Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920466441.9U
Other languages
Chinese (zh)
Inventor
艾姣龙
周少华
苏军
林斌
刘锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201920466441.9U priority Critical patent/CN210031914U/en
Application granted granted Critical
Publication of CN210031914U publication Critical patent/CN210031914U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本实用新型公开了一种装配式检查井,包括井室、井筒(2)、井室盖板(3)和相互匹配的上企口(4)与下企口(5),井室包括顶节(11)、一节或若干节标准节(12)和底节(13);底节顶部设有上企口,标准节顶部和底部设有上企口和下企口,标准节(12)通过上企口和下企口依次拼接成埋深标准节,埋深标准节通过下企口经上企口与底节匹配安装;顶节底部设有下企口,顶节通过下企口经上企口匹配安装在埋深标准节上;井室盖板匹配安装在顶节的顶部,井筒设在井室盖板上并与井室连通。本实用新型能将预制的井室、井筒和井室盖板采用装配式施工,提高施工效率和质量,能满足井室埋深要求,降低施工成本。

Figure 201920466441

The utility model discloses an assembled inspection well, which comprises a well chamber, a wellbore (2), a well chamber cover plate (3) and an upper groove (4) and a lower groove (5) matched with each other. The well chamber comprises a top Section (11), one or several standard sections (12) and bottom section (13); the top of the bottom section is provided with upper and lower grooves, the top and bottom of the standard section are provided with upper and lower grooves, and the standard section (12) ) The upper and lower tongues are spliced to form a buried depth standard section, and the buried depth standard section is installed through the lower tongue and the upper tongue and the bottom section; the bottom of the top section is provided with a lower tongue, and the top section passes through the lower tongue. It is installed on the standard section of buried depth by matching the upper groove and mouth; the well chamber cover is matched and installed on the top of the top section, and the wellbore is set on the well chamber cover and communicated with the well chamber. The utility model can adopt the prefabricated well chamber, the well bore and the well chamber cover plate to adopt the prefabricated construction, improve the construction efficiency and quality, can meet the well chamber buried depth requirement, and reduce the construction cost.

Figure 201920466441

Description

装配式检查井Prefabricated inspection well

技术领域technical field

本实用新型涉及市政给排水施工领域,尤其涉及一种装配式检查井。The utility model relates to the field of municipal water supply and drainage construction, in particular to an assembled inspection well.

背景技术Background technique

检查井是为城市地下基础设施的供电、给水、排水、排污、通讯、有线电视、煤气管、路灯线路等维修,安装方便而设置的,每个一定距离设置检查井,便于定期检查附属构筑物。Inspection wells are installed for the maintenance of power supply, water supply, drainage, sewage, communication, cable television, gas pipes, and street light lines of urban underground infrastructure. They are installed for convenient installation. Inspection wells are set at a certain distance to facilitate regular inspection of auxiliary structures.

目前,给排水及其他管道工程的检查井在施工时,均为土方开挖后采用砖砌或者钢筋混凝土现浇。此类传统方法主要存在以下问题:At present, the inspection wells for water supply and drainage and other pipeline projects are constructed with brickwork or reinforced concrete cast-in-place after earthwork excavation. Such traditional methods mainly have the following problems:

1)、检查井埋深较深时需要进行基坑支护,否则容易造成边坡坍塌,危险系数高。1) When the inspection well is buried deep, foundation pit support is required, otherwise it is easy to cause the slope to collapse and the risk factor is high.

2)、检查井采用现浇钢筋混凝土结构或者砖砌结构,材料组织困难,施工质量差,功效低。2) The inspection well adopts the cast-in-place reinforced concrete structure or the brick structure, the material organization is difficult, the construction quality is poor, and the efficiency is low.

发明内容SUMMARY OF THE INVENTION

本实用新型的目的在于提供一种装配式检查井,能将预制的井室、井筒和井室盖板采用装配式施工,提高施工效率和质量,能满足井室埋深要求,降低施工成本。The purpose of the utility model is to provide a prefabricated inspection well, which can use prefabricated well chamber, wellbore and well chamber cover for prefabricated construction, improve construction efficiency and quality, meet well chamber buried depth requirements, and reduce construction costs.

本实用新型是这样实现的:The utility model is realized in this way:

一种装配式检查井,包括井室、井筒、井室盖板和相互匹配的上企口与下企口,井室包括顶节、一节或若干节标准节和底节;底节上预留U型槽口,底节作为基坑支护固定在井底,底节的顶部设有上企口;标准节的顶部和底部分别设有上企口和下企口,一节或若干节标准节通过上企口和下企口依次匹配拼接成埋深标准节,埋深标准节的底部通过下企口经上企口与底节匹配安装;顶节的底部设有下企口,顶节通过下企口经上企口匹配安装在埋深标准节上;井室盖板匹配安装在顶节的顶部,井筒固定设置在井室盖板上并与井室连通。A prefabricated inspection well, comprising a well chamber, a well bore, a well chamber cover, and matching upper and lower grooves, the well chamber includes a top section, one section or several standard sections and a bottom section; U-shaped notch is reserved, the bottom section is fixed at the bottom of the well as the foundation pit support, and the top of the bottom section is provided with an upper groove; the top and bottom of the standard section are respectively provided with an upper groove and a lower groove, one or several sections. The standard section is matched and spliced into a buried depth standard section through the upper tongue and the lower tongue in turn, and the bottom of the buried depth standard section is installed through the lower tongue and the upper tongue and the bottom section; the bottom of the top section is provided with a lower tongue, and the top The joint is installed on the buried depth standard section through the lower tongue and the upper tongue matching; the well chamber cover is matched and installed on the top of the top section, and the wellbore is fixed on the well chamber cover and communicated with the well chamber.

所述的底节的内壁底部设有浇筑企口,底板及流槽浇筑在底节内,底板通过浇筑企口嵌入检查井的井室底部。The bottom of the inner wall of the bottom section is provided with a pouring groove, the bottom plate and the launder are cast in the bottom section, and the bottom plate is embedded in the bottom of the well chamber of the inspection well through the pouring groove.

所述的井筒的底部设有防水凸缘,井室盖板上设有与防水凸缘匹配的防水凹槽,防使井筒匹配安装在井室盖板上。The bottom of the wellbore is provided with a waterproof flange, and the well chamber cover plate is provided with a waterproof groove matched with the waterproof flange to prevent the wellbore from being matched and installed on the well chamber cover plate.

所述的井室盖板与井室的顶部之间设有防水砂浆。Waterproof mortar is provided between the well chamber cover and the top of the well chamber.

所述的防水砂浆的厚度为5cm。The thickness of the waterproof mortar is 5cm.

所述的上企口与下企口的拼接缝内设有止水圈。A water stop ring is arranged in the seam between the upper tongue and the lower tongue.

所述的顶节、标准节、底节、井筒和井室盖板均为工厂预制件。The top section, standard section, bottom section, wellbore and well cover are all factory prefabricated parts.

本实用新型与现有技术相比,具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、本实用新型采用沉井方法施工安装,井室兼做沉井支护,不需要单独施工基坑支护,节约工程造价。1. The utility model adopts the caisson method for construction and installation, and the well chamber also serves as the caisson support, so it is not necessary to construct the foundation pit support separately, which saves the project cost.

2、本实用新型采用的井室、井室盖板及井筒均在工厂预制,可采用现场装配式施工,安装便捷,工期短,施工质量好。2. The well chamber, well chamber cover and wellbore adopted by the utility model are all prefabricated in the factory, and can be constructed by on-site assembly, with convenient installation, short construction period and good construction quality.

3、本实用新型通过井室标准节调整检查井的高度,可以适应不同深度的检查井要求。3. The utility model adjusts the height of the inspection well through the standard section of the well room, and can adapt to the requirements of inspection wells of different depths.

附图说明Description of drawings

图1是本实用新型装配式检查井的剖视图;Fig. 1 is the sectional view of the utility model assembled inspection well;

图2是本实用新型装配式检查井的顶节的剖视图;Fig. 2 is the sectional view of the top section of the assembled inspection well of the present invention;

图3是本实用新型装配式检查井的标准节的剖视图;Fig. 3 is the sectional view of the standard section of the assembled inspection well of the present utility model;

图4是本实用新型装配式检查井的底节的剖视图;4 is a cross-sectional view of the bottom section of the assembled inspection well of the present invention;

图5是本实用新型装配式检查井的井筒的剖视图;5 is a cross-sectional view of the wellbore of the fabricated inspection well of the present utility model;

图6是本实用新型装配式检查井的井室盖板的俯视图。Fig. 6 is a top view of the well cover plate of the assembled inspection well of the present invention.

图中,11顶节,12标准节,13底节,131U型槽口,2井筒,21防水凸缘,3井室盖板,31防水凹槽,4上企口,5下企口,6浇筑企口,7底板及流槽。In the figure, 11 top section, 12 standard section, 13 bottom section, 131 U-shaped notch, 2 wellbore, 21 waterproof flange, 3 well chamber cover, 31 waterproof groove, 4 upper tongue, 5 lower tongue, 6 Pouring tongue and groove, 7 base plates and launders.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型作进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.

请参见附图1至附图3,一种装配式检查井,包括井室、井筒2、井室盖板3和相互匹配的上企口4与下企口5,井室包括顶节11、一节或若干节标准节12和底节13;请参见附图4,底节13上根据管道直径预留两个向下的U型槽口131,底节13作为基坑支护固定在井底,底节13的顶部设有上企口4;标准节12的顶部和底部分别设有上企口4和下企口5,根据埋深要求采用一节或若干节标准节12通过上企口4和下企口5依次匹配拼接成埋深标准节,埋深标准节的底部通过下企口5经上企口4与底节13匹配安装;顶节11的底部设有下企口5,顶节11通过下企口5经上企口4匹配安装在埋深标准节上,完成井室的安装;井室盖板3匹配安装在顶节11的顶部,井筒2固定设置在井室盖板3上并与井室连通。Please refer to accompanying drawings 1 to 3, an assembled inspection well, including a well chamber, a wellbore 2, a well chamber cover 3 and a matching upper groove 4 and a lower groove 5, the well chamber includes a top section 11, One or several standard sections 12 and bottom sections 13; please refer to Figure 4, two downward U-shaped notches 131 are reserved on the bottom section 13 according to the diameter of the pipeline, and the bottom section 13 is used as foundation pit support and fixed in the well The top of the bottom section 13 is provided with an upper groove 4; the top and bottom of the standard section 12 are respectively provided with an upper groove 4 and a lower groove 5. According to the requirements of the burial depth, one or several standard sections 12 are used to pass the upper groove. The mouth 4 and the lower tongue 5 are matched and spliced in sequence to form a buried depth standard section, and the bottom of the buried depth standard section is installed through the lower tongue 5 through the upper tongue 4 and the bottom section 13; the bottom of the top section 11 is provided with a lower tongue 5 , the top section 11 is matched and installed on the buried depth standard section through the lower tongue 5 and the upper tongue 4 to complete the installation of the well chamber; the well chamber cover plate 3 is matched and installed on the top of the top section 11, and the wellbore 2 is fixed in the well chamber on the cover plate 3 and communicate with the well chamber.

请参见附图1和附图4,所述的底节13的内壁底部设有浇筑企口6,底板及流槽7通过素砼二次浇筑在底节13内,底板通过浇筑企口6嵌入检查井的井室底部,起到防水的作用。优选的,浇筑企口6的高度为15cm。Please refer to accompanying drawing 1 and accompanying drawing 4, the bottom of the inner wall of the bottom section 13 is provided with a pouring groove 6, the bottom plate and the trough 7 are cast in the bottom section 13 by the second time of plain concrete, and the bottom plate is embedded through the pouring groove 6 The bottom of the well chamber of the inspection well plays a waterproof role. Preferably, the height of the pouring groove 6 is 15 cm.

请参见附图5和附图6,所述的井筒2的底部设有防水凸缘21,井室盖板3上设有与防水凸缘21匹配的防水凹槽31,防使井筒2匹配安装在井室盖板3上,起到防水的作用。优选的,防水凸缘21的高度为3cm,厚度为3cm。5 and 6, the bottom of the wellbore 2 is provided with a waterproof flange 21, and the well chamber cover plate 3 is provided with a waterproof groove 31 matching the waterproof flange 21 to prevent the wellbore 2 from being matched and installed. On the well cover plate 3, it plays a waterproof role. Preferably, the height of the waterproof flange 21 is 3 cm, and the thickness is 3 cm.

所述的井室盖板3与井室的顶部之间设有防水砂浆(图中未示出),可起到防水的作用,优选的,防水砂浆的厚度为5cm。Waterproof mortar (not shown in the figure) is provided between the well chamber cover plate 3 and the top of the well chamber, which can play a waterproof role. Preferably, the thickness of the waterproof mortar is 5 cm.

所述的上企口4与下企口5的拼接缝内设有止水圈(图中未示出),优选的,可采用橡胶材质的止水圈,起到防水的作用。A water stop ring (not shown in the figure) is provided in the splicing seam between the upper tongue 4 and the lower tongue 5. Preferably, a rubber water stop ring can be used to play a waterproof role.

所述的顶节11、标准节12、底节13、井筒2和井室盖板3均为工厂预制件,加工、运输方便,运送至现场后即可根据检查井的埋深要求进行下沉安装,根据不同的检查井埋深要求选择合适数量的标准节12,以满足施工要求。The top section 11, the standard section 12, the bottom section 13, the wellbore 2 and the well cover 3 are all factory prefabricated parts, which are easy to process and transport, and can be sunk according to the buried depth requirements of the inspection well after being transported to the site. For installation, select an appropriate number of standard sections 12 according to different inspection well burial depth requirements to meet construction requirements.

本实用新型装配式检查井的具体施工工艺如下:The concrete construction technology of the assembled inspection well of the present utility model is as follows:

1、检查井的井室、井筒及井室盖板在工厂预制完成以后运送至现场,检查井采用沉井施工方法下沉安装。井室的管壁厚度为20cm。1. The well room, wellbore and well cover plate of the inspection well shall be transported to the site after the prefabrication in the factory, and the inspection well shall be installed by means of the caisson construction method. The wall thickness of the well chamber is 20cm.

2、先定位下沉井室的底节13,土方在井内开挖,井室兼做沉井支护,通过安装一节或多节标准节12来调整检查井的高度,直至符合设计要求。底节13上预留U型槽口131,使其能匹配管径为100cm的管道安装。2. First locate the bottom section 13 of the caisson chamber, excavate the earth in the well, and the well chamber also serves as the caisson support, and adjust the height of the inspection well by installing one or more standard sections 12 until it meets the design requirements. A U-shaped notch 131 is reserved on the bottom section 13 so that it can be installed with a pipe with a diameter of 100 cm.

井室的底节13、标准节12、顶节11均采用上企口4和下企口5的连接方式,上企口4和下企口5中间安放橡胶止水圈防水,大大简化了施工工艺。下企口5位于管壁的外侧,上企口4位于管壁的内侧,上企口4和下企口5的厚度均为10cm并匹配卡接,使底节13、标准节12、顶节11在安装时保持内外壁的重合。The bottom section 13, the standard section 12, and the top section 11 of the well chamber are all connected by the upper tongue 4 and the lower tongue 5. A rubber water stop ring is placed between the upper tongue 4 and the lower tongue 5 for waterproofing, which greatly simplifies the construction. craft. The lower groove 5 is located on the outside of the pipe wall, and the upper groove 4 is located on the inner side of the pipe wall. The thicknesses of the upper groove 4 and the lower groove 5 are both 10cm and matched and connected, so that the bottom section 13, the standard section 12 and the top section are 11 Keep the inner and outer walls coincident during installation.

3、井室下沉到设计标高以后开始施工底板及流槽7,底板及流槽7采用混凝土二次浇筑,底节13的管壁下部内侧设置15cm高的浇筑企口6,使底板可以嵌入井室从而起到防水作用,流槽的高度及形式符合相关图集要求即可。3. After the well room sinks to the design elevation, start the construction of the bottom plate and the runner 7. The bottom plate and the runner 7 are made of concrete for secondary pouring, and a 15cm-high pouring groove 6 is set on the inner side of the lower part of the pipe wall of the bottom section 13, so that the bottom plate can be embedded The well chamber thus plays a waterproof role, and the height and form of the flow trough can meet the requirements of the relevant atlas.

4、安装井室盖板3,井室盖板3的直径与井室的直径相当,井室盖板3与井室之间设置5cm厚的防水砂浆,可在井室与井室盖板3之间起到较好的防水作用。4. Install the well cover plate 3. The diameter of the well cover plate 3 is equivalent to the diameter of the well room. A 5cm thick waterproof mortar is set between the well room cover plate 3 and the well room. It has a better waterproof effect.

5、在井室盖板3上安装井筒2,井筒2的直径小于井室的直径,位于井室盖板3的侧部,井筒2的底部中间位置设置3*3cm的防水凸缘21,嵌入井室盖板3相应位置的防水凹槽31中,安装时,防水凸缘21插入在防水凹槽31内,起到防水作用。5. Install the wellbore 2 on the wellbore cover 3. The diameter of the wellbore 2 is smaller than the diameter of the wellbore, and is located on the side of the wellbore cover 3. A 3*3cm waterproof flange 21 is set in the middle of the bottom of the wellbore 2, which is inserted into the wellbore 2. In the waterproof groove 31 at the corresponding position of the well cover plate 3 , during installation, the waterproof flange 21 is inserted into the waterproof groove 31 to play a waterproof role.

以上仅为本实用新型的较佳实施例而已,并非用于限定实用新型的保护范围,因此,凡在本实用新型的精神和原则之内所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only the preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall include within the scope of protection of the present invention.

Claims (7)

1. An assembled inspection shaft, characterized by: the well chamber comprises a well chamber, a shaft (2), a well chamber cover plate (3) and an upper rabbet (4) and a lower rabbet (5) which are matched with each other, wherein the well chamber comprises a top section (11), one or a plurality of standard sections (12) and a bottom section (13); a U-shaped notch (131) is reserved on the bottom section (13), the bottom section (13) is used as a foundation pit support and fixed at the bottom of the well, and an upper rabbet (4) is arranged at the top of the bottom section (13); the top and the bottom of the standard section (12) are respectively provided with an upper rabbet (4) and a lower rabbet (5), one or a plurality of sections of the standard section (12) are sequentially matched and spliced into a buried-depth standard section through the upper rabbet (4) and the lower rabbet (5), and the bottom of the buried-depth standard section is matched and installed with the bottom section (13) through the lower rabbet (5) through the upper rabbet (4); the bottom of the top section (11) is provided with a lower rabbet (5), and the top section (11) is arranged on the buried standard section in a matching way through the lower rabbet (5) and the upper rabbet (4); the well chamber cover plate (3) is installed at the top of the top section (11) in a matching mode, and the shaft (2) is fixedly arranged on the well chamber cover plate (3) and communicated with the well chamber.
2. The fabricated manhole of claim 1 wherein: the bottom of the inner wall of the bottom section (13) is provided with a pouring rabbet (6), the bottom plate and the launder (7) are poured in the bottom section (13), and the bottom plate is embedded into the bottom of a well chamber of the inspection well through the pouring rabbet (6).
3. The fabricated manhole of claim 1 wherein: the bottom of pit shaft (2) be equipped with waterproof flange (21), be equipped with on well room apron (3) with waterproof recess (31) of waterproof flange (21) matching, make pit shaft (2) match and install on well room apron (3).
4. The fabricated manhole as claimed in claim 1 or 3, wherein: waterproof mortar is arranged between the well chamber cover plate (3) and the top of the well chamber.
5. The fabricated manhole of claim 4 wherein: the thickness of the waterproof mortar is 5 cm.
6. The fabricated manhole of claim 1 wherein: and a water stop ring is arranged in a splicing seam of the upper rabbet (4) and the lower rabbet (5).
7. The fabricated manhