CN1155312A - Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane - Google Patents

Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane Download PDF

Info

Publication number
CN1155312A
CN1155312A CN 95194578 CN95194578A CN1155312A CN 1155312 A CN1155312 A CN 1155312A CN 95194578 CN95194578 CN 95194578 CN 95194578 A CN95194578 A CN 95194578A CN 1155312 A CN1155312 A CN 1155312A
Authority
CN
China
Prior art keywords
crane
wind turbine
boom
bearing
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 95194578
Other languages
Chinese (zh)
Inventor
约翰·托马斯·奥列森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Micon AS
Original Assignee
Micon AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Micon AS filed Critical Micon AS
Priority to CN 95194578 priority Critical patent/CN1155312A/en
Publication of CN1155312A publication Critical patent/CN1155312A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Abstract

A crane adapted for the erection of elongated bodies, preferably wind turbines, is attached to the same foundation which is used for the wind turbine. The crane comprises a jib which may be displaced forwards and backwards. The cap and the blades of the wind turbine are thereby hoisted to the top of the wind turbine tower once this has been erected. The crane is mounted on the same foundation. Bearing pedestals for seating the jib and anchoring straps for the attachment of double acting lifting and lowering devices are connected to the foundation, this foundation being additionally provided with an anchoring base for the wind turbine tower. The crane is of particular advantage for the erection of wind turbines in regions where it is difficult and costly to bring in a mobile crane for the erection of tall wind turbines or in case it is difficult to use a stationary crane in view of the anchoring and the support required for such cranes. Floating or wheeled mobile cranes need a large counterweight while stationary cranes according to the prior art require a solid anchoring at a great distance from the wind turbine foundation and put great demands to the steadiness of the support.

Description

The crane of raising longitudinal bodies, the base of this crane and with the method for this crane raising longitudinal bodies
The present invention relates to longitudinal bodies is erected at crane on the vertical position, this crane comprises can be around the boom of the clutch shaft bearing inclination with an axis that horizontally rotates, described clutch shaft bearing is arranged on the boom bottom that links to each other with a bearing surface, and at least one second bearing, described second bearing is arranged on also link to each other with bearing surface one two moving ascending, descending mechanism bottom, and the top of described ascending, descending mechanism is fixed on the boom.
The invention still further relates to by crane and erect a kind of base and the method that longitudinal bodies uses.
Towering wind turbine, for example, portion highly reaches 50 meters wind turbine to the wind turbine blade hub, normally erects by crane movably, erects by helicopter in the country of impassabitity.The energy is obtained in order to make little local community in certain areas in the world, needs vertical wind turbine, and at this moment movably crane often can not achieve the goal owing to abominable, narrow path.Can use helicopter in this case, but this is very expensive method, if particularly road is far.At sea the wind turbine of Shu Liing is usually by movably Floating Crane setting.
Therefore, in this case, can only lower low performance wind turbine be installed by truck crane and small-sized removable crane so far, therefore must vertical a large amount of wind turbine.As substituting of mobile job crane, also can use the crane that firmly fixes on the ground.
DE2,602,745 have described a kind of crane that is used to lift by crane and erect elongate objects, and this crane comprises first pair of boom, a cross bar and second pair of boom that extends from the upper end of one of first pair of boom.This crane is articulated in a base, and after crane installed, the latter was fixed by a pair of chain that stretches to first pair of boom from base.Can second pair the slinging elongate objects of boom it be erected thereafter.
Disclosed crane has some defectives in above-mentioned file.At first, the principle of this crane is longitudinal bodies upwards transporting between second pair of boom, because crane is than microscler low body.Therefore, after having erect, longitudinal bodies can not again other part be winched to above the longitudinal bodies.In addition, be necessary for crane and set up an independently base.
For the known crane or the miscellaneous equipment of the boom hoisting that constitutes longitudinal bodies such as wind turbine, flagpole or phone post, be necessary for crane or lifting appliance and set up independently a base or a fixed point independently.
This crane or lifting appliance can be known clearly and be read GB1, and 270,205, GB2,115,368, DE2,255,713, FR1,213,060, FR3,075,866, EP0,169,104, SE152,198 or above-mentioned DE2,602,745.
The basic defect of disclosed crane or lifting appliance is in the above-mentioned file, is necessary for to absorb tension force and set up at least one point, and this point is often away from the place of the longitudinal bodies of preparing to erect.This just has very high requirement to the rigidity and the fastness of supporting member, so that set up to absorb the point of tension force on this supporting member, this also has very high requirement at that point anchor device itself.If rigidity at that point, fastness and anchoring are not enough, in the setting process, longitudinal bodies may be suddenly, have warning message ground not fall earthward, thereby cause the catastrophic effect to equipment and personnel.Particularly when preparing to be erected at longitudinal bodies on sea or the swamp land, erectting large-sized object can occasion a great deal of trouble.
The purpose of this invention is to provide a kind of crane, a kind of base and a kind of method, except erectting longitudinal bodies and after erectting longitudinal bodies, other part can being sling to the top of longitudinal bodies or part are highly sentenced, it does not rely on the independent seats of establishing for crane, the danger that longitudinal bodies does not plunk down in longitudinal bodies setting process yet.
Above-mentioned purpose is to realize by the crane with following characteristics: support and the base of formation longitudinal bodies, the clutch shaft bearing of crane is anchored on the base by first anchor device, first anchor device of described clutch shaft bearing be arranged on the longitudinal bodies installing zone and the base opposed edges district that looks with respect to first anchor device between, at least one of crane second bearing uses at least one second anchor device to be anchored on the base, and described second anchor device is arranged in the side from first anchor device to described fringe area and leaves distance of first anchor device in the opposite direction.
This crane is specially adapted to and mainly develops for erectting tall and big wind turbine.But, also can be used for erectting other longitudinal bodies such as flagpole, phone post or other object according to crane of the present invention.In addition, this crane can be used for being erected at the longitudinal bodies that sea and land have a base.Hereinafter, this crane will be described at erectting wind turbine, and still, this explanation does not limit the application of crane.
Use the base of the base of wind turbine according to crane of the present invention as oneself.This has some advantages.The base of wind turbine often rigidity is fine, and is very firm, that is, it is anchored at well on the ground or on the sea bed, the employed material of base is also very firm, because base is wanted to bear very big power when wind turbine is worked.Therefore, base is that the anchoring crane can rigidity or fastness deficiency yet.In addition, on the water or in the situation of wheeled removable crane counterweight must be set, and crane of the present invention needn't be provided with counterweight.
For static crane or lifting appliance, be according to another advantage of crane of the present invention, do not need to provide place away from wind turbine, that is, wind turbine base a bit or a plurality of point.In wind turbine setting process, the basic load power by the anchoring position of above-mentioned first and second anchor devices that reaches crane is pressure.Base can easily absorb this pressure load force, and is less demanding to the anchoring on base according to crane of the present invention, and this point is different from by the crane of the fixing prior art of tension force or the anchoring situation of lifting appliance.
Also make the tall and big powerful wind turbine that has of installation become possibility according to crane of the present invention, thereby can reduce the quantity of the wind turbine that needs installation.The advantage of tall and big wind turbine is to reduce cost of electricity-generating, thus corresponding reduction electricity price.
Than the wind turbine tower height that will erect, this makes it wind turbine cap and blade can be winched to cat head after holding up wind turbine tower according to crane of the present invention.This obviously is impossible in the situation of the crane lower than tower.This crane mainly is to be used to erect 30 to 50 meters even higher wind turbine.Past, this required the use ability to approach 350 tons very big removable crane.
In order to finish the purpose that wind turbine cap and blade is winched to cat head, crane must be suitable for forward and backward tilting to makes crane loading mechanism be positioned at forward and backward side of the wind turbine tower that is erected and the position directly over it not.Wind turbine cap and wind turbine blade will be placed on column foot the place ahead or rear, and the lifting appliance of derricking gear such as suspension hook etc. will be placed on the place ahead or the rear of tower, and its position is suitable for wind turbine cap and wind turbine blade are winched to cat head.When wind turbine cap and blade being winched to the height that needs, crane will tilt so that respectively relative respectively tower of wind turbine cap and blade and wind turbine cap are moved horizontally to the position that place.
Jiang Ta erect and with wind turbine cap and blade installation after on the tower, generally just no longer needed crane.Crane is reduced to boom along ground or the position of extending, sea, pull down crane from base, and pull down bearing.Crane can be transferred to another wind turbine base then, connect and erect, can prepare to erect another wind turbine.
The load that crane with above-mentioned feature can guarantee to be added on the base distributes with possible best mode, need not to be provided with the other discharge mechanism of tension force or pressure with base spaced apartly, and this static crane and lifting appliance to other is essential, also need not to use counterweight in addition, and this is necessary concerning removable crane.
Contrast the following drawings describes the present invention in detail now.
Figure 1A is mounted in first schematic plan view according to crane of the present invention on the longitudinal bodies base;
Figure 1B is mounted in second schematic plan view according to crane of the present invention on the longitudinal bodies base;
Fig. 2 is the top bottom plan view according to longitudinal bodies base of the present invention;
Fig. 3 A is first plan view according to a specific embodiment of crane of the present invention;
Fig. 3 B is second plan view according to a specific embodiment of crane of the present invention.
Figure 1A and 1B are respectively from the crane side and the view of looking from one position, crane back, and the surface is according to an embodiment of crane 1 of the present invention.Crane 1 comprises two booms 2 and on boom top 2 ' be connected the cross bar 3 between the boom.Boom 2 and cross bar 3 are to be made by suitable shaped steel, also can use steel other material in addition.
The lower end 2 of boom 2 " is connected on the bearing support 4 by the bearing 5 with horizontal axis of rotation A.Bearing 5 is bearings of journals, but also can be the bearing of other kind, as ball bearing or roller bearing.Bearing support 4 is connected in base 6.In fact the support plinth of the longitudinal bodies (not drawing among the figure) that will erect by crane 1 exactly of base 6.At this manual hereinafter, the instantiation of longitudinal bodies is the tower of wind turbine, but the application of crane of the present invention is not limited thereto.
Crane 1 also comprises two at boom 2 be connected in the extending cylinder 7 (only drawing in the drawings) that extends between the anchoring ring 8 of base 6.The main effect of fluid cylinder 7 is to make boom 2 forward and backward inclinations when wind turbine cap (not drawing in the drawings) and wind turbine blade assembly (not drawing among the figure) are installed.Second effect of fluid cylinder 7 is that to erect wind turbine tower (not drawing among the figure) respectively forward and backward, plays synergism in the process of ascending, descending crane 1.
Each fluid cylinder 7 comprises a band piston rod 9 and is connected in piston (not drawing among the figure) and a cylinder body 11 of the anchoring eye 10 of anchoring ring 8 that its anchoring eye 12 is connected in the ring 13 on the boom 2.Respectively anchoring ring 8 with in being connected of boom 2 be bearing 14,15 by band horizontal pivot axis, preferably the bearing of journals is realized, also can use other kind bearing.
Crane 1 also be included in the lower end 2 that is positioned at boom 2 in the illustrated embodiment ' winch 16.Winch 16 is handled one along the upwardly extending in parallelly rope 17 of boom 2, and it extends towards base 6 downwards by being located at the coaster 18 on the cross bar 3 again, and the far-end 19 of rope 17 is provided with acquisition equipment 20, as drawn suspension hook among the figure.Winch 16 is being erect wind turbine tower and is being used in the process of cat head installation wind turbine cap and blade later on together with rope 17 and suspension hook 20.
Fig. 2 represents according to base 6 of the present invention.Base 6 is provided with wind turbine anchor foundation 21.The anchor foundation 4 of the bearing support 4 of boom 2 ' and the anchor block 8 of the anchoring ring 8 of fluid cylinder 27 ' be embedded in the base 6.
Now consult Figure 1A and 1B, base shown in the figure 6 is applicable to large-scale wind turbine, have about 1 meter height h and the about 9 meters width b on both direction, be buried in the depth d of 1.5 to 2.0 meters of the datum such as the ground J next ones, it is that end face 22 from ground to base 6 is measured.Bearing support 4 and anchoring ring 8 comprise spacing part 23,24, and its end face 22 from base 6 extends to ground J.
Bearing support 4 and anchoring ring 8 are fixed in base 6, and its layout is extended wind turbine tower between boom 2 and fluid cylinder 7.Anchoring ring 8 is positioned at anchor foundation 21 both sides of wind turbine tower, and bearing support 4 is its displacement relatively, and horizontal rotation axis A is parallel to the horizontal rotation axis B of the bearing 14 in the anchoring ring 8.
Summary is according to the use of crane 1 of the present invention and base 6 now.Initial step is to be provided with according to base 6 of the present invention.Behind the hole of excavating a suitable size and the degree of depth, base casts out for wind turbine at the scene.Simultaneously, bearing support 4 and anchoring ring 8 are embedded in the base together with the anchor foundation 21 of wind turbine tower.
In case setting completed just wind turbine tower can be erect and is fixed on the base for base 6.Boom 2 is installed in the bearing support 4, and this moment, boom was placed along ground J.Make the top 2 of boom ' lift by being connected chain on pull unit and the boom 2 or other device pulling boom then from ground.In case boom fully lifts, fluid cylinder 7 is connected is embedded in the base between the ring 13 on the anchoring ring 8 and boom 2.Can use fluid cylinder 7 further boom to be lifted to maximum height then, at this moment the grip device 20 on the rope 17 is positioned at the anchor foundation top of base just.On this position, boom is with respect to ground inclination α angle.
Then, wind turbine tower is placed under the crane, along on the position of ground lay.Grip device 20 is displaced downwardly to the top of wind turbine tower, the rope 17 that winch 16 will have a grip device pull to the upper end 2 of boom ', tower is holded up.After tower is erected on the vertical position, tower is fixed on the anchor foundation.
Step subsequently comprises the wind turbine cap is installed on the cat head, and on the wind turbine cap a rotatable boss that has hub portion is installed, and fixing wind turbine blade on it.After the above-mentioned manipulation stage finished, grip device 20 was positioned at the wind turbine tower top just, can easily not move down ground so that wind turbine cap and blade are winched to a position of cat head suitable position thereby be not positioned at.Therefore, boom 2 is leaned forward, reducing the α angle, thereby make a position before grip device 20 moves forward to tower, make it can shift to ground downwards by fluid cylinder 7.
The wind turbine cap is placed on wind turbine column foot the place ahead at first, so that after grip device has moved down and be connected on the wind turbine cap in column foot the place ahead, it is winched to cat head.In case the wind turbine cap rises to cat head fully, boom 2 recedes by fluid cylinder 7, so that the wind turbine cap is moved to position directly over the cat head, then the wind turbine cap is fixed on the cat head.
Last step is that wind turbine blade is installed.When hub portion and blade are placed on ground J and go up, blade is connected in the hub portion.By fluid cylinder boom 2 is leaned forward once more.Grip device 20 also moves forward to before the tower and the position before the wind turbine cap, is displaced downwardly to ground J then.Blade-carrying hub portion is placed on the place ahead, wind turbine basis in advance, so that upwards winch to wind turbine cap place when grip device moves down and be connected in blade.In case when blade rises to the wind turbine cap, boom can be moved to the appropriate location that blade is prepared installation, then with vanes fixed.Perhaps, also can boom 2 be tilted, so that blade is moved to be adjacent to the appropriate location of wind turbine cap by fluid cylinder 7.The operation of carrying out for the setting wind turbine also can be divided into than the top described more stage.
Finish in case wind turbine has been assembled, crane has promptly been finished its effect, and boom is leaned forward until once more along position that ground J extends.Fluid cylinder 7 and boom 2 are pulled down from base 6.Thereafter, they can be connected in another base that also is provided with bearing support 4 and anchoring ring 8, so that erect another wind turbine.
Fig. 3 A and 3B represent according to a specific embodiment of the present invention, and these two accompanying drawings are to look from the side and from a position above the device that is used for crane is fixed on the wind turbine base 6 respectively.Crane 1 comprises a boom 2, in the top 2 ' be provided with a common mechanism 25 of slinging.Boom 2 according to this embodiment comprises 5 flexible mutually parts 26.
The lower end 2 of boom 2 " is connected in bearing support 4 by a bearing 5 with horizontal rotation axis A.Bearing 5 can be the bearing of any kind of, the preferably bearing of journals.Bearing support 4 is parts of bearing assembly 27, and bearing assembly 27 is connected in base 6 by at least one horizontally extending anchoring beam 28.Bearing assembly 27 can rotate with respect to anchoring beam 28 around a vertical axis B.Shown in Fig. 3 B, crane 1 can be provided with many anchoring beams 28.Base 6 is exactly the base that is used for supporting the longitudinal bodies (figure does not draw) that will be erect by crane.The profile of the longitudinal bodies wind turbine tower that chain-dotted line 29 expression cranes 1 are suitable for slinging.
Crane also comprises two telescopic fluid cylinders 7 (only drawing among the figure one), and they extend in the boom both sides respectively between boom and anchoring ring 8, and anchoring ring 8 constitutes the parts of bearing assembly with bearing support 4.Fluid cylinder 7 is specifically designed to forward and backward inclination boom 2 in the process that wind turbine cap and wind turbine blade (both all do not draw in the drawings) are installed.Crane also is provided with at the boom 2 inner monolithic fluid cylinders (not drawing in the drawings) that extend, are suitable for the extensible member 26 of mutual displacement boom.
The mode that crane 1 is installed anchoring beam 28 by the bolt 30 that extends, passes the bolt hole 31 on the anchoring beam 28 from base 6 is connected in base 6.In Fig. 3 B illustrated embodiment, anchoring beam 28 can its objective is the fixing area supported that stretches from the primary importance telescopic displacement to the second place.But, this have in wind turbine base be only under the situation of suitable size feasible.
According to the crane of Fig. 3 A and 3B illustrated embodiment, it is operated to similar substantially according to the operation of the Figure 1A and the crane of 1B illustrated embodiment.
So far, at the diagram specific embodiment of crane and base the present invention has been described.These embodiment are the scope of the present invention of office's border claims qualification not, and just is used for illustrating feasible embodiment of the present invention.Crane can comprise, two or more booms as shown in the figure.Cross bar can not be provided with, and perhaps can be extended forward and is not replaced with respect to the boom of boom horizontal expansion by another root.Fluid cylinder can be replaced by other double-acting control device, its can be shown in the figure, two form or comprise more a plurality of.Can be in other position at the winch shown in Figure 1A and the 1B with respect to crane, rather than the lower end of crane, grip device can be other device except that suspension hook.

Claims (10)

1. one kind is used for longitudinal bodies is erected at crane on the vertical position, this crane comprises the boom that can fascinate around the clutch shaft bearing with horizontal rotation axis, described clutch shaft bearing is arranged on the bottom of the boom that links to each other with a bearing surface, and at least one second bearing, described second bearing is arranged on two moving a liter that also links to each other with above-mentioned bearing surface, the bottom of descending mechanism, described liter, the top of descending mechanism is contained on the boom, it is characterized in that: described bearing surface constitutes the base of longitudinal bodies, the clutch shaft bearing of crane is anchored on the base by first anchor device, described first anchor device of clutch shaft bearing is arranged between the installing zone and the opposite edges district with respect to first anchor device of longitudinal bodies, described at least one second bearing of crane is anchored on the base by at least one second anchor device, and described second anchor device is arranged in and leaves distance of first anchor device in the opposite direction from first anchor device to described fringe area side.
2. crane as claimed in claim 1, it is characterized in that: described two moving ascending, descending mechanism comprises a telescopic fluid cylinder that has a piston and a cylinder body, piston comprises that one is connected in the anchoring eyelet of anchoring ring by a bearing, and cylinder body also comprises an anchoring eyelet that is connected in the ring on the boom by a bearing.
3. crane as claimed in claim 1 or 2, it is characterized in that: at least one boom comprises first and second booms, every described boom extends upwardly to the upper end from the lower end of adjacent support face, and a cross bar extends between the upper end of first and second booms.
4. the described crane of arbitrary as described above claim is characterized in that: bearing support and anchoring ring comprise from base top surface to being separately positioned on the spacing part that bearing support and anchoring ring middle (center) bearing extend.
5. the described crane of arbitrary as described above claim is characterized in that: described crane is provided with the winch of a contiguous boom layout, and described winch is provided with rope, and the coaster that rope is arranged by contiguous boom upper end from winch also extends towards base downwards.
6. the described crane of arbitrary as described above claim is characterized in that: at least one in the boom is provided with the another weighing arm in the upper end, described another weighing arm extends forward with respect to described boom.
7. the described crane of arbitrary as described above claim is characterized in that: boom is connected in bearing support and the anchoring eyelet is connected in the anchoring ring and is respectively the bearing of journals with the bearing that the anchoring eyelet is connected in the ring on the boom.
8. the described crane of arbitrary as described above claim is characterized in that: described bearing support, anchoring ring and the ring on boom are removable.
9. the described crane of arbitrary as described above claim is characterized in that: described base comprises a longitudinal bodies anchor foundation, and at least one bearing support and at least one anchoring ring.
10. method of using described crane of aforementioned arbitrary claim and base to erect wind turbine, described wind turbine comprises a wind turbine tower, wind turbine cap and wind turbine blade, it is characterized in that: wind turbine tower is erected on the vertical position by grip device, crane turns forward to reduce the α angle, by grip device the wind turbine cap is winched to the wind turbine cat head, make the crane hypsokinesis and the crane cap is contained on the cat head, crane is leaned forward, the hub portion that will have wind turbine blade by grip device winches to wind turbine cap place, and the hub portion that will have wind turbine blade is contained in the wind turbine cap.
CN 95194578 1994-08-16 1995-08-15 Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane Pending CN1155312A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95194578 CN1155312A (en) 1994-08-16 1995-08-15 Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DK0941/94 1994-08-16
CN 95194578 CN1155312A (en) 1994-08-16 1995-08-15 Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane

Publications (1)

Publication Number Publication Date
CN1155312A true CN1155312A (en) 1997-07-23

Family

ID=5082763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95194578 Pending CN1155312A (en) 1994-08-16 1995-08-15 Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane

Country Status (1)

Country Link
CN (1) CN1155312A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1325792C (en) * 2002-05-27 2007-07-11 威斯塔斯风力系统公开有限公司 Method of mounting wind turbine, wind turbine foundation and wind turbine assembly
CN102530737A (en) * 2012-02-24 2012-07-04 叶楚中 Automatic lifting installation technology of wind driven generator
CN102639870A (en) * 2009-12-01 2012-08-15 爱罗丁工程有限公司 Wind turbine having a lifting device
CN102877680A (en) * 2012-10-09 2013-01-16 陕西有色建设有限公司 Construction method for prefabricated column to be lifted in position for one time
CN103314211A (en) * 2011-09-22 2013-09-18 三菱重工业株式会社 Wind turbine generator and component transferring method for the same
CN103502635A (en) * 2011-04-29 2014-01-08 乌本产权有限公司 Wind turbine
CN106044582A (en) * 2016-07-01 2016-10-26 国网冀北电力有限公司迁西县供电分公司 Integral hoisting method for super-long tower

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1325792C (en) * 2002-05-27 2007-07-11 威斯塔斯风力系统公开有限公司 Method of mounting wind turbine, wind turbine foundation and wind turbine assembly
CN102639870A (en) * 2009-12-01 2012-08-15 爱罗丁工程有限公司 Wind turbine having a lifting device
CN103502635A (en) * 2011-04-29 2014-01-08 乌本产权有限公司 Wind turbine
US9464625B2 (en) 2011-04-29 2016-10-11 Wobben Properties Gmbh Wind turbine
CN103314211A (en) * 2011-09-22 2013-09-18 三菱重工业株式会社 Wind turbine generator and component transferring method for the same
CN102530737A (en) * 2012-02-24 2012-07-04 叶楚中 Automatic lifting installation technology of wind driven generator
CN102877680A (en) * 2012-10-09 2013-01-16 陕西有色建设有限公司 Construction method for prefabricated column to be lifted in position for one time
CN102877680B (en) * 2012-10-09 2014-07-30 陕西有色建设有限公司 Construction method for prefabricated column to be lifted in position for one time
CN106044582A (en) * 2016-07-01 2016-10-26 国网冀北电力有限公司迁西县供电分公司 Integral hoisting method for super-long tower

Similar Documents

Publication Publication Date Title
CA2635656C (en) Lifting system and apparatus for constructing wind turbine towers
US7748547B2 (en) Movable independent crane system used temporarily for moving or replacing components and mounting wind generators
EP2956400B1 (en) Device and method for placing a rotor blade of a wind turbine
EP1350953A2 (en) Crane for the assembly of wind turbines and assembly procedure
EP1101936A2 (en) Method for mounting main components in a nacelle of a windturbine
CN109689561A (en) Crane, vessel comprising such a crane and method for erecting a longitudinal structure
EP2189575B1 (en) Jack-up offshore platform and a method thereof
EP2585712A1 (en) Lifting device and method for positioning of an unwieldy object
RU2744782C1 (en) Lifting system for installing a wind turbine and method for lifting operations (options)
EP1101935A2 (en) Method and vessel for installation of off-shore windmills
CN104284857A (en) Heavy lifting apparatus and method
US20120027523A1 (en) Device and method for assembling a structure at sea
EP3372550A1 (en) Lifting system
KR20150081252A (en) Device and method for assembling a structure
EP2256079B1 (en) Device for assembling a large structure at sea
US20050211653A1 (en) Mobile crane with stationary counterweight
CN201485194U (en) 60T walking type full-swing erecting crane
CN101519178A (en) Crane and method thereof
CN1155312A (en) Crane for raising longitudinal bodies, foundation for such crane and method for raising longitudinal bodies by such crane
CN201068371Y (en) Self-hoisting tower crane
JPH0245274Y2 (en)
CN211113627U (en) Unsettled self-supporting formula pile driver
WO1996005391A1 (en) Crane for raising longitudinal bodies, foundation for such a crane and method for raising of longitudinal bodies by means of such a crane
JP3700306B2 (en) Wind power generator construction method
CN201626782U (en) Amphibious crawler crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication