CN2723407Y - 8吨铝锭专用吊具 - Google Patents
8吨铝锭专用吊具 Download PDFInfo
- Publication number
- CN2723407Y CN2723407Y CN 200420029537 CN200420029537U CN2723407Y CN 2723407 Y CN2723407 Y CN 2723407Y CN 200420029537 CN200420029537 CN 200420029537 CN 200420029537 U CN200420029537 U CN 200420029537U CN 2723407 Y CN2723407 Y CN 2723407Y
- Authority
- CN
- China
- Prior art keywords
- aluminium ingot
- tons
- framework
- around
- lower ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
一种8吨铝锭专用吊具,有一个多格平衡框架,在框架的四周向上连接有多个上耳板,框架的四周向下连接多个下耳板,每个上耳板向上连接连接卸扣,每个连接卸扣连接钢丝绳上吊系,每个下耳板连接连接卸扣,每个连接卸扣连接圆环链条,在每个圆环链条上穿有两个吊钩。其效果:操作简便,灵活,减少了使用撬棍作业过程,大大降低了工人劳动强度。作业速度快,效率高,提高卸车,堆、拆垛效率2倍以上。节省操作时间,缩短火车站点达50%。作业平稳,安全可靠,铝锭没散捆,保证了货物包装质量和作业安全。节约了大量钢丝绳费用。
Description
技术领域
本实用新型属于装卸吊具,特别涉及一种8吨铝锭专用吊具。
背景技术
铝锭货类是我公司外贸出口的主要货类之一,约占全局90%以上的铝锭在我公司集港装船出口,仅去年一年就达40多万吨。但长期以来,铝锭卸货火车(卸汽车)堆垛作业和拆垛装拖板车作业过程始终使用钢丝绳扣捆扎起吊作业,由于每件1吨的成组铝锭在车厢内与箱侧板间隙过小,因此作业中存在以下缺陷:
1.作业速度慢,卸车效率低,造成火车站点延长,铁路部门意见大。
2.钢丝绳扣捆扎不到位,经常造成货物起吊中散捆,影响作业安全和货物包装损坏,货主单位意见大。
3.工人作业工序时间长,劳动强度大。(经常使用撬棍,撬出缝隙)
发明内容
本实用新型所要解决的技术问题是:提供一种8吨铝锭专用吊具。解决作业速度慢,卸车效率低,起吊散捆,作业不安全,货物包装损坏,作业工序时间长,劳动强度大问题。
本实用新型的技术方案是:
一种8吨铝锭专用吊具,其特征在于:有一个多格平衡框架,在框架的四周向上连接有多个上耳板,框架的四周向下连接多个下耳板,每个上耳板向上连接连接卸扣,每个连接卸扣连接钢丝绳上吊系,每个下耳板连接连接连接卸扣,每个连接卸扣连接圆环链条,在每个圆环链条上穿有两个吊钩。
在框架的四周向上均布连接有四个上耳板。
框架的四周向下均布连接六个下耳板。
本实用新型效果是:
8吨铝锭专用吊具主要由专用框架、上首钢丝绳、下首高强度链条和专用钩四部分通过卸扣组装而成,每套吊具自重70kg,安全负荷为7.2吨,可同时起吊6捆铝锭,为保证安全专用钩采用25MnV材料经锻造和机加工后达到每对吊钩安全负荷为2吨,安全系数可达3倍。作业时,只需将每对吊钩挂住每捆铝锭上层中间部位同一块铝锭的凹处,收紧链条即可起吊。(既不需用撬棍,也不需要钢丝绳)
此项工艺和专用吊具投产使用后,不仅及时解决了原作业中存在的难题而且深受作业工人和货主的欢迎,并取得如下效果:
1.操作简便,灵活,减少了使用撬棍作业过程,大大降低了工人劳动强度。
2.作业速度快,效率高,提高卸车,堆、拆垛效率2倍以上。
3.节省操作时间,缩短火车站点达50%。
4.作业平稳,安全可靠,铝锭没散捆,保证了货物包装质量和作业安全。
5.节约了大量钢丝绳费用。(每年可节约材料费5万元以上)
6.每年可为公司创新经济效益30万元以上。
附图说明。
图1是8吨铝锭专用吊具示意图
图2是8吨铝锭专用吊具使用状态图
具体实施方式
图1是一种8吨铝锭专用吊具,有一个多格平衡框架3,在框架的四周向上连接有多个上耳板6,框架的四周向下连接多个下耳板7,每个上耳板向上连接连接卸扣2,每个连接卸扣连接钢丝绳上吊系1,每个下耳板连接连接连接卸扣8,每个连接卸扣连接圆环链条4,在每个圆环链条上穿有两个吊钩5。
在框架的四周向上均布连接有四个上耳板。
框架的四周向下均布连接六个下耳板。
Claims (3)
1、一种8吨铝锭专用吊具,其特征在于:有一个多格平衡框架,在框架的四周向上连接有多个上耳板,框架的四周向下连接多个下耳板,每个上耳板向上连接连接卸扣,每个连接卸扣连接钢丝绳上吊系,每个下耳板连接连接连接卸扣,每个连接卸扣连接圆环链条,在每个圆环链条上穿有两个吊钩。
2、根据权利要求1所述的8吨铝锭专用吊具,其特征在于:在框架的四周向上均布连接有四个上耳板。
3、根据权利要求1所述的8吨铝锭专用吊具,其特征在于:框架的四周向下均布连接六个下耳板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420029537 CN2723407Y (zh) | 2004-08-16 | 2004-08-16 | 8吨铝锭专用吊具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420029537 CN2723407Y (zh) | 2004-08-16 | 2004-08-16 | 8吨铝锭专用吊具 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2723407Y true CN2723407Y (zh) | 2005-09-07 |
Family
ID=35037037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420029537 Expired - Fee Related CN2723407Y (zh) | 2004-08-16 | 2004-08-16 | 8吨铝锭专用吊具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2723407Y (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103754750A (zh) * | 2014-01-21 | 2014-04-30 | 亚洲铝业(中国)有限公司 | 吊具 |
CN106115462A (zh) * | 2016-08-31 | 2016-11-16 | 成都市工业设备安装公司 | 一种多功能吊装平衡梁结构及其使用方法 |
CN107867624A (zh) * | 2017-12-12 | 2018-04-03 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | 一种型钢行车吊具 |
-
2004
- 2004-08-16 CN CN 200420029537 patent/CN2723407Y/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103754750A (zh) * | 2014-01-21 | 2014-04-30 | 亚洲铝业(中国)有限公司 | 吊具 |
CN103754750B (zh) * | 2014-01-21 | 2017-01-04 | 广东铝遊家科技有限公司 | 吊具 |
CN106115462A (zh) * | 2016-08-31 | 2016-11-16 | 成都市工业设备安装公司 | 一种多功能吊装平衡梁结构及其使用方法 |
CN106115462B (zh) * | 2016-08-31 | 2018-08-10 | 成都市工业设备安装公司 | 一种多功能吊装平衡梁结构及其使用方法 |
CN107867624A (zh) * | 2017-12-12 | 2018-04-03 | 铜陵有色金属集团铜冠建筑安装股份有限公司 | 一种型钢行车吊具 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201077713Y (zh) | 钢轨专用的夹具及组合吊具 | |
CN202321966U (zh) | 一种多吊点高线盘条专用吊具 | |
CN200958001Y (zh) | 可调式专用钢轨吊具 | |
CN2723407Y (zh) | 8吨铝锭专用吊具 | |
CN200967703Y (zh) | 链条捆扎索具 | |
CN2855988Y (zh) | 拖杠式重型车辆专用吊具 | |
CN201077714Y (zh) | 集装箱起吊底角锁孔专用吊具 | |
CN2851213Y (zh) | 装卸集装箱空箱作业一钩双箱专用吊具 | |
CN205132903U (zh) | 钢丝绳索具 | |
CN200961084Y (zh) | 方钢装卸抓具 | |
CN203513086U (zh) | 长捆状物料专用吊具 | |
CN200967705Y (zh) | 装卸工字钢的卡具 | |
CN2723409Y (zh) | 8吨铝锭装卸作业专用夹具 | |
CN203128025U (zh) | 装卸“箱装玻璃”作业的专用吊具 | |
CN203033677U (zh) | 成品吊机 | |
CN200964319Y (zh) | 集装袋专用组合吊具 | |
CN200949006Y (zh) | 方钢装卸吊具 | |
CN204624959U (zh) | 船台主机安装用吊装结构 | |
CN210528243U (zh) | 一种新型板锭吊具 | |
CN210001440U (zh) | 自卸吊装装置 | |
CN211078185U (zh) | 新型起重机吊钩防脱钩装置 | |
CN201385980Y (zh) | 龙门吊联吊吊排 | |
CN2868966Y (zh) | 多用途吊架 | |
CN2547712Y (zh) | 钢坯吊钩 | |
CN211078171U (zh) | 多排吊绳吊装带 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20050907 Termination date: 20120816 |