CN2646157Y - Structure of aluminium electrolysis shop and factory building - Google Patents

Structure of aluminium electrolysis shop and factory building Download PDF

Info

Publication number
CN2646157Y
CN2646157Y CN 200320105063 CN200320105063U CN2646157Y CN 2646157 Y CN2646157 Y CN 2646157Y CN 200320105063 CN200320105063 CN 200320105063 CN 200320105063 U CN200320105063 U CN 200320105063U CN 2646157 Y CN2646157 Y CN 2646157Y
Authority
CN
China
Prior art keywords
service platform
factory building
air
electrolyzer
aluminium electrolysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200320105063
Other languages
Chinese (zh)
Inventor
杨晓东
佘海波
万沐
王印夫
刘军山
高淑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Original Assignee
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd filed Critical Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority to CN 200320105063 priority Critical patent/CN2646157Y/en
Application granted granted Critical
Publication of CN2646157Y publication Critical patent/CN2646157Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a structure of aluminium electrolysis shop and factory building, comprising an electrobath, a service platform and an intercolpate space. The utility model is characterized by determining reasonable height of the service platform according to different capacity of the electrolytic bath; the service platform is raised to let most of outdoor air into a lower air inlet in the lower end of the service platform; most of indoor air passes through the intercolpate space of the electrolytic bath to cool the electrolytic bath; another part of the outdoor air enters the plane of the service platform through an inner wall of a grille arranged on the side of a factory building and the plane of the service platform; heat air is discharged from a plant through a natural ventilator or a louver on the top of the factory building, thereby the plant forms a natural and ordered current. With a changeless dimension of the plant exterior, the utility model can adjust current structure effectively to make the current structure more reasonable and enhance natural ventilation effect.

Description

A kind of structure of aluminium electrolysis shop factory building
Technical field
The utility model relates to a kind of structure of factory building, relates in particular to a kind of structure that helps the aluminium electrolysis shop of factory building natural ventilation.
Background technology
Aluminium electrolysis shop, specific heat load is about 200w/m 3Below in conjunction with accompanying drawing existing aluminium electrolysis shop is described, Fig. 1 is existing cell room natural ventilation synoptic diagram, and electrolyzer 4 shells and power bus surface temperature be up to more than 100 ℃, service platform 9 apart from the skin temperature in electrolyzer 4 upper surface 450mm zones about 350 ℃.Operator's workspace radiant heat is very big, and air themperature can reach 70 ℃, and it is healthy to have a strong impact on the workman, also will influence electrolyzer works better efficient.
Air intake district, bottom 6 and workshop side window 5 air intakes are adopted in the realization of existing cell room 1 natural ventilation usually, and the structural shape of skylight or roof natural ventilation air draft is adopted on top.Side window 5 air intakes in workshop are subjected to influenced by wind pressure comparatively obvious, can cause air turbulence in the workshop, and reasonably air current composition can't realize that the factory building effect of natural ventilation is bad, and ventilation can't satisfy the workshop temperature requirement, and workshop and equipment surface temperature are too high.
Summary of the invention
Technical problem to be solved in the utility model is: a kind of structure of aluminium electrolysis shop factory building is provided, and the utility model has carried out reasonable configuration to the workshop mill construction, effectively regulates air current composition, to strengthen the effect of natural ventilation.
In order to solve the problems of the technologies described above, the utility model is achieved in that a kind of structure of aluminium electrolysis shop factory building, it comprises electrolyzer, service platform, space between groove, it is characterized in that determining the height of rational service platform according to the electrolyzer of differing capacities, service platform is raised, make the bottom air intake district air intake of the major part of outside air from the service platform bottom, the major part of room air is passed through from space between electrolyzer, cool electrolysis cells, some outside air is by being arranged on the factory building side in addition, the above grid interior wall in service platform plane enters the service platform plane, warm air is discharged outside the workshop by the natural ventilator or the skylight at factory building top, forms the orderly air-flow of nature in the workshop.
The height that the aforesaid operations platform is raised can be consistent with the electrolyzer upper level, also can be lower than electrolyzer upper surface 0-0.5m.
The height of aforesaid operations platform is 2.65-4.0m; The vertical side band height of grid interior wall is than the high 4.0-5.0m of service platform.
In place, air intake district, the bottom of above-mentioned factory building workshop exterior wall side, be provided with flow apron.
Advantage of the present utility model and effect are:
Owing to adopted technique scheme, the utility model is under the constant situation of workshop overall dimensions, regulate air current composition effectively, most of outside air is passed through from space between groove 7, cool electrolysis cells 4, and there is certain outside air to enter people's service platform district more equably and improves work situation, strengthened effect of natural ventilation.The total heat exhaust of the natural ventilation of novel mill construction 2 has bigger increase than the total heat exhaust of existing cell room 1 natural ventilation; The natural ventilation of existing cell room 1 is subjected to side window 5 air intake influenced by wind pressure in workshop comparatively obvious, easily causes the indoor air flow chaotic, and the natural ventilation of novel mill construction 2 is only worked its indoor air flow steady ordered under hot pressing.
Description of drawings
Fig. 1 is existing cell room natural ventilation synoptic diagram;
Fig. 2 is the utility model cell room natural ventilation synoptic diagram;
Fig. 3 is the utility model cell room operating surface synoptic diagram.
Wherein, 1. existing cell room structure, 2. novel cell room structure, 3. air draft, 4. electrolyzer, 5. workshop side window, 6. bottom air intake district, 7. space between groove, 8. grid interior wall, 9. service platform, 10. flow apron.
Embodiment
The concrete structure of novel mill construction 2 is as follows: the height of determining rational service platform 9 according to the electrolyzer 4 of differing capacities, the height of service platform 9 is raised, the height of service platform 9 can be consistent with the electrolyzer upper level, also can be lower than electrolyzer upper surface 0-0.5m.The major part of outside air enters from the air intake district, bottom 6 of the bottom setting of both sides, workshop service platform 9, in addition some outside air is by being arranged on factory building side, the vertical side interlayer of grid interior wall 8 more than service platform 9 planes along its air intake highly in a organized way, the major part of room air is passed through cool electrolysis cells 4 from space 7 between electrolyzer 4 grooves; Roof natural ventilation or arc, Polygons or traditional rectangular skylight are adopted in air draft 3.
Service platform 9 highly is 2.65-4.0m; Grid interior wall 8 vertical side band height are than service platform 9 high 4.0-5.0m, and the grid of glass reinforced plastic window shutter, glass-fiber reinforced plastic grille, checkers grid or other insulating material formation is adopted in grid interior wall 8 air ports; Flow apron 10 is established on the top in air intake district, bottom 6, and it is end distance grade 2.4-3.0m down, with 30~45 ° of grade angles.

Claims (5)

1. the structure of an aluminium electrolysis shop factory building, it comprises electrolyzer (4), service platform (9), space between groove (7), it is characterized in that electrolyzer (4) according to differing capacities determines the height of rational service platform (9), service platform (9) is raised, the air intake district, bottom (6) that the major part of outside air is provided with from service platform (9) bottom enters, the major part of room air is passed through from space (7) between the groove of electrolyzer (4), cool electrolysis cells (4), some outside air is by being arranged on the factory building side in addition, the above grid interior wall (8) in service platform (9) plane enters the plane of service platform (9), warm air is discharged outside the workshop by the natural ventilator or the skylight at factory building top, forms the orderly air-flow of nature in the workshop.
2. the structure of the described a kind of aluminium electrolysis shop factory building of claim 1 is characterized in that the height that described service platform (9) is raised can be consistent with the electrolyzer upper level, also can be lower than electrolyzer upper surface 0-0.5m.
3. the structure of the described a kind of aluminium electrolysis shop factory building of claim 1, the height that it is characterized in that service platform (9) is 2.65--4.0m; The vertical side band height of grid interior wall (8) is than the high 4.0-5.0m of service platform (9).
4. the structure of the described a kind of aluminium electrolysis shop factory building of claim 1 is characterized in that locating workshop exterior wall side in air intake district, the bottom of factory building (6), is provided with flow apron (10).
5. the structure of the described a kind of aluminium electrolysis shop factory building of claim 4 is characterized in that the following end distance grade 2.4-3.0m of flow apron (10), with the grade angle be 30~45 °.
CN 200320105063 2003-10-29 2003-10-29 Structure of aluminium electrolysis shop and factory building Expired - Lifetime CN2646157Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200320105063 CN2646157Y (en) 2003-10-29 2003-10-29 Structure of aluminium electrolysis shop and factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200320105063 CN2646157Y (en) 2003-10-29 2003-10-29 Structure of aluminium electrolysis shop and factory building

Publications (1)

Publication Number Publication Date
CN2646157Y true CN2646157Y (en) 2004-10-06

Family

ID=34305040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200320105063 Expired - Lifetime CN2646157Y (en) 2003-10-29 2003-10-29 Structure of aluminium electrolysis shop and factory building

Country Status (1)

Country Link
CN (1) CN2646157Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1325851C (en) * 2005-11-17 2007-07-11 上海交通大学 Industrial factory building safety energy-saving mixed ventilating control system
CN101368756A (en) * 2008-09-25 2009-02-18 长沙有色冶金设计研究院 Replacement type ventilation method and system for large spacing factory building of open type reaction groove
CN1844601B (en) * 2006-04-25 2010-04-07 贵阳铝镁设计研究院 Insulating method and structure for workshop operating side and inner side of external wall
CN103014763A (en) * 2012-12-25 2013-04-03 云南云铝涌鑫铝业有限公司 Aluminum electrolysis workshop system
CN103436918A (en) * 2013-08-30 2013-12-11 沈阳银海机械设备制造有限公司 Green anode carbon block passive energy-saving combination water-cooling system
CN103470074A (en) * 2012-06-06 2013-12-25 贵阳铝镁设计研究院有限公司 Method for eliminating influence of low elevation of crown block on discharging
CN106894050A (en) * 2015-12-18 2017-06-27 沈阳铝镁设计研究院有限公司 Heat preservation ventilating type cell room structure
CN107120770A (en) * 2017-04-28 2017-09-01 中联西北工程设计研究院有限公司 A kind of natural ventilation system for being used to build large space
CN107541749A (en) * 2016-06-23 2018-01-05 沈阳铝镁设计研究院有限公司 The potroom mill construction of enhanced natural ventilating

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1325851C (en) * 2005-11-17 2007-07-11 上海交通大学 Industrial factory building safety energy-saving mixed ventilating control system
CN1844601B (en) * 2006-04-25 2010-04-07 贵阳铝镁设计研究院 Insulating method and structure for workshop operating side and inner side of external wall
CN101368756A (en) * 2008-09-25 2009-02-18 长沙有色冶金设计研究院 Replacement type ventilation method and system for large spacing factory building of open type reaction groove
CN103470074A (en) * 2012-06-06 2013-12-25 贵阳铝镁设计研究院有限公司 Method for eliminating influence of low elevation of crown block on discharging
CN103014763A (en) * 2012-12-25 2013-04-03 云南云铝涌鑫铝业有限公司 Aluminum electrolysis workshop system
CN103014763B (en) * 2012-12-25 2016-06-01 云南云铝涌鑫铝业有限公司 Aluminium electrolysis shop system
CN103436918A (en) * 2013-08-30 2013-12-11 沈阳银海机械设备制造有限公司 Green anode carbon block passive energy-saving combination water-cooling system
CN103436918B (en) * 2013-08-30 2016-08-10 沈阳银海机械设备制造有限公司 Green anode carbon block passive energy-saving water-cooling system
CN106894050A (en) * 2015-12-18 2017-06-27 沈阳铝镁设计研究院有限公司 Heat preservation ventilating type cell room structure
CN107541749A (en) * 2016-06-23 2018-01-05 沈阳铝镁设计研究院有限公司 The potroom mill construction of enhanced natural ventilating
CN107120770A (en) * 2017-04-28 2017-09-01 中联西北工程设计研究院有限公司 A kind of natural ventilation system for being used to build large space

Similar Documents

Publication Publication Date Title
CN2646157Y (en) Structure of aluminium electrolysis shop and factory building
CN201835553U (en) Energy-saving machine room
CN211046217U (en) Outdoor box-type substation
CN203174916U (en) Lighting ventilation roof
CN211058226U (en) Environment-friendly log cabin capable of purifying air
CN205348518U (en) Dislocation formula ventilation cooling dormer roof
CN102345397A (en) Energy-saving machine room
CN208431905U (en) A kind of totally-enclosed coal yard ventilating system
CN207686073U (en) Double-layer curtain wall for vent air cycle
CN206929922U (en) High-rise Building Energy Saving ventilating system
CN201169635Y (en) Ventilated heat radiation structure of aluminum electrolysis hall
CN206267432U (en) Translation open-close type roofing lets out sudden and violent ventilating skylight
CN216690115U (en) Energy-concerving and environment-protective green building roof
CN212271703U (en) Energy-saving and environment-friendly residential building
CN209742441U (en) modularization pin-connected panel natatorium
CN2545818Y (en) Double-slope intelligent greenhouses
CN1096869A (en) Following discharge, upper absorbing air conditioning method
CN201866883U (en) Novel roofing natural ventilator
CN206379654U (en) A kind of outdoor integrated distribution box
CN105421642A (en) Staggered ventilation and heat dissipation clerestory roof
CN201354521Y (en) Factory building structure of large air intake ventilation outer wall
CN2924915Y (en) Rectifier chamber configuration structure with natural ventilating duct
CN88203953U (en) Energy saving and frost-proof air conditioner
CN216775538U (en) Low-temperature grain warehouse
CN213178786U (en) Air deflector for central air conditioner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENYANG ALUMINUM + MAGNESIUM ENGINEERING + RESEAR

Free format text: FORMER NAME: SHENYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP01 Change in the name or title of a patent holder

Address after: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee after: Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

Address before: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee before: Shenyang Aluminium and Magnesium Design Institute

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20131029