CN2701914Y - 砼预制拼装多用塔机基础 - Google Patents

砼预制拼装多用塔机基础 Download PDF

Info

Publication number
CN2701914Y
CN2701914Y CN 200420080405 CN200420080405U CN2701914Y CN 2701914 Y CN2701914 Y CN 2701914Y CN 200420080405 CN200420080405 CN 200420080405 CN 200420080405 U CN200420080405 U CN 200420080405U CN 2701914 Y CN2701914 Y CN 2701914Y
Authority
CN
China
Prior art keywords
foundation
tower crane
bolt
piece
concrete precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200420080405
Other languages
English (en)
Inventor
从卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cong Weimin
JIANGSU XINTA CONSTRUCTION NEW TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34777944&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN2701914(Y) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 200420080405 priority Critical patent/CN2701914Y/zh
Application granted granted Critical
Publication of CN2701914Y publication Critical patent/CN2701914Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种砼预制拼装多用塔机基础,它由不同形状砼预制件的中心件、过渡件、端件通过柔性材料穿孔联接成十字形组合体,再在十字形组合体的相应构件上扣压配重件;组合体的过渡件、端件上设有多种组合的地脚螺栓孔,在塔机和基础固定时可根据机型选择相应孔通过地脚螺栓固定;在组合体构件之间,设置了抗剪凹凸件;过渡件可以多块串联组合,以增加受力面积;如配以桩基还可适应地耐力较低的场地使用。整个塔机基础的平面呈八角风车形,整体稳固,安全可靠,实现了一次投入、反复使用和“一基”多用,节约了大量人力、材料,也消除了砼废弃物的污染,是目前中小型固定式起重机理想的新型基础,特别适合东部沿海地区使用。

Description

砼预制拼装多用塔机基础
技术领域:
本实用新型涉及建筑机械安装固定砼基础,具体地说涉及砼预制拼装多用塔机基础。
背景技术:
目前建筑施工中,固定式起重机基础,大多采用整体式现浇砼基础,因其施工周期长,只能一次使用,用毕拆除,造成人力、物力的大量浪费,同时污染环境。近两年已有预制件组合式塔机基础问世,因其砼构件采用螺栓联接,砼构件的每个结合面均设有螺栓联接装置,因此预制和现场组装较复杂,且螺栓易锈蚀,而且这种预制件组合式塔机基础不能用于多用机型,从而限制了这种基础的推广使用。
发明内容:
发明目的:本实用新型的目的和任务,是提供一种砼构件组合时联接简单,简作方便,联接物不易锈蚀,能适合多种规格机型使用的塔机基础。
技术方案:
为解决上述问题,本实用新型的砼预制拼装多用塔机基础,包括预制件及其组合体,组合体的联接紧固装置,抗剪凹凸件,塔机固定装置;它的联接紧固装置是在过渡件、端件的两端面轴向中心偏下位置设有联接孔相通,中心件的四端面设有同样的联接孔,各预制件组装时孔孔平行相通;在端件端部联接孔的外周设有锚垫板和螺旋筋,以增加此处强度和配合联接物的张拉与紧固;中心件、过渡件、端件采用柔性材料穿孔联接成十字形组合体,所述的柔性材料为钢绞线,钢绞线在端件的端部通过张拉,再用锚板7、夹板8紧固,所述的柔性材料也可以用工程材料;在过渡件之间,端件之间分别压有中间配重件和边缘抗扭配重件;塔机的固定装置,是在过渡件和端件上设有多种组合的地脚螺栓孔,以适应不同机型要求,在塔机和基础固定时可选择相应孔通过地脚螺栓固定。
作为本实用新型应用范围的进一步拓展,为了适应大负荷吊装要求,过渡件可以多块串联组合;对于地耐力较低的施工场地可以打桩,在过渡件、端件上设置与桩基联接的螺栓孔,用螺栓将过渡件、端件与桩基联接固定。
有益效果:
一、本实用新型在砼预制件拼装塔机基础时,仅需将柔性联接物从构件的联接孔中穿出,在两端作固定即可,避免了构件之间用螺栓固定的操作难度,同时也降低了预制件的成本。
二、采用柔性材料联接,其抗拉、抗弯的作用均强于已有技术,而且不易锈蚀。
三、在砼构件上设有多种组合的地脚螺栓孔,能根据不同规格塔机,选择相应孔位固定;加之设置了配重件,且过渡件可根据需要增加,适应了大负荷要求;同时,配以桩基可适应地耐力较低的场地使用。真正实现了“一基”多用。
综上,本实用新型的推广使用,能大大缩短了塔机安装时间,提高了塔机的利用率和机动性。多用塔机基础一基多用,加快了基础的周转速度。把现场湿作业操作变为工厂化生产,现场拼装,基础质量有可靠保证。实现了一次投入、反复使用,节约了塔机使用成本中占相当比例的基础费用,同时节约了大量人力、材料,也消除了砼废弃物的污染。由于基础底面积加大,可降低地基的地耐力的要求,基础的端件加大,增加抗倾覆能力,基础的抗扭配重件与基础联成抗扭整体,加大基础的自身重量等等,可以说本实用新型砼预制拼装多用塔机基础,是目前中小型固定式起重机理想的新型基础,特别适合东部沿海地区使用。
附图说明:
下面结合附图和具体实施方式对本实用新型作进一步详细的说明:
图1为本实用新型塔机基础俯视图。
图2为图1A-A剖视图。
图3为图1B-B剖视图。
图4为部份预埋件示意图。
图5为图4C-C剖视图。
图6为图5局部放大及锚固示意图。
图7为图6D-D剖视图。
图8为图4的凹凸件放大图
图9为塔机基础与桩基联接固定示意图
具体实施方式:
由图1可知,砼预制拼装多用塔机基础,是由多块不同形状的砼预制件拼装组合而成,从图4可知,用于拼装组合的砼预制件在制作时,需将塔机基础的联接紧固装置,抗剪凹凸件,塔机固定装置等先作预埋。
联接孔6是塑料管14预埋在过渡件2、端件3的轴向中心偏下位置(如图2、图3所示),对于中心件1则是按上述位置十字交叉预埋,从而在中心件1、过渡件2、端件3之间形成孔孔相通,使拼装件处于同一水平面上(如图4所示)。在端件端部塑料管14的一周预埋有钢(铁)锚垫板17,同时,围绕锚垫板17预埋有多圈螺旋钢筋(如图5、图6所示)。
在过渡2、端件3上,于地脚螺栓孔10的相应位置预埋螺栓盒11(如图2、3、4、5所示),所述的螺栓盒11为栓管与底盒垂直粘接组成,底盒可以是方形、月牙形、圆形,以上部为一平面较佳,在本实用新型中螺栓盒为月牙形,月牙形的上部为平面(如图5、所示),平面内侧设有相应孔的钢垫板19(如图2、3所示)。
为了防止构件受力后位移,提高构件之间的抗剪能力,本实用新型在中心件1与过渡件2之间,过渡2与端件3之间,设置了抗剪件,由精密铸造的凹件15,凸件16组合而成(如图8所示),凹凸件垂直于相邻两构件的结合面埋置,即凹件凹头向混凝土,凹面与构件结合面相平,凸件凸头垂直突出预制件的结合面,在凹凸件的背面均焊有钢筋,将剪力传递至混凝土基础。
成型的砼预制件,中心件形状为十字倒T形体,过渡件2、端件3的横断面为倒T形,倒T行底边为L形(如图2、图3所示),中间配重件4,边缘抗扭配重件5横断面为矩形,两侧为L形,当中间配重件、边缘配重件分别扣压在过渡件2、端件3上时,它们的L形相吻合(如图2、图3所示)。
拼装组合:以中小型塔机为例,塔机基础由中心件1一件,过渡2四件n(n为过渡件级数,中小型塔机基础n=1),端件3四件按规定位置排列成十字形,用钢绞线13穿过联接孔6进行联接固定(图4、图6所示),为了防止锈蚀,钢绞线13涂抹防锈蚀材料(如黄油)后,套上柔性套管18(如图7所示),钢绞线13在端件的端部通过张拉,再用锚板7、夹板8紧固(如图6所示)。钢绞线13在使用一次后,由于锚固的原因,在钢绞线上留下刻痕,刻痕部不能再锚固,本实用新型采用两端张拉法,即钢绞线预留一定的长度,在两端锚固位置可以自由移动,保证了钢绞线的重复使用,当然,如果采用一端张拉、一端固定的方式,可以在张拉端增垫钢板,也可以克服钢绞线刻痕处再次被锚固的缺陷。
塔机十字形组合体拼装完毕后,再将中间配重件4四块,边缘抗扭配重件5四块分别扣压到过渡件2、端件3上,则完成了整个塔机基础的拼装,基础平面呈八角风车形(如图1所示)。由于中心件1、过渡件2、端件3等设计呈倒T形(如图2、图3所示),扩大了基础受力面积,使其承载力和抗倾覆力明显加大,加之中间配重件,边缘抗扭配重件悬空扣压于过渡件、端件上(如图2、图3所示),既抵抗塔机的扭力,又充分利用构件上的覆土增加配重,从而提高了基础的安全度。
在现场施工中,根据塔机机型、规格,选择相应的地脚螺栓孔,如单孔、双孔、多孔,用地脚螺栓9作固定即可(如图1、2、3所示)。
对于大吨位塔机来说,可以增加过渡件2的级数,也就是说过渡件2可以多块串联组合,达到增大基础的受力面积和增加配重,以适应大负荷吊装要求。
对于地耐力较低的施工场地,为了能满足要求,可以采用以下措施来解决,在过渡件2、端件3的轴线两侧,设置与桩基联接的螺栓孔20(如图9所示),并在桩基上设置相应联接螺栓,用螺栓将渡件2、端件3与桩基21联接为一体。从而保证了塔机基础整体稳固、安全可靠,适应各类地基要求。

Claims (9)

1、砼预制拼装多用塔机基础,包括多块砼预制件及其组合体,组合体的联接紧固装置、抗剪凹凸件及塔机固定装置,其特征在于:
(一)它的联接紧固装置是在过渡件(2)、端件(3)的两端面轴向中心偏下位置有联接孔(6),中心件(1)四个端面有同样设置的联接孔(6),端件(3)的端部联接孔(6)的外周设有锚垫板(17)、螺旋筋(12),中心件(1)、过渡件(2)、端件(3)用柔性材料联接,柔性材料通过锚板(7)和夹板(8)紧固;
(二)过渡件(2)之间,端件(3)之间分别压有中间配重件(4)、边缘抗扭配重件(5);
(三)塔机固定装置是在过渡件(2)、端件(3)上设有多种组合的地脚螺栓孔(10)。
2、如权利要求1所述的砼预制拼装多用塔机基础,其特征在于联接孔(6)为构件中预埋的塑料管(14)。
3、如权利要求1所述的砼预制拼装多用塔机基础,其特征在于所述的柔性材料为钢绞线(13),也可采用工程材料联接。
4、如权利要求1或3所述的砼预制拼装多用塔机基础,其特征在于所述的钢绞线(13)外周有柔性套管(18)。
5、如权利要求1所述的砼预制拼装多用塔机基础,其特征在于中间配重件(4)、边缘抗扭配重件(5)两侧为L形,与过渡件(2)、端件(3)两侧的L形相吻合。
6、如权利要求1所述的砼预制拼装多用塔机基础,其特征在于所述的地脚螺栓孔(10)为设置在过渡件(2)、端件(3)中的螺栓盒(11)的栓管孔,栓管孔的上端平于构件表面。
7、如权利要求1或6所述的砼预制拼装多用塔机基础,其特征在于螺栓盒(11)为栓管与底盒的垂直粘接,底盒可以是方形、月牙形、圆形,以上部为一平面较佳,平面内侧设有相应孔的钢垫板(19)。
8、如权利要求1所述的砼预制拼装多用塔机基础,其特征在于多种组合的地脚螺栓孔(10)是指塔机与基础的固定,可根据机型选择相应地脚螺栓孔(10)的单孔、双孔、多孔用地脚螺栓(9)联接固定。
9、如权利要求1所述的砼预制拼装多用塔机基础,其特征在于可以在端件(3)轴线两侧设置与桩基固定的螺栓孔(20),端件(3)与桩基(21)用螺栓联接固定。
CN 200420080405 2004-10-18 2004-10-18 砼预制拼装多用塔机基础 Expired - Lifetime CN2701914Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420080405 CN2701914Y (zh) 2004-10-18 2004-10-18 砼预制拼装多用塔机基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420080405 CN2701914Y (zh) 2004-10-18 2004-10-18 砼预制拼装多用塔机基础

Publications (1)

Publication Number Publication Date
CN2701914Y true CN2701914Y (zh) 2005-05-25

Family

ID=34777944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420080405 Expired - Lifetime CN2701914Y (zh) 2004-10-18 2004-10-18 砼预制拼装多用塔机基础

Country Status (1)

Country Link
CN (1) CN2701914Y (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831918A (zh) * 2010-05-11 2010-09-15 徐州九鼎建设集团有限公司 预应力拼装箱型预制混凝土塔吊基础
CN101537662B (zh) * 2009-04-17 2011-05-18 从卫民 砼预制拚装塔机基础预制中连接孔道定位方法
CN102080383A (zh) * 2010-12-31 2011-06-01 中国二十二冶集团有限公司 悬空式预埋件、预留孔洞模板固定方法
CN102296626A (zh) * 2011-05-18 2011-12-28 从卫民 砼预制拼装塔机基础多组合地脚螺栓孔
CN102373806A (zh) * 2010-08-11 2012-03-14 中国市政工程东北设计研究总院 混凝土预制构件角接组合装配新方法
CN102587408A (zh) * 2012-03-26 2012-07-18 秦大春 一种用于陆地复合模块式钻机基础
CN103850265A (zh) * 2014-03-03 2014-06-11 中联重科股份有限公司 预制拼装的塔机基础
TWI462865B (zh) * 2010-01-11 2014-12-01
CN105862903A (zh) * 2016-05-03 2016-08-17 泰兴市第建筑安装工程有限公司 一种混凝土预制拼装塔机基础
CN106013207A (zh) * 2016-06-12 2016-10-12 武汉市创先专利技术服务有限公司 一种连接桩基础的全对称预应力拼装式塔机基础
CN107288349A (zh) * 2017-08-09 2017-10-24 赤峰市天山农牧业机械有限责任公司 固定喷灌机中心架的水泥砼块

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101537662B (zh) * 2009-04-17 2011-05-18 从卫民 砼预制拚装塔机基础预制中连接孔道定位方法
TWI462865B (zh) * 2010-01-11 2014-12-01
CN101831918A (zh) * 2010-05-11 2010-09-15 徐州九鼎建设集团有限公司 预应力拼装箱型预制混凝土塔吊基础
CN102373806A (zh) * 2010-08-11 2012-03-14 中国市政工程东北设计研究总院 混凝土预制构件角接组合装配新方法
CN102080383A (zh) * 2010-12-31 2011-06-01 中国二十二冶集团有限公司 悬空式预埋件、预留孔洞模板固定方法
CN102296626A (zh) * 2011-05-18 2011-12-28 从卫民 砼预制拼装塔机基础多组合地脚螺栓孔
CN102587408A (zh) * 2012-03-26 2012-07-18 秦大春 一种用于陆地复合模块式钻机基础
CN103850265A (zh) * 2014-03-03 2014-06-11 中联重科股份有限公司 预制拼装的塔机基础
CN103850265B (zh) * 2014-03-03 2015-11-18 中联重科股份有限公司 预制拼装的塔机基础
CN105862903A (zh) * 2016-05-03 2016-08-17 泰兴市第建筑安装工程有限公司 一种混凝土预制拼装塔机基础
CN106013207A (zh) * 2016-06-12 2016-10-12 武汉市创先专利技术服务有限公司 一种连接桩基础的全对称预应力拼装式塔机基础
CN107288349A (zh) * 2017-08-09 2017-10-24 赤峰市天山农牧业机械有限责任公司 固定喷灌机中心架的水泥砼块
CN107288349B (zh) * 2017-08-09 2019-05-07 赤峰市天山农牧业机械有限责任公司 固定喷灌机中心架的水泥砼块

Similar Documents

Publication Publication Date Title
CN204282199U (zh) 桩柱式混凝土空心桩桥墩结构
CN2701914Y (zh) 砼预制拼装多用塔机基础
JP2004520511A (ja) プレストレスト合成トラス桁及びその製造方法
CN106894326A (zh) 装配式先张法预应力波形钢腹板组合箱梁的施工方法
CN107386127A (zh) 一种桥墩拼装装置
JP4762406B2 (ja) 高層壁式建物
CN212128825U (zh) 装配式一体化墩柱盖梁组合结构
CN101403246B (zh) 大吨位吊车单层厂房组合柱及单层厂房组合柱结构的制作方法
CN105821962B (zh) 装配整体式预制预应力钢筋混凝土梁与框架柱连接构造
CN220927513U (zh) 一种新型波纹叠合桥面结构
CN101550703B (zh) 钢筋混凝土基础或桩承台的设计方法
CN113027021A (zh) 一种带牛腿的免支撑预制楼板
CN201358514Y (zh) 一种预制空心梁与柱的组装节点
CN207314161U (zh) 一种无支座连续刚构边跨梁段组成的临时t构
CN114876262B (zh) 叠合剪力墙及建筑
CN2921109Y (zh) 桅杆式机械设备组合基础
CN105908705B (zh) 一种预制先张预应力地下连续墙及其施工方法
CN215484082U (zh) 成型钢筋骨架及应用其的楼板、无梁楼盖和桩基承台
CN101881030A (zh) 可拼装组合式塔机基础
CN201411704Y (zh) 钢筋混凝土基础或桩承台
CN2775143Y (zh) 大直径桩静载试验钢筋混凝土平台
CN2285330Y (zh) 一种新型预制混凝土方桩尖
CN206570674U (zh) 装配式先张法预应力波形钢腹板组合箱梁
CN220888624U (zh) 一种预制管桩的预应力连接接头
CN201003171Y (zh) 桅杆式机械设备新型基础

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090109

Address after: No. 18 Middle South Road, Haian County, Nantong City, Jiangsu Province, China: 226600

Patentee after: Jiangsu Suzhong Construction Group Co., Ltd.

Address before: Institute of Surveying and mapping, Xinmin East Road, Jiangsu, Huaian, China: 223001

Patentee before: Cong Weimin

ASS Succession or assignment of patent right

Owner name: JIANGSU PROVINCE SUZHONG CONSTRUCTION GROUP CO., L

Free format text: FORMER OWNER: CONG WEIMIN

Effective date: 20090109

ASS Succession or assignment of patent right

Owner name: CONG WEIMIN

Free format text: FORMER OWNER: JIANGSU SUZHONG CONSTRUCTION GROUP CO., LTD.

Effective date: 20121008

Owner name: JIANGSU XINTA JIYE NEW CONSTRUCTION TECHNOLOGY DEV

Effective date: 20121008

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226600 NANTONG, JIANGSU PROVINCE TO: 223002 HUAIAN, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121008

Address after: 223002 Huaian City, Jiangsu Province Institute of Surveying and mapping in Qingpu District Xinmin Road

Patentee after: Cong Weimin

Patentee after: Jiangsu Xinta Construction New Technology Development Co., Ltd.

Address before: 226600, No. 18 Middle South Road, Haian County, Nantong, Jiangsu

Patentee before: Jiangsu Suzhong Construction Group Co., Ltd.

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20141018

Granted publication date: 20050525