CN2509250Y - Integral one-time forming reinforced concrete manhole with climbing ladder - Google Patents

Integral one-time forming reinforced concrete manhole with climbing ladder Download PDF

Info

Publication number
CN2509250Y
CN2509250Y CN 01261812 CN01261812U CN2509250Y CN 2509250 Y CN2509250 Y CN 2509250Y CN 01261812 CN01261812 CN 01261812 CN 01261812 U CN01261812 U CN 01261812U CN 2509250 Y CN2509250 Y CN 2509250Y
Authority
CN
China
Prior art keywords
walling
pit shaft
bucket
room
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 01261812
Other languages
Chinese (zh)
Inventor
张移生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Qianqiuye Cement Products Co ltd
Original Assignee
Xiamen Qianqiuye Cement Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Qianqiuye Cement Products Co ltd filed Critical Xiamen Qianqiuye Cement Products Co ltd
Priority to CN 01261812 priority Critical patent/CN2509250Y/en
Application granted granted Critical
Publication of CN2509250Y publication Critical patent/CN2509250Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a drainage manhole having the advantages of high strength, rapid installation, good impermeability, easy check and maintenance by man. The drainage manhole consists of a round walling cover(1), a walling cover seat(2), a regulating ring(5), a walling bucket(3) and a walling room(4). The utility model is characterized in that: the regulating ring(5), the walling bucket(3) and the walling room(4) adopt a reinforced steel bar concrete one-time forming structure; the upper part of the walling bucket(5) takes the shape of tapering mouth and the inside wall is provided with a U-shaped climbing ladder(6), the walling bucket(3) and the walling room(4) are connected though a gliding rubber sealing ring(8), the connectors of the walling room(2) and a drainage pipe(7) adopt an inserting rubber sealing ring(9) to seal. The utility model has the advantages of long service life, fast installation, effective preventing of leakage and improving the capacity of anti-base-sinking.

Description

Band cat ladder integral one-step molding steel bar concrete manhole
Technical field
The utility model relates to a kind of urban construction drainage pipeline project drainage inspection well.
Background technology
Existing urban road, highway, biotope still generally adopt common brick, cement mortar to be built into drainage inspection well, and the interface slit of well chamber and gutter also is a filled with mortar, its shortcoming is that construction technology falls behind, labour intensity is big, speed of application is slow, well body fastness is poor, in piping erection finishes the backfilling of earthwork compacting process, and the phenomenon that the breakage of well body often occurs, tilts even collapse; In addition, because the differential settlement of concrete pipe base, usually cause interface or well body slit and percolating water phenomenon takes place.
Summary of the invention
The purpose of this utility model is to propose fast, impervious good, the drainage inspection well of being convenient to hand inspection and maintenance of a kind of intensity height, installation rate at deficiency of the prior art.
The manhole that the utility model proposes is made up of round manhole cover, manhole cover base, adjustment circle, pit shaft and well chamber, and round manhole cover and manhole cover base adopt the ductile iron casting to form, and it is characterized in that adjusting circle, pit shaft and well chamber and adopts steel bar concrete one-shot forming structure; Upper wellbore closing in flare, inner wall belt U-shaped cat ladder; Pit shaft can be according to the required arbitrary height that is made in building site, and adjusts the well head height by adjusting circle; Pit shaft is connected by slip rubber seal tongue and groove with the well chamber; The interface of well chamber and sewer pipe adopts the sealing of fitting type rubber sealing ring.
Because the utility model adopts the pit shaft and the well chamber of steel bar concrete one-shot forming structure, thereby makes the well body sturdy and durable, but and Fast Installation; Employing slip rubber seal and fitting type rubber sealing ring can prevent the generation of seepage phenomenon, and anti-uneven settlement of foundation ability improves; Shaft in wall U-shaped cat ladder is the important component that is provided with when the pit shaft moulding, and it is different from the rear installed cat ladder of prefabricated well, and is stable and do not come off, more safety and being suitable for.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is pit shaft and well chamber assembling interface sectional drawing;
Fig. 4 is well chamber and reinforced concrete sewer pipe interface sectional drawing.
Wherein: 1 is round manhole cover; 2 is manhole cover base; 3 is pit shaft; The 4th, the well chamber; 5 for adjusting circle; 6 is the U-shaped cat ladder; 7 is sewer pipe; 8 are the slip rubber seal; 9 is the fitting type rubber sealing ring.
The specific embodiment
Shown in Fig. 1,2,3,4, the utility model by round manhole cover (1), manhole cover base (2), adjust circle (5), pit shaft (3) and well chamber (4) are formed.Round manhole cover (1) and manhole cover base (2) adopt the ductile iron casting to form; Adjust circle (5), pit shaft (3) and well chamber (4) employing steel bar concrete (strength grade of concrete is not less than C40), use the disposable pouring moulding of full-automatic core extrusion and vibration system well machine of up-to-date development; Pit shaft (3) top closing in flare, inner wall belt U-shaped cat ladder (6); Pit shaft (3) can be according to the required arbitrary height that is made in building site, and adjusts the well head height by adjusting circle (5); Pit shaft (3) is connected by slip rubber seal (8) tongue and groove with well chamber (4); The interface of well chamber (4) and sewer pipe (7) adopts fitting type rubber sealing ring (9) sealing.

Claims (3)

1, band cat ladder integral one-step molding steel bar concrete manhole, by round manhole cover (1), manhole cover base (2), adjust circle (5), pit shaft (3) and well chamber (4) are formed, round manhole cover (1) and manhole cover base (2) adopt the ductile iron casting to form, and it is characterized in that adjusting circle (5), pit shaft (3) and well chamber (4) employing steel bar concrete one-shot forming structure.
2, band cat ladder integral one-step molding steel bar concrete manhole according to claim 1 is characterized in that pit shaft (3) top closing in flare, inner wall belt U-shaped cat ladder (6).
3, band cat ladder integral one-step molding steel bar concrete manhole according to claim 1, it is characterized in that pit shaft (3) is connected by slip rubber seal (8) tongue and groove with well chamber (4), the interface of well chamber (4) and sewer pipe (7) adopts fitting type rubber sealing ring (9) sealing.
CN 01261812 2001-09-20 2001-09-20 Integral one-time forming reinforced concrete manhole with climbing ladder Expired - Lifetime CN2509250Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01261812 CN2509250Y (en) 2001-09-20 2001-09-20 Integral one-time forming reinforced concrete manhole with climbing ladder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01261812 CN2509250Y (en) 2001-09-20 2001-09-20 Integral one-time forming reinforced concrete manhole with climbing ladder

Publications (1)

Publication Number Publication Date
CN2509250Y true CN2509250Y (en) 2002-09-04

Family

ID=33669682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01261812 Expired - Lifetime CN2509250Y (en) 2001-09-20 2001-09-20 Integral one-time forming reinforced concrete manhole with climbing ladder

Country Status (1)

Country Link
CN (1) CN2509250Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320217C (en) * 2003-12-16 2007-06-06 周佰兴 Pipe fitting type examination well
CN100476085C (en) * 2006-04-30 2009-04-08 广东联塑科技实业有限公司 Manhole with steps
CN100476086C (en) * 2006-04-30 2009-04-08 广东联塑科技实业有限公司 Pipe with steps
CN100485139C (en) * 2006-04-30 2009-05-06 广东联塑科技实业有限公司 Pipe with steps and its application in manhole
CN1851165B (en) * 2006-05-24 2010-10-20 贵阳铝镁设计研究院 Pipeline crossing method for water supply and sewerage pipeline and its structure
CN102392485A (en) * 2011-11-14 2012-03-28 四川泰鑫实业发展有限责任公司 Manufacturing method of plastic concrete inspection well
CN114319443A (en) * 2021-12-22 2022-04-12 深圳市市政工程总公司 Assembled working well

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320217C (en) * 2003-12-16 2007-06-06 周佰兴 Pipe fitting type examination well
CN100476085C (en) * 2006-04-30 2009-04-08 广东联塑科技实业有限公司 Manhole with steps
CN100476086C (en) * 2006-04-30 2009-04-08 广东联塑科技实业有限公司 Pipe with steps
CN100485139C (en) * 2006-04-30 2009-05-06 广东联塑科技实业有限公司 Pipe with steps and its application in manhole
CN1851165B (en) * 2006-05-24 2010-10-20 贵阳铝镁设计研究院 Pipeline crossing method for water supply and sewerage pipeline and its structure
CN102392485A (en) * 2011-11-14 2012-03-28 四川泰鑫实业发展有限责任公司 Manufacturing method of plastic concrete inspection well
CN114319443A (en) * 2021-12-22 2022-04-12 深圳市市政工程总公司 Assembled working well
CN114319443B (en) * 2021-12-22 2023-09-26 深圳市市政工程总公司 Assembled working well

Similar Documents

Publication Publication Date Title
CN210031914U (en) Assembled inspection shaft
CN206859369U (en) Assembled plastic circular municipal drainage inspection shaft
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN102162253A (en) Precipitation construction method employing pipe embedding in deep foundation pits
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN2509250Y (en) Integral one-time forming reinforced concrete manhole with climbing ladder
CN2893020Y (en) Road sewage apparatus
CN110117959B (en) Construction method for foundation pit support near river
CN206752632U (en) Plastic reinforcing steel composite construction municipal drainage inspection shaft
CN105926665A (en) Large block assembled type prefabricated concrete drainage pipeline base and construction method thereof
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN214143998U (en) Sewage collecting pipe network arrangement structure for households along river
CN210315908U (en) Immersed tube type inspection well
CN112726784A (en) Fully-prefabricated PC sewer inspection well component assembly type structure and construction method
CN113323117A (en) Hydraulic cyclone separation type sewage intercepting well and construction method
CN112012330A (en) Installation and construction method of integrated sewage lifting equipment under roadway
CN214657154U (en) Novel cantilever type retaining wall drain pipe
CN215630545U (en) Prefabricated socket joint formula rainwater well
CN216920628U (en) Novel precast concrete drainage inspection shaft
CN214423530U (en) Pouring structure of precast concrete inspection well and precast concrete inspection well
CN210917653U (en) Automatic drainage rainwater inspection well structure applied to coastal area
CN215715540U (en) Simple prefabricated inspection well
CN216839787U (en) Prefabricated assembly type reinforced concrete sewage streetwork reserved well
CN219219075U (en) Basement elevator shaft construction dewatering device
CN220747008U (en) Spliced heightening well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20110920

Granted publication date: 20020904