CN2632135Y - Pile unitary columnar pier structure - Google Patents

Pile unitary columnar pier structure Download PDF

Info

Publication number
CN2632135Y
CN2632135Y CN 03266633 CN03266633U CN2632135Y CN 2632135 Y CN2632135 Y CN 2632135Y CN 03266633 CN03266633 CN 03266633 CN 03266633 U CN03266633 U CN 03266633U CN 2632135 Y CN2632135 Y CN 2632135Y
Authority
CN
China
Prior art keywords
pier
pile
columnar
plate
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03266633
Other languages
Chinese (zh)
Inventor
李强
吴洪峰
张星云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANDA ROAD-BRIDGE CONSULTING Co Ltd BEIJING
Original Assignee
JIANDA ROAD-BRIDGE CONSULTING Co Ltd BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANDA ROAD-BRIDGE CONSULTING Co Ltd BEIJING filed Critical JIANDA ROAD-BRIDGE CONSULTING Co Ltd BEIJING
Priority to CN 03266633 priority Critical patent/CN2632135Y/en
Application granted granted Critical
Publication of CN2632135Y publication Critical patent/CN2632135Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a pile-column integrative columnar pier structure without a supporting table. The basis of the utility model adopts a pile with a large diameter, the upper part of the basis is directly connected with a columnar pier with a large diameter, and the columnar pier is embedded in a main beam. The water surface position or the position which is separated from the pier at a certain height is provided with a frame style contact supporting plate or a contact plate in order to reinforce the connection of the column top and the main beam. The pier top is provided with a lateral contact plate which contacts the same row of pier columns in the position of the column top. Because the pier with the structure is not provided with the supporting table, the utility model has the advantages of low construction difficulty, low manufacturing cost, short construction time, high structural strength and beautiful appearance.

