CN104404869A - Pile column type concrete hollow pile pier structure - Google Patents
Pile column type concrete hollow pile pier structure Download PDFInfo
- Publication number
- CN104404869A CN104404869A CN201410698130.7A CN201410698130A CN104404869A CN 104404869 A CN104404869 A CN 104404869A CN 201410698130 A CN201410698130 A CN 201410698130A CN 104404869 A CN104404869 A CN 104404869A
- Authority
- CN
- China
- Prior art keywords
- pier
- pile
- concrete hollow
- hollow pile
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a pile column type concrete hollow pile pier structure. The pile column type concrete hollow pile pier structure is characterized by comprising a concrete hollow pile pier, a bridge support, a pier cover beam and a base bearing platform, a flange disc is arranged at the lower end of the concrete hollow pile pier, a reserved bolt hole is formed in the flange disc, the flange disc is connected with the base bearing platform, the flange disc and the base bearing platform are arranged in cast-in-place concrete, an upper bridge support steel plate is arranged at the upper surface of the bridge support while a lower bridge support steel plate is arranged at the lower surface of the bridge support, a flange disc is arranged at the upper end of the concrete hollow pile pier and connected with the lower bridge support steel plate, and the upper bridge support steel plate is connected with the pier cover beam. The pile column type concrete hollow pile pier structure has beneficial effects that the concrete hollow pile pier can be prefabricated in a factory, the pier length can be controlled precisely, the bearing ability of the pier is improved, the concrete hollow pile pier is connected with the base bearing platform through using the flange discs and an insert core reinforcing cage and casting concrete in place, the connecting intensity of the pier can be guaranteed, and the stability thereof is improved.
Description
Technical field
The invention belongs to bridge pier structure, particularly relate to a kind of pile-column concrete hollow pile bridge pier structure.
Background technology
Be erected on rivers,lakes and seas, mountain valley or traffic route, the building that traffic can be passed through smoothly, is called bridge.Bridge is generally made up of superstructure, substructure and attached structure, and superstructure comprises bridge span structure and support system, and substructure comprises abutment, bridge pier and basis, and attached structure comprises transition slab at bridge head, truncated cone banking, shore protection etc.
Bridge pier structure is primarily of pier cap, pier shaft and basic three part compositions, and can be divided into gravity pier and the large class of lighter pier two by make difference, lighter pier can be divided into again hollow pier, framed bent, thin-wall piers and pile-column bridge pier
Gravity pier: be generally the entity structure adopting concrete or barnacle, be characterized in making full use of the compressive property of building work material, bear the external force of vertical direction and horizontal direction by self larger cross-section size and weight, when bridge pier is higher, bearing capacity of foundation soil is lower, application is comparatively unfavorable;
Hollow pier: be similar to gravity pier outward, but the Thin-Wall Piers of hollow, can adopt reinforced concrete cast-in-situ or for prestressed concrete splicing structure, comparatively be applicable to high pier;
Framed bent: based on the lighter pier of truss, rigid frame, has low to foundation requirement, that pier high accommodation is large feature, often adopts the rigid frame formula bridge piers such as X-shaped, Y shape, V-arrangement;
Thin-wall piers: mostly be the reinforced concrete structure adopting slding form operation, because Thin-Wall Piers size is along the bridge very thin, easily produce deflection deformation by during longitudinal horizontal force, therefore also known as flexible pier;
Pile-column bridge pier: be the general designation of stake formula, queen post, single-columned pier, adopt pours into steel concrete construction on the spot, also adopts splicing prefabricated components, or driven pile is formed framed bent formula pier.
Number of patent application: 201310420662.X discloses a kind of tubular concrete bridge pier, the invention provides a kind of tubular concrete bridge pier, is made up of pier stud lower end segment body, more than one pier stud standard knot segment body and pier stud upper end segment body; Pier stud lower end segment body is placed on ground, and the upper end of pier stud lower end segment body is connected with the lower end of pier stud standard knot segment body assembly, and the upper end of pier stud standard knot segment body assembly is connected with the lower end of pier stud upper end segment body.The Advantageous Effects of this structure is: reduce concrete consumption than traditional solid bridge pier, meets the demand of energy-saving and emission-reduction while improving economy; Adopt pretensioned precast element, effectively can improve the cracking resistance of pier stud; Adopt steel beam column between bridge pier sections, effectively improve the safety of bridge pier structure under geological process.The shortcoming of this structure is that construction is complicated, and bridge pier is leveling not easily, and pier shaft is poor with the bonding strength on basis, and when bearing horizontal loading or uplift resistance, pier shaft easily produces cracking with the connecting portion on basis to be caused destroying.
Number of patent application: 201320571705.X discloses a kind of box concrete pier, is made up of pier stud lower end segment body, pier stud standard knot segment body assembly and pier stud upper end segment body; Pier stud lower end segment body is placed on ground, and the upper end of pier stud lower end segment body is connected with the lower end of pier stud standard knot segment body assembly, and the upper end of pier stud standard knot segment body assembly is connected with the lower end of pier stud upper end segment body; Pier stud standard knot segment body assembly is made up of 1 to 20 pier stud standard knot segment body 1.The beneficial effect of this structure has: the mode adopting hollow box-type section, meets the demand of energy-saving and emission-reduction while improving economy; Adopt pretensioned precast element, the effective cracking resistance improving pier stud; Pier stud standard knot segment body, pier stud lower edge segment body are prefabrication, can improve component quality, increase the durability of bridge pier.The shortcoming of this structure is that construction is complicated, and bridge pier is leveling not easily, and pier shaft is poor with the bonding strength on basis, and when bearing horizontal loading or uplift resistance, pier shaft easily produces cracking with the connecting portion on basis to be caused destroying.
Number of patent application: 201110396034.3 disclose a kind of precast prestressed concrete pier of steel tube, comprises bottom bridge pier section and prefabricated section of multiple tops bridge pier; Bottom bridge pier section is cast in situs encased structures; Prefabricated section of multiple tops bridge pier is end to end successively and be arranged on the upper end of bottom bridge pier section, and is provided with a branch of prestressed strand in prestressed pore passage in the bridge pier section of bottom on all prestressed pore passages and prefabricated section of corresponding top bridge pier.The precast prestressed concrete pier of steel tube of this invention is that prefabricated section of bridge pier bridge abutment integral being divided into certain length is prefabricated in the factory, and be transported to on-site hoisting, assembling, then be utilize prestressed strand Shi Hanzhang, the connection between prefabricated section of each bridge pier is strengthened, therefore, it is possible to ensure the globality of bridge pier with this.The shortcoming of this structure is complicated construction technique, long construction period, and the bonding strength of precast pier is poor.
Number of patent application: 200710049308.5 disclose a kind of steel-pipe concrete assembled pier, the two ends of its longitudinal bracing are fixedly connected with the girder of bridge, cushion cap respectively, longitudinal bracing system comprises at least one support unit, support unit comprises at least four along the spaced steel core concrete column of bridge vertical and horizontal, and builds formation lattice column by the support be fixedly connected with it.The shortcoming of this invention is complex structure, and difficulty of construction is large, and steel consumption is large, construction cost is high.
Summary of the invention
The present invention is to overcome deficiency of the prior art, a kind of pile-column concrete hollow pile bridge pier structure is provided, this structure uses concrete hollow pile as bridge pier, concrete hollow pile bridge pier uses flange to be connected with foundation platform, pier cap beam, the bonding strength of bridge pier can be ensured, improve its bearing capacity and stability.
The present invention for achieving the above object, be achieved through the following technical solutions, a kind of pile-column concrete hollow pile bridge pier structure, it is characterized in that: comprise concrete hollow pile bridge pier, bridge pad, pier cap beam and foundation platform, described concrete hollow pile bridge pier lower end is provided with flange, flange is provided with prepared screw-bolt hole, described flange is connected with foundation platform, described flange and foundation platform are placed in cast-in-situ concrete, described bridge pad upper and lower surface is respectively equipped with bridge pad upper steel plate and bridge pad lower steel plate, described concrete hollow pile bridge pier upper end is provided with flange, described flange is connected with bridge pad lower steel plate, described bridge pad upper steel plate is connected with pier cap beam.
The both sides on described concrete hollow pile bridge pier bottom and top are arranged with respectively and thicken skirtboard and pile end plate, described thickening skirtboard and pile end plate and flange affixed.Described flange and thickening skirtboard are connected with triangle floor.
Foundation anchor bolt is embedded with in described foundation platform, described foundation anchor bolt is connected with leveling nut, the setting position of foundation anchor bolt is corresponding with flange prepared screw-bolt hole position, and run through flange prepared screw-bolt hole, after described flange is placed in leveling nut upper surface, described foundation anchor bolt screws in hold-down nut again, cushion cap preformed hole is provided with in described foundation platform, lock pin reinforcing cage is provided with in described cushion cap preformed hole, described lock pin reinforcing cage one end is placed in foundation platform, the other end is placed in concrete hollow pile bridge pier hollow position, described flange, thicken skirtboard and lock pin reinforcing cage and concrete hollow pile bridge pier and form pile-column concrete hollow pile pier footing structure by cast-in-situ concrete is fixing.
Be provided with bent cap crab-bolt in described pier cap beam, bent cap crab-bolt position is corresponding with the bolt hole position of bridge pad upper steel plate, and described bent cap crab-bolt is affixed by nut through the bolt hole of bridge pad upper steel plate.
Described concrete hollow pile bridge pier is elongated structure or is formed by connecting by more piece stake, and described concrete hollow pile bridge pier is PHC pile tube, PC pile tube, PRC stake, TSC stake, hollow square pile.
Beneficial effect: concrete hollow pile bridge pier can greatly save concrete and rolled steel dosage, concrete hollow pile bridge pier can being prefabricated in the factory be produced, bridge pier length can accurately control, steady quality is reliable, and the bearing capacity of bridge pier can be improved, very big saving construction period, concrete hollow pile bridge pier and foundation platform use flange and lock pin reinforcing cage and cast-in-situ concrete is connected, the bonding strength of bridge pier can be ensured, improve its stability, in addition, concrete hollow pile bridge pier is adopted also can to do Bridge Landscape easily.
Accompanying drawing explanation
Fig. 1 is structural facades schematic diagram of the present invention;
Fig. 2 is concrete hollow pile pier footing structural representation;
Fig. 3 is concrete hollow pile bridge pier structure schematic diagram;
Fig. 4 is bridge pad structural representation;
Fig. 5 is that concrete hollow pile bridge pier is connected detail drawing A with basis;
Fig. 6 is that concrete hollow pile bridge pier is connected detail drawing B with bent cap;
Fig. 7 is that concrete hollow pile bridge pier is connected top view with flange;
Fig. 8 is the elevational schematic view that concrete hollow pile bridge pier is fixedly connected with pier cap beam.
In figure: 1-foundation platform, 2-foundation anchor bolt, 3-lock pin reinforcing cage, 4-cushion cap preformed hole, 5-concrete hollow pile bridge pier, 6-thickeies skirtboard, 7-pile end plate, 8-flange, 9-floor, 10-prepared screw-bolt hole, 11-hold-down nut, 12-leveling nut, 13-cast-in-situ concrete, 14-bridge pad lower steel plate, 15-bridge pad, 16-bridge pad upper steel plate, 17-bent cap crab-bolt, 18-pier cap beam.
Detailed description of the invention
Below in conjunction with preferred embodiment, to according to detailed description of the invention provided by the invention, details are as follows: embodiment
Refer to accompanying drawing, compared with prior art, the invention provides a kind of pile-column concrete hollow pile bridge pier structure, comprise concrete hollow pile bridge pier 5, bridge pad 15, pier cap beam 18 and foundation platform 1, described concrete hollow pile bridge pier lower end is provided with flange 8, flange is provided with prepared screw-bolt hole 10, described flange is connected with foundation platform, described flange and foundation platform are placed in cast-in-situ concrete 13, described bridge pad upper and lower surface is respectively equipped with bridge pad upper steel plate 16 and bridge pad lower steel plate 14, described concrete hollow pile bridge pier upper end is provided with flange, described flange is connected with bridge pad lower steel plate, described bridge pad upper steel plate is connected with pier cap beam 18.The both sides on described concrete hollow pile bridge pier bottom and top are arranged with respectively and thicken skirtboard 6 and pile end plate 7, described thickening skirtboard and pile end plate and flange affixed.Described flange and thickening skirtboard are connected with triangle floor 9.Foundation anchor bolt 2 is embedded with in described foundation platform, described foundation anchor bolt is connected with leveling nut 12, the setting position of foundation anchor bolt is corresponding with flange prepared screw-bolt hole position, and run through flange prepared screw-bolt hole, after described flange is placed in leveling nut upper surface, described foundation anchor bolt screws in hold-down nut 11 again, cushion cap preformed hole 4 is provided with in described foundation platform, lock pin reinforcing cage 3 is provided with in described cushion cap preformed hole, described lock pin reinforcing cage one end is placed in foundation platform, the other end is placed in concrete hollow pile bridge pier hollow position, described flange, thicken skirtboard, triangle floor and lock pin reinforcing cage and concrete hollow pile bridge pier form pile-column concrete hollow pile pier footing structure by cast-in-situ concrete 13 is fixing.Be provided with bent cap crab-bolt 17 in described pier cap beam, bent cap crab-bolt position is corresponding with the bolt hole position of bridge pad upper steel plate, and described bent cap crab-bolt is affixed by nut through the bolt hole of bridge pad upper steel plate.Described concrete hollow pile bridge pier is elongated structure or is formed by connecting by more piece stake, and described concrete hollow pile bridge pier is PHC pile tube, PC pile tube, PRC stake, TSC stake, hollow square pile.
Adopt the construction technology process of pile-column concrete hollow pile bridge pier structure:
(1) be prefabricated in the factory concrete hollow pile bridge pier 5, and concrete hollow pile bridge pier both sides are established pile end plate 7 and thickeied skirtboard 6, and at factory process flange 8 and floor 9.
(2) concrete hollow pile bridge pier that is prefabricated and that process, flange, floor are transported to job site, flange 8 is connected on concrete hollow pile bridge pier both sides pile end plate 7 at the construction field (site), and at flange and thicken and skirtboard welds floor 9 reinforce.
(3) construction pier footing and foundation platform 1, in foundation platform, pre-buried 8 stone bolt, leave cushion cap preformed hole 4, and are provided with lock pin reinforcing cage 3 in foundation platform, and lock pin reinforcing cage lower end is embedded in foundation platform, and upper end is exposed and exceeded foundation platform.
(4) on stone bolt, leveling nut 12 is screwed into, hang in concrete hollow pile bridge pier 5 and be placed on leveling nut by flange prepared screw-bolt hole 10, lock pin reinforcing cage 3 is inserted into concrete hollow pile bridge pier hollow position, stone bolt is screwed into hold-down nut 11, by regulating leveling nut 12, the verticality of concrete hollow pile bridge pier 5 is regulated.
(5), after concrete hollow pile bridge pier 5 is installed and stablized, cast-in-situ concrete 13 above foundation platform, is embedded in steel beam column such as flange 8, thickening skirtboard 6, floor 9, lock pin reinforcing cages 3 in concrete.
(6) on concrete hollow pile bridge pier 5, install bridge pad 15, bridge pad lower steel plate 14 uses bolt to be connected with concrete hollow pile bridge pier flange 8.
(7) construct pier cap beam 18 and in pier cap beam pre-buried bent cap crab-bolt 17, bent cap crab-bolt position is corresponding with bridge pad upper steel plate 16 bolt hole position, is screwed into nut is fixed in bent cap crab-bolt lower end, completes a concrete hollow pile Bridge Pier Construction.
Refer to accompanying drawing 8, when concrete hollow pile bridge pier is fixedly connected with pier cap beam, pier cap beam can be stretched in concrete hollow pile bridge pier upper end, be connected with bent cap crab-bolt by its upper flange plate, connect after-pouring concrete and concrete hollow pile bridge pier upper end is embedded in pier cap beam.
Above-mentioned detailed description of this kind of pile-column concrete hollow pile bridge pier structure being carried out with reference to embodiment; illustrative instead of determinate; several embodiments can be listed according to institute's limited range; therefore in the change do not departed under general plotting of the present invention and amendment, should belong within protection scope of the present invention.
Claims (5)
1. a pile-column concrete hollow pile bridge pier structure, it is characterized in that: comprise concrete hollow pile bridge pier, bridge pad, pier cap beam and foundation platform, described concrete hollow pile bridge pier lower end is provided with flange, flange is provided with prepared screw-bolt hole, described flange is connected with foundation platform, described flange and foundation platform are placed in cast-in-situ concrete, described bridge pad upper and lower surface is respectively equipped with bridge pad upper steel plate and bridge pad lower steel plate, described concrete hollow pile bridge pier upper end is provided with flange, described flange is connected with bridge pad lower steel plate, described bridge pad upper steel plate is connected with pier cap beam.
2. pile-column concrete hollow pile bridge pier structure according to claim 1, is characterized in that: the both sides on described concrete hollow pile bridge pier bottom and top are arranged with respectively and thicken skirtboard and pile end plate, described thickening skirtboard and pile end plate and flange affixed.Described flange and thickening skirtboard are connected with triangle floor.
3. pile-column concrete hollow pile bridge pier structure according to claim 2, it is characterized in that: in described foundation platform, be embedded with foundation anchor bolt, described foundation anchor bolt is connected with leveling nut, the setting position of foundation anchor bolt is corresponding with flange prepared screw-bolt hole position, and run through flange prepared screw-bolt hole, after described flange is placed in leveling nut upper surface, described foundation anchor bolt screws in hold-down nut again, cushion cap preformed hole is provided with in described foundation platform, lock pin reinforcing cage is provided with in described cushion cap preformed hole, described lock pin reinforcing cage one end is placed in foundation platform, the other end is placed in concrete hollow pile bridge pier hollow position, described flange, thicken skirtboard and lock pin reinforcing cage and concrete hollow pile bridge pier and form pile-column concrete hollow pile pier footing structure by cast-in-situ concrete is fixing.
4. pile-column concrete hollow pile bridge pier structure according to claim 1, it is characterized in that: in described pier cap beam, be provided with bent cap crab-bolt, bent cap crab-bolt position is corresponding with the bolt hole position of bridge pad upper steel plate, and described bent cap crab-bolt is affixed by nut through the bolt hole of bridge pad upper steel plate.
5. pile-column concrete hollow pile bridge pier structure according to claim 1, it is characterized in that: described concrete hollow pile bridge pier is elongated structure or is formed by connecting by more piece stake, described concrete hollow pile bridge pier is PHC pile tube, PC pile tube, PRC stake, TSC stake, hollow square pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410698130.7A CN104404869A (en) | 2014-11-26 | 2014-11-26 | Pile column type concrete hollow pile pier structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410698130.7A CN104404869A (en) | 2014-11-26 | 2014-11-26 | Pile column type concrete hollow pile pier structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104404869A true CN104404869A (en) | 2015-03-11 |
Family
ID=52642530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410698130.7A Pending CN104404869A (en) | 2014-11-26 | 2014-11-26 | Pile column type concrete hollow pile pier structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104404869A (en) |
Cited By (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735112A (en) * | 2016-04-14 | 2016-07-06 | 北京工业大学 | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier |
CN105908621A (en) * | 2016-06-29 | 2016-08-31 | 北京工业大学 | Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof |
CN105970952A (en) * | 2016-05-18 | 2016-09-28 | 中铁上海设计院集团有限公司 | Design method for pile foundation of large-diameter PHC tubular pile for railroad bridge |
WO2017045223A1 (en) * | 2015-09-18 | 2017-03-23 | 河海大学 | Prefabricated pier column member with steel-concrete composite structure |
CN107059589A (en) * | 2017-04-24 | 2017-08-18 | 陆厚铭 | A kind of stake beam bridge overall structure and construction technology and construction machinery |
CN107794932A (en) * | 2017-11-06 | 2018-03-13 | 固远晨通科技发展有限公司 | A kind of light-weight foamed concrete backfill bridge pier structure |
CN107794837A (en) * | 2016-08-31 | 2018-03-13 | 南京理工大学 | Suitable for the prefabricated assembled bridge pier and its construction method of middle meizoseismal area |
CN108708298A (en) * | 2018-05-25 | 2018-10-26 | 上海应用技术大学 | A kind of bridge pier rapid constructing method of old bridge reparation |
CN108978699A (en) * | 2018-07-18 | 2018-12-11 | 中铁广州工程局集团有限公司 | Land integral prefabricated bearing platform and production and installation method thereof |
CN109083003A (en) * | 2018-09-21 | 2018-12-25 | 上海市隧道工程轨道交通设计研究院 | A kind of precast pier pier top connection structure and its construction method |
CN109487782A (en) * | 2018-12-29 | 2019-03-19 | 威海中恒管桩有限公司 | A kind of concrete tubular pile Crane Rail support column and manufacture craft |
CN109518594A (en) * | 2018-12-04 | 2019-03-26 | 中交公路规划设计院有限公司 | Assembling pier stake connecting structure and its construction method |
CN109853363A (en) * | 2018-12-18 | 2019-06-07 | 中交第二公路勘察设计研究院有限公司 | Pipe pier and cushion cap connection structure and construction method |
CN109898542A (en) * | 2019-03-19 | 2019-06-18 | 河北省交通规划设计院 | A kind of variable diameters pile integral structure and preparation method thereof |
CN110004819A (en) * | 2019-05-16 | 2019-07-12 | 福州大学 | A kind of girder of Longspan Bridge and bridge pier built-in structure and its construction method |
CN110158633A (en) * | 2019-05-13 | 2019-08-23 | 明阳智慧能源集团股份公司 | A kind of prefabricated pier plate girder type basis of lattice concrete air pylon |
CN110761124A (en) * | 2018-07-26 | 2020-02-07 | 中铁华铁工程设计集团有限公司 | Assembled concrete track bridge |
CN110847022A (en) * | 2019-12-19 | 2020-02-28 | 浙江省交通规划设计研究院有限公司 | Multi-support steel pipe concrete single-column pier with concrete cover beam |
CN110904986A (en) * | 2019-10-28 | 2020-03-24 | 国网福建省电力有限公司 | Precast pile-bearing platform assembly type foundation tenon type flange connection structure and construction method |
CN110952456A (en) * | 2019-12-06 | 2020-04-03 | 中铁十八局集团建筑安装工程有限公司 | Pile type bridge construction process |
CN111188264A (en) * | 2020-03-20 | 2020-05-22 | 重庆单轨交通工程有限责任公司 | Double-limb thin-wall T-shaped pier |
CN111691290A (en) * | 2020-07-07 | 2020-09-22 | 郑琼华 | Prefabricated pier of equipment |
CN112575676A (en) * | 2019-09-30 | 2021-03-30 | 比亚迪股份有限公司 | Track support assembly and construction method thereof |
CN112832306A (en) * | 2021-02-09 | 2021-05-25 | 中交路桥建设有限公司 | CFG pile bearing capacity detection structure and detection method |
CN113005886A (en) * | 2021-03-04 | 2021-06-22 | 北京国道通公路设计研究院股份有限公司 | Connecting mode of bridge pier joint zero cast-in-situ double-column pier, capping beam and bearing platform |
CN113123222A (en) * | 2021-04-23 | 2021-07-16 | 上海市政工程设计研究总院(集团)有限公司 | Socket joint type connecting structure between prefabricated bridge pier column and bearing platform additionally provided with boss |
CN113235402A (en) * | 2021-06-10 | 2021-08-10 | 深圳市城市交通规划设计研究中心股份有限公司 | Connection structure of layered pouring bearing platform and prefabricated pier stud and construction method |
CN113235400A (en) * | 2021-06-10 | 2021-08-10 | 深圳市城市交通规划设计研究中心股份有限公司 | Adjustable slot-in type prefabricated pier stud and bearing platform connecting structure and construction method |
CN113373799A (en) * | 2021-05-26 | 2021-09-10 | 北京交通大学 | Mortise and tenon type spliced pier structure and implementation method thereof |
CN113585049A (en) * | 2021-09-08 | 2021-11-02 | 辽宁省交通规划设计院有限责任公司 | Self-resetting prefabricated assembled concrete filled steel tube pier node connection structure with replaceable plastic hinges and manufacturing method thereof |
CN113897948A (en) * | 2021-10-25 | 2022-01-07 | 安徽省公路桥梁工程有限公司 | Overwater drilled pile inclination prevention anchoring method for main trestle construction |
CN114134798A (en) * | 2021-12-09 | 2022-03-04 | 福州大学 | Self-resetting, anti-overturning and efficient shock absorption system for viaduct and construction method thereof |
CN114134803A (en) * | 2021-09-26 | 2022-03-04 | 重庆大学 | Assembled thin-walled steel tube concrete pier system and construction process thereof |
CN114960410A (en) * | 2022-06-23 | 2022-08-30 | 中国十七冶集团有限公司 | Thin-wall reducing high pier structure and long-span bridge |
CN115162173A (en) * | 2022-06-22 | 2022-10-11 | 中铁四局集团有限公司 | Construction method of square steel-concrete combined type portal pier |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09296459A (en) * | 1996-04-30 | 1997-11-18 | Masumi Yamada | Steel encased reinforced concrete |
KR100804125B1 (en) * | 2007-02-28 | 2008-02-19 | 진성토건 주식회사 | Connecting apparatus for precast concrete members, and fabricated bridge pier using the apparatus, and constructing method thereof |
CN201280687Y (en) * | 2008-10-17 | 2009-07-29 | 中铁十二局集团第二工程有限公司 | Integral bridge steel plate pier-hooping stand |
KR20100066857A (en) * | 2008-12-10 | 2010-06-18 | 한국건설기술연구원 | Connecting structure steel composite bent and cast in a place concrete pile and constructing method thereof |
CN101818478A (en) * | 2010-03-09 | 2010-09-01 | 河海大学 | Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam |
CN201786041U (en) * | 2010-09-27 | 2011-04-06 | 北京市新发京建工贸有限公司 | Steel support |
CN202073110U (en) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | Concrete pile and bearing platform connecting structure |
CN202187285U (en) * | 2011-08-25 | 2012-04-11 | 重庆新科建设工程有限公司 | Basin type rubber support of cast-in-situ bridge |
CN203603038U (en) * | 2013-12-02 | 2014-05-21 | 中铁第一勘察设计院集团有限公司 | Railway pier guard pile |
CN204282199U (en) * | 2014-11-26 | 2015-04-22 | 天津港航工程有限公司 | Pile-column concrete hollow pile bridge pier structure |
-
2014
- 2014-11-26 CN CN201410698130.7A patent/CN104404869A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09296459A (en) * | 1996-04-30 | 1997-11-18 | Masumi Yamada | Steel encased reinforced concrete |
KR100804125B1 (en) * | 2007-02-28 | 2008-02-19 | 진성토건 주식회사 | Connecting apparatus for precast concrete members, and fabricated bridge pier using the apparatus, and constructing method thereof |
CN201280687Y (en) * | 2008-10-17 | 2009-07-29 | 中铁十二局集团第二工程有限公司 | Integral bridge steel plate pier-hooping stand |
KR20100066857A (en) * | 2008-12-10 | 2010-06-18 | 한국건설기술연구원 | Connecting structure steel composite bent and cast in a place concrete pile and constructing method thereof |
CN101818478A (en) * | 2010-03-09 | 2010-09-01 | 河海大学 | Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam |
CN201786041U (en) * | 2010-09-27 | 2011-04-06 | 北京市新发京建工贸有限公司 | Steel support |
CN202073110U (en) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | Concrete pile and bearing platform connecting structure |
CN202187285U (en) * | 2011-08-25 | 2012-04-11 | 重庆新科建设工程有限公司 | Basin type rubber support of cast-in-situ bridge |
CN203603038U (en) * | 2013-12-02 | 2014-05-21 | 中铁第一勘察设计院集团有限公司 | Railway pier guard pile |
CN204282199U (en) * | 2014-11-26 | 2015-04-22 | 天津港航工程有限公司 | Pile-column concrete hollow pile bridge pier structure |
Cited By (46)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017045223A1 (en) * | 2015-09-18 | 2017-03-23 | 河海大学 | Prefabricated pier column member with steel-concrete composite structure |
US10047485B2 (en) | 2015-09-18 | 2018-08-14 | Honhai University | Assembled type pier column member with steel-concrete composite structure |
CN105735112A (en) * | 2016-04-14 | 2016-07-06 | 北京工业大学 | Bolt connection-based rapid assembling precast rectangular concrete filled steel tube bridge pier |
CN105970952A (en) * | 2016-05-18 | 2016-09-28 | 中铁上海设计院集团有限公司 | Design method for pile foundation of large-diameter PHC tubular pile for railroad bridge |
CN105970952B (en) * | 2016-05-18 | 2020-02-07 | 中国铁路总公司 | Design method for pile foundation of large-diameter PHC pipe pile of railway bridge |
CN105908621A (en) * | 2016-06-29 | 2016-08-31 | 北京工业大学 | Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof |
CN105908621B (en) * | 2016-06-29 | 2017-12-22 | 北京工业大学 | It is a kind of to damage controllable Self-resetting precast segment steel-pipe assembly concrete pier and the practice |
CN107794837A (en) * | 2016-08-31 | 2018-03-13 | 南京理工大学 | Suitable for the prefabricated assembled bridge pier and its construction method of middle meizoseismal area |
CN107059589B (en) * | 2017-04-24 | 2019-02-26 | 陆厚铭 | A kind of beam bridge overall structure and construction technology and construction machinery |
CN107059589A (en) * | 2017-04-24 | 2017-08-18 | 陆厚铭 | A kind of stake beam bridge overall structure and construction technology and construction machinery |
CN107794932A (en) * | 2017-11-06 | 2018-03-13 | 固远晨通科技发展有限公司 | A kind of light-weight foamed concrete backfill bridge pier structure |
CN107794932B (en) * | 2017-11-06 | 2023-10-03 | 固远晨通科技发展有限公司 | Pier structure is backfilled to foam lightweight concrete |
CN108708298A (en) * | 2018-05-25 | 2018-10-26 | 上海应用技术大学 | A kind of bridge pier rapid constructing method of old bridge reparation |
CN108978699A (en) * | 2018-07-18 | 2018-12-11 | 中铁广州工程局集团有限公司 | Land integral prefabricated bearing platform and production and installation method thereof |
CN110761124B (en) * | 2018-07-26 | 2021-05-28 | 中铁华铁工程设计集团有限公司 | Assembled concrete pillar track bridge |
CN110761124A (en) * | 2018-07-26 | 2020-02-07 | 中铁华铁工程设计集团有限公司 | Assembled concrete track bridge |
CN109083003A (en) * | 2018-09-21 | 2018-12-25 | 上海市隧道工程轨道交通设计研究院 | A kind of precast pier pier top connection structure and its construction method |
CN109083003B (en) * | 2018-09-21 | 2023-11-28 | 上海市隧道工程轨道交通设计研究院 | Pier top connecting structure for prefabricated pier and construction method of pier top connecting structure |
CN109518594A (en) * | 2018-12-04 | 2019-03-26 | 中交公路规划设计院有限公司 | Assembling pier stake connecting structure and its construction method |
CN109853363A (en) * | 2018-12-18 | 2019-06-07 | 中交第二公路勘察设计研究院有限公司 | Pipe pier and cushion cap connection structure and construction method |
CN109487782A (en) * | 2018-12-29 | 2019-03-19 | 威海中恒管桩有限公司 | A kind of concrete tubular pile Crane Rail support column and manufacture craft |
CN109898542A (en) * | 2019-03-19 | 2019-06-18 | 河北省交通规划设计院 | A kind of variable diameters pile integral structure and preparation method thereof |
CN110158633A (en) * | 2019-05-13 | 2019-08-23 | 明阳智慧能源集团股份公司 | A kind of prefabricated pier plate girder type basis of lattice concrete air pylon |
CN110158633B (en) * | 2019-05-13 | 2024-08-13 | 明阳智慧能源集团股份公司 | Prefabricated pier slab beam type foundation of lattice type concrete wind power tower |
CN110004819A (en) * | 2019-05-16 | 2019-07-12 | 福州大学 | A kind of girder of Longspan Bridge and bridge pier built-in structure and its construction method |
CN112575676A (en) * | 2019-09-30 | 2021-03-30 | 比亚迪股份有限公司 | Track support assembly and construction method thereof |
CN110904986A (en) * | 2019-10-28 | 2020-03-24 | 国网福建省电力有限公司 | Precast pile-bearing platform assembly type foundation tenon type flange connection structure and construction method |
CN110904986B (en) * | 2019-10-28 | 2021-06-22 | 国网福建省电力有限公司 | Precast pile-bearing platform assembly type foundation tenon type flange connection structure and construction method |
CN110952456A (en) * | 2019-12-06 | 2020-04-03 | 中铁十八局集团建筑安装工程有限公司 | Pile type bridge construction process |
CN110847022A (en) * | 2019-12-19 | 2020-02-28 | 浙江省交通规划设计研究院有限公司 | Multi-support steel pipe concrete single-column pier with concrete cover beam |
CN111188264A (en) * | 2020-03-20 | 2020-05-22 | 重庆单轨交通工程有限责任公司 | Double-limb thin-wall T-shaped pier |
CN111691290A (en) * | 2020-07-07 | 2020-09-22 | 郑琼华 | Prefabricated pier of equipment |
CN112832306A (en) * | 2021-02-09 | 2021-05-25 | 中交路桥建设有限公司 | CFG pile bearing capacity detection structure and detection method |
CN113005886A (en) * | 2021-03-04 | 2021-06-22 | 北京国道通公路设计研究院股份有限公司 | Connecting mode of bridge pier joint zero cast-in-situ double-column pier, capping beam and bearing platform |
CN113123222A (en) * | 2021-04-23 | 2021-07-16 | 上海市政工程设计研究总院(集团)有限公司 | Socket joint type connecting structure between prefabricated bridge pier column and bearing platform additionally provided with boss |
CN113373799A (en) * | 2021-05-26 | 2021-09-10 | 北京交通大学 | Mortise and tenon type spliced pier structure and implementation method thereof |
CN113235402A (en) * | 2021-06-10 | 2021-08-10 | 深圳市城市交通规划设计研究中心股份有限公司 | Connection structure of layered pouring bearing platform and prefabricated pier stud and construction method |
CN113235400A (en) * | 2021-06-10 | 2021-08-10 | 深圳市城市交通规划设计研究中心股份有限公司 | Adjustable slot-in type prefabricated pier stud and bearing platform connecting structure and construction method |
CN113585049A (en) * | 2021-09-08 | 2021-11-02 | 辽宁省交通规划设计院有限责任公司 | Self-resetting prefabricated assembled concrete filled steel tube pier node connection structure with replaceable plastic hinges and manufacturing method thereof |
CN113585049B (en) * | 2021-09-08 | 2022-11-08 | 辽宁省交通规划设计院有限责任公司 | Self-resetting prefabricated assembled concrete filled steel tube pier node connecting structure with replaceable plastic hinges and construction method thereof |
CN114134803A (en) * | 2021-09-26 | 2022-03-04 | 重庆大学 | Assembled thin-walled steel tube concrete pier system and construction process thereof |
CN113897948B (en) * | 2021-10-25 | 2022-11-18 | 安徽省公路桥梁工程有限公司 | Overwater drilled pile inclination prevention anchoring method for main trestle construction |
CN113897948A (en) * | 2021-10-25 | 2022-01-07 | 安徽省公路桥梁工程有限公司 | Overwater drilled pile inclination prevention anchoring method for main trestle construction |
CN114134798A (en) * | 2021-12-09 | 2022-03-04 | 福州大学 | Self-resetting, anti-overturning and efficient shock absorption system for viaduct and construction method thereof |
CN115162173A (en) * | 2022-06-22 | 2022-10-11 | 中铁四局集团有限公司 | Construction method of square steel-concrete combined type portal pier |
CN114960410A (en) * | 2022-06-23 | 2022-08-30 | 中国十七冶集团有限公司 | Thin-wall reducing high pier structure and long-span bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104404869A (en) | Pile column type concrete hollow pile pier structure | |
CN204282199U (en) | Pile-column concrete hollow pile bridge pier structure | |
CN105908621B (en) | It is a kind of to damage controllable Self-resetting precast segment steel-pipe assembly concrete pier and the practice | |
CN106869316B (en) | The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube | |
CN103741604B (en) | Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof | |
CN106894326B (en) | The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder | |
CN101215819B (en) | Separated double-layer bridge-floor cable stayed bridge | |
CN103290784B (en) | Arched girder conjugative bridge construction method for hanging | |
CN102535327B (en) | Through prestress steel truss and concrete combined continuous steel structure bridge and construction method thereof | |
CN106368348B (en) | A kind of superposed type compound shear wall with two benches stress characteristic | |
CN108978434A (en) | A kind of Novel steel-is mixed to be combined Continuous Box Girder Bridge and its industrializes construction method without bracket | |
CN205875394U (en) | Antidetonation concrete beam column that dry process is connected | |
CN111411724A (en) | Steel beam-concrete composite floor slab combined assembly system | |
CN108643429B (en) | But height-adjusting's assembled coincide floor | |
CN103981803A (en) | Prefabricated assembled combination type door-shaped pillar and construction method thereof | |
CN105133484B (en) | A kind of part earth anchor higher-lower tower cable-stayed bridge structure | |
CN201077951Y (en) | Track traffic overhead viaduct interval structure | |
CN201786045U (en) | House structure with combined steel beam and pretensioning method prestress laminated beam | |
CN207714129U (en) | A kind of wet seam construction of floorings using T reinforcing bars | |
CN206408639U (en) | Assembled steel reinforced concrete composite bridge | |
CN206376178U (en) | A kind of steel reinforced concrete beam rigid framed structure arch bridge | |
CN202530364U (en) | Inverted triangle pier simply supported or continuous bridge structure | |
CN202611096U (en) | I-shaped steel concrete beam | |
CN110206020B (en) | Prefabricated snowflake type concrete steel sheet pile and construction method thereof | |
CN106638265A (en) | Steel reinforced concrete beam rigid framework bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150311 |