspension bridge anchorage prestress anchorage system; comprise anchorage part; the suspension cable coupling part; following anchorage part; last anchorage part is by the protective cover that links to each other successively; ground tackle; the connector flat board; connecting cylinder; anchor plate; spiral bar; embedded steel tube is formed; following anchorage part is by the protective cover that links to each other successively; ground tackle; anchor plate; spiral bar; embedded steel tube is formed; it is characterized in that: described embedded steel tube be communicated with up and down anchorage part and with hermetically sealed chamber of its formation; fill antiseptic oil in the chamber, non-bending steel cable is in the parallel sealing chamber of passing of embedded steel tube.
Because adopt said structure, the interchangeable suspension bridge anchorage prestress anchorage system of the utility model has following beneficial effect:
1, the hermetically sealed chamber of forming by connector flat board, connecting cylinder, the embedded steel tube of upper and lower anchorage part and last anchorage part, fill the antiseptic oil of good fluidity in the chamber, make whole anchorage prestress anchorage system be immersed in wherein, because the antiseptic power of anticorrosion grease is much higher than cement mortar, thereby, the antiseptic property of whole anchorage system is significantly improved;
2, adopt the unbonded prestressing tendon form to help checking, detecting Suo Li, can carry out the stress adjustment or change presstressed reinforcing steel;
3, presstressed reinforcing steel keeping parallelism in the embedded steel tube pipeline helps the transmission of power and changes presstressed reinforcing steel;
4, since adopt embedded steel tube be communicated with up and down anchorage part and with hermetically sealed chamber of its formation, need not establish sealing mat respectively at upper and lower anchorage part, its good sealing effect, and easy construction, to change presstressed reinforcing steel also more convenient in the future;
5, in the ground tackle locking device can be set up and down, improve the anchoring safety of anchorage prestress anchorage system.
Description of drawings:
Fig. 1: the interchangeable suspension bridge anchorage prestress anchorage system structural representation of the utility model.
The specific embodiment:
A kind of interchangeable suspension bridge anchorage prestress anchorage system comprises anchorage part, suspension cable coupling part, following anchorage part, and last anchorage part is by the protective cover 3 that links to each other successively 1, locking device 4 1, ground tackle 5 1, connector flat board 6, connecting cylinder 8, anchor plate 9 1, spiral bar 10 1, embedded steel tube 12 forms, following anchorage part is by the protective cover 3 that links to each other successively 2, locking device 4 2, ground tackle 5 2, anchor plate 9 2, spiral bar 10 2, embedded steel tube 12 forms, described embedded steel tube 12 be communicated with up and down anchorage part and with hermetically sealed chamber of its formation, fill antiseptic oil 13 in the chamber, non-bending steel cable 11 is the parallel sealing chamber of passing in embedded steel tube 12, at protective cover 3 1And gasket seal 3 is arranged between the connector flat board 6 11, at protective cover 3 2With anchor plate 9 2Between gasket seal 3 is arranged 21
The suspension cable coupling part that main rope of suspension bridge 1 is formed by pull bar 2 and nut assembly is connected to connector flat board 6, power on the main push-towing rope 1 is delivered in the anchorage goes.
As a kind of conversion of the utility model embodiment, described main rope of suspension bridge 1 also can adopt other connected mode to be connected with last anchorage part.
As a kind of conversion of the utility model embodiment, described upper and lower anchorage part also can adopt other forms of anchorage style and sealing means.

Claims (2)

1, a kind of interchangeable suspension bridge anchorage prestress anchorage system; comprise anchorage part, suspension cable coupling part, following anchorage part; last anchorage part is made up of the protective cover, ground tackle, connector flat board, connecting cylinder, anchor plate, spiral bar, the embedded steel tube that link to each other successively; following anchorage part is made up of the protective cover, ground tackle, anchor plate, spiral bar, the embedded steel tube that link to each other successively; it is characterized in that: described embedded steel tube (12) be communicated with up and down anchorage part and with hermetically sealed chamber of its formation, fill antiseptic oil or anticorrosion grease (13) in the chamber.
2, interchangeable suspension bridge anchorage prestress anchorage system according to claim 1 is characterized in that: the through hole in the described anchor plate is a straight hole, and non-bending steel cable (11) is the parallel sealing chamber of passing in embedded steel tube (12).
CN 200420115180 2004-11-06 2004-11-06 Changeable suspension bridge anchored prestressed anchoring system Expired - Lifetime CN2739227Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420115180 CN2739227Y (en) 2004-11-06 2004-11-06 Changeable suspension bridge anchored prestressed anchoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420115180 CN2739227Y (en) 2004-11-06 2004-11-06 Changeable suspension bridge anchored prestressed anchoring system

Publications (1)

Publication Number Publication Date
CN2739227Y true CN2739227Y (en) 2005-11-09

Family

ID=35354293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420115180 Expired - Lifetime CN2739227Y (en) 2004-11-06 2004-11-06 Changeable suspension bridge anchored prestressed anchoring system

Country Status (1)

Country Link
CN (1) CN2739227Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071651A (en) * 2010-12-15 2011-05-25 江苏法尔胜新日制铁缆索有限公司 Sling replacement method for suspension bridge
CN102704396A (en) * 2012-06-27 2012-10-03 四川天元机械工程股份有限公司 Anchorage method for main cable of suspension bridge
CN108951420A (en) * 2018-08-16 2018-12-07 江苏法尔胜缆索有限公司 Analysis of Suspension Bridges ' Anchorage hot extruded polyethylene steel wire finished guy cable pre-stress system
CN110820523A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Cable strand connecting structure for replacing main cable of suspension bridge, anchorage structure and construction method
CN110820524A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Connecting structure, fixing structure, new main cable system and construction method for replacing main cable of suspension bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071651A (en) * 2010-12-15 2011-05-25 江苏法尔胜新日制铁缆索有限公司 Sling replacement method for suspension bridge
CN102071651B (en) * 2010-12-15 2012-06-27 江苏法尔胜新日制铁缆索有限公司 Sling replacement method for suspension bridge
CN102704396A (en) * 2012-06-27 2012-10-03 四川天元机械工程股份有限公司 Anchorage method for main cable of suspension bridge
CN108951420A (en) * 2018-08-16 2018-12-07 江苏法尔胜缆索有限公司 Analysis of Suspension Bridges ' Anchorage hot extruded polyethylene steel wire finished guy cable pre-stress system
CN110820523A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Cable strand connecting structure for replacing main cable of suspension bridge, anchorage structure and construction method
CN110820524A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Connecting structure, fixing structure, new main cable system and construction method for replacing main cable of suspension bridge

Similar Documents

Publication Publication Date Title
CN104153287B (en) There is the section assembling concrete frame bridge pier system and method for self-resetting capability
CN208415082U (en) Unit construction bridge formed precast concrete pier stud and bent cap bell and spigot frame
CN2739227Y (en) Changeable suspension bridge anchored prestressed anchoring system
CN207079627U (en) A kind of assembled underground pipe gallery member connecting structure
CN105332370B (en) A kind of assembled underground continuous wall unit and its construction method
CN102535456A (en) Back-anchored uplift pile with flexible pile top
CN103711330A (en) Method for using prefabricated reinforced concrete frame to reinforce existing structure through prestressing assembly
CN102286944A (en) Device for replacing stay cable of cable-stayed bridge
CN1837482A (en) Method and apparatus for pouring concrete into steel pipe of steel pipe concrete arch ring
CN202031027U (en) Whole replaceable anchorage system
CN103898834A (en) Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof
CN105350532A (en) Prefabricated assembly type internal prestressed anchoring pile
CN2667007Y (en) Multi-stage prestressed finished anchorage cable
CN202031026U (en) Finished cable type anchorage anchoring system
CN113183312A (en) Modular sleeve type steel strand steering gear
CN202672143U (en) Back-anchor type flexible pile top uplift pile
CN206736906U (en) Pretensioning prestressed concrete resistance to plucking prefabricated pile attachment structure
CN112095586A (en) Prestressed post-inserted composite anchor cable uplift pile and preparation method thereof
CN112095585A (en) Prestressed composite anchor cable uplift pile and preparation method thereof
CN110172908A (en) A kind of pre-embedded bolt fastening node of assembled steel reinforced concrete composite bridge and preparation method thereof
CN202214682U (en) A cable-stayed bridge stay cable replacing device
CN2673945Y (en) Rock earth corrosion-proof anchorage cable with flexible self-sealing structure under said anchor
CN207211388U (en) The vertical connection structure of precast shear wall
CN102776828B (en) A kind of special-shaped precast beam for bridge
CN217372826U (en) Modular sleeve type steel strand steering gear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20141106

Granted publication date: 20051109