Description

Pile one columnar pier structure
Technical field
The utility model relates to a kind of bridge pier, the no cushion cap pile one columnar pier structure that particularly a kind of continuous rigid frame bridge adopts.
Background technology
At present in concrete continuous rigid frame bridge beam design, because the hydrology, geology, duration and equipment requirement must be adopted deep water foundation, common design scheme is that clump of piles top is provided with the scheme that cushion cap and wall formula thin-walled pier shaft join.But this scheme causes to adopt needs the subaqueous work cushion cap when hanging down cushion cap, and difficulty of construction is big, and the cost height is long in time limit; Adopt the cushion cap bottom surface to be higher than can pile foundation to occur with SEA LEVEL VARIATION when waterborne and expose, it is attractive in appearance to influence integral bridge.
Summary of the invention
The purpose of this utility model is to propose a kind of employing pillar pier shaft, the cancellation cushion cap, and one one post is to the continuous rigid frame bridge bridge pier structure that pushes up.
The technical solution of the utility model is: large diameter pile is adopted on the basis, directly be connected with the major diameter column pier on it, column pier gos deep in the girder, when the pier height is big, frame type contact support or contact plate are set at water surface site or along pier shaft certain altitude position, are convenient No. 0 piece cast-in-place construction, and strengthen being connected of capital and girder, at Dun Ding the lateral ties plate is set, same row's pier stud is connected in the capital position.
The utility model not only can guarantee substructure rigidity and the intensity that rigid frame bridge is required, and can avoid large volume bearing platform construction in the water, helps reducing difficulty of construction, reduces construction costs, shortens the construction period, guarantees that bridge is attractive in appearance.
Description of drawings
Fig. 1 is the schematic diagram that main bridge bridge type is arranged;
Fig. 2 is the bridge pier generalized section.
Fig. 3 is the A-A cut-away view of Fig. 2.Among the figure
1 bridge floor, 2 main piers
3 transition pier, 4 straining beams
5 casees beam 6 diagonal braces
The specific embodiment
As shown in Figure 1, main bridge bridge type can adopt three to stride the prestressed concrete continuous rigid frame, and bridge opening is arranged and be can be 56+104+56m, main bridge length overall 216m; Two main piers 2 all adopt 4 diameter 2m drilled pile bases, on connect 4 diameter 2m pier studs, be one one post to roof construction, twice frame type straining beam 4 is set more than ordinary water level, cancel conventional underwater support table, can save a large amount of cushion cap concrete.Main access bridge transition pier 3 can adopt 2 diameter 2m drilled pile bases, on connect 2 diameter 2m pier studs, also be that one one post is to roof construction.The transition pier bent cap adopts prestressed reinforced concrete construction.
Because main pier 2 and transition pier 3 all are arranged in deep water, construction period, the height of water reached 15~20m, and the while has the navigation requirement again, how fully to use the advantage that the riverbed covering layer is thin, basement rock intensity is high, reducing basic scale in the water, is the key of this bridge substructure design.Consider that from nature, execution conditions this bridge adopts the bundle pillar basis comparatively favourable, but cushion cap should not be set.Because of the height of water is big, from consideration attractive in appearance, the cushion cap bottom surface is located at the following scheme of water level and brings many difficulties to construction, is difficult to guarantee that engineering completes on schedule; Add the skirtboard scheme below the ordinary water level during the cushion cap bottom surface is located at, need 4~5m because of skirtboard is high, anti-ship hits ability, and construction also acquires a certain degree of difficulty.Comparatively ideal scheme is to adopt no cushion cap multi-column pier foundation scheme.Than choosing, main pier 2 adopts 4 diameter 2m drilled pile bases through multi-scheme, on connect 4 diameter 2m pier studs, do not establish cushion cap, be that one one post is to roof construction.Referring to Fig. 2, visually form integral body for making four pier studs, and reduce the pier shaft drift, increase the anti-ship collision ability of pier shaft, twice frame type straining beam 4 is set more than ordinary water level, with four pier studs in length and breadth to being unified into framework and being provided with diagonal brace 6 (see figure 3)s.The pier stud of can constructing earlier during construction, at the water level straining beam of constructing again under than the situation at the end, main pier foundation construction is not controlled by water level.
After adopting columnar pier,, can take following measure for guaranteeing the reliable and convenient construction of structure stress:
1. with pier stud center line and No. 0 piece web central lines, make vertical load not produce off-centre to pier stud, vertical force is directly passed to four pier studs by web;
2. pier stud is made progress extends to case back plate smooth-goingly, strengthens the effect that is connected of pier stud and case beam 5, guarantees the smooth-going transition in top and the bottom, avoids structural mutation to cause that stress concentrates, from visually also reaching safe, attractive in appearance effect;
3. corresponding case Liang Henggebanchu establishes the horizontal tie-plate of high 3m, wide 0.5m together under No. 0 piece in pier top, horizontal tie-plate direction across bridge links to each other with two pier studs, horizontal tie-plate can strengthen the globality of case beam and two pier studs in No. 0 piece work progress, be convenient to the setting of No. 0 piece construction bracket supporting member again;
4. when full-bridge vertically totally calculates the twice straining beam is modeled to two horizontal bars, considers its influence structure collectivity rigidity and local internal force.
The utility model is by adopting the new structure design of pile foundation and pier shaft, pier shaft and girder, and the bearing platform construction that cancellation is commonly used can realize reducing construction costs, reduces difficulty of construction, guarantees the purpose of bridge construction overall appearance.

Claims (3)

1. pile one columnar pier structure, comprise pile foundation, pier shaft and girder, it is characterized in that: large diameter pile is adopted on the basis, directly be connected with the major diameter column pier on it, column pier gos deep in the girder, frame type contact support or contact plate are set in pier shaft certain altitude position, the lateral ties plate are set, same row's pier stud is connected in the capital position at Dun Ding.
2. pile one columnar pier structure according to claim 1 is characterized in that: stake is directly joined with pier, no cushion cap, and pier stud center line and No. 0 piece web central lines, pier stud made progress extends to case back plate smooth-goingly.
3. pile one columnar pier structure according to claim 1 is characterized in that: corresponding case Liang Henggebanchu establishes horizontal tie-plate together under No. 0 piece in pier top, and horizontal tie-plate direction across bridge links to each other with two pier studs.
CN 03266633 2003-06-27 2003-06-27 Pile unitary columnar pier structure Expired - Fee Related CN2632135Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03266633 CN2632135Y (en) 2003-06-27 2003-06-27 Pile unitary columnar pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03266633 CN2632135Y (en) 2003-06-27 2003-06-27 Pile unitary columnar pier structure

Publications (1)

Publication Number Publication Date
CN2632135Y true CN2632135Y (en) 2004-08-11

Family

ID=34298374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03266633 Expired - Fee Related CN2632135Y (en) 2003-06-27 2003-06-27 Pile unitary columnar pier structure

Country Status (1)

Country Link
CN (1) CN2632135Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906754A (en) * 2010-07-09 2010-12-08 清华大学 Rigid connection method for steel beam and concrete pier
CN102182192A (en) * 2011-03-01 2011-09-14 浙江大学宁波理工学院 Rear transverse septum type building foundation pit enclosure structure and construction method
CN102433889A (en) * 2011-10-20 2012-05-02 中天建设集团有限公司天津分公司 Method for constructing high-rise pile cap tower footing and high-rise pile cap tower footing structure
CN103074846A (en) * 2013-01-17 2013-05-01 广州市市政工程设计研究院 Bridge with transverse bearing system
CN105421484A (en) * 2015-12-25 2016-03-23 中铁十四局集团有限公司 Deep pond spanning structure
CN106120541A (en) * 2016-08-22 2016-11-16 田海荣 Novel gallery bridge concrete foundation structure and construction method thereof
CN106120531A (en) * 2016-08-22 2016-11-16 田海荣 New steel structure shelter bridge base structure and construction method thereof
CN107700424A (en) * 2017-11-15 2018-02-16 中船第九设计研究院工程有限公司 A kind of yacht wharf pontoon bridge pile holding structure
CN109056510A (en) * 2018-09-26 2018-12-21 中铁二院工程集团有限责任公司 The queen post superelevation frame pier of multiple steel member connection

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906754A (en) * 2010-07-09 2010-12-08 清华大学 Rigid connection method for steel beam and concrete pier
CN102182192A (en) * 2011-03-01 2011-09-14 浙江大学宁波理工学院 Rear transverse septum type building foundation pit enclosure structure and construction method
CN102433889A (en) * 2011-10-20 2012-05-02 中天建设集团有限公司天津分公司 Method for constructing high-rise pile cap tower footing and high-rise pile cap tower footing structure
CN103074846A (en) * 2013-01-17 2013-05-01 广州市市政工程设计研究院 Bridge with transverse bearing system
CN105421484A (en) * 2015-12-25 2016-03-23 中铁十四局集团有限公司 Deep pond spanning structure
CN106120541A (en) * 2016-08-22 2016-11-16 田海荣 Novel gallery bridge concrete foundation structure and construction method thereof
CN106120531A (en) * 2016-08-22 2016-11-16 田海荣 New steel structure shelter bridge base structure and construction method thereof
CN107700424A (en) * 2017-11-15 2018-02-16 中船第九设计研究院工程有限公司 A kind of yacht wharf pontoon bridge pile holding structure
CN109056510A (en) * 2018-09-26 2018-12-21 中铁二院工程集团有限责任公司 The queen post superelevation frame pier of multiple steel member connection

Similar Documents

Publication Publication Date Title
CN103790267A (en) Reinforcement type prefabricated assembly type shear wall structure and construction method thereof
CN2632135Y (en) Pile unitary columnar pier structure
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN104895229A (en) Prefabricated steel joint concrete slab-column structure and hoisting method thereof
CN203487664U (en) Suspension type flexible connection for precast concrete infilled wall
CN204825914U (en) A reinforced concrete roof beam and fish belly sill combined supporting structure for complicated plane foundation ditch
CN210067020U (en) Sub-structure assembled frame structure
CN201786045U (en) House structure with combined steel beam and pretensioning method prestress laminated beam
CN105625573A (en) Beam-bottom medium-strength prestressed steel bar and ordinary steel bar sleeve connecting beam-column joint
CN106498977B (en) Outrigger formula retaining wall structure
CN210104765U (en) High and large retaining structure of soft geological side slope
CN217974413U (en) Deep and shallow foundation pit supporting construction structure
CN208309592U (en) Foundation pit supporting structure
CN202265831U (en) Deep-water bridge elevated pile cap grouped pile foundation connecting structure
CN213508949U (en) Assembled platform canopy beam column node connection structure
CN214737331U (en) Batter post pier
CN210737587U (en) Cantilever type retaining wall structure
CN212248255U (en) Plate-type connecting structure for double-row supporting of front wall rear piles
CN2600488Y (en) Frame-box-type high support platform and panel board structure of deep water large dolphin pierhead
CN209260571U (en) A kind of prestressed concrete beam cast-in-place construction Ultra-Long Spans beam-column type bracket
KR20070104111A (en) Bridge with pile and construction method thereof
CN216839550U (en) Multifunctional composite cantilever type prefabricated retaining wall with unloading table
CN210946890U (en) Floor system comprising box-shaped beams
CN215562480U (en) A platform structure for construction of coastal precast tubular pile
CN114856034B (en) Prefabricated shear wall and construction method adopting same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040811