CN2712878Y - Crane capable of hoisting materials on the inclined ramp - Google Patents

Crane capable of hoisting materials on the inclined ramp Download PDF

Info

Publication number
CN2712878Y
CN2712878Y CN 200420017733 CN200420017733U CN2712878Y CN 2712878 Y CN2712878 Y CN 2712878Y CN 200420017733 CN200420017733 CN 200420017733 CN 200420017733 U CN200420017733 U CN 200420017733U CN 2712878 Y CN2712878 Y CN 2712878Y
Authority
CN
China
Prior art keywords
disc
ramp
utility
model
hoisting crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420017733
Other languages
Chinese (zh)
Inventor
周湘桥
谢军
刘沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Wuhan Bridge Industries Ltd
Original Assignee
Wuhan Bridge Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Bridge Machinery Co ltd filed Critical Wuhan Bridge Machinery Co ltd
Priority to CN 200420017733 priority Critical patent/CN2712878Y/en
Application granted granted Critical
Publication of CN2712878Y publication Critical patent/CN2712878Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a crane which can hoist materials on a ramp, belonging to the heavy machinery field. All of the cranes generally mentioned at present work on a horizontal plane (non-ramp operation), the existing cranes which lost balance can not work, if a hoisting is needed on a larger ramp, and a leveling mechanism in the technical project of the utility model solves the problem. The utility model is characterized in that a pair of spiral leveling mechanisms and a pair of double-ended trapezoidal screw mechanisms are installed on the rear end of an upper and a lower chassis, the lower part of the screw rod is connected with the lower chassis by a pivot shaft, and the upper part of the screw rod is in a fit connection with a big gear wheel installed on the upper chassis. The big gear wheel driven by an electric motor can rotate left and right, driving the upper chassis which rotates around the connecting pivot shaft of the upper and the lower chassis, and the upper chassis is horizontally maintained. The utility model has simple and flexible leveling mechanism, with the convenient control and the strong practicability, and the utility model has been successively applied in the assembly and the mounting of the subsections of the steel arch bridge, with obvious technique and economic effect.

Description

Can be on the ramp hoisting crane of lift heavy
Technical field
Can on the ramp, belong to the heavy-duty machinery field by the hoisting crane of lift heavy
Background technology
Our usually alleged all operations on horizontal surface of hoisting crane at present, the operation of promptly non-ramp is even the gradient slightly generally also is no more than 5 ° the gradient.As the need heavy work of hanging oneself in the ramp of great slope, existing hoisting crane will because of himself unbalance can not operation.
Summary of the invention
Along with the development of building cause and the variety of construction operating mode, need on the ramp, the situation of hoisting operation day by day increase, for example need on the steel braced arch, lifting set a roof beam in place, or need on the ramp, play heavy equipment etc., and existing hoisting crane can not satisfy the job requirements of this type of operating mode.Therefore in order to solve the problem of the heavy work of can not hanging oneself in the ramp that has the hoisting crane existence now, the utility model proposes double-deck chassis structure and hoisting crane levelling gear technical scheme, solve the existing unbalance problem of hoisting crane ramp lift heavy self, thereby realize that this hoisting crane can be at 50 ° with the hang oneself target of heavy work of internal ramp.
The utility model can be on the ramp hoisting crane technical scheme of lift heavy as follows:
1. can be on the ramp hoisting crane of lift heavy, comprise tackling system, the double bottom disc mechanism, levelling gear, rope traction running mechanism and anchoring mechanism, it is characterized in that the double bottom disc mechanism is by top bottom-disc (1), low bottom-disc (2) is formed, tackling system (3) is installed on the top bottom-disc (1), low bottom-disc (2) is equipped with away driving wheel (4), traction displacement node (5) and anchoring mechanism (6), the front portion of top bottom-disc (1) and low bottom-disc (2) is connected with rotation hinge (7), and a pair of spiral levelling gear (8) is equipped with at the rear portion of top bottom-disc (1) and low bottom-disc (2) makes top bottom-disc keep horizontality.
2. can be on the ramp hoisting crane of lift heavy, it is characterized in that described a pair of spiral levelling gear (8) is made up of screw rod (9), big gear wheel (11) and motor (12), the bottom of screw rod (9) is connected with low bottom-disc (2) with hinge (10), screw rod (9) and top and the big gear wheel (11) that is installed in top bottom-disc (1) are connected, big gear wheel (11) at motor (12) but left rotation and right rotation under driving, drive top bottom-disc (1) and connect hinge (7) rotation around upper and lower chassis, make top bottom-disc (1) maintenance level.
3. can be on the ramp hoisting crane of lift heavy, it is characterized in that drawing anchor (13) before the described anchoring mechanism (6) that is installed in low bottom-disc (2) comprises anterior top (14) and post-tensioning anchor (15).
The utility model hoisting crane levelling gear is simple and direct flexibly, and control is convenient, and is practical, and safeguards simple.The hoisting crane top bottom-disc can change with foundation slope and keep horizontality, has solved hoisting crane self unbalance problem during lift heavy on the ramp, and the section assembling that successfully is used for steel arch bridge sets up, and its technology and economic effects are fairly obvious.
Description of drawings
Fig. 1 the utility model crane structure scheme drawing
Fig. 2 the utility model hoisting crane levelling gear scheme drawing
Specific embodiments
The utility model tackling system is in normal working, the traction displacement node (5) of hoisting crane low bottom-disc (2) is subjected to rope traction, walking wheel (4) by low bottom-disc (2) is at the ramp superior displacement, in shifting process, constantly top bottom-disc is carried out horizontal adjustment by spiral levelling gear (8), keep top bottom-disc (1) to be in visual derection level as far as possible, i.e. positive and negative rotation by motor (12) passes motion to big gear wheel (11), drive top bottom-disc (1) by worm drive then and connect axle (2) rotation, make top bottom-disc (1) maintenance level around last low bottom-disc.
After hoisting crane arrives the operation position,, make away driving wheel unsettled, finish anterior grappling and rear portion grappling, unclamp haulage cable with manual anterior top (14), a top, oil top, with level indicator, accurately finish the horizontal adjustment of top bottom-disc (1) after, carry out hoisting operation.After finishing hoisting operation, unclamp anterior top (14) and post-tensioning anchor (15), the tensioning haulage cable draws anchor (13) before unclamping then.
Example 1:
When building certain steel arch bridge, flat segments and arch dam intersection at steel arch bridge, the hoisting crane erect-position is on flat segments, at first set up first, second internode (the arch dam gradient is 35 °) of steel arch bridge, hoisting crane reach climbing then, be the traction displacement node (5) of rope traction hoisting crane low bottom-disc (2), by walking wheel (4) at the ramp superior displacement.In shifting process, drive big gear wheel (11) rotation by motor (12), the worm drive of big gear wheel drive top bottom-disc (1) around last low bottom-disc connection hinge (2) rotation then, make top bottom-disc (1) maintenance level, when hoisting crane was advanced to first internode of arch bridge, the angle of last low bottom-disc reached 35 °.
After hoisting crane is advanced between first segment,, make walking wheel (4) unsettled with anterior top (14) of manual jack stand, draw anchor (13) and post-tensioning anchor (15) before fixing, unclamp haulage cable, accurately adjust again, make top bottom-disc (1) maintenance level, promptly carry out hoisting operation.After installing the steel arched girder of a sections, top (14) and post-tensioning anchor (15) before unclamping, the tensioning haulage cable draws anchor (13) before unclamping then.Sections of traveling forward again.A sections is installed like this, and the sections that advances is finished the whole process of setting a roof beam in place.
The main technical parameters of hoisting crane is as follows:
Rated load weight: 150KN
Loop wheel machine degreeof turn: ± 50 °
Loop wheel machine change angle: 15 °~18 °
The levelling gear maximum horizontal gradient: 35 °
Top bottom-disc jacking speed: 180mm/min

