CN2620007Y - Guide rail lift scaffold capable of sectional eccentric lifting - Google Patents

Guide rail lift scaffold capable of sectional eccentric lifting Download PDF

Info

Publication number
CN2620007Y
CN2620007Y CN 03202949 CN03202949U CN2620007Y CN 2620007 Y CN2620007 Y CN 2620007Y CN 03202949 CN03202949 CN 03202949 CN 03202949 U CN03202949 U CN 03202949U CN 2620007 Y CN2620007 Y CN 2620007Y
Authority
CN
China
Prior art keywords
lifting
scaffold
attached wall
overhead
main frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03202949
Other languages
Chinese (zh)
Inventor
曾绍强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03202949 priority Critical patent/CN2620007Y/en
Application granted granted Critical
Publication of CN2620007Y publication Critical patent/CN2620007Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

A segmentable eccentric lifting guide track raise scaffold is provided, which is composed of a mainframe one, two, three joints, a bridge bracket, a vertical post, a scaffold board, an attached overhead, an anti roll guidance system, an anti falling system, a lifting mechanism, an attached bracket and a pull bar, the vertical post of inside the mainframe is shaped by welding two channel steels and meanwhile is used as the guide track, two groups of guide wheels which are arranged at the upper and lower sides of the attached overhead are clamped in an inner cavity of the guide track for up and down running, the middle part of the attached overhead is provided with the anti falling locking system, an anti falling suspender which is fixed on the mainframe is clamped on the central line of two anti falling locking blocks, a hoisting machine is eccentrically lifted through two steel wires, thereby forming the lifting scaffold which only contains a three layer building height.

Description

The eccentric lifting of sectional lifting rail scaffold
The utility model relates to a kind of building operations attached lift scaffold.
Known existing attached lift scaffold, support body contain four layers of construction level height, and weight is big.
The purpose of this utility model provides a kind of and contains three layers of construction level height, by plant produced, can assemble or half assembling the eccentric lifting of sectional lifting rail scaffold entirely in the building site assembling.During full the assembling, with main frame, crane span structure, lifting gear, anti-dumping anti-drop device assembling lifting structure part with vertical position welding, steel typing scaffold floor, is assembled the scaffold part.Except that the lifting structure part was identical, its scaffold partly adopted conventional steel tube fastener and bamboo wood scaffold floor when partly assembling.During segmentation, use two to four main frames, scaffold in the middle of one to three group of crane span structure is formed each side uses one group of cantilever crane span structure to form one section scaffold altogether, with adjacent another section scaffold sectional lifting, and also can two sections whole liftings.Become a kind of combined and instant, the attached lift scaffold of construction safety.
The purpose of this utility model is to realize like this.Promote the place, seat in the plane at each the main frame of a welding fabrication is set, and be divided into one two three joints, internode ties with the flange valve snail and connects, its inboard vertical bar, be again guide rail, remaining standpipe, steel scaffold floor, pull bar, lifting appliance, anti-dumping anti-drop device, crane span structure are conventional member, crane span structure is installed in the both sides of main frame bottom one joint, and the cantilever crane span structure is installed in the main frame outside, two ends.Vertical rod is installed in the crane span structure top, scaffold floor is formed one section lifting false work.Attached wall is overhead to be fastened on the structure side bar with through-wall bolt, and it respectively is equipped with a directive wheel bearing up and down, and guide wheel is enclosed within the anti-dumping lifting of can leading of main frame medial shaft in the vertical rod inner chamber.The overhead middle part of attached wall is equipped with anti-tenesmus locking device bearing, has the anti-fall suspension rod that is fixed in the inboard vertical rod of main frame to pass on its center line, forms anti-tenesmus structure.Reaching on the intensity layer side bar, each attached wall frame about being equipped with, the extension motor hoist in the left side, the extension in the right two wire rope tails of rope, forms to walk two eccentric Hoisting System.Formed that attached wall is overhead to be installed on the side bar of double-layer structure up and down that reaches intensity, scaffold with bottom attached wall frame and about two pairs of pull bars be installed on the side bar of double-layer structure up and down that reaches intensity, the anti-dumping anti-drop device is installed in the attached wall self-lifting scaffold frame system of attached wall on overhead.
Owing to adopted such scheme, its main frame, crane span structure, standpipe, scaffold floor, attached wall be overhead all to become stressed clear and definite structural member, can carry out theory by existing Code for design of steel structures calculates, be adapted to plant produced, reach standardization, assemblingization, tool and alleviate the purpose of lifting hand frame deadweight, simple in structure.
Further specify below in conjunction with drawings and Examples.
Fig. 1 is the front elevation view of one section lifting false work.
Fig. 2 is the side elevational view of the overhead lifting of main frame attached wall when putting in place.
Fig. 3 is anti-dumping directive wheel nodal plane figure.
Fig. 4 is anti-drop device nodal plane figure.
In Fig. 1: the 1st, main frame one joint; The 2nd, main frame two joints; The 3rd, main frame three joints, internode have flange 4 usefulness bolts to connect into a main frame; 5 is four internode crane span structures, is installed in main frame one joint 1 bottom with bolt; 6 is internode cantilever crane span structures, is installed in the outside in the outside of dual-side main frame one joint with bolt; The 7th, vertical rod is joint down, is installed in the crane span structure top; The 8th, vertical rod; The 9th, the vertical rod adpting flange; The 10th, the steel scaffold floor; The 11st, the handrail steel pipe is formed one section can be separately or the lifting rail scaffold of integral elevating.
In Fig. 2: main frame one joint 1, main frame two joints 2, main frame three joints 3 connect into a main frame through flange 4 usefulness bolts.Retaining is through turnover panel attached wall frame 12 in its underpart, and through-wall bolt 13 is fastening with structure side bar 14, the outside, bottom pull bar 15, and through-wall bolt 16 is installed in the whole piece main frame on the structure side bar 17.Overhead 18 bottoms of attached wall are fastened on the structure side bar 14 with through-wall bolt 17, the middle part is fastened on the structure side bar 17 with through-wall bolt 20, overhead 18 napexes of attached wall have directive wheel bearing 21, directive wheel bearing 22 is arranged at the bottom, there is anti-tenesmus locking device bearing 23 at the middle part, and anti-tenesmus suspension rod 24 passes anti-tenesmus locking device center line to be passed through.The 25th, fulcrum on the anti-tenesmus suspension rod.The 26th, anti-tenesmus suspension rod lower fulcrum.The 27th, motor hoist hangs on the attached wall frame 28, and be fastened on through-wall bolt 29 on the structure limit 17 on overhead 18 left sides of attached wall, motor hoist movable pulley 30 hooks away the bottom pulley 32 of two wire rope 31 through being fixed on main frame one joint 1 and up hangs on the attached wall frame 33, and be fastened on through-wall bolt 34 on the structure side bar 17 on overhead 18 the right of attached wall, form and walk two Hoisting System, and abdicate the position of center line of occupying by attached wall overhead 18.The 35th, main frame channel-section steel guide rail.The 36th, give and boxing out, every layer one row gives altogether and stays five holes.The 37th, just watered the concrete structure layer.The 38th, the Hot work in progress layer.
In Fig. 3: the 35th, main frame channel-section steel guide rail.The 39th, the channel-section steel guide rail splice.The 40th, the horizontal connecting rod of main frame.The 41st, the outside standpipe of attached wall overhead 18, directive wheel bearing 21 usefulness bolts 42 are installed on the seat board 43 that is welded on the attached wall overhead 18, there are guide wheel shaft 45 and directive wheel 46 in stiffener 44 ends that are welded on the directive wheel bearing, make it to stretch into guiding operation up and down in channel-section steel guide rail 35 inner chambers.
In Fig. 4: the 35th, main frame channel-section steel guide rail.The 41st, the outside standpipe of attached wall overhead 18, anti-tenesmus locking device bearing 23 usefulness bolts 47 are installed on the bearing 48 that is welded in the overhead outside of attached wall standpipe 41.The 49th, the stiffener of anti-tenesmus locking device bearing 23.The 24th, anti-tenesmus suspension rod is about being on the center line of two lock dogs 50.The 51st, the gathering sill of lock dog 50.The 52nd, the compression spring hole at lock dog 50 tops, stage clip 53 is placed in the compression spring hole 52.

Claims (8)

1, the eccentric lifting of a kind of sectional lifting rail scaffold is by main frame one two three joints, crane span structure, vertical rod, scaffold floor, attached wall is overhead, the anti-dumping guidance system, anti-drop system down, hoisting mechanism, the attached wall frame, pull bar is formed, it is characterized in that: two groups of directive wheels are installed in two places up and down of the overhead outside of attached wall standpipe up and down, and two groups of directive wheels are to be stuck in the inboard vertical rod of the main frame operation up and down of holding concurrently in the channel-section steel inner chamber of guide rail.
2, the eccentric lifting of sectional according to claim 1 lifting rail scaffold, it is characterized in that: anti-tenesmus locking device is mounted in standpipe middle part, the overhead outside of attached wall, and the upper and lower side of anti-tenesmus suspension rod is fixed in the inboard vertical rod of main frame and by two lock dog center lines.
3, the eccentric lifting of sectional according to claim 1 lifting rail scaffold, it is characterized in that: elevator is to hang on the attached wall frame on the overhead left side of attached wall, and be fastened on the structure side bar with through-wall bolt, its movable pulley hooks away two wire rope, one end, pulley through being fixed on the main frame bottom upwards is fixed on tail of rope on the another attached wall frame on the overhead the right of attached wall, and be fastened on the structure side bar with through-wall bolt downwards.
4, the eccentric lifting of sectional according to claim 1 lifting rail scaffold, it is characterized in that: two groups of directive wheels all are that wheel stand is motionless under the lifting operating mode up and down, and guide wheel rotates, and guide rail is up and down.
5, the eccentric lifting of sectional according to claim 1 lifting rail scaffold is characterized in that: under the lifting operating mode, anti-tenesmus locking device is motionless, and anti-tenesmus suspension rod moves up and down with main frame.
6, the eccentric lifting of sectional according to claim 1 lifting rail scaffold, it is characterized in that: during segmentation, use two to four main frames, scaffold in the middle of one to three group of crane span structure is formed, each side use one group of cantilever crane span structure to form one section scaffold altogether, with another section scaffold sectional lifting of actor mutually, also can wholely promote.
7, sectional lifting rail scaffold according to claim 1 is characterized in that: when partly assembling, except that lifting structure was partly identical, its scaffold partly adopted conventional steel tube fastener and bamboo wood scaffold floor.
8, the eccentric lifting of sectional according to claim 1 lifting rail scaffold, it is held to levy and is: the height of lifting false work contains three construction level height.
CN 03202949 2003-02-18 2003-02-18 Guide rail lift scaffold capable of sectional eccentric lifting Expired - Fee Related CN2620007Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03202949 CN2620007Y (en) 2003-02-18 2003-02-18 Guide rail lift scaffold capable of sectional eccentric lifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03202949 CN2620007Y (en) 2003-02-18 2003-02-18 Guide rail lift scaffold capable of sectional eccentric lifting

Publications (1)

Publication Number Publication Date
CN2620007Y true CN2620007Y (en) 2004-06-09

Family

ID=34241217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03202949 Expired - Fee Related CN2620007Y (en) 2003-02-18 2003-02-18 Guide rail lift scaffold capable of sectional eccentric lifting

Country Status (1)

Country Link
CN (1) CN2620007Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643551A (en) * 2018-07-23 2018-10-12 广州达蒙安防科技有限公司 Inner guide type elevating scaffold wall-attaching equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643551A (en) * 2018-07-23 2018-10-12 广州达蒙安防科技有限公司 Inner guide type elevating scaffold wall-attaching equipment

Similar Documents

Publication Publication Date Title
CN201268938Y (en) Corner hanging cradle for working aloft
CN113638312A (en) Multi-functional bridge railing construction trolley
CN110980478B (en) Construction lifting system
CN2620007Y (en) Guide rail lift scaffold capable of sectional eccentric lifting
CN205604084U (en) Hanging flower basket device of prefabricated little case roof beam construction usefulness
KR102599944B1 (en) Overhead moving type gondola apparatus
CN215925636U (en) Multi-functional bridge railing construction trolley
CN211499699U (en) Ladder-climbing type operation rack for hanging cage
CN214141458U (en) Bolt type mounting rack
CN214302804U (en) Double-layer hanging basket of riding horse type
CN212535058U (en) Be used for construction machinery and construction grouping synchronous elevation structure
CN2578461Y (en) Liftable scaffold
CN211419276U (en) Construction platform assembly for construction elevator
CN217418117U (en) Handrail elevator protection mounting tool
CN211895621U (en) Rope returning wheel frame assembly for construction elevator
CN217296857U (en) Hanging type backpack frame structure
CN216276810U (en) Connecting assembly for hanging frame of building machine
CN215631510U (en) Steel construction canopy construction platform
CN208899815U (en) A kind of modularization steel construction elevator
CN2433349Y (en) Lifting scaffold of full-assembled eccentric sling rail guide type
CN211895633U (en) Machine room assembly for construction elevator
CN219471477U (en) Steel construction stair auxiliary installation equipment
CN218479507U (en) Basket is hung in construction that cascaded abnormal shape aluminum plate curtain cornices
CN217650668U (en) Traction type platform elevator framework supporting structure
CN214495505U (en) Auxiliary hoisting device for partition board installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee