CN2563238Y - Door type steel pipe scaffold for building constructure - Google Patents
Door type steel pipe scaffold for building constructure Download PDFInfo
- Publication number
- CN2563238Y CN2563238Y CN 02238689 CN02238689U CN2563238Y CN 2563238 Y CN2563238 Y CN 2563238Y CN 02238689 CN02238689 CN 02238689 CN 02238689 U CN02238689 U CN 02238689U CN 2563238 Y CN2563238 Y CN 2563238Y
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- type steel
- scaffold
- door type
- standpipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides a door type steel pipe scaffold for construction, which is improved form the prior scaffold, wherein a level pipe and an arc support pipe are welded on an upright pipe, forming the door type steel pipe frame, which not only conveniences the process and saves materials, but also improves the intensity of the door type steel pipe frame. An upper layer of the door type steel pipe frame and a lower layer of the door type steel pipe frame are connected with each other by connecting pipes, which is convenient for assembly. The utility model is additionally provided with a foot blocking rod, which makes builders safer. The utility model has the advantages of novel structure, convenient assembly, material save, good intensity, safety and reliability, thereby the utility model is the novel door type steel pipe scaffold for construction which is combined of the economical efficiency and the practicability as a whole.
Description
Technical field
The utility model relates to the scaffold that a kind of building operations is used.
Background technology
National economy and scientific and technical develop rapidly at present, building trade are that the update aspect the building operations apparatus is also rapid unusually in advance, and old job practices and instrument progressively are eliminated, and are substituted continual renovation, constantly perfect by more advanced technical equipment.The scaffold of using with regard to building operations also is the same, and is through repeatedly improving, progressively perfect.But in use still there are some problems, complex structure, cost is higher, and the construction safety performance is poor, and spare and accessory parts are more, and management is inconvenient, and installs and waste time and energy, and old shape steel tube shelf structure is unreasonable, intensity is low.At existing problem in the prior art, a kind of novel building operations gate-type steel pipe scaffold of research and design, existing problem is very necessary in the prior art thereby overcome.
Summary of the invention
In view of existing problem in the above-mentioned prior art, the purpose of this utility model is improved on the basis of existing door shape steel tube scaffold, and a kind of novel building simple in structure, easy for installation, that intensity is good, safe and reliable of research and design is constructed and used the gate-type steel pipe scaffold.Building operations described in the utility model is made up of door shaped steel pipe support, crossbar, scaffold floor, adjustable base etc. with the gate-type steel pipe scaffold, the top of its shaped steel pipe support is welded on the standpipe by horizontal tube and circular arc stay pipe, and tube connector is equipped with on the top of standpipe.Between the Kong Yukong below two standpipes of the scaffold outside, set up the retaining foot lever.Be drilled with fixing hole on the tube connector of building operations described in the utility model with the gate-type steel pipe scaffold, the standpipe lower end also is drilled with fixing hole, and the fixing hole of the fixing hole on the tube connector and standpipe lower end should concentric and equal diameters, and the retaining foot lever should be able to pass from fixing hole.The utility model has adopted tube connector to assemble the structure of upper and lower layer shaped steel pipe support, only needs and will get final product on the tube connector on the door shaped steel pipe support standpipe lower end insertion lower floor door shaped steel pipe support standpipe on upper strata.Owing to adopted horizontal tube and circular arc stay pipe and standpipe Type of Welding, not only saved tubing, be easy to make, but also increased intensity.Installing additional of foot lever of retaining can remind the constructor to take care better, and the retaining foot lever passes from fixing hole, not only is convenient to keep off the installation of foot lever, also saves steady pin simultaneously.The utlity model has novel structure, simple structure, easy for installation, handsome in appearance, save advantages such as material, intensity are good, safe and reliable, it puts goods on the market in enormous quantities and will produce positive social benefit and remarkable economic efficiency.
Description of drawings
The utility model has three accompanying drawings, wherein
1 shape steel tube shelf structure of accompanying drawing schematic diagram
Accompanying drawing 2 building operations gate-type steel pipe scaffold combining structure schematic diagram
Accompanying drawing 3 building operations gate-type steel pipe scaffold combining structure schematic diagram lateral view
Among the figure: 1, standpipe 2, cross pipe 3, retaining foot lever 4, scaffold floor 5, adjustable base 6, tube connector 7, horizontal tube 8, circular arc stay pipe 9, fixing hole
The specific embodiment
Specific embodiment of the utility model is welded with horizontal tube 7 as shown in drawings above standpipe 1, circular arc stay pipe 8 is welded on horizontal tube 7 bottoms.The upper port plug-in mounting tube connector 6 of standpipe 1, tube connector 6 all is drilled with fixing hole 9 with the lower end of standpipe 1, two holes are concentric and diameter is identical, and when the standpipe 1 of upper strata door shaped steel pipe support was inserted on the tube connector 6 of lower floor door shaped steel pipe support standpipe 1 upper end, two fixing holes 9 should overlap.Retaining foot lever 3 should be able to pass from fixing hole 9.Two door shaped steel pipe supports are coupled together by crossbar 2.Carry out horizontal and vertical scaffold combination according to construction requirement.Scaffold floor 4 be installed in horizontal tube 7 above, for constructor construction or walking.Adjustable base 5 is installed in the lower end of lowermost layer door shaped steel pipe support standpipe 1, to regulate the levelness of whole scaffold.The application of circular arc stay pipe 8 described in the utility model, not only convenient construction personnel's walking has increased the intensity of door shaped steel pipe support, and has saved material.The application of tube connector 6 makes things convenient for the installation of scaffold, and installing additional of foot lever of retaining makes the constructor more have a sense of security.
Claims (2)
1, a kind of building operations gate-type steel pipe scaffold, form by door shaped steel pipe support, crossbar (2), scaffold floor (4), adjustable base (5) etc., it is characterized in that a top of shaped steel pipe support is welded on the standpipe (1) by horizontal tube (7) and circular arc stay pipe (8), tube connector (6) is equipped with on the top of standpipe (1); Between the Kong Yukong of the scaffold outside two standpipes (1) below, set up retaining foot lever (3).
2, building operations according to claim 1 gate-type steel pipe scaffold, it is characterized in that being drilled with on the tube connector (6) fixing hole (9), standpipe (1) lower end also is drilled with fixing hole (9), the fixing hole (9) of the fixing hole (9) on the tube connector (6) and standpipe (1) lower end should concentric and equal diameters, and retaining foot lever (3) should be able to pass from fixing hole (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02238689 CN2563238Y (en) | 2002-06-13 | 2002-06-13 | Door type steel pipe scaffold for building constructure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02238689 CN2563238Y (en) | 2002-06-13 | 2002-06-13 | Door type steel pipe scaffold for building constructure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2563238Y true CN2563238Y (en) | 2003-07-30 |
Family
ID=33712312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02238689 Expired - Fee Related CN2563238Y (en) | 2002-06-13 | 2002-06-13 | Door type steel pipe scaffold for building constructure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2563238Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383630A (en) * | 2011-09-15 | 2012-03-21 | 金华市农业科学研究院 | Parking shed with grape trellis roof |
CN102561668A (en) * | 2011-01-20 | 2012-07-11 | 司徒添荣 | Top-supported walk-through scaffold |
CN102864921A (en) * | 2011-05-21 | 2013-01-09 | 司徒添荣 | Frame scaffold and scaffold frame thereof |
CN105697870A (en) * | 2016-05-03 | 2016-06-22 | 袁静 | Fluorescent metal supporting pipe |
CN110924660A (en) * | 2019-12-09 | 2020-03-27 | 靳春华 | Semi-rigid scaffold device of disk pin type arched portal frame for constructional engineering |
-
2002
- 2002-06-13 CN CN 02238689 patent/CN2563238Y/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561668A (en) * | 2011-01-20 | 2012-07-11 | 司徒添荣 | Top-supported walk-through scaffold |
CN102864921A (en) * | 2011-05-21 | 2013-01-09 | 司徒添荣 | Frame scaffold and scaffold frame thereof |
CN102383630A (en) * | 2011-09-15 | 2012-03-21 | 金华市农业科学研究院 | Parking shed with grape trellis roof |
CN105697870A (en) * | 2016-05-03 | 2016-06-22 | 袁静 | Fluorescent metal supporting pipe |
CN110924660A (en) * | 2019-12-09 | 2020-03-27 | 靳春华 | Semi-rigid scaffold device of disk pin type arched portal frame for constructional engineering |
CN110924660B (en) * | 2019-12-09 | 2021-08-24 | 靳春华 | Semi-rigid scaffold device of disk pin type arched portal frame for constructional engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107327097A (en) | A kind of guardrail | |
CN201176703Y (en) | Tripod for construction of hyperbola cooling tower cylinder | |
CN2563238Y (en) | Door type steel pipe scaffold for building constructure | |
CN204645417U (en) | A kind of switching node of large-scale crossed circular tube | |
CN205976733U (en) | Can have enough to meet need encloses fender temporarily | |
CN104372923A (en) | Scaffold | |
CN202850395U (en) | Novel combined handrail | |
CN205688778U (en) | A kind of elevating scaffold special over sling structure | |
CN204174915U (en) | Scaffold | |
CN207245046U (en) | A kind of guardrail | |
CN205666020U (en) | Environmental protection profiled steel structure swiftly assembles trilateral bill -board of single -upright -column | |
CN203654689U (en) | Combined scaffold | |
CN206748385U (en) | A kind of construction tool rack easy to use | |
CN206616923U (en) | A kind of concurrent | |
CN206957334U (en) | A kind of electric flagpole | |
CN201554220U (en) | Connecting device of working frame member bar | |
CN201128959Y (en) | Novel building top structure | |
CN104372935A (en) | Scaffold | |
CN204174903U (en) | Scaffold | |
CN204163358U (en) | Scaffold | |
CN204174919U (en) | Scaffold | |
CN205089053U (en) | Standardize and prevent guardrail bar | |
CN204531362U (en) | Scaffold | |
CN201581552U (en) | Steel structure supporting column | |
CN205918302U (en) | Anti -theft slide window |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |