CN209397501U - Deck crane - Google Patents

Deck crane Download PDF

Info

Publication number
CN209397501U
CN209397501U CN201821757898.7U CN201821757898U CN209397501U CN 209397501 U CN209397501 U CN 209397501U CN 201821757898 U CN201821757898 U CN 201821757898U CN 209397501 U CN209397501 U CN 209397501U
Authority
CN
China
Prior art keywords
hoist
main truss
bridge deck
pulley block
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821757898.7U
Other languages
Chinese (zh)
Inventor
刘怀刚
陈玉良
高世强
肖向荣
汪君文
吴曼
赵升辉
陈振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201821757898.7U priority Critical patent/CN209397501U/en
Application granted granted Critical
Publication of CN209397501U publication Critical patent/CN209397501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bridge floor hoist has solved the great problem of the required pulling force of current lifting steel box girder, and its technical scheme main points are, including main truss, play to rise system and hoist, play to rise the system and include the hoist engine of the lifting rope of being connected with the hoist, be equipped with the fixed pulley group on the main truss, be equipped with the running block on the hoist, lifting rope one end is fixed with the main truss, and the other end walks around the fixed pulley group in proper order and is connected in order to be pulled the promotion by the hoist engine with the running block and with the hoist engine. Through the combination of the fixed pulley block and the movable pulley block, the direction of a pull rope for lifting the steel box girder can be changed so as to be conveniently hoisted by a hoist, meanwhile, the movable pulley has a labor-saving effect, the rope section connected with the movable pulley block has N sections, and the pulling force required to be applied by the hoist is one N times of the gravity of the steel box girder and a hoist, so that the labor-saving effect is achieved, the hoisting speed is low, the hoisting speed is one N times of the hoisting speed of the hoist, the hoisting of the steel box girder is stable, and the stability of the hoisting process of the steel box girder is improved.

Description

桥面吊机Deck crane

技术领域technical field

本实用新型涉及桥梁工程领域,尤其涉及一种桥面吊机。The utility model relates to the field of bridge engineering, in particular to a bridge deck crane.

背景技术Background technique

在现有的桥梁施工中,主跨梁体多处于水中或峡谷等交通不便之处,桥梁梁体通常采用工厂化加工制造,运输至施工现场,然后采用架梁吊机或浮吊等大型架设起重设备进行吊设,但这些大型吊装设备的体积大,成本高,占用施工空间大,同时也受环境和水位等条件影响大,资源受限、施工周期长、效率低、成本费用高,给施工带来很大的局限性。吊机虽体积小,但受自身结构限制,起重能力有限,起吊大型装备时稳定性不够,存在安全隐患。In the existing bridge construction, the main span girders are mostly located in inconvenient places such as water or canyons. The bridge girders are usually manufactured in a factory, transported to the construction site, and then used for large-scale erection such as girder cranes or floating cranes. Lifting equipment is used for hoisting, but these large-scale hoisting equipment are large in size, high in cost, occupy a large construction space, and are also greatly affected by environmental and water level conditions, limited resources, long construction period, low efficiency, and high cost. Bring great limitations to the construction. Although the crane is small in size, it is limited by its own structure and its lifting capacity is limited. When lifting large equipment, its stability is not enough, and there are potential safety hazards.

实用新型内容Utility model content

本实用新型的目的旨在提供一种桥面吊机,具省力以节省能源损耗,起吊平稳的效果。The purpose of the utility model is to provide a bridge deck crane, which is labor-saving to save energy consumption and has the effect of stable lifting.

为了实现上述目的,本实用新型提供以下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:

一种桥面吊机,包括主桁架、起升系统以及吊具,所述起升系统包括与吊具连接的吊绳和卷扬吊绳的卷扬机,所述主桁架上设有定滑轮组,所述吊具上设有动滑轮组,所述吊绳一端与主桁架固定,另一端依次绕过定滑轮组和动滑轮组且与卷扬机连接以被卷扬机卷扬。A bridge deck crane includes a main truss, a hoisting system and a spreader, the hoisting system includes a hoist connected to the hanger and a hoist for hoisting the rope, the main truss is provided with a fixed pulley block, the A movable pulley block is arranged on the spreader, and one end of the suspension rope is fixed to the main truss, and the other end passes around the fixed pulley block and the movable pulley block in turn and is connected with the hoist to be hoisted by the hoist.

通过上述方案,通过定滑轮组与动滑轮组的结合,使得起吊钢箱梁的拉绳可改变方向以便于被卷扬机进行卷扬,同时动滑轮具有省力的效果,与动滑轮组连接的绳段有N段,则卷扬机所需施加的拉力为钢箱梁及吊具重力的N分之一,从而达到省力的效果,已达到减少能源损耗的效果,并且起吊速度慢,为卷扬机卷扬速度的N分之一,使得钢箱梁的起吊平稳,提高了钢箱梁起吊过程的稳定性。Through the above scheme, through the combination of the fixed pulley block and the movable pulley block, the direction of the stay rope for hoisting the steel box girder can be changed so as to be hoisted by the winch. At the same time, the movable pulley has the effect of saving labor. The pulling force required by the hoist is one-Nth of the gravity of the steel box girder and the spreader, so as to achieve the effect of labor saving and reduce energy consumption, and the lifting speed is slow, which is one-Nth of the hoisting speed of the hoist , so that the lifting of the steel box girder is stable, and the stability of the steel box girder lifting process is improved.

进一步设置:所述主桁架上设有沿桥向移动的用于安装定滑轮组的安装座,所述主桁架及安装座上设有用于调整定滑轮组位置的调节装置。Further setting: the main truss is provided with a mounting seat for installing the fixed pulley block moving along the bridge direction, and the main truss and the mounting seat are provided with an adjustment device for adjusting the position of the fixed pulley block.

进一步设置:所述调节装置包括推拉安装座沿桥向移动的纵向调节千斤顶,所述纵向调节千斤顶的反力座与所述主桁架固定,所述调节装置还包括设于安装座上用于推拉定滑轮组的横向调节千斤顶。It is further provided that: the adjustment device includes a longitudinal adjustment jack whose push-pull mounting base moves along the bridge direction, the reaction seat of the longitudinal adjustment jack is fixed to the main truss, and the adjustment device also includes a push-pull jack arranged on the installation base for pushing and pulling Lateral adjustment jack for fixed pulley blocks.

通过上述方案,通过调节装置可调节定滑轮组的纵向及横向的位置,则在连接钢箱梁时,可通过调节装置调节起吊的钢箱梁与已安装好的钢梁的位置匹配,以实现钢箱梁的连接,结构简单,操作方便。Through the above scheme, the longitudinal and lateral positions of the fixed pulley block can be adjusted through the adjustment device, and when the steel box girder is connected, the hoisted steel box girder can be adjusted to match the position of the installed steel girder through the adjustment device, so as to realize the steel box girder. The connection of the box girder is simple in structure and easy to operate.

进一步设置:所述主桁架为由两个三角形拼接形成的四边形框架结构。Further setting: the main truss is a quadrilateral frame structure formed by splicing two triangles.

通过上述方案,桁架杆件主要承受拉力或压力,可以充分发挥材料的作用,节约材料,减轻结构重量,并且三角形结构具有较高的稳定性。Through the above scheme, the truss member mainly bears tension or pressure, which can give full play to the role of materials, save materials, reduce the weight of the structure, and the triangular structure has high stability.

进一步设置:所述主桁架的顶部设有施工平台。Further setting: the top of the main truss is provided with a construction platform.

进一步设置:所述主桁架沿竖直方向还设有用于进出施工平台的上下通道。Further setting: the main truss is also provided with upper and lower passages for entering and exiting the construction platform along the vertical direction.

通过上述方案,工作人员可通过施工平台达到各个操作和检修位置,而上下通道方便工作人员进出操作平台。Through the above scheme, the staff can reach various operation and maintenance positions through the construction platform, and the upper and lower passages are convenient for the staff to enter and exit the operation platform.

进一步设置:所述吊具包括主横梁和可滑动地扣在主横梁上滑座,所述主横梁上设有推动滑座沿主横梁的长度方向移动的纵坡调节千斤顶。It is further provided that the hanger includes a main beam and a sliding seat slidably buckled on the main beam, and the main beam is provided with a vertical slope adjustment jack that pushes the sliding seat to move along the length direction of the main beam.

通过上述方案,由于主横梁通过与吊绳连接的滑座进行起吊钢箱梁,通过纵坡调节千斤顶可推动滑座沿主横梁的长度方向移动,从而可调节主横梁的水平度,使吊绳拉力中心与所吊钢箱梁重心在一条竖直线上,以确保钢箱梁的水平起吊,保证各吊点的拉力均匀。Through the above scheme, since the main beam is lifted by the sliding seat connected with the suspension rope, the vertical slope adjustment jack can push the sliding seat to move along the length direction of the main beam, thereby adjusting the levelness of the main beam and making the suspension rope The tension center and the center of gravity of the hoisted steel box girder are on a vertical line to ensure the horizontal hoisting of the steel box girder and the uniform tension of each hoisting point.

进一步设置:所述主横梁的两端设有用于连接钢箱梁的吊耳,所述吊耳与主横梁之间设有万向节。Further setting: the two ends of the main beam are provided with lifting lugs for connecting the steel box girder, and a universal joint is provided between the lifting lugs and the main beam.

通过上述方案,主横梁通过吊耳与钢箱梁的梁段吊耳连接,吊具的吊耳通过万向节与主横梁连接,可360°转动,实现吊具与梁段吊耳的快速连接,避免卡滞,减少航道占用时间。Through the above scheme, the main beam is connected to the beam section lifting lug of the steel box girder through the lifting lug, and the lifting lug of the spreader is connected to the main beam through a universal joint, which can be rotated 360° to realize the quick connection between the spreader and the beam section lifting lug , to avoid stagnation and reduce channel occupation time.

进一步设置:所述桥面吊机还包括行走系统,所述行走系统包括位于主桁架底部的行走梁,所述主桁架与行走梁之间设有分别与两者铰接的行走油缸,所述行走梁还设有与桥面相抵的穿心顶。Further setting: the bridge deck crane also includes a walking system, the walking system includes a walking beam located at the bottom of the main truss, and a walking oil cylinder hinged to the two is provided between the main truss and the walking beam, and the walking The girder is also provided with a piercing roof which is against the bridge deck.

通过上述方案,通过行走系统使得桥面吊机行走,首先通过行走油缸推动轨道触点以推动主桁架在所述行走梁上向前移动一个行程,然后用穿心顶把桥面吊机顶升,随后回缩行走油缸,并拖动行走梁向前行走与主桁架移动的行程一样的行程,然后回缩穿心顶,将轨道触点即主桁架落到行走梁上,重复上述步骤,直到桥面吊机行走到指定位置,无需工作人员重新拆装吊机,操作方便,节省时间,提高了工作效率。Through the above-mentioned scheme, the bridge deck crane is made to walk through the walking system. First, the track contact is pushed by the walking cylinder to push the main truss to move forward for a stroke on the walking beam, and then the bridge deck crane is lifted by the through-center top. , and then retract the traveling cylinder, and drag the traveling beam forward to travel the same distance as the main truss, then retract the penetrating roof, drop the track contact, that is, the main truss, onto the traveling beam, and repeat the above steps until the bridge deck When the crane travels to the designated position, there is no need for staff to disassemble the crane again, which is convenient to operate, saves time and improves work efficiency.

相比现有技术,本实用新型的方案具有以下优点:Compared with the prior art, the solution of the utility model has the following advantages:

1.通过定滑轮组与动滑轮组的结合,使得起吊钢箱梁的拉绳可改变方向以便于被卷扬机进行卷扬,同时动滑轮具有省力的效果,与动滑轮组连接的绳段有N段,则卷扬机所需施加的拉力为钢箱梁及吊具重力的N分之一,从而达到省力的效果,已达到减少能源损耗的效果,并且起吊速度慢,为卷扬机卷扬速度的N分之一,使得钢箱梁的起吊平稳,提高了钢箱梁起吊过程的稳定性。1. Through the combination of the fixed pulley block and the movable pulley block, the direction of the stay rope for hoisting the steel box girder can be changed so that it can be hoisted by the winch. The required pulling force is one-Nth of the gravity of the steel box girder and spreader, so as to achieve the effect of labor saving and reduce energy consumption, and the lifting speed is slow, which is one-Nth of the hoisting speed of the winch, so that The hoisting of the steel box girder is stable, which improves the stability of the steel box girder hoisting process.

2.通过调节装置可调节定滑轮组的纵向及横向的位置,则在连接钢箱梁时,可通过调节装置调节起吊的钢箱梁与已安装好的钢梁的位置匹配,以实现钢箱梁的连接,结构简单,操作方便。2. The longitudinal and lateral positions of the fixed pulley block can be adjusted through the adjusting device. When the steel box girder is connected, the lifting steel box girder can be adjusted to match the position of the installed steel girder through the adjusting device, so as to realize the steel box girder connection, simple structure and convenient operation.

3.主横梁通过吊耳与钢箱梁的梁段吊耳连接,吊具的吊耳通过万向节与主横梁连接,可360°转动,实现吊具与梁段吊耳的快速连接,避免卡滞,减少航道占用时间。3. The main beam is connected to the lifting lug of the beam section of the steel box girder through the lifting lug, and the lifting lug of the spreader is connected to the main beam through a universal joint, which can be rotated 360°, so as to realize the quick connection between the spreader and the lifting lug of the beam section, and avoid Stuck, reducing the channel occupation time.

4.通过行走系统使得桥面吊机行走,首先通过行走油缸推动轨道触点以推动主桁架在所述行走梁上向前移动一个行程,然后用穿心顶把桥面吊机顶升,随后回缩行走油缸,并拖动行走梁向前行走与主桁架移动的行程一样的行程,然后回缩穿心顶,将轨道触点即主桁架落到行走梁上,重复上述步骤,直到桥面吊机行走到指定位置,无需工作人员重新拆装吊机,操作方便,节省时间,提高了工作效率。4. Make the bridge deck crane walk through the walking system. First, push the track contact through the walking cylinder to push the main truss forward on the walking beam for a stroke, and then lift the bridge deck crane with the through-center top, and then Retract the walking cylinder, and drag the walking beam forward to travel the same stroke as the main truss, then retract the penetrating roof, drop the track contact, that is, the main truss, onto the walking beam, and repeat the above steps until the bridge deck crane Walking to the designated position, there is no need for staff to disassemble and assemble the crane again, which is convenient to operate, saves time and improves work efficiency.

本实用新型附加的方面和优点将在下面的描述中部分给出,这些将从下面的描述中变得明显,或通过本实用新型的实践了解到。Additional aspects and advantages of the invention will be set forth in part in the description which follows, and will become apparent from the description, or may be learned by practice of the invention.

附图说明Description of drawings

本实用新型上述的和/或附加的方面和优点从下面结合附图对实施例的描述中将变得明显和容易理解,其中:The above-mentioned and/or additional aspects and advantages of the utility model will become apparent and easy to understand from the following description of the embodiments in conjunction with the accompanying drawings, wherein:

图1为本实用新型实施例的结构示意图;Fig. 1 is the structural representation of the utility model embodiment;

图2为图1的A部放大图;Figure 2 is an enlarged view of part A of Figure 1;

图3为图1的B部放大图;Fig. 3 is an enlarged view of part B of Fig. 1;

图4为本实用新型实施例的纵向示意图;Fig. 4 is the longitudinal schematic view of the utility model embodiment;

图5为图4的C部放大图;Fig. 5 is an enlarged view of part C of Fig. 4;

图6为图4的D部放大图;Fig. 6 is an enlarged view of part D of Fig. 4;

图7为本实用新型实施例的吊绳缠绕定滑轮组及动滑轮组的示意图。Fig. 7 is a schematic diagram of a fixed pulley block and a movable pulley block wound by a suspension rope according to an embodiment of the present invention.

图中,1、主桁架;100、前支点;200、后锚点;11、上纵梁;12、下纵梁;13、立杆;14、前斜杆;15、后斜杆;16、加强筋;17、施工平台;18、上下通道;2、起升系统;21、卷扬机;22、吊绳;3、吊具;31、主横梁;32、滑座;33、吊耳;34、万向节;35、纵坡调节千斤顶;4、定滑轮组;41、安装座;5、调节装置;51、纵向调节千斤顶;52、横向调节千斤顶;6、动滑轮组;7、液压系统;8、电气系统;9、行走系统;91、行走油缸;92、行走梁;93、轨道触点;94、穿心顶;95、反扣;96、行走轮。In the figure, 1, main truss; 100, front fulcrum; 200, rear anchor point; 11, upper longitudinal beam; 12, lower longitudinal beam; Reinforcing rib; 17, construction platform; 18, upper and lower passages; 2, hoisting system; 21, winch; 22, sling; 3, spreader; 31, main beam; 32, sliding seat; 33, lifting lug; 34, Universal joint; 35. Vertical slope adjustment jack; 4. Fixed pulley block; 41. Mounting seat; 5. Adjusting device; 51. Longitudinal adjustment jack; 52. Horizontal adjustment jack; Electrical system; 9. Walking system; 91. Walking cylinder; 92. Walking beam; 93. Track contact;

具体实施方式Detailed ways

下面详细描述本实用新型的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本实用新型,而不能解释为对本实用新型的限制。Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals represent the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary, and are only used to explain the present invention, and cannot be construed as limiting the present invention.

参见图1至图7,本实用新型涉及一种桥面吊机,包括主桁架1、起升系统2以及吊具3,所述吊具3与钢箱梁连接,并且所述吊具3通过所述起升系统2以升降从而起吊钢箱梁。Referring to Fig. 1 to Fig. 7, the utility model relates to a bridge deck crane, comprising a main truss 1, a hoisting system 2 and a hanger 3, the hanger 3 is connected with a steel box girder, and the hanger 3 passes through The hoisting system 2 can lift the steel box girder by lifting.

所述起升系统2包括与所述吊具3连接的吊绳22和用于卷扬吊绳22的卷扬机21,优选地,本实施例中的吊绳22为钢丝绳。The hoisting system 2 includes a suspension rope 22 connected to the spreader 3 and a hoist 21 for hoisting the suspension rope 22. Preferably, the suspension rope 22 in this embodiment is a steel wire rope.

所述主桁架1由型钢杆件组成,体现为由两个三角形拼接形成的四边形框架结构,所述型钢杆件之间通过销轴或者联接法兰联接,所述主桁架1包括上纵梁11、下纵梁12、前斜杆14、后斜杆15以及立杆13,其中,上纵梁11、下纵梁12采用HM588×300×12×20mm型钢,前斜杆14及后斜杆15采用HW400×400×13×21mm型钢,立杆13采用HM390×300×10×16mm型钢,同时所述主桁架1的板材材质为Q345B,型钢为Q235B,联接型钢杆件之间的联接轴销采用45钢,调质处理,所述主桁架1中还设有若干加强筋16。The main truss 1 is composed of shaped steel rods, embodied as a quadrilateral frame structure formed by splicing two triangles. The shaped steel rods are connected by pins or connecting flanges. The main truss 1 includes an upper longitudinal beam 11 , lower longitudinal beam 12, front inclined bar 14, rear inclined bar 15 and vertical bar 13, wherein, upper longitudinal beam 11, lower longitudinal beam 12 adopt HM588×300×12×20mm section steel, front inclined bar 14 and rear inclined bar 15 HW400×400×13×21mm section steel is used, the vertical rod 13 is HM390×300×10×16mm section steel, and the plate material of the main truss 1 is Q345B, the section steel is Q235B, and the connecting shaft pin between the connecting section steel rods is made of 45 steel, quenched and tempered, and several reinforcing ribs 16 are also arranged in the main truss 1 .

其中,所述下纵梁12靠近所述立杆13的一端视为桥面吊机的前支点100,所述前支点100通过横梁支撑在两道横隔板上,共分8个点进行应力分散,以实现吊机的锚固,并确保钢箱梁结构在施工期间的安全,所述下纵梁12远离前支点100的一端设置有主桁架1的后锚点200(即后支点),后锚点200对应钢箱梁的吊点的作用点设置,优选地,前支点100和后锚点200的间距为17.05mm。Wherein, the end of the lower longitudinal girder 12 close to the vertical pole 13 is regarded as the front fulcrum 100 of the bridge deck crane, and the front fulcrum 100 is supported on two transverse diaphragms by a beam, and is divided into 8 points for stress. In order to realize the anchoring of the crane and ensure the safety of the steel box girder structure during construction, the rear anchor point 200 (ie, the rear fulcrum) of the main truss 1 is arranged at the end of the lower longitudinal beam 12 away from the front fulcrum 100, and the rear The anchor point 200 is set corresponding to the action point of the suspension point of the steel box girder. Preferably, the distance between the front fulcrum 100 and the rear anchor point 200 is 17.05 mm.

所述卷扬机21设置在所述主桁架1对应后锚点200的位置,所述主桁架1远离卷扬机21的一端对应钢箱梁吊点的位置设置有定滑轮组4,所述定滑轮组4包括多个,例如7个同轴设置的定滑轮,同时在所述主桁架1上还设有调节所述定滑轮组4纵向、横向位置的调节装置5,所述调节装置5包括调节所述定滑轮组4纵向位置的纵向调节千斤顶51和调节所述定滑轮组4横向位置的横向调节千斤顶52。The winch 21 is arranged at the position corresponding to the rear anchor point 200 of the main truss 1, and a fixed pulley block 4 is arranged at a position corresponding to the steel box girder lifting point at one end of the main truss 1 away from the winch 21, and the fixed pulley block 4 includes multiple One, for example, 7 coaxially arranged fixed pulleys, and an adjustment device 5 for adjusting the longitudinal and lateral positions of the fixed pulley block 4 is also provided on the main truss 1, and the adjustment device 5 includes adjusting the fixed pulley block 4 The vertical adjustment jack 51 of the longitudinal position and the horizontal adjustment jack 52 of the horizontal position of the fixed pulley block 4 are adjusted.

所述主桁架1上设有沿上纵梁11的长度方向移动的安装座41,所述上纵梁11上设有沿上纵梁11长度方向延伸且与所述安装座41相匹配的限位槽(图中未示意),所述定滑轮组4设置在所述安装座41上,所述纵向调节千斤顶51的反力座与主桁架1固定,所述纵向调节千斤顶51的活塞杆的伸出端与所述安装座41固定,所述纵向调节千斤顶51通过推动所述安装座41移动,以实现调节所述定滑轮组4的纵向位置,满足取梁要求,此外,所述横向调节千斤顶52设置在所述安装座41上,所述横向调节千斤顶52的反力座与所述安装座41固定连接,所述横向调节千斤顶52的活塞杆的伸出端与定滑轮组4固定,所述横向调节千斤顶52通过推动所述定滑轮组4移动,以实现调节定滑轮组4的横向位置,并且调整范围为±100mm。The main truss 1 is provided with a mounting seat 41 that moves along the length direction of the upper longitudinal beam 11, and the upper longitudinal beam 11 is provided with a limiter that extends along the length direction of the upper longitudinal beam 11 and matches the mounting seat 41. position slot (not shown in the figure), the fixed pulley block 4 is arranged on the mounting seat 41, the reaction seat of the longitudinal adjustment jack 51 is fixed to the main truss 1, and the extension of the piston rod of the longitudinal adjustment jack 51 The outlet end is fixed with the mounting seat 41, and the longitudinal adjustment jack 51 is moved by pushing the mounting seat 41 to realize adjusting the longitudinal position of the fixed pulley block 4 to meet the requirements for taking beams. In addition, the horizontal adjustment jack 52 It is arranged on the mounting base 41, the reaction seat of the horizontal adjustment jack 52 is fixedly connected with the mounting base 41, the protruding end of the piston rod of the horizontal adjustment jack 52 is fixed to the fixed pulley block 4, and the horizontal adjustment jack 52 is fixed to the fixed pulley block 4. The adjustment jack 52 moves by pushing the fixed pulley block 4 to realize the adjustment of the lateral position of the fixed pulley block 4, and the adjustment range is ±100mm.

所述吊具3包括主横梁31和可滑动地扣于主横梁31上的滑座32,所述滑座32的顶部设有动滑轮组6,所述动滑轮组6包括7个同轴设置的动滑轮,所述吊绳22的一端与主桁架1固定,即与定滑轮组4的轴线相对固定,所述吊绳22的另一端绕过定滑轮组4的定滑轮与动滑轮组6的动滑轮且与卷扬机21连接,以被卷扬机21进行卷扬。The spreader 3 includes a main beam 31 and a sliding seat 32 slidably buckled on the main beam 31, the top of the sliding seat 32 is provided with a movable pulley block 6, and the movable pulley block 6 includes 7 coaxially arranged movable pulleys One end of the suspension rope 22 is fixed to the main truss 1, that is, it is relatively fixed to the axis of the fixed pulley block 4, and the other end of the suspension rope 22 goes around the fixed pulley of the fixed pulley block 4 and the movable pulley of the movable pulley block 6 and connects with the hoist 21 Connect to be hoisted by hoisting machine 21.

所述主横梁31沿桥向延伸设置,所述滑座32中开设有与主横梁31相匹配的通槽(图中未标示),所述主横梁31穿过所述通槽,所述主横梁31上固定有推动所述滑座32沿主横梁31的长度方向移动的纵坡调整千斤顶,所述纵坡调节千斤顶35的缸筒与所述主横梁31固定连接,所述纵坡调节千斤顶35的活塞杆的伸出端与所述滑座32固定连接,此外,在主横梁31上螺纹连接有位于滑座32沿其移动方向两端的限位螺栓,通过限位螺栓可限制滑座32的纵向位移。The main crossbeam 31 extends along the bridge direction, and a through slot (not shown in the figure) matching the main crossbeam 31 is provided in the sliding seat 32, the main crossbeam 31 passes through the through slot, and the main crossbeam 31 passes through the through slot. The longitudinal slope adjustment jack that pushes the slide seat 32 to move along the length direction of the main beam 31 is fixed on the beam 31, the cylinder barrel of the longitudinal slope adjustment jack 35 is fixedly connected with the main beam 31, and the longitudinal slope adjustment jack The extended end of the piston rod of 35 is fixedly connected with the slide seat 32. In addition, the main beam 31 is threaded with limit bolts located at both ends of the slide seat 32 along its moving direction, and the slide seat 32 can be limited by the limit bolts. the longitudinal displacement.

所述主桁架1的顶部还布置有施工平台17,以方便工作人员到达各个操作和检修位置,所述施工平台17采用φ48×3.5mm的小钢管制作,同时在主桁架1还设有沿竖直方向延伸的上下通道18,通过所述上下通道18以便于工作人员进出施工平台17。The top of the main truss 1 is also equipped with a construction platform 17 to facilitate the staff to reach various operation and maintenance positions. The construction platform 17 is made of small steel pipes of φ48×3.5mm, and the main The vertically extending upper and lower passages 18 pass through the upper and lower passages 18 so that workers can enter and exit the construction platform 17 .

所述主横梁31的两端还设有与钢箱梁连接的吊耳33,所述吊耳33与主横梁31之间设置有万向节34。Both ends of the main beam 31 are also provided with lifting lugs 33 connected to the steel box girder, and a universal joint 34 is arranged between the lifting lugs 33 and the main beam 31 .

该桥面吊机还包括液压系统7、电气系统8以及行走系统9。The deck crane also includes a hydraulic system 7 , an electrical system 8 and a traveling system 9 .

所述行走系统9由行走油缸91、行走梁92、轨道触点93以及穿心顶94,所述轨道触点93与主桁架1的前支点100的横梁固定,所述行走油缸91的缸筒地段与所述行走梁92的上表面铰接,所述行走油缸91的活塞杆的伸出端与轨道触点93铰接,并且所述穿心顶94的压力座与所述主桁架1固定,所述穿心顶94的活塞杆的伸出端与桥面相抵。The walking system 9 is composed of a walking oil cylinder 91, a walking beam 92, a track contact 93 and a piercing top 94. The track contact 93 is fixed to the crossbeam of the front fulcrum 100 of the main truss 1, and the cylinder barrel of the walking oil cylinder 91 The section is hinged to the upper surface of the walking beam 92, the protruding end of the piston rod of the walking cylinder 91 is hinged to the track contact 93, and the pressure seat of the piercing roof 94 is fixed to the main truss 1, so The protruding end of the piston rod that passes through the center top 94 is against the bridge deck.

此外,轨道触点93的下端设有与行走梁92配合的反扣95,当所述穿心顶94顶升桥面吊机时,所述反扣95不脱离所述行走梁92,在桥面吊机行走的过程中,所述行走梁92扣合在反扣95内,并且通过反扣95的设计,可起到导向的作用,并且保证所述行走梁92与所述轨道触点93的活动间隙,又避免所述行走梁92与所述轨道触点93的脱离。In addition, the lower end of the track contact 93 is provided with a buckle 95 that is matched with the walking beam 92. When the through-center roof 94 lifts the bridge deck crane, the buckle 95 does not break away from the walking beam 92. During the walking process of the surface crane, the walking beam 92 is buckled in the reverse buckle 95, and the design of the reverse buckle 95 can play a guiding role, and ensure that the walking beam 92 and the track contact 93 The movable clearance of the walking beam 92 and the track contact 93 are prevented from being disengaged.

所述桥面吊机对应后锚点200的位置还设置有行走轮96。The position corresponding to the rear anchor point 200 of the bridge deck crane is also provided with traveling wheels 96 .

该桥面吊机的各个调整动作都是采用液压系统7进行驱动,降低了人员的工作强度,提高了工作效率,吊具3的起吊配备一台泵站,安装在所述主横梁31上,吊具3自带遥控启动,无需外接电源,另外整机还配备一台泵站,给行走油缸91、定滑轮组4的调节装置5供油,而穿心顶94则配备手提泵站,方便移位操作。Each adjustment action of the deck crane is driven by the hydraulic system 7, which reduces the work intensity of the personnel and improves work efficiency. The hoisting of the spreader 3 is equipped with a pump station, which is installed on the main beam 31. The spreader 3 has its own remote control start without external power supply. In addition, the whole machine is also equipped with a pump station to supply oil to the travel oil cylinder 91 and the adjustment device 5 of the fixed pulley block 4. bit manipulation.

该桥面吊机的电气系统8是通过无线遥控控制整机的操作,PLC进行数据处理,变频器控制起升系统2频率进行调速,同时,还配备称重传感器、起升高度限制器、起升高度上下限位、大风报警仪等安装保护装置。The electrical system 8 of the bridge deck crane controls the operation of the whole machine through wireless remote control, the PLC performs data processing, and the frequency converter controls the frequency of the lifting system 2 to adjust the speed. At the same time, it is also equipped with weighing sensors, lifting height limiters, The upper and lower limits of the lifting height and the gale alarm are installed with protective devices.

本实用新型的桥面吊机的安装步骤如下:The installation steps of the bridge deck crane of the present utility model are as follows:

桥面吊机利用塔吊分散件吊装到索塔区钢箱梁桥面上进行拼装,桥面吊机拼装完毕后,可进行空载、加载和同步进行调试实验。The bridge deck crane is hoisted to the steel box girder bridge deck in the cable tower area by using the scattered parts of the tower crane for assembly. After the bridge deck crane is assembled, it can carry out no-load, loading and synchronous debugging experiments.

首先,在索塔区钢箱梁桥面上安装桥面吊机前支点100和后锚点200,随后,安装上纵梁11、下纵梁12、立杆13、前斜杆14以及后斜杆15,并安装节点结构以稳固桁架结构,并且在主桁架1中安装加强筋16以加强主桁架1的稳定性,接着,安装工作平台和上下通道18,最后,安装起升系统2、定滑轮组4、电气系统8、液压系统7及吊具3和动滑轮组6。First, install the front fulcrum 100 and the rear anchor point 200 of the deck crane on the steel box girder bridge deck in the cable tower area, and then install the upper longitudinal beam 11, the lower longitudinal beam 12, the vertical pole 13, the front inclined pole 14 and the rear inclined rod 15, and install the node structure to stabilize the truss structure, and install ribs 16 in the main truss 1 to strengthen the stability of the main truss 1, then install the working platform and the upper and lower passages 18, and finally install the lifting system 2, fixed Pulley block 4, electrical system 8, hydraulic system 7, spreader 3 and movable pulley block 6.

桥面吊机安装好之后,根据要求进行荷载试验,检验桥面吊机的主要技术性能,其目的是检验桥面吊机及其各部分的结构承载能力,验证其即将进行的桥面吊装作业是否可靠,以保障桥面吊机的正常运行。After the bridge deck crane is installed, carry out the load test according to the requirements to check the main technical performance of the bridge deck crane. The purpose is to test the structural bearing capacity of the bridge deck crane and its various parts, and verify its upcoming bridge deck hoisting Whether it is reliable to ensure the normal operation of the bridge deck crane.

空载试验主要进行以下内容:⑴、抬起下降,调平试验;⑵、行走试验;(3)起升试验。The no-load test mainly carries out the following contents: (1) Lifting and lowering, leveling test; (2) Walking test; (3) Lifting test.

静载试验的目是检桥面吊机以及各结构件承能力,如未见到裂纹、永久变形、油漆剥落或对桥面吊机的性能与安全有影响损坏,连接处也没出现松动伤,受力最不利点应力变在规范围内,则认为该项试验的结果合格。The purpose of the static load test is to check the bearing capacity of the deck crane and various structural parts. If there is no crack, permanent deformation, paint peeling or damage to the performance and safety of the bridge deck crane, there is no looseness at the connection. , and the stress strain at the most unfavorable point under force is within the specified range, the test result is considered qualified.

试验完毕后可利用桥面吊机进行钢箱梁的吊装,其具体步骤如下:After the test is completed, the bridge deck crane can be used to hoist the steel box girder. The specific steps are as follows:

吊具3与装节段采用专门设计的万向转动耳,可360度转动,实现吊具3与梁段吊耳33的快速连接,避免卡滞,减少航道占用时间。The spreader 3 and the loading section adopt specially designed universal swivel lugs, which can rotate 360 degrees, so as to realize the quick connection between the spreader 3 and the lifting lug 33 of the beam section, avoiding stagnation and reducing the time occupied by the waterway.

拧松主横梁31位于滑座32两端的螺栓,并且通过移动螺栓,改变螺栓的位置以对滑座32的移动范围起到限制,随后连接梁段吊耳33与吊具3,缓慢收紧吊绳22使得各吊点开始受力,用水平尺测量吊具3是否水平,如不水平可通过吊具3上的纵坡调整千斤顶调整滑座32的位置,确保钢箱梁水平起吊,进而保证各吊点均匀受力。Loosen the bolts on both ends of the main beam 31 at the two ends of the slider 32, and change the position of the bolts by moving the bolts to limit the movement range of the slider 32, then connect the lifting lug 33 of the beam section and the lifting device 3, and slowly tighten the lifting The rope 22 makes each lifting point start to bear force, and use a spirit level to measure whether the spreader 3 is level. If it is not level, the position of the sliding seat 32 can be adjusted through the vertical slope adjustment jack on the spreader 3 to ensure that the steel box girder is lifted horizontally, thereby ensuring Each lifting point is evenly stressed.

当梁段吊装至桥面附近时,采用主桁架1上的调节装置5调节该段钢箱梁至已安装好的钢箱梁边缘30mm内,然后利用吊具3上的纵坡调节千斤顶35调节桥面纵坡,使其与已安装的钢箱梁对应位置处上下接口的缝隙宽度大致相等;横坡调节则由所使用的左右侧吊机抬吊高度差来控制。When the beam section is hoisted to the vicinity of the bridge deck, use the adjustment device 5 on the main truss 1 to adjust the section of steel box girder to within 30mm of the edge of the installed steel box girder, and then use the vertical slope adjustment jack 35 on the spreader 3 to adjust The longitudinal slope of the bridge deck makes it roughly equal to the gap width of the upper and lower interfaces at the corresponding positions of the installed steel box girder; the adjustment of the transverse slope is controlled by the lifting height difference of the left and right side cranes used.

随后,利用桥面吊机前端的纵向调节千斤顶51驱使钢箱梁纵向移动,使梁段向已安装梁段缓慢靠拢,同时拉动布置于两梁段间的纵向和斜向手拉葫芦,使梁段向已安装钢箱梁靠拢。钢箱梁轴线及偏角的调整采用在箱梁左右两侧采用手拉葫芦或者千斤顶进行前后牵拉或顶推达到箱梁轴线调节的效果。反复微调,使钢箱梁与已安装梁段对应位置处的顶、底板处的止顶板对齐。Subsequently, use the longitudinal adjustment jack 51 at the front end of the bridge deck crane to drive the steel box girder to move longitudinally, so that the beam section slowly moves closer to the installed beam section, and at the same time pull the longitudinal and oblique hand chain hoists arranged between the two beam sections to make the beam section The section moves closer to the installed steel box girder. Steel box girder axis and deflection angle are adjusted by using hand chain hoists or jacks on the left and right sides of the box girder to pull or push back and forth to achieve the effect of box girder axis adjustment. Repeated fine-tuning to align the steel box girder with the roof stop plate at the corresponding position of the installed beam section and the bottom plate.

当焊接好该节钢箱梁后,可继续安装下一节的钢箱梁,此时,结束主桁架1与桥面的锚固,通过行走系统9使得桥面吊机行走,首先通过行走油缸91推动轨道触点93以推动主桁架1在所述行走梁92上向前移动一个行程,然后用穿心顶94把桥面吊机顶升,此时,桥面吊机与行走梁92不相贴,但由于反扣95将轨道触点93与行走梁92扣合,两者不分离,随后回缩行走油缸91,并拖动行走梁92向前行走与主桁架1移动的行程一样的行程,然后回缩穿心顶94,将轨道触点93即主桁架1落到行走梁92上,重复上述步骤,直到桥面吊机行走到指定位置,行走完成后再次对主桁架1进行锚固。After this section of steel box girder is welded, the next section of steel box girder can be installed. At this time, the anchorage between the main truss 1 and the bridge deck is finished, and the bridge deck crane is made to walk through the walking system 9. First, the walking cylinder 91 Push the track contact 93 to move the main truss 1 forward on the walking beam 92 for a stroke, and then lift the bridge deck crane with the through-center roof 94. At this time, the bridge deck crane is not in phase with the walking beam 92 However, because the buckle 95 buckles the track contact 93 and the walking beam 92, the two are not separated, and then the walking cylinder 91 is retracted, and the walking beam 92 is dragged forward to travel the same stroke as the main truss 1. , then retract the piercing roof 94, drop the track contact point 93, that is, the main truss 1 onto the walking beam 92, repeat the above steps until the bridge deck crane travels to the designated position, and then anchor the main truss 1 again after the walking is completed.

此外,吊机通过定滑轮组4与动滑轮组6的配合以起吊吊具3,并且定滑轮的个数与动滑轮的个数总和为14个,则使得吊具3的起吊速度为卷扬机21卷扬速度的1/14,而钢箱梁与吊具3的重量为卷扬机所施加的拉力的14倍,从而起到省力的作用。In addition, the crane lifts the spreader 3 through the cooperation of the fixed pulley 4 and the movable pulley 6, and the sum of the fixed pulley and the movable pulley is 14, so that the lifting speed of the spreader 3 is the hoisting speed of the hoist 21 1/14 of that, and the weight of the steel box girder and the spreader 3 is 14 times of the pulling force applied by the winch, thereby saving labor.

以上所述仅是本实用新型的部分实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The foregoing is only a partial implementation of the utility model, and it should be pointed out that for those of ordinary skill in the art, some improvements and modifications can also be made without departing from the principle of the utility model. Retouching should also be regarded as the scope of protection of the present utility model.

Claims (9)

1.一种桥面吊机,其特征是:包括主桁架、起升系统以及吊具,所述起升系统包括与吊具连接的吊绳和卷扬吊绳的卷扬机,所述主桁架上设有定滑轮组,所述吊具上设有动滑轮组,所述吊绳一端与主桁架固定,另一端依次绕过定滑轮组和动滑轮组且与卷扬机连接以被卷扬机卷扬。1. a deck crane, it is characterized in that: comprise main truss, hoisting system and spreader, described hoisting system comprises the winch of the sling that is connected with sling and hoisting sling, on described main truss A fixed pulley block is provided, and a movable pulley block is provided on the spreader. One end of the suspension rope is fixed to the main truss, and the other end of the sling bypasses the fixed pulley block and the movable pulley block in turn and is connected with the hoist to be hoisted by the hoist. 2.根据权利要求1所述的桥面吊机,其特征是:所述主桁架上设有沿桥向移动的用于安装定滑轮组的安装座,所述主桁架及安装座上设有用于调整定滑轮组位置的调节装置。2. The bridge deck crane according to claim 1, characterized in that: the main truss is provided with a mounting seat for mounting the fixed pulley block moving along the bridge direction, and the main truss and the mounting seat are provided with a Adjusting device for adjusting the position of the fixed pulley block. 3.根据权利要求2所述的桥面吊机,其特征是:所述调节装置包括推拉安装座沿桥向移动的纵向调节千斤顶,所述纵向调节千斤顶的反力座与所述主桁架固定,所述调节装置还包括设于安装座上用于推拉定滑轮组的横向调节千斤顶。3. The bridge deck crane according to claim 2, characterized in that: the adjustment device includes a longitudinal adjustment jack whose push-pull mounting base moves along the bridge direction, and the reaction seat of the longitudinal adjustment jack is fixed to the main truss , the adjustment device also includes a horizontal adjustment jack arranged on the mounting base for pushing and pulling the fixed pulley block. 4.根据权利要求1所述的桥面吊机,其特征是:所述主桁架为由两个三角形拼接形成的四边形框架结构。4. The bridge deck crane according to claim 1, characterized in that: the main truss is a quadrilateral frame structure formed by splicing two triangles. 5.根据权利要求1或4所述的桥面吊机,其特征是:所述主桁架的顶部设有施工平台。5. The bridge deck crane according to claim 1 or 4, characterized in that: the top of the main truss is provided with a construction platform. 6.根据权利要求5所述的桥面吊机,其特征是:所述主桁架沿竖直方向还设有用于进出施工平台的上下通道。6. The bridge deck crane according to claim 5, characterized in that: the main truss is also provided with upper and lower passages for entering and leaving the construction platform along the vertical direction. 7.根据权利要求1所述的桥面吊机,其特征是:所述吊具包括主横梁和可滑动地扣在主横梁上的滑座,所述主横梁上设有推动滑座沿主横梁的长度方向移动的纵坡调节千斤顶。7. The bridge deck crane according to claim 1, characterized in that: the spreader includes a main beam and a slide seat slidably buckled on the main beam, and the main beam is provided with a push slide seat along the main beam. Slope adjustment jacks that move along the length of the beam. 8.根据权利要求7所述的桥面吊机,其特征是:所述主横梁的两端设有用于连接钢箱梁的吊耳,所述吊耳与主横梁之间设有万向节。8. The bridge deck crane according to claim 7, characterized in that: the two ends of the main beam are provided with lifting lugs for connecting the steel box girder, and a universal joint is provided between the lifting lugs and the main beam . 9.根据权利要求1所述的桥面吊机,其特征是:还包括行走系统,所述行走系统包括位于主桁架底部的行走梁,所述主桁架与行走梁之间设有分别与两者铰接的行走油缸,所述行走梁还设有与桥面相抵的穿心顶。9. The bridge deck crane according to claim 1, characterized in that: it also includes a walking system, the walking system includes a walking girder positioned at the bottom of the main truss, and two separate and two Or a hinged walking oil cylinder, and the walking beam is also provided with a piercing top that is against the bridge deck.
CN201821757898.7U 2018-10-26 2018-10-26 Deck crane Expired - Fee Related CN209397501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821757898.7U CN209397501U (en) 2018-10-26 2018-10-26 Deck crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821757898.7U CN209397501U (en) 2018-10-26 2018-10-26 Deck crane

Publications (1)

Publication Number Publication Date
CN209397501U true CN209397501U (en) 2019-09-17

Family

ID=67879154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821757898.7U Expired - Fee Related CN209397501U (en) 2018-10-26 2018-10-26 Deck crane

Country Status (1)

Country Link
CN (1) CN209397501U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111453630A (en) * 2020-05-09 2020-07-28 中铁第五勘察设计院集团有限公司 Bridge deck crane and using method thereof
CN111532999A (en) * 2020-04-28 2020-08-14 中铁大桥局集团有限公司 A beam erecting crane and a beam erecting method
CN111620244A (en) * 2020-06-05 2020-09-04 招商局重庆交通科研设计院有限公司 a bridge crane
CN111719439A (en) * 2020-07-24 2020-09-29 中交二公局第二工程有限公司 Device, system and method for walking reverse buckle of bridge deck crane
CN111926716A (en) * 2020-08-20 2020-11-13 中交路桥华南工程有限公司 Method for accurately adjusting position of steel box girder by using bridge deck crane
CN112695644A (en) * 2020-12-30 2021-04-23 中交路桥华南工程有限公司 Bridge floor crane and rear anchor mechanism thereof
CN114108478A (en) * 2021-11-30 2022-03-01 合建卡特工业股份有限公司 Steel box and truss combined bridge deck crane support anchor system and walking method
CN114657901A (en) * 2022-03-16 2022-06-24 中铁大桥局集团第一工程有限公司 Interim landing stage demolishs device
CN115092825A (en) * 2022-07-08 2022-09-23 中鹏联合重工集团有限公司 Novel bridge deck hoisting device and using method
CN115613476A (en) * 2022-12-05 2023-01-17 长沙市规划设计院有限责任公司 A method for erecting a continuous Feiyan truss arch bridge with low rise-span ratio without supports

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111532999A (en) * 2020-04-28 2020-08-14 中铁大桥局集团有限公司 A beam erecting crane and a beam erecting method
CN111453630A (en) * 2020-05-09 2020-07-28 中铁第五勘察设计院集团有限公司 Bridge deck crane and using method thereof
CN111620244A (en) * 2020-06-05 2020-09-04 招商局重庆交通科研设计院有限公司 a bridge crane
CN111719439A (en) * 2020-07-24 2020-09-29 中交二公局第二工程有限公司 Device, system and method for walking reverse buckle of bridge deck crane
CN111719439B (en) * 2020-07-24 2024-05-31 中交二公局第二工程有限公司 A bridge crane travel reverse lock device, system and method
CN111926716A (en) * 2020-08-20 2020-11-13 中交路桥华南工程有限公司 Method for accurately adjusting position of steel box girder by using bridge deck crane
CN112695644A (en) * 2020-12-30 2021-04-23 中交路桥华南工程有限公司 Bridge floor crane and rear anchor mechanism thereof
CN114108478A (en) * 2021-11-30 2022-03-01 合建卡特工业股份有限公司 Steel box and truss combined bridge deck crane support anchor system and walking method
CN114108478B (en) * 2021-11-30 2024-02-23 中国铁建大桥工程局集团有限公司 A steel box truss combined deck crane support and anchor system and walking method
CN114657901A (en) * 2022-03-16 2022-06-24 中铁大桥局集团第一工程有限公司 Interim landing stage demolishs device
CN115092825A (en) * 2022-07-08 2022-09-23 中鹏联合重工集团有限公司 Novel bridge deck hoisting device and using method
CN115613476A (en) * 2022-12-05 2023-01-17 长沙市规划设计院有限责任公司 A method for erecting a continuous Feiyan truss arch bridge with low rise-span ratio without supports

Similar Documents

Publication Publication Date Title
CN104453231B (en) Gantry type building construction hoisting device and its manufacturing and construction method
CN103437298B (en) Prefabricated concrete box girder hoisting method and hoisting device
CN207361624U (en) A kind of multi-functional walking erection crane structure
CN201411900Y (en) Hydraulic die lifter for chimneys
CN204298743U (en) Rope traction and the all-hydraulic deck unit erection gantry of lifting
CN102953553B (en) Method for mounting large-span pipe truss by using boom luffing mechanism
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN110396931A (en) A kind of excessively cable-styled erection crane of center double plane cable stayed bridge and its construction method
CN201485194U (en) 60T walking type full-swing erecting crane
CN105645275B (en) Cable hoist and its construction method
CN100522793C (en) Installing method of portal crane
CN105484166B (en) A kind of ladder type masts type cantilever loop wheel machine
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN113882281B (en) Hanging basket walking system for bridge cantilever construction and operation method
CN208994999U (en) Mobile cable crane device
CN209397500U (en) Spreader for bridge deck crane
CN205171374U (en) A towed instrument derrick rig that is used for steel pipe truss concrete hunch bridge crane pole to change
CN105970981A (en) High slope construction lifting platform and construction method thereof
CN201762035U (en) A simple driving movable arm
CN210103322U (en) Self-driven urban underground prefabricated comprehensive pipe gallery laying and hoisting machine
CN112758803A (en) Overhead hook replacement technology for hoisting prefabricated box girder
CN221917159U (en) Self-unloading device for crane boom of tower crane
CN204569237U (en) A kind of oscillating type pole equilibrium arm
CN220643888U (en) Descending system of climbing arch crane for cantilever hoisting
CN219670013U (en) Hoisting system suitable for long and narrow tunnel anchor hole with multiple dip angles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190917

CF01 Termination of patent right due to non-payment of annual fee