CN2575147Y - Road barricade pole - Google Patents
Road barricade pole Download PDFInfo
- Publication number
- CN2575147Y CN2575147Y CN 02256782 CN02256782U CN2575147Y CN 2575147 Y CN2575147 Y CN 2575147Y CN 02256782 CN02256782 CN 02256782 CN 02256782 U CN02256782 U CN 02256782U CN 2575147 Y CN2575147 Y CN 2575147Y
- Authority
- CN
- China
- Prior art keywords
- bridge
- bridge plate
- bridge pier
- utility
- gang
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a road barricade pole which can be directly assembled on a roadbed after reinforcing treatment and has a shortened construction period of a grade separation crossing and low engineering cost. The utility model comprises a bridge pier, a bridge plate, a transverse beam and a guard bar, wherein, the bridge pier, the bridge plate, the transverse beam and the guard bar are in a combined structure; a positioning structure is arranged between independent members, and a connecting place for one independent member with another independent member is provided with a corresponding fixedly connecting structure.
Description
Technical field
The utility model relates to a kind of basic means of transportation, is specifically related to a kind of Gang Qiao that can be used for flyover crossing as the upper strata road.
Background technology
Along with Chinese economic development, the various vehicles rapidly increase, and thus, have brought great pressure to urban traffic.For improving this situation, various places are strengthened the input that traffic infrastructure is built one after another, be used for newly-built road, original road is carried out reorganization and expansion etc., wherein, a most outstanding variation is no more than being flyover crossing with a large amount of level crossing reconstructions on the urban traffic trunk line.
Flyover crossing can make the wagon flow of each main travel direction be independent of each other, and can alleviate traffic pressure to a great extent.But existing flyover crossing is in process of construction, and bridge pier need adopt on-the-spot pouring, and bridge plate, crossbeam etc. are also many to water construction at the scene with bridge pier.Therefore, there is following weak point in existing flyover crossing, needs to be resolved hurrily.One, because each main member needs on-the-spot pouring, existing overpass bridge not only want closure construction, and construction period is longer when building.During this period, all contact vehicles all need detour, and make nervous more with regard to obstructed traffic originally.Two, this long-time, large-scale site operation, the huge and expensive costliness of engineering is unfavorable for extensive popularization, is restricting the improvement as early as possible of urban traffic conditions.
Summary of the invention
At the deficiency of prior art scheme, technical problem underlying to be solved in the utility model is that a kind of Gang Qiao that can shorten the flyover crossing site operation cycle is provided.
The technical solution adopted in the utility model is, Gang Qiao comprises bridge pier, bridge plate, crossbeam and guardrail, this Gang Qiao is a fabricated structure, is equipped with location structure between each individual member, and each individual member is provided with corresponding fixed connection structure respectively at itself and other individual member place of linking.
The bridge pier of this Gang Qiao can segmentation form several individual members, and its epimere and crossbeam are one-body molded, is an individual member.
Can be between each individual member of this Gang Qiao by projection and groove location.
The fixed connection structure of described Gang Qiao can be the embedded iron of being located on each individual member, is coupled to each other together by the embedded iron welding between each individual member.
Compare with traditional flyover crossing, each individual member of Gang Qiao described in the utility model can prefabricatedly be processed, split transportation, assembled on site, and easily realizes standardization and seriation, is convenient to construction and management.This Gang Qiao can directly be assembled in the road bed after strong processing, can shorten the engineering construction cycle of flyover crossing greatly, saves engineering cost.
Description of drawings
Below in conjunction with an accompanying drawing and a specific embodiment, the utility model is elaborated.
The utility model drawings attached 17 width of cloth:
Fig. 1 is the schematic perspective view of the utility model The initial segment bridge plate;
Fig. 2 is the schematic perspective view of the utility model gradient section bridge plate;
Fig. 3 is the three-dimensional exploded view and the combination schematic diagram of the utility model combined type bridge pier;
Fig. 4 is the combination schematic diagram of the another kind of combined type bridge pier of the utility model;
Fig. 5 is the combination schematic diagram of the utility model interlude bridge plate and bridge pier;
Fig. 6 prolongs the combination schematic diagram of bridge plate and bridge pier for the utility model interlude;
Fig. 7 is the schematic perspective view of the utility model guardrail;
Fig. 8 is the utility model roadbed schematic diagram;
The combination schematic diagram of The initial segment bridge plate and guardrail when Fig. 9 is site operation;
The combination schematic diagram of The initial segment bridge plate, gradient section bridge plate and bridge pier when Figure 10 is site operation;
The combination schematic diagram of gradient section bridge plate and bridge pier when Figure 11,12 is site operation;
The combination schematic diagram of interlude bridge plate and bridge pier when Figure 13 is site operation;
Interlude prolonged the combination schematic diagram of bridge plate and bridge pier when Figure 14 was site operation;
Figure 15 is a hilllock bridge assembled state schematic diagram, and wherein guardrail is not installed as yet;
User mode schematic diagram when Figure 16 is used for a blossom type flyover crossing for Gang Qiao described in the utility model;
Schematic diagram when Figure 17 is used to cross over a level crossing for the utility model.
The specific embodiment
Gang Qiao described in the utility model comprises bridge pier, bridge plate, crossbeam and guardrail, and it is a kind of fabricated structure, is equipped with location structure between each individual member, and each individual member is provided with corresponding fixed connection structure respectively at itself and other individual member place of linking.In specific embodiment as described below, all individual members are prefabricated component.
Fig. 1 is the schematic perspective view of the utility model The initial segment bridge plate, this The initial segment bridge plate 1 has certain gradient, its right-hand member is higher, be provided with detent 11, locating convex block 12 and step 14 at its right-hand member, described detent 11 lower ends formation one is lower than the depressed part 111 of step 14, is equipped with embedded iron 13 at each locating convex block place.Domatic and ground angle 5 degree (concrete angle can be determined according to designing requirement) of described The initial segment bridge plate.
Fig. 2 is the schematic perspective view of the utility model gradient section bridge plate, there is shown wide, narrow two kinds of gradient section bridge plates, wherein wide person's width is 2 times of narrow person, so that the bridge plate that joins before and after each can stagger mutually at left and right directions, to strengthen the fastness of bridge plate integral body.These gradient section bridge plate 2 two ends are equipped with location structure, its left end is provided with detent 21, locating convex block 22 and embedded iron 23, the lower end of its locating convex block 22 extends to form a convex extension part 221, its right-hand member is provided with detent 24, locating convex block 25 and embedded iron 26, and the lower end of described locating convex block 25 extends to form a convex extension part 251.
Fig. 3 is the three-dimensional exploded view and the combination schematic diagram of the utility model combined type bridge pier, bridge pier 3 comprises epimere bridge pier 33, stage casing bridge pier 32 and hypomere bridge pier 31, the cylinder of each section bridge pier is square, be respectively equipped with embedded iron 331,321 and 311 on it, wherein epimere bridge pier 33 is provided with crossbeam 34, the two ends of crossbeam 34 are respectively equipped with limiting section 341, and its middle part is provided with detent 342.In the actual engineering, the epimere bridge pier 33 of this combined type bridge pier 3 can use separately, also can be used in combination with stage casing bridge pier 32, hypomere bridge pier 31 with stage casing bridge pier 32 or while as the case may be.
Fig. 4 is the combination schematic diagram of the another kind of combined type bridge pier of the utility model, with shown in Figure 3 different be that the cylinder of bridge pier 3 be an ellipse in this example.
Fig. 5 is the combination schematic diagram of the utility model interlude bridge plate and bridge pier, described interlude bridge plate 4 left and right two ends are respectively equipped with detent 41 and locating convex block 42, described locating convex block 42 lower ends extend to form a convex extension part 421, at each detent 41 place and bridge plate upper surface and guardrail junction be equipped with embedded iron 13.
Fig. 6 prolongs the combination schematic diagram of bridge plate and bridge pier for the utility model interlude, with shown in Figure 5 different be, interlude prolongation bridge plate 5 left end structures are different with the left end structure of interlude bridge plate 4, and it is and the corresponding a kind of structure of the right-hand member structure of interlude bridge plate 4.
Fig. 7 is the schematic perspective view of the utility model guardrail, there is shown the guardrail 6 that is positioned at bridge bridge plate both sides, hilllock, the bottom of every section guard 6 and two ends are respectively equipped with embedded iron 61, wherein Di Bu embedded iron be used for and bridge plate between welding (corresponding position of bridge plate upper surface also is provided with embedded iron), the embedded iron at its two ends be used for and adjacent guardrail between welding.
Fig. 8 is the utility model roadbed schematic diagram, and the utility model requires strong processing is done on on-the-spot road surface before installation, for example, and the pouring steel concrete roadbed of digging pit in each bridge pier corresponding position.Be respectively equipped with locating slot 7 with each bridge pier corresponding position on the roadbed, the initiating terminal corresponding section of The initial segment bridge plate can be provided with boss 71.。
The combination schematic diagram of The initial segment bridge plate and guardrail when Fig. 9 is site operation, among the figure, The initial segment bridge plate 1 directly is arranged on the roadbed after the on-the-spot strong processing, according to design hilllock bridge circuit face width degree, a plurality of bridge plates are placed side by side, weld together by embedded iron between each bridge plate.Guardrail 6 is welded in the both sides of being made up of bridge plate, road surface.
The combination schematic diagram of The initial segment bridge plate, gradient section bridge plate and bridge pier when Figure 10 is site operation, The initial segment bridge plate and gradient section bridge plate junction are passed through detent 11,21 and locating convex block 12, the 22 interlaced embedding interlocks on it respectively, and weld together by embedded iron.The convex extension part 221 of the locating convex block 22 of the gradient section bridge plate 2 left ends (not shown) that matches with the depressed part 111 of the detent 11 of The initial segment bridge plate 1, its right-hand member is set up on the bridge pier 3, and described bridge pier 3 is to adopt epimere bridge pier 33 separately.Gradient section bridge plate 2 cooperates the location by the convex extension part 251 on its locating convex block 25 with detent 342 on the bridge pier 33.Also weld together between this group gradient section bridge plate by embedded iron.
When Figure 11,12 is respectively site operation, the combination schematic diagram of gradient section bridge plates at different levels and bridge pier, the combination schematic diagram of interlude bridge plate and bridge pier when Figure 13 is site operation, interlude prolonged the combination schematic diagram of bridge plate and bridge pier when Figure 14 was site operation, and its principle is same as shown in Figure 10.
Figure 15 is a hilllock bridge assembled state schematic diagram, and wherein guardrail is not installed as yet.After the Gang Qiao combination finishes, only need require after the road surface pavement of bridge plate surface, to get and to come into operation as ordinary road.
User mode schematic diagram when Figure 16 is used for a blossom type flyover crossing for Gang Qiao described in the utility model.
Schematic diagram when Figure 17 is used to cross over a level crossing for the utility model.
Compare with traditional flyover crossing, each individual member of Gang Qiao described in the utility model can prefabricatedly be processed, split transportation, assembled on site, and easily realizes standardization and seriation, is convenient to construction and management.This Gang Qiao can directly be assembled in the road bed after strong processing, can shorten the construction project cycle of flyover crossing greatly, saves engineering cost.
Claims (4)
1, a kind of Gang Qiao, comprise bridge pier, bridge plate, crossbeam and guardrail, it is characterized in that: this Gang Qiao is a fabricated structure, is equipped with location structure between each individual member, and each individual member is provided with corresponding fixed connection structure respectively at itself and other individual member place of linking.
2, Gang Qiao according to claim 1 is characterized in that: the bridge pier segmentation forms several individual members, and its epimere and crossbeam are one-body molded, is an individual member.
3, Gang Qiao according to claim 1 and 2 is characterized in that: locate by projection and groove between each individual member.
4, a kind of Gang Qiao according to claim 1 and 2 is characterized in that; Described fixed connection structure is the embedded iron of being located on each individual member, is coupled to each other together by the embedded iron welding between each individual member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02256782 CN2575147Y (en) | 2002-09-23 | 2002-09-23 | Road barricade pole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02256782 CN2575147Y (en) | 2002-09-23 | 2002-09-23 | Road barricade pole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2575147Y true CN2575147Y (en) | 2003-09-24 |
Family
ID=33724925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02256782 Expired - Fee Related CN2575147Y (en) | 2002-09-23 | 2002-09-23 | Road barricade pole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2575147Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845791A (en) * | 2010-05-26 | 2010-09-29 | 云南大红山管道有限公司 | Device capable of allowing loader to directly enter accident pool |
CN102677581A (en) * | 2012-05-02 | 2012-09-19 | 邢台路桥建设总公司 | Novel prefabricated bridge approach and construction method thereof |
CN103835222A (en) * | 2014-03-18 | 2014-06-04 | 合肥工业大学 | Traffic structure spanning urban rail transit construction area |
CN105970795A (en) * | 2016-06-27 | 2016-09-28 | 河北广通路桥集团有限公司 | Combined viaduct |
-
2002
- 2002-09-23 CN CN 02256782 patent/CN2575147Y/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845791A (en) * | 2010-05-26 | 2010-09-29 | 云南大红山管道有限公司 | Device capable of allowing loader to directly enter accident pool |
CN102677581A (en) * | 2012-05-02 | 2012-09-19 | 邢台路桥建设总公司 | Novel prefabricated bridge approach and construction method thereof |
CN102677581B (en) * | 2012-05-02 | 2015-11-11 | 邢台路桥建设总公司 | Reinforced concrete prefabricated access bridge and construction method thereof |
CN103835222A (en) * | 2014-03-18 | 2014-06-04 | 合肥工业大学 | Traffic structure spanning urban rail transit construction area |
CN103835222B (en) * | 2014-03-18 | 2015-07-01 | 合肥工业大学 | Traffic structure spanning urban rail transit construction area |
CN105970795A (en) * | 2016-06-27 | 2016-09-28 | 河北广通路桥集团有限公司 | Combined viaduct |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201850505U (en) | Rigid-flexible transition structure capable of preventing bumping at bridge-head | |
US8496397B2 (en) | Precast concrete slabs and related systems, methods of manufacture and installation | |
CN2575147Y (en) | Road barricade pole | |
CN106320352B (en) | Construction method of multifunctional steel sheet pile cofferdam | |
CN106168031B (en) | Multifunctional steel sheet pile cofferdam | |
CN205636397U (en) | Assembled cement road surface structure | |
CN102912701A (en) | Multifunctional left-turning directional interchange overpass | |
JP4196267B2 (en) | Construction method of multilevel intersection road | |
CN1154766C (en) | Process for the articulated imbrication of concrete slabs in situ | |
CN207110599U (en) | A kind of under(-)chassis of up-down cross sliding type multi-storied garage | |
CN214401374U (en) | New and old T type roof beam mosaic structure | |
CN201010988Y (en) | Conveniently draining shutter grate cover | |
CN2625438Y (en) | Curbstone | |
KR100699328B1 (en) | Mounting structure of pavement block of collective building area | |
CN211571228U (en) | Road surface roadbed mosaic structure for reconstruction and extension engineering | |
CN2579933Y (en) | Plum blossom type stereo cross crossing | |
JPH0711691A (en) | Underground water storage tank | |
CN214613537U (en) | Cable-arch combined landscape bridge | |
CN1460748A (en) | Roadbed structrue for highway and railway and its construction method | |
CN2679263Y (en) | Joint of semi-precast beam | |
CN211547132U (en) | Municipal works concrete road subgrade | |
CN217298488U (en) | Assembled road section structure | |
JP3232407U (en) | Upper and lower split type gutter | |
CN215210482U (en) | Pedestrian overpass and canopy structure attached to vehicle travelling bridge | |
CN204435145U (en) | Mould structure viaduct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |