CN2725126Y - 山地布管索道 - Google Patents

山地布管索道 Download PDF

Info

Publication number
CN2725126Y
CN2725126Y CN 200420061302 CN200420061302U CN2725126Y CN 2725126 Y CN2725126 Y CN 2725126Y CN 200420061302 CN200420061302 CN 200420061302 CN 200420061302 U CN200420061302 U CN 200420061302U CN 2725126 Y CN2725126 Y CN 2725126Y
Authority
CN
China
Prior art keywords
utility
model
bipod
steel pipe
main cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420061302
Other languages
English (en)
Inventor
张成伟
周勇
周剑琴
张龙
陈仕清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Sichuan Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Petroleum Administration Bureau filed Critical Sichuan Petroleum Administration Bureau
Priority to CN 200420061302 priority Critical patent/CN2725126Y/zh
Application granted granted Critical
Publication of CN2725126Y publication Critical patent/CN2725126Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

一种山地布管索道,用于石油天然气长输管道建设在山区地带的布管,属于山区管道布管施工设备的制造技术领域,本实用新型解决了现有技术在山区进行管道布管施工时,特别是在坡道起伏不定的山地施工时,车辆无法上山和人工都不能上去的坡道上将钢管运到必要的位置的难题,根据索道运送物质具有轻快便捷的特点,本实用新型在运送钢索上设置的升降装置由于运动滑轮和升降葫芦的作用具有运动和提升货物的特点,同时由于设置在升降装置的平衡装置,可以使升降装置在空载时不会翻转。

Description

山地布管索道
技术领域:一种山地布管索道,用于石油天然气长输管道建设在山区地带的布管,属于山区管道布管施工设备的制造技术领域。
背景技术:现有技术中,在山区进行管道布管施工时,特别是在坡道起伏的不定的山地施工时,为了将钢管运到必要的位置,如果山坡坡度较低时,可以采用履带运管车运输,但是在许多的地方,山高坡陡,地势起伏,没有车辆上山的路,这时,采用的现有办法,一般都是用人工往上台,在人工都不能上去的坡道上,就采取拖船的办法从上往下放,或者采用卷扬机从下往上拖,具体做法是,先将钢管用车辆绕道运送到坡道的上方,然后将钢管包好,放在一种船一样的拖运工具中由溜尾钢索拉住尾部向下溜行,或者在坡下包好钢管,将钢管放在拖船中由卷扬机由下向上拖;用人工的方法,尽管可以在允许的坡度下将钢管运到位,但是,由于钢管十分沉重,其运送难度是显而易见的,用拖船的办法虽然是半机械化,但是从坡下或从坡上运送的道路也是十分艰难的,更主要的是,钢管在向下溜放或向上拖时,尽管钢管经过包裹保护,但是,大多时候钢管还是被坡上的岩石划伤而需要重新处理,现有技术的两种方法都存在耗时而功效低的问题。
本实用新型的目的根据索道运送物质具有轻快便捷的特点,设计一种在山地的两端设置具有两脚吊架和钢管运送索道的山地布管索道。
发明内容:本实用新型是这样实现的,根据坡道的长度、起伏的高低情况,在坡上和坡下分别设置两处两脚吊架4,两脚吊架4用于支撑主运输钢索,两脚吊架4的后面和两侧面都设置地锚1,以保证吊架的稳定和承载能力,在坡上和坡下两处两脚吊架4之间设置一根运输主钢索6,在运输主钢索6的上面设置有带运动滑轮12的升降装置7,升降装置7上设置有一个可以使升降装置保持平衡的平衡装置8,在升降装置7的前端有前端牵引绳5,后端有溜尾绳11,钢管运送时,将需要运送的钢管挂在升降装置7的挂钩10上,然后由升降装置7将钢管起升到可以跨越坡道上最高点的的高度,开动坡上的卷扬机,由于升降装置7上有滑轮,所以在卷扬机的拖动下可以带着钢管向上运动直到卸管的位置放下钢管即可。
本发明的优点是:坡上坡下两处设置的两脚吊架具有方便安装的特点,在地锚的固定下又十分稳固,在运送钢索上设置的升降装置由于运动滑轮和升降葫芦的作用具有运动和提升钢管的特点,同时由于设置在升降装置的平衡装置,可以使升降装置在空载时不会翻转。
图例说明:
图1为本实用新型的布局示意图。
图1为本实用新型升降装置7的放大示意图。
具体实施方法:下面结合附图给出本实用新型的实施例:本实用新型包括两脚吊架4、地锚1,拉索2,运输主钢索6,牵引绳5和升降装置7,两脚吊架4分别由两根上部捆绑在一起的直杆构成,在每根直杆的上端设置有与地锚1连接的连接环,运输主钢索6架设在两根两脚吊架4之间,运输主钢索6中间的下垂度根据山坡起伏的情况而定,其离地面的最低点应允许钢管在运输过程中不接触起伏点最高的地面,为了升降装置7能在运输主钢索6上运动、升降和空载时不翻转,升降装置7上设置有平衡块8;运动滑轮12在运输主钢索6上运行,升降葫芦吊9挂在运动滑轮12的下部,在运动滑轮12的下部两边设置有平衡块8,在运动滑轮12的前端连接前端牵引绳5,前端牵引绳5经过设置在两脚吊架4顶端的滑轮3与坡上的牵引卷扬机连接,后端的溜尾绳11与溜尾卷扬机连接;本山地布管索道也可以将升降葫芦吊7固定在运输主钢索6上,而运输主钢索6的两端经过两端的两脚吊架4分别与前端的牵引卷扬机连接和设置在后端的溜尾卷扬机连接;运送钢管时,先将钢管吊挂在升降装置的挂钩10上,然后由升降葫芦吊9将钢管提升起来,提升的高度,根据坡道上起伏的情况,将钢管起升到可以跨越坡道上最高点的高度即可,然后,开动前端的牵引卷扬机,使升降装置的运动滑轮12在运输主钢索6上运动,将钢管运送到指定的位置。

Claims (2)

1.一种山地布管索道,包括吊架,钢索和升降装置,其特征在于:
a.所述两脚吊架由两根上部捆绑在一起的直杆构成,在每根直杆的上端设置有与地锚连接的连接环,运输主钢索架设在两根两脚吊架之间;
b.所述升降装置上设置有运动滑轮,升降葫芦吊和平衡块,运动滑轮设置在运输主钢索上,升降葫芦吊挂在运动滑轮的下部,在运动滑轮的下部两边设置有平衡块;
c.所述运动滑轮的前端连接牵引绳与牵引卷扬机连接,后端的溜尾绳与溜尾卷扬机连接。
2.根据权利要求1所述的一种山地布管索道,其特征在于:所述升降葫芦吊也可以固定在运输主钢索上,运输主钢索的两端经过两端的两脚吊架分别与前端的牵引卷扬机连接和设置在后端的溜尾卷扬机连接。
CN 200420061302 2004-09-20 2004-09-20 山地布管索道 Expired - Lifetime CN2725126Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420061302 CN2725126Y (zh) 2004-09-20 2004-09-20 山地布管索道

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420061302 CN2725126Y (zh) 2004-09-20 2004-09-20 山地布管索道

Publications (1)

Publication Number Publication Date
CN2725126Y true CN2725126Y (zh) 2005-09-14

Family

ID=35039851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420061302 Expired - Lifetime CN2725126Y (zh) 2004-09-20 2004-09-20 山地布管索道

Country Status (1)

Country Link
CN (1) CN2725126Y (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020206A (zh) * 2010-12-17 2011-04-20 长江水利委员会长江勘测规划设计研究院 大跨度陡峭地形风电设备索道运输系统
CN101063285B (zh) * 2007-05-11 2011-05-11 中国电力科学研究院 塔架高度可调的双承载索货运索道
CN103613033A (zh) * 2013-11-29 2014-03-05 何光忠 便携式山地货物转运装置
CN105003738A (zh) * 2015-07-02 2015-10-28 山西宏厦建筑工程有限公司 山区复杂地形运用索道安装大管径管道施工工法
CN106627594A (zh) * 2016-11-18 2017-05-10 陈继勇 空中公共交通运输系统及方法
CN106744540A (zh) * 2016-11-29 2017-05-31 贵州大学 一种升降测试系统及升降方法
CN109552344A (zh) * 2017-09-24 2019-04-02 戴瑛瑛 湖中过山索道海空船

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101063285B (zh) * 2007-05-11 2011-05-11 中国电力科学研究院 塔架高度可调的双承载索货运索道
CN102020206A (zh) * 2010-12-17 2011-04-20 长江水利委员会长江勘测规划设计研究院 大跨度陡峭地形风电设备索道运输系统
CN103613033A (zh) * 2013-11-29 2014-03-05 何光忠 便携式山地货物转运装置
CN105003738A (zh) * 2015-07-02 2015-10-28 山西宏厦建筑工程有限公司 山区复杂地形运用索道安装大管径管道施工工法
CN106627594A (zh) * 2016-11-18 2017-05-10 陈继勇 空中公共交通运输系统及方法
CN106744540A (zh) * 2016-11-29 2017-05-31 贵州大学 一种升降测试系统及升降方法
CN109552344A (zh) * 2017-09-24 2019-04-02 戴瑛瑛 湖中过山索道海空船

Similar Documents

Publication Publication Date Title
RU2470802C2 (ru) Способ и устройство для транспортировки длинномерных громоздких грузов
RU2451634C2 (ru) Способ и устройство для транспортировки длинномерных крупногабаритных грузов
US3083839A (en) Cable logging operation
CN2725126Y (zh) 山地布管索道
CN105620493B (zh) 一种新型快装货运索道
CN106892281A (zh) 一种适合装载卷钢的集装箱配套系统及该系统的使用方法
CN203006301U (zh) 一种双索循环式索道
CN108082194A (zh) 一种6吨级重型索道及其安装方法
CN213140288U (zh) 一种斜拉加悬索组合桥架双绳轨运输线
US9011073B2 (en) Truck loading device
CN202163344U (zh) 单层垂直升降尾板
DE69006700D1 (de) An einem Hochseil hängender Wagen zum Transport schwerer Lasten.
CN105539806B (zh) 一种悬球索道运输装置
CN105003738B (zh) 山区复杂地形运用索道安装大管径管道施工工法
CN106315427B (zh) 一种履带式货物起重转运机
CN106315420B (zh) 一种吊臂式y型双线缆索运输装置
CN102602398A (zh) 一种可折式临时索道快速运输方法及其装置
CN205952919U (zh) 一种船舱内搬运螺旋桨轴的轨道小车
CN207241554U (zh) 腹挂式杆梁运载车和电线杆运输车
CN203844653U (zh) 货车
CN2739055Y (zh) 山地轻轨布管车
CN201941770U (zh) 曲线运输索道系统
CN212373359U (zh) 可移动无电力空中运输装置
CN212025920U (zh) 一种运梁吊机
CN204297970U (zh) 重型机械吊装转运系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA PETROLEUM GROUP CHUANQING DRILLING ENGINEER

Free format text: FORMER OWNER: SICHUAN PETROLEUM ADMINISTRATION

Effective date: 20081024

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081024

Address after: Overlooking the green road Chengdu city Sichuan province 1 No. 3 company Chuanqing drilling technology information office, zip code: 610051

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: Patent Office of No.1 Petroleum Bureau, Sichuan, Chengdu Province: 610051

Patentee before: Sichuan Petroleum Administration

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20140920

Granted publication date: 20050914