Claims (3)

1. can be on the ramp hoisting crane of lift heavy, comprise tackling system, the double bottom disc mechanism, levelling gear, rope traction running mechanism and anchoring mechanism is characterized in that the double bottom disc mechanism is by top bottom-disc (1), low bottom-disc (2) is formed, tackling system (3) is installed on the top bottom-disc (1), and low bottom-disc (2) is equipped with away driving wheel (4), traction displacement node (5) and anchoring mechanism (6), and the front portion of top bottom-disc (1) and low bottom-disc is connected with rotation hinge (7).A pair of spiral levelling gear (8) is equipped with at the rear portion of top bottom-disc (1) and low bottom-disc (2) makes top bottom-disc keep horizontality.
2. according to claim 1 can be on the ramp hoisting crane of lift heavy, it is characterized in that described a pair of spiral levelling gear (8) is made up of screw rod (9), big gear wheel (11) and motor (12), the bottom of screw rod (9) is connected with low bottom-disc (2) with hinge (10), screw rod (9) and top and the big gear wheel (1) that is installed in top bottom-disc (1) are connected, big gear wheel (11) at motor (12) but left rotation and right rotation under driving, drive top bottom-disc (1) and connect hinge (7) rotation around upper and lower chassis, make top bottom-disc (1) maintenance level.
3. according to claim 1 can be on the ramp hoisting crane of lift heavy, it is characterized in that drawing anchor (13) before the described anchoring mechanism (6) that is installed in low bottom-disc (2) comprises anterior top (14) and post-tensioning anchor (15).
CN 200420017733 2004-04-12 2004-04-12 Crane capable of hoisting materials on the inclined ramp Expired - Fee Related CN2712878Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420017733 CN2712878Y (en) 2004-04-12 2004-04-12 Crane capable of hoisting materials on the inclined ramp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420017733 CN2712878Y (en) 2004-04-12 2004-04-12 Crane capable of hoisting materials on the inclined ramp

Publications (1)

Publication Number Publication Date
CN2712878Y true CN2712878Y (en) 2005-07-27

Family

ID=34870347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420017733 Expired - Fee Related CN2712878Y (en) 2004-04-12 2004-04-12 Crane capable of hoisting materials on the inclined ramp

Country Status (1)

Country Link
CN (1) CN2712878Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102616651A (en) * 2012-03-27 2012-08-01 武桥重工集团股份有限公司 Traction running mechanism for climbing girder crane
CN102616652A (en) * 2012-03-20 2012-08-01 武桥重工集团股份有限公司 Front anchoring device for climbing crane
CN102616653A (en) * 2012-03-21 2012-08-01 武桥重工集团股份有限公司 Torsion resistance device for variable-gradient beam erecting crane
CN105576539A (en) * 2016-03-08 2016-05-11 江苏省电力公司常州供电公司 Centrally-installed switchgear intelligent maintenance dolly bearing bench
CN108675167A (en) * 2018-07-31 2018-10-19 武汉武桥交通装备技术有限公司 A kind of levelling mechanism for being applied to climb arch loop wheel machine

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102616652A (en) * 2012-03-20 2012-08-01 武桥重工集团股份有限公司 Front anchoring device for climbing crane
CN102616653A (en) * 2012-03-21 2012-08-01 武桥重工集团股份有限公司 Torsion resistance device for variable-gradient beam erecting crane
CN102616653B (en) * 2012-03-21 2014-08-27 武桥重工集团股份有限公司 Torsion resistance device for variable-gradient beam erecting crane
CN102616651A (en) * 2012-03-27 2012-08-01 武桥重工集团股份有限公司 Traction running mechanism for climbing girder crane
CN105576539A (en) * 2016-03-08 2016-05-11 江苏省电力公司常州供电公司 Centrally-installed switchgear intelligent maintenance dolly bearing bench
CN108675167A (en) * 2018-07-31 2018-10-19 武汉武桥交通装备技术有限公司 A kind of levelling mechanism for being applied to climb arch loop wheel machine

Similar Documents

Publication Publication Date Title
CN109680967B (en) Jacking equipment of steel structure beam for mounting small-sized factory building
CN209397501U (en) Erection crane
CN102953553B (en) Method for mounting large-span pipe truss by using boom luffing mechanism
CN2858608Y (en) Folding dual-horizontal-arm self-rising crane
CN201068371Y (en) Self-hoisting tower crane
CN201485194U (en) 60T walking type full-swing erecting crane
CN2712878Y (en) Crane capable of hoisting materials on the inclined ramp
CN107826986A (en) A kind of amplitude variation type erection crane with A type structure arms
CN206188254U (en) Mobile lifting bracket for building bridge
CN102530782A (en) Hydraulic synchronous lifting hoisting technology and equipment for ultra-large members
CN105484166A (en) Ladder-shaped mast type cantilever assembling crane
CN205063835U (en) Novel hydraulic drive derrick mechanism
CN101343949B (en) Dislocation assembly network frame hoisting construction method and its hoisting system
CN108755445B (en) Bridge rotation construction remote control method based on PLC
CN211846934U (en) Tower-free construction crane for arch bridge
CN217025112U (en) Tower crane with nonstandard crane boom
CN112709137B (en) Hoisting construction method for stiffening beam of suspension bridge
CN115030036A (en) Construction process for mounting suspended steel ladder based on cross rail in non-open space
CN210797292U (en) Six-direction positioning and quick adjusting device for realizing prefabricated section beam
CN108590171A (en) A kind of pre-splicing separate type of steel and wood composite is from the frame body template construction method that climbs
CN111776956A (en) Split type beam-moving crane
CN203474321U (en) Tower crane used for constructing and erecting electric transmission line iron towers
CN111439676A (en) Stable motion system of lifting steel wire rope for field bridge
CN2483472Y (en) Tower crame and able to be used for distributing concrete having its motion and horizontal beam
CN1155312A (en) Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAYWUQIAO HEAVY INDUSTRY CO., LTD.

Free format text: FORMER NAME OR ADDRESS: WUHAN BRIDGE BASE CO., LTD., ZHONGTIE BRIDGE BUREAU GROUP

CP03 Change of name, title or address

Address after: No. 448, parrot Avenue, Hanyang District, Hubei, Wuhan: 430052

Patentee after: China Railway Wuhan Bridge Industries Ltd.

Address before: No. 448, parrot Avenue, Hanyang District, Hubei, Wuhan: 430052

Patentee before: Wuhan Bridge Machinery Co., Ltd., Zhongtie Major Bridge Engineering Group

C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY WUHAN BRIDGE INDUSTRIES LIMITES

Free format text: FORMER NAME: CHINA RAILWAY WUHAN BRIDGE INDUSTRIES LIMITED (CRWB)

CP03 Change of name, title or address

Address after: No. 777, Zhuankou Road, Wuhan economic and Technological Development Zone, Hubei, Wuhan Province: 430056

Patentee after: China Railway Wuhan Bridge Industries Limited

Address before: No. 448, parrot Avenue, Hanyang District, Hubei, Wuhan: 430052

Patentee before: China Railway Wuhan Bridge Industries Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050727

Termination date: 20130412