CN2692206Y - River dam biotunnel - Google Patents

River dam biotunnel Download PDF

Info

Publication number
CN2692206Y
CN2692206Y CN 200420003694 CN200420003694U CN2692206Y CN 2692206 Y CN2692206 Y CN 2692206Y CN 200420003694 CN200420003694 CN 200420003694 CN 200420003694 U CN200420003694 U CN 200420003694U CN 2692206 Y CN2692206 Y CN 2692206Y
Authority
CN
China
Prior art keywords
creature
hole
gate
utility
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420003694
Other languages
Chinese (zh)
Inventor
于明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420003694 priority Critical patent/CN2692206Y/en
Application granted granted Critical
Publication of CN2692206Y publication Critical patent/CN2692206Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Biological Treatment Of Waste Water (AREA)

Abstract

The utility model discloses a river dam creature tunnel used for solving the problem of the creature traveling of building water valve dams on rivers. The utility model is composed of a creature tunnel cave, an upper reaches valve door, a lower reaches valve door, an upper reaches water inlet hole, a lower reaches water outlet hole, an upper reaches pressure regulating chamber, a lower reaches pressure regulating chamber, a wall lamp and a monitoring apparatus. As the river dam cuts off the river at the middle, the creature traveling is seriously blocked, even leading to the extinction of the creature and breaking the sustainable development of the ecological environment. The creature tunnel design is provided. The utility model solves the problem of the creature traveling, and has no influence on the standard of dam storage or other standards. The utility model is characterized in that two valve doors of the upper reaches and lower reaches are designed, that is a double brake structure. Adopting the opening and closing method of crossing, and reasonable opening and closing time of crossing is determined; opening and closing time of crossing of the double valve doors is equal to the ratio of the creature cave length which divides the swimming speed of the creature; the creature can successful pass in the process of opening and closing of crossing of the double valve door; thus the hazard and the breakage of development and survival of the creature are avoided.

Description

Rivers dam biological corridor
Technical field
The utility model relates to the biological corridor on a kind of hydraulic structure rivers dam.
Background technology
At present, the rivers dam of being built is in the world just considered the human needs that oneself develop, and all not solve biological current problem when building, in the design of rivers dam, all is not designed to the biological biological corridor that passes through.The result blocks great rivers by the waist, and aquatile is current is obstructed to making, and has had a strong impact on and has destroyed biological existence and sustainable development, even caused species extinction, has greatly destroyed the diversity of ecological environment and species.At present, removed more than 500 on rivers dam all over the world, only more than 200 on dam is just removed by the U.S., and Maine State Ai Dewo reservoir had been removed by the U.S. in 1999, had recovered the survival and development of this river salmon.The Ge Zhou Ba of China, Three Gorges Dam all exist this problem.Particularly very serious to the influence of mandarin sturgeon, because the migration route of mandarin sturgeon has been blocked in the interception of dam, influence and destroyed the existence and the sustainable development of the biology of migrating, a large amount of mandarin sturgeons do not increase, and are tired out to death under the dam, this is not only biological tragedy, and Ren Lei something lost is shaken especially.The design of biological corridor proposes in order to address this problem just.
The utility model content
The purpose of this utility model be to provide a kind of on the rivers dam the current biological corridor that designs for biology.Promptly when the building of dam, design biological corridor, promptly do not influence other index of dam, biology is passed through, thereby avoided harm biology for passing through of biology.
The technical solution of the utility model is: the utility model rivers dam biological corridor, contain by the hole, the upstream and downstream gate, the upstream and downstream paddle hole, the upstream and downstream surge-chamber, wall lamp and watch-dog are formed, the section that the hole is contained can be designed to square or circular, the import department of containing in the hole establishes the upstream gate, the trip gate is set in the exit of containing in the hole, and gate all is designed to bulkhgead gate, and the both sides of the upstream gate of containing in the hole are provided with inlet opening and upstream surge-chamber, water hole and downstream surge-chamber are designed in the both sides of the lower gate of containing in the hole, in the sidewall that the hole is contained wall lamp and watch-dog are set.
The utility model biological corridor design upstream and downstream double-gate structure, and take the double-gate keying method of interlocking, determine reasonably staggered opening and closing time, staggered opening and closing time equals hole length divided by the general biological speed of moving about, thereby realized passing through smoothly of upstream and downstream biology, and do not influenced other index of dam.
Description of drawings
Fig. 1 is the plane structure chart of rivers dam biological corridor;
Fig. 2 is the longitudinal plan of rivers dam biological corridor.
The specific embodiment
The utility model rivers dam biological corridor, passage contains 1 by the hole, upstream gate 2, lower gate 3, inlet opening, upstream 4, downstream weep hole 5, upstream surge-chamber 6, downstream surge-chamber 7, wall lamp 8 and watch-dog 9 are formed.The hole is contained 1 section and can be designed to square or circularly all can, import department in hole culvert 1 establishes gate 2, and gate 3 is established in the exit of containing in the hole, and gate all is designed to bulkhgead gate, adopt up and down vertical lift or the plug-type keying of level all can, adopt the keying of computer program controlled double-gate.The both sides of containing 1 upstream gate 2 in the hole are provided with inlet opening 4 and upstream surge-chamber 6, in order to guarantee the hole contain in the microfluidic state of water body.Water hole 5 and downstream surge-chamber 7 are designed in the both sides of containing 1 exit gate 3 in the hole, in 1 sidewall is contained in the hole wall lamp 8 and watch-dog 9 are set, in order to illumination and the monitoring biological passage situation of hole in containing to be provided.
As shown in Figure 2,10. upper pond level, 11. dams, 12. levels of tail water are in, 13. rivers bottom lines.
The biological corridor that the utility model designs on the rivers dam, when downstream gate 3 is opened, the biological admission passage hole in downstream is contained in 1, biology upstream moves about along passage, when swimming to upstream gate 2, lower gate 3 cuts out, and upstream gate 2 is opened simultaneously, biology is swum out of the hole culvert, and trip is to the upstream of rivers.At this moment, the biology of upstream can enter the biological corridor hole again to be contained in 1, moves about downstream, and when swimming to lower gate 3 places, the gate 2 of upstream is closed, and the gate 3 in downstream is opened simultaneously, and biology just can be swum out of the culvert of passage hole, goes to the trip of the downstream of rivers.This has just finished the current process of a biology in passage, and the staggered keying that double-gate comes to this and moves in circles has realized biological passing through.
The biological corridor of the utility model rivers dam is applicable on the water conservancy project dam of building on the rivers and uses, and has solved biological current the biggest problem, has avoided influence and destruction to biology, has realized the ecological property structure design of water construction.

Claims (1)

1, a kind of rivers lock dam biological corridor, contain (1) by the hole, upstream and downstream gate (2) and (3), upstream and downstream paddle hole (4) and (5), upstream and downstream surge-chamber (6) and (7), wall lamp (8) and watch-dog (9) are formed, it is characterized in that: the section that the hole is contained can be designed to square or circular, the import department of containing in the hole establishes gate (2), gate (3) is established in the exit of containing in the hole, gate all is designed to bulkhgead gate, the both sides of the upstream gate of containing in the hole are provided with inlet opening (4) and upstream surge-chamber (6), water hole (5) and downstream surge-chamber (7) are designed in the both sides of the lower gate of containing in the hole, in the sidewall that the hole is contained wall lamp (8) and watch-dog (9) are set.
CN 200420003694 2004-02-03 2004-02-03 River dam biotunnel Expired - Fee Related CN2692206Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420003694 CN2692206Y (en) 2004-02-03 2004-02-03 River dam biotunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420003694 CN2692206Y (en) 2004-02-03 2004-02-03 River dam biotunnel

Publications (1)

Publication Number Publication Date
CN2692206Y true CN2692206Y (en) 2005-04-13

Family

ID=34767309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420003694 Expired - Fee Related CN2692206Y (en) 2004-02-03 2004-02-03 River dam biotunnel

Country Status (1)

Country Link
CN (1) CN2692206Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322046A (en) * 2011-07-21 2012-01-18 林升 Doorway type fishway
CN103590375A (en) * 2013-12-02 2014-02-19 烟台桑尼橡胶有限公司 Ecological air bag supporting dam
CN103924559A (en) * 2014-05-04 2014-07-16 赵永宪 Multifunctional inclined type dam underport gate
CN105464058A (en) * 2015-12-25 2016-04-06 长江勘测规划设计研究有限责任公司 Tunnel type artificially-natural fishway
CN106522176A (en) * 2016-11-18 2017-03-22 中国电建集团成都勘测设计研究院有限公司 Fish inlet structure for fish passing facility
CN107012836A (en) * 2017-04-21 2017-08-04 中国科学院、水利部成都山地灾害与环境研究所 Sill may and levee system
CN113463582A (en) * 2021-07-09 2021-10-01 中国电建集团华东勘测设计研究院有限公司 Be suitable for and found bottom hole type fishway view weir structure that falls
CN114164805A (en) * 2022-01-06 2022-03-11 重庆水利电力职业技术学院 Dam convenient to fish migratory

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322046A (en) * 2011-07-21 2012-01-18 林升 Doorway type fishway
CN103590375A (en) * 2013-12-02 2014-02-19 烟台桑尼橡胶有限公司 Ecological air bag supporting dam
CN103924559A (en) * 2014-05-04 2014-07-16 赵永宪 Multifunctional inclined type dam underport gate
CN103924559B (en) * 2014-05-04 2016-07-06 赵永宪 A kind of multi-functional tilting Bottom Sutlet gate
CN105464058A (en) * 2015-12-25 2016-04-06 长江勘测规划设计研究有限责任公司 Tunnel type artificially-natural fishway
CN105464058B (en) * 2015-12-25 2018-01-19 长江勘测规划设计研究有限责任公司 Tunnel formula imitates nature fish pass
CN106522176A (en) * 2016-11-18 2017-03-22 中国电建集团成都勘测设计研究院有限公司 Fish inlet structure for fish passing facility
CN106522176B (en) * 2016-11-18 2018-09-11 中国电建集团成都勘测设计研究院有限公司 The fish inlet structure of fish pass structure
CN107012836A (en) * 2017-04-21 2017-08-04 中国科学院、水利部成都山地灾害与环境研究所 Sill may and levee system
CN113463582A (en) * 2021-07-09 2021-10-01 中国电建集团华东勘测设计研究院有限公司 Be suitable for and found bottom hole type fishway view weir structure that falls
CN114164805A (en) * 2022-01-06 2022-03-11 重庆水利电力职业技术学院 Dam convenient to fish migratory

Similar Documents

Publication Publication Date Title
CN101638889B (en) Step-type fish passage facilities suitable for steep slope of high dam and control method
CN2692206Y (en) River dam biotunnel
CN204959707U (en) Ecological fishway of multiple -step type
CN104480914B (en) The fish pass structure that fish pass combines with ship lock and method
CN106930262B (en) Province pond is overlapped high-lift lock
CN104452719B (en) A kind of base plate transport formula ship lock
CN105464058A (en) Tunnel type artificially-natural fishway
CN106759167A (en) A kind of imitative nature fish pass of narrow deep type for adapting to multiple target population
CN107700442A (en) Export structure for fish pass system
CN2898107Y (en) Large-fall head shaft tunnel lock
CN102561290A (en) Ship lock integrated with navigation, power generation and flood discharge
CN106592541B (en) Fish pass system of the upstream water level luffing compared with large-engineering
CN205875113U (en) Can realize water yield complemental navigation lock many times
CN205776113U (en) Tunnel formula is imitated nature fish pass and is combined the comprehensive layout of fish lock
CN205314073U (en) Imitative nature fishway of tunnel style combines arranging of lifting means
CN202519635U (en) Crescent gate
CN205205797U (en) Marine spilled oil recovery air supporting processing apparatus based on venturi effect
CN209555894U (en) A kind of ecoscape weir for taking into account fish pass
CN200946262Y (en) High-water head ship lock
CN204849678U (en) Novel butyl dam structure
CN104430128A (en) Aeration flow-producing device applied in cultivation of fish with rheotaxis
CN209493909U (en) A kind of aqueduct is across reservoir point water intaking structure
Mkandawire Opportunities and Challenges of Re‐Mining Mine Water for Resources
CN103866743B (en) Environment-friendly barrage and water body purification method
CN106869103B (en) Four line half complementation water saving lock of three-level

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee