CN2549035Y - Continuous sleeper replacer - Google Patents

Continuous sleeper replacer Download PDF

Info

Publication number
CN2549035Y
CN2549035Y CN 02222494 CN02222494U CN2549035Y CN 2549035 Y CN2549035 Y CN 2549035Y CN 02222494 CN02222494 CN 02222494 CN 02222494 U CN02222494 U CN 02222494U CN 2549035 Y CN2549035 Y CN 2549035Y
Authority
CN
China
Prior art keywords
sleeper
model
utility
pillow
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02222494
Other languages
Chinese (zh)
Inventor
章继楠
刘恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Large Maintenance Machinery Co Ltd
Original Assignee
KUNMING MACHINERY FACTORY CHIN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING MACHINERY FACTORY CHIN filed Critical KUNMING MACHINERY FACTORY CHIN
Priority to CN 02222494 priority Critical patent/CN2549035Y/en
Application granted granted Critical
Publication of CN2549035Y publication Critical patent/CN2549035Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model provides a continuous sleeper replacement machine, which comprises a frame, a bogie, an operation room, a motor unit, an old sleeper extraction device, a ballast leveling device, a rail lifting device and a new sleeper transportation device. The utility model is characterized in that the frame is also provided with a new sleeper installation device which comprises a moving device, a lifting component and a rotary clamping part arranged at the moving device. The utility model can continuously and high efficiently replace a plurality of new sleepers without replacing steel rails. The utility model is not only high in mechanization work degree, but also quick, even and high in working efficiency. Besides, the utility model has the advantages of simple structure and convenient operation, which can fully and reasonably use limited 'skylight' working time. The utility model is actually an ideal sleeper replacement machine.

Description

A kind of continous way sleeper relaying machine
The utility model relates to a kind of sleeper relaying machine, belongs to rail track maintenance plant equipment.
At present, on the rail track, along with the increase of gapless track and the application of rail grinding machine, effectively improve the application life of rail to a certain extent at home.But then, because train speed raising and the heavy increase of axle, the rate of decay of sleeper is accelerated, this just needs the instantaneously changing sleeper, and existing sleeper replacement manually changes pillow except labour intensity is big, ineffective to do out of trade, also use section of track machine to change sleeper, and section of track machine is when changing sleeper, needs still spendable rail together to change, and can not satisfy construction requirement efficient, quick, the material-saving that saves time so the existing section of track is more changed planes.External sleeper replacement device category is more, the operating efficiency height that has, but to remove rail; What have both can single replacing sleeper, also can change sleeper continuously, but operating efficiency was low.Therefore, be necessary prior art is improved.
The purpose of this utility model is to overcome the deficiency of prior art, provides a kind of at the sleeper relaying machine of not changing energy high-efficiency and continuous replacing sleeper under the rail situation.
The utility model is realized by following technical proposal: it comprises vehicle frame, be located at bogie on the vehicle frame, operation chamber, cluster engine, Job Operations chamber, old pillow withdrawing device, flat quarrel device, rail-lifting equipment, new sleeper feedway, it is characterized in that also being provided with on the vehicle frame by shifter, be located at the new pillow erecting device that Lift Part on the shifter and rotating clip gripping member are constituted.The shifter of described new pillow erecting device is the travelling car of a belt wheel, and its wheel places on the slide rail at vehicle frame top, so that move on this slide rail, is used to transport new pillow.Lift Part on the described shifter is a liftable guide pillar, and an end of guide pillar is fixed on the shifter bottom, is used to carry pillow or puts pillow.Described rotating clip gripping member is arranged on the other end of guide pillar, this rotating clip gripping member is by the swivel head of being located at the guide pillar end, and the pillow folder of being located on the swivel head by tensioning hydro-cylinder constitutes, the pillow folder is used for folder, puts new pillow, swivel head can rotate around guide pillar, so that by the lifting of guide pillar and the rotation of swivel head, finish the liter of new pillow, the action of changeing, fall, changeing, be put into below the rail thereby will newly rest the head on.
The utility model compared with prior art has following advantage and effect: owing to be provided with the new pillow erecting device of removable, lifting, rotation, clamping on vehicle frame, make the utility model under the situation of not changing rail, can continuously, efficiently change many new pillows, mechanized degree height not only, and it is quick, smooth, high efficiency, other the utlity model has simple in structure, characteristics such as easy to operate, can fully, rationally utilize limited " skylight " activity duration, real is a kind of desirable sleeper relaying machine.
Fig. 1 is the structural representation of the utility model.
Below in conjunction with accompanying drawing the utility model is described further.
Among the figure, 1 is vehicle frame, 2 for being located at bogie and the brake under the vehicle frame, 3 for being located at the motor and the actuating unit of vehicle frame front end, 4 is the operation chamber, 5 is Job Operations, the control room, 6 is old pillow withdrawing device, can move radially along vehicle frame, clamp by its end is extracted old pillow out, 7 are flat quarrel device, by pull bar 71, expansion link 72 up and down, herringbone scraper plate 73, tensioning pull bar 74 constitutes, by adjusting this flat upper-lower position of device and opening angle of herringbone plate of being cut, ballast in the railway roadbed is shakeout, 8 is rail-lifting equipment, be used for rail is mentioned specified altitude, so that carry out the extraction of old pillow, the installation of flat quarrel and new pillow, 9 is travelling car, wheel 95 on it places on the slide rail 10 on vehicle frame top, 9 bottom is connected with lifting guide pillar 91, the lifting of this guide pillar realizes by oil cylinder, swivel head 92 is equipped with in the end of guide pillar, the rotation of this swivel head realizes by motor, swivel head is provided with the pillow folder 94 by tensioning hydro-cylinder 93 controls, described travelling car 9, lifting guide pillar 91, swivel head 92, tensioning hydro-cylinder 93, the new pillow of pillow folder 94 common formations erecting device, during installation travelling car 9 is moved to conveying place of new pillow, pillow folder 94 is clamped new pillow 11 backs and is moved to new pillow installation place by dolly 9, by the rotation of swivel head 92 and the newest the pillow under the rail of packing into of lifting of lifting guide pillar 91, thereby realize the sleeper replacement of continuous high-efficient, 12 is new sleeper feedway.

Claims (4)

1, a kind of continous way sleeper relaying machine, it comprises vehicle frame, be located at bogie on the vehicle frame, operation chamber, cluster engine, Job Operations chamber, old pillow withdrawing device, flat quarrel device, rail-lifting equipment, new sleeper feedway, it is characterized in that also being provided with on the vehicle frame by shifter and be located at Lift Part on this shifter and new pillow erecting device that the rotating clip gripping member is constituted.
2, sleeper relaying machine according to claim 1, the shifter that it is characterized in that described new pillow erecting device is the travelling car of a belt wheel, its wheel places on the slide rail at vehicle frame top.
3, sleeper relaying machine according to claim 1 is characterized in that the Lift Part on the described shifter is a liftable guide pillar, and an end of guide pillar is fixed on the shifter bottom.
4, sleeper relaying machine according to claim 1 is characterized in that described rotating clip gripping member is arranged on the other end of guide pillar, and this rotating clip gripping member is by the swivel head of being located at the guide pillar end, and the pillow folder of being located on the swivel head by tensioning hydro-cylinder constitutes.
CN 02222494 2002-04-30 2002-04-30 Continuous sleeper replacer Expired - Fee Related CN2549035Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02222494 CN2549035Y (en) 2002-04-30 2002-04-30 Continuous sleeper replacer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02222494 CN2549035Y (en) 2002-04-30 2002-04-30 Continuous sleeper replacer

Publications (1)

Publication Number Publication Date
CN2549035Y true CN2549035Y (en) 2003-05-07

Family

ID=33700391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02222494 Expired - Fee Related CN2549035Y (en) 2002-04-30 2002-04-30 Continuous sleeper replacer

Country Status (1)

Country Link
CN (1) CN2549035Y (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261024A (en) * 2011-04-29 2011-11-30 昆明学院 Sleeper rapid replacing machine
CN102296499A (en) * 2011-06-09 2011-12-28 贵州航天红光机械制造有限公司 Dragging machine dedicated to railway
CN104099837A (en) * 2013-04-15 2014-10-15 昆明中铁大型养路机械集团有限公司 Side-tipping single-sleeper pulling and replacing sleeper replacing method
CN104179096A (en) * 2014-09-04 2014-12-03 昆明学院 Sleeper replacement device
CN106168008A (en) * 2016-08-30 2016-11-30 中国铁建大桥工程局集团有限公司 One has Figure recognition function railway maintenance mechanical-electrical-hydraulic integration machinery
CN106192627A (en) * 2016-08-31 2016-12-07 昆明学院 Mechanical-electrical-hydraulic integration sleeper replacement device
CN106192626A (en) * 2016-08-31 2016-12-07 昆明学院 Change sleeper automated machine
CN106223136A (en) * 2016-08-31 2016-12-14 昆明学院 Sprocket calculus automation equipment below a kind of rail
CN106223134A (en) * 2016-08-31 2016-12-14 昆明学院 A kind of mechanical-electrical-hydraulic integration changes sleeper machine
CN106223133A (en) * 2016-08-30 2016-12-14 中国铁建大桥工程局集团有限公司 A kind of multifunctional railway maintaining machine electrohydraulic integration machinery
CN106283992A (en) * 2016-08-31 2017-01-04 淮阴工学院 One has the small-sized maintenance of equipment of railway of traversing grab bucket clear stone device
CN106320109A (en) * 2016-11-05 2017-01-11 昆明学院 Mechanical-electronic-hydraulic integrated sleeper changing device
CN106337338A (en) * 2016-11-05 2017-01-18 昆明学院 Iintetrated Mechanism of Swivel Block and Mechanical-electrical-hydraulics of Push-and-pull Sleeper
CN106351089A (en) * 2016-08-31 2017-01-25 昆明学院 Mechanics-electronics-hydraulics-integrated sleeper replacing machine
CN106351082A (en) * 2016-08-30 2017-01-25 中国铁建大桥工程局集团有限公司 Multifunctional railway maintenance automated machine
CN106368088A (en) * 2016-08-31 2017-02-01 昆明学院 Automatic machine for replacing sleepers
CN106381780A (en) * 2016-08-31 2017-02-08 南通大学 Automatic sleeper hoisting device
CN106381779A (en) * 2016-08-31 2017-02-08 南京工程学院 Automatic device for fast sleeper hoisting
CN106381781A (en) * 2016-08-31 2017-02-08 昆明学院 Automatic sleeper replacing device
CN106381784A (en) * 2016-08-31 2017-02-08 昆明学院 Automatic sleeper replacing device
CN106400624A (en) * 2016-08-31 2017-02-15 昆明学院 Sleeper replacement device with four-nut synchronous disassembly and assembly function
CN106436505A (en) * 2016-10-11 2017-02-22 昆明学院 Mechanical-electrical-hydraulic integration equipment for sleeper replacement
CN106498815A (en) * 2016-11-05 2017-03-15 昆明学院 It is a kind of that there is swivel block and push-and-pull sleeper integrating device to change pillow machine
CN106522046A (en) * 2016-11-06 2017-03-22 昆明学院 Mechanical-electrical-hydraulic integrated sleeper replacement device
CN111705567A (en) * 2020-06-30 2020-09-25 汪美霞 Urban rail transit line track laying and installing method

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261024A (en) * 2011-04-29 2011-11-30 昆明学院 Sleeper rapid replacing machine
CN102296499A (en) * 2011-06-09 2011-12-28 贵州航天红光机械制造有限公司 Dragging machine dedicated to railway
CN102296499B (en) * 2011-06-09 2013-04-24 贵州航天红光机械制造有限公司 Dragging machine dedicated to railway
CN104099837A (en) * 2013-04-15 2014-10-15 昆明中铁大型养路机械集团有限公司 Side-tipping single-sleeper pulling and replacing sleeper replacing method
CN104099837B (en) * 2013-04-15 2016-01-20 昆明中铁大型养路机械集团有限公司 A kind of side turn over list pillow is substituted and is changed pillow method
CN104179096A (en) * 2014-09-04 2014-12-03 昆明学院 Sleeper replacement device
CN104179096B (en) * 2014-09-04 2016-02-10 昆明学院 A kind of sleeper relaying machine
CN106223133A (en) * 2016-08-30 2016-12-14 中国铁建大桥工程局集团有限公司 A kind of multifunctional railway maintaining machine electrohydraulic integration machinery
CN106168008A (en) * 2016-08-30 2016-11-30 中国铁建大桥工程局集团有限公司 One has Figure recognition function railway maintenance mechanical-electrical-hydraulic integration machinery
CN106351082A (en) * 2016-08-30 2017-01-25 中国铁建大桥工程局集团有限公司 Multifunctional railway maintenance automated machine
CN106381781A (en) * 2016-08-31 2017-02-08 昆明学院 Automatic sleeper replacing device
CN106400624A (en) * 2016-08-31 2017-02-15 昆明学院 Sleeper replacement device with four-nut synchronous disassembly and assembly function
CN106223136A (en) * 2016-08-31 2016-12-14 昆明学院 Sprocket calculus automation equipment below a kind of rail
CN106283992A (en) * 2016-08-31 2017-01-04 淮阴工学院 One has the small-sized maintenance of equipment of railway of traversing grab bucket clear stone device
CN106223134A (en) * 2016-08-31 2016-12-14 昆明学院 A kind of mechanical-electrical-hydraulic integration changes sleeper machine
CN106381784A (en) * 2016-08-31 2017-02-08 昆明学院 Automatic sleeper replacing device
CN106351089A (en) * 2016-08-31 2017-01-25 昆明学院 Mechanics-electronics-hydraulics-integrated sleeper replacing machine
CN106192626A (en) * 2016-08-31 2016-12-07 昆明学院 Change sleeper automated machine
CN106368088A (en) * 2016-08-31 2017-02-01 昆明学院 Automatic machine for replacing sleepers
CN106381780A (en) * 2016-08-31 2017-02-08 南通大学 Automatic sleeper hoisting device
CN106381779A (en) * 2016-08-31 2017-02-08 南京工程学院 Automatic device for fast sleeper hoisting
CN106192627A (en) * 2016-08-31 2016-12-07 昆明学院 Mechanical-electrical-hydraulic integration sleeper replacement device
CN106436505A (en) * 2016-10-11 2017-02-22 昆明学院 Mechanical-electrical-hydraulic integration equipment for sleeper replacement
CN106337338A (en) * 2016-11-05 2017-01-18 昆明学院 Iintetrated Mechanism of Swivel Block and Mechanical-electrical-hydraulics of Push-and-pull Sleeper
CN106320109A (en) * 2016-11-05 2017-01-11 昆明学院 Mechanical-electronic-hydraulic integrated sleeper changing device
CN106498815A (en) * 2016-11-05 2017-03-15 昆明学院 It is a kind of that there is swivel block and push-and-pull sleeper integrating device to change pillow machine
CN106522046A (en) * 2016-11-06 2017-03-22 昆明学院 Mechanical-electrical-hydraulic integrated sleeper replacement device
CN111705567A (en) * 2020-06-30 2020-09-25 汪美霞 Urban rail transit line track laying and installing method
CN111705567B (en) * 2020-06-30 2022-04-15 汪美霞 Urban rail transit line track laying and installing method

Similar Documents

Publication Publication Date Title
CN2549035Y (en) Continuous sleeper replacer
CN205821911U (en) One is combined changes pillow device
CN107419625B (en) Full-automatic numerical control hydraulic turnout tamping car
KR100701216B1 (en) Vehicle for driveway and railroad
CN109629354B (en) Roller retraction device for rail laying, tractor and rail laying operation method
CN202766937U (en) Railway sleeper replacement device
CN202577076U (en) Derusting machine for steel rail
CN202755341U (en) Magnetic device for recovering scrap iron
CN111733638A (en) Railway mechanical sleeper replacement construction method based on sleeper replacement machine
CN110258206A (en) The small device of the stone tiny fragments of stone, coal, etc. under a kind of cleaning railroad sleeper
CN112048951A (en) Sleeper replacing device for railway track traffic
CN111155375A (en) Railway fastener dismounting device and method
CN2552999Y (en) Machine for replacing sleeper
CN203700892U (en) Continuous multi-sleeper renewal device and sleeper renewal car using same
US4221169A (en) Track tamper
CN104099836B (en) A kind of side turn over list pillow replacing device
CN204455980U (en) Medium-sized tamping car clearing apparatus
CN215714961U (en) Sleeper railway ballast cleaning device
CN2193227Y (en) Movable switch polishing machine
CN111501442B (en) Novel long rail replacing operation method
CN208088221U (en) A kind of clearing apparatus
CN209227305U (en) Railway ballast is backfilling and compacted comprehensive operation vehicle between railway pillow
CN2761676Y (en) Bridge guardrail hydraulic raising device
CN201857558U (en) Dual-purpose tool cart for diesel impact pick
CN214573004U (en) Hydraulic steel rail recovery device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: KUMING ZHONGTIE LARGE MACHINERY GROUP CO., LTD.

Free format text: FORMER NAME OR ADDRESS: KUMING MACHINERY FACTORY, CHINESE RAILWAY BUILDING CORP.

CP01 Change in the name or title of a patent holder

Patentee after: Zhongtie Giant Road Maintenance Machinery Group Co., Ltd., Kunming

Patentee before: Kunming Machinery Factory, China Railway Construction General Co.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20030507

Termination date: 20110430