CN2549035Y - Continuous sleeper replacer - Google Patents
Continuous sleeper replacer Download PDFInfo
- Publication number
- CN2549035Y CN2549035Y CN 02222494 CN02222494U CN2549035Y CN 2549035 Y CN2549035 Y CN 2549035Y CN 02222494 CN02222494 CN 02222494 CN 02222494 U CN02222494 U CN 02222494U CN 2549035 Y CN2549035 Y CN 2549035Y
- Authority
- CN
- China
- Prior art keywords
- sleeper
- model
- utility
- pillow
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model provides a continuous sleeper replacement machine, which comprises a frame, a bogie, an operation room, a motor unit, an old sleeper extraction device, a ballast leveling device, a rail lifting device and a new sleeper transportation device. The utility model is characterized in that the frame is also provided with a new sleeper installation device which comprises a moving device, a lifting component and a rotary clamping part arranged at the moving device. The utility model can continuously and high efficiently replace a plurality of new sleepers without replacing steel rails. The utility model is not only high in mechanization work degree, but also quick, even and high in working efficiency. Besides, the utility model has the advantages of simple structure and convenient operation, which can fully and reasonably use limited 'skylight' working time. The utility model is actually an ideal sleeper replacement machine.
Description
The utility model relates to a kind of sleeper relaying machine, belongs to rail track maintenance plant equipment.
At present, on the rail track, along with the increase of gapless track and the application of rail grinding machine, effectively improve the application life of rail to a certain extent at home.But then, because train speed raising and the heavy increase of axle, the rate of decay of sleeper is accelerated, this just needs the instantaneously changing sleeper, and existing sleeper replacement manually changes pillow except labour intensity is big, ineffective to do out of trade, also use section of track machine to change sleeper, and section of track machine is when changing sleeper, needs still spendable rail together to change, and can not satisfy construction requirement efficient, quick, the material-saving that saves time so the existing section of track is more changed planes.External sleeper replacement device category is more, the operating efficiency height that has, but to remove rail; What have both can single replacing sleeper, also can change sleeper continuously, but operating efficiency was low.Therefore, be necessary prior art is improved.
The purpose of this utility model is to overcome the deficiency of prior art, provides a kind of at the sleeper relaying machine of not changing energy high-efficiency and continuous replacing sleeper under the rail situation.
The utility model is realized by following technical proposal: it comprises vehicle frame, be located at bogie on the vehicle frame, operation chamber, cluster engine, Job Operations chamber, old pillow withdrawing device, flat quarrel device, rail-lifting equipment, new sleeper feedway, it is characterized in that also being provided with on the vehicle frame by shifter, be located at the new pillow erecting device that Lift Part on the shifter and rotating clip gripping member are constituted.The shifter of described new pillow erecting device is the travelling car of a belt wheel, and its wheel places on the slide rail at vehicle frame top, so that move on this slide rail, is used to transport new pillow.Lift Part on the described shifter is a liftable guide pillar, and an end of guide pillar is fixed on the shifter bottom, is used to carry pillow or puts pillow.Described rotating clip gripping member is arranged on the other end of guide pillar, this rotating clip gripping member is by the swivel head of being located at the guide pillar end, and the pillow folder of being located on the swivel head by tensioning hydro-cylinder constitutes, the pillow folder is used for folder, puts new pillow, swivel head can rotate around guide pillar, so that by the lifting of guide pillar and the rotation of swivel head, finish the liter of new pillow, the action of changeing, fall, changeing, be put into below the rail thereby will newly rest the head on.
The utility model compared with prior art has following advantage and effect: owing to be provided with the new pillow erecting device of removable, lifting, rotation, clamping on vehicle frame, make the utility model under the situation of not changing rail, can continuously, efficiently change many new pillows, mechanized degree height not only, and it is quick, smooth, high efficiency, other the utlity model has simple in structure, characteristics such as easy to operate, can fully, rationally utilize limited " skylight " activity duration, real is a kind of desirable sleeper relaying machine.
Fig. 1 is the structural representation of the utility model.
Below in conjunction with accompanying drawing the utility model is described further.
Among the figure, 1 is vehicle frame, 2 for being located at bogie and the brake under the vehicle frame, 3 for being located at the motor and the actuating unit of vehicle frame front end, 4 is the operation chamber, 5 is Job Operations, the control room, 6 is old pillow withdrawing device, can move radially along vehicle frame, clamp by its end is extracted old pillow out, 7 are flat quarrel device, by pull bar 71, expansion link 72 up and down, herringbone scraper plate 73, tensioning pull bar 74 constitutes, by adjusting this flat upper-lower position of device and opening angle of herringbone plate of being cut, ballast in the railway roadbed is shakeout, 8 is rail-lifting equipment, be used for rail is mentioned specified altitude, so that carry out the extraction of old pillow, the installation of flat quarrel and new pillow, 9 is travelling car, wheel 95 on it places on the slide rail 10 on vehicle frame top, 9 bottom is connected with lifting guide pillar 91, the lifting of this guide pillar realizes by oil cylinder, swivel head 92 is equipped with in the end of guide pillar, the rotation of this swivel head realizes by motor, swivel head is provided with the pillow folder 94 by tensioning hydro-cylinder 93 controls, described travelling car 9, lifting guide pillar 91, swivel head 92, tensioning hydro-cylinder 93, the new pillow of pillow folder 94 common formations erecting device, during installation travelling car 9 is moved to conveying place of new pillow, pillow folder 94 is clamped new pillow 11 backs and is moved to new pillow installation place by dolly 9, by the rotation of swivel head 92 and the newest the pillow under the rail of packing into of lifting of lifting guide pillar 91, thereby realize the sleeper replacement of continuous high-efficient, 12 is new sleeper feedway.
Claims (4)
1, a kind of continous way sleeper relaying machine, it comprises vehicle frame, be located at bogie on the vehicle frame, operation chamber, cluster engine, Job Operations chamber, old pillow withdrawing device, flat quarrel device, rail-lifting equipment, new sleeper feedway, it is characterized in that also being provided with on the vehicle frame by shifter and be located at Lift Part on this shifter and new pillow erecting device that the rotating clip gripping member is constituted.
2, sleeper relaying machine according to claim 1, the shifter that it is characterized in that described new pillow erecting device is the travelling car of a belt wheel, its wheel places on the slide rail at vehicle frame top.
3, sleeper relaying machine according to claim 1 is characterized in that the Lift Part on the described shifter is a liftable guide pillar, and an end of guide pillar is fixed on the shifter bottom.
4, sleeper relaying machine according to claim 1 is characterized in that described rotating clip gripping member is arranged on the other end of guide pillar, and this rotating clip gripping member is by the swivel head of being located at the guide pillar end, and the pillow folder of being located on the swivel head by tensioning hydro-cylinder constitutes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02222494 CN2549035Y (en) | 2002-04-30 | 2002-04-30 | Continuous sleeper replacer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02222494 CN2549035Y (en) | 2002-04-30 | 2002-04-30 | Continuous sleeper replacer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2549035Y true CN2549035Y (en) | 2003-05-07 |
Family
ID=33700391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02222494 Expired - Fee Related CN2549035Y (en) | 2002-04-30 | 2002-04-30 | Continuous sleeper replacer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2549035Y (en) |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102261024A (en) * | 2011-04-29 | 2011-11-30 | 昆明学院 | Sleeper rapid replacing machine |
CN102296499A (en) * | 2011-06-09 | 2011-12-28 | 贵州航天红光机械制造有限公司 | Dragging machine dedicated to railway |
CN104099837A (en) * | 2013-04-15 | 2014-10-15 | 昆明中铁大型养路机械集团有限公司 | Side-tipping single-sleeper pulling and replacing sleeper replacing method |
CN104179096A (en) * | 2014-09-04 | 2014-12-03 | 昆明学院 | Sleeper replacement device |
CN106168008A (en) * | 2016-08-30 | 2016-11-30 | 中国铁建大桥工程局集团有限公司 | One has Figure recognition function railway maintenance mechanical-electrical-hydraulic integration machinery |
CN106192627A (en) * | 2016-08-31 | 2016-12-07 | 昆明学院 | Mechanical-electrical-hydraulic integration sleeper replacement device |
CN106192626A (en) * | 2016-08-31 | 2016-12-07 | 昆明学院 | Change sleeper automated machine |
CN106223136A (en) * | 2016-08-31 | 2016-12-14 | 昆明学院 | Sprocket calculus automation equipment below a kind of rail |
CN106223134A (en) * | 2016-08-31 | 2016-12-14 | 昆明学院 | A kind of mechanical-electrical-hydraulic integration changes sleeper machine |
CN106223133A (en) * | 2016-08-30 | 2016-12-14 | 中国铁建大桥工程局集团有限公司 | A kind of multifunctional railway maintaining machine electrohydraulic integration machinery |
CN106283992A (en) * | 2016-08-31 | 2017-01-04 | 淮阴工学院 | One has the small-sized maintenance of equipment of railway of traversing grab bucket clear stone device |
CN106320109A (en) * | 2016-11-05 | 2017-01-11 | 昆明学院 | Mechanical-electronic-hydraulic integrated sleeper changing device |
CN106337338A (en) * | 2016-11-05 | 2017-01-18 | 昆明学院 | Iintetrated Mechanism of Swivel Block and Mechanical-electrical-hydraulics of Push-and-pull Sleeper |
CN106351089A (en) * | 2016-08-31 | 2017-01-25 | 昆明学院 | Mechanics-electronics-hydraulics-integrated sleeper replacing machine |
CN106351082A (en) * | 2016-08-30 | 2017-01-25 | 中国铁建大桥工程局集团有限公司 | Multifunctional railway maintenance automated machine |
CN106368088A (en) * | 2016-08-31 | 2017-02-01 | 昆明学院 | Automatic machine for replacing sleepers |
CN106381780A (en) * | 2016-08-31 | 2017-02-08 | 南通大学 | Automatic sleeper hoisting device |
CN106381779A (en) * | 2016-08-31 | 2017-02-08 | 南京工程学院 | Automatic device for fast sleeper hoisting |
CN106381781A (en) * | 2016-08-31 | 2017-02-08 | 昆明学院 | Automatic sleeper replacing device |
CN106381784A (en) * | 2016-08-31 | 2017-02-08 | 昆明学院 | Automatic sleeper replacing device |
CN106400624A (en) * | 2016-08-31 | 2017-02-15 | 昆明学院 | Sleeper replacement device with four-nut synchronous disassembly and assembly function |
CN106436505A (en) * | 2016-10-11 | 2017-02-22 | 昆明学院 | Mechanical-electrical-hydraulic integration equipment for sleeper replacement |
CN106498815A (en) * | 2016-11-05 | 2017-03-15 | 昆明学院 | It is a kind of that there is swivel block and push-and-pull sleeper integrating device to change pillow machine |
CN106522046A (en) * | 2016-11-06 | 2017-03-22 | 昆明学院 | Mechanical-electrical-hydraulic integrated sleeper replacement device |
CN111705567A (en) * | 2020-06-30 | 2020-09-25 | 汪美霞 | Urban rail transit line track laying and installing method |
-
2002
- 2002-04-30 CN CN 02222494 patent/CN2549035Y/en not_active Expired - Fee Related
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102261024A (en) * | 2011-04-29 | 2011-11-30 | 昆明学院 | Sleeper rapid replacing machine |
CN102296499A (en) * | 2011-06-09 | 2011-12-28 | 贵州航天红光机械制造有限公司 | Dragging machine dedicated to railway |
CN102296499B (en) * | 2011-06-09 | 2013-04-24 | 贵州航天红光机械制造有限公司 | Dragging machine dedicated to railway |
CN104099837A (en) * | 2013-04-15 | 2014-10-15 | 昆明中铁大型养路机械集团有限公司 | Side-tipping single-sleeper pulling and replacing sleeper replacing method |
CN104099837B (en) * | 2013-04-15 | 2016-01-20 | 昆明中铁大型养路机械集团有限公司 | A kind of side turn over list pillow is substituted and is changed pillow method |
CN104179096A (en) * | 2014-09-04 | 2014-12-03 | 昆明学院 | Sleeper replacement device |
CN104179096B (en) * | 2014-09-04 | 2016-02-10 | 昆明学院 | A kind of sleeper relaying machine |
CN106223133A (en) * | 2016-08-30 | 2016-12-14 | 中国铁建大桥工程局集团有限公司 | A kind of multifunctional railway maintaining machine electrohydraulic integration machinery |
CN106168008A (en) * | 2016-08-30 | 2016-11-30 | 中国铁建大桥工程局集团有限公司 | One has Figure recognition function railway maintenance mechanical-electrical-hydraulic integration machinery |
CN106351082A (en) * | 2016-08-30 | 2017-01-25 | 中国铁建大桥工程局集团有限公司 | Multifunctional railway maintenance automated machine |
CN106381781A (en) * | 2016-08-31 | 2017-02-08 | 昆明学院 | Automatic sleeper replacing device |
CN106400624A (en) * | 2016-08-31 | 2017-02-15 | 昆明学院 | Sleeper replacement device with four-nut synchronous disassembly and assembly function |
CN106223136A (en) * | 2016-08-31 | 2016-12-14 | 昆明学院 | Sprocket calculus automation equipment below a kind of rail |
CN106283992A (en) * | 2016-08-31 | 2017-01-04 | 淮阴工学院 | One has the small-sized maintenance of equipment of railway of traversing grab bucket clear stone device |
CN106223134A (en) * | 2016-08-31 | 2016-12-14 | 昆明学院 | A kind of mechanical-electrical-hydraulic integration changes sleeper machine |
CN106381784A (en) * | 2016-08-31 | 2017-02-08 | 昆明学院 | Automatic sleeper replacing device |
CN106351089A (en) * | 2016-08-31 | 2017-01-25 | 昆明学院 | Mechanics-electronics-hydraulics-integrated sleeper replacing machine |
CN106192626A (en) * | 2016-08-31 | 2016-12-07 | 昆明学院 | Change sleeper automated machine |
CN106368088A (en) * | 2016-08-31 | 2017-02-01 | 昆明学院 | Automatic machine for replacing sleepers |
CN106381780A (en) * | 2016-08-31 | 2017-02-08 | 南通大学 | Automatic sleeper hoisting device |
CN106381779A (en) * | 2016-08-31 | 2017-02-08 | 南京工程学院 | Automatic device for fast sleeper hoisting |
CN106192627A (en) * | 2016-08-31 | 2016-12-07 | 昆明学院 | Mechanical-electrical-hydraulic integration sleeper replacement device |
CN106436505A (en) * | 2016-10-11 | 2017-02-22 | 昆明学院 | Mechanical-electrical-hydraulic integration equipment for sleeper replacement |
CN106337338A (en) * | 2016-11-05 | 2017-01-18 | 昆明学院 | Iintetrated Mechanism of Swivel Block and Mechanical-electrical-hydraulics of Push-and-pull Sleeper |
CN106320109A (en) * | 2016-11-05 | 2017-01-11 | 昆明学院 | Mechanical-electronic-hydraulic integrated sleeper changing device |
CN106498815A (en) * | 2016-11-05 | 2017-03-15 | 昆明学院 | It is a kind of that there is swivel block and push-and-pull sleeper integrating device to change pillow machine |
CN106522046A (en) * | 2016-11-06 | 2017-03-22 | 昆明学院 | Mechanical-electrical-hydraulic integrated sleeper replacement device |
CN111705567A (en) * | 2020-06-30 | 2020-09-25 | 汪美霞 | Urban rail transit line track laying and installing method |
CN111705567B (en) * | 2020-06-30 | 2022-04-15 | 汪美霞 | Urban rail transit line track laying and installing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2549035Y (en) | Continuous sleeper replacer | |
CN205821911U (en) | One is combined changes pillow device | |
CN107419625B (en) | Full-automatic numerical control hydraulic turnout tamping car | |
KR100701216B1 (en) | Vehicle for driveway and railroad | |
CN109629354B (en) | Roller retraction device for rail laying, tractor and rail laying operation method | |
CN202766937U (en) | Railway sleeper replacement device | |
CN202577076U (en) | Derusting machine for steel rail | |
CN202755341U (en) | Magnetic device for recovering scrap iron | |
CN111733638A (en) | Railway mechanical sleeper replacement construction method based on sleeper replacement machine | |
CN110258206A (en) | The small device of the stone tiny fragments of stone, coal, etc. under a kind of cleaning railroad sleeper | |
CN112048951A (en) | Sleeper replacing device for railway track traffic | |
CN111155375A (en) | Railway fastener dismounting device and method | |
CN2552999Y (en) | Machine for replacing sleeper | |
CN203700892U (en) | Continuous multi-sleeper renewal device and sleeper renewal car using same | |
US4221169A (en) | Track tamper | |
CN104099836B (en) | A kind of side turn over list pillow replacing device | |
CN204455980U (en) | Medium-sized tamping car clearing apparatus | |
CN215714961U (en) | Sleeper railway ballast cleaning device | |
CN2193227Y (en) | Movable switch polishing machine | |
CN111501442B (en) | Novel long rail replacing operation method | |
CN208088221U (en) | A kind of clearing apparatus | |
CN209227305U (en) | Railway ballast is backfilling and compacted comprehensive operation vehicle between railway pillow | |
CN2761676Y (en) | Bridge guardrail hydraulic raising device | |
CN201857558U (en) | Dual-purpose tool cart for diesel impact pick | |
CN214573004U (en) | Hydraulic steel rail recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: KUMING ZHONGTIE LARGE MACHINERY GROUP CO., LTD. Free format text: FORMER NAME OR ADDRESS: KUMING MACHINERY FACTORY, CHINESE RAILWAY BUILDING CORP. |
|
CP01 | Change in the name or title of a patent holder |
Patentee after: Zhongtie Giant Road Maintenance Machinery Group Co., Ltd., Kunming Patentee before: Kunming Machinery Factory, China Railway Construction General Co. |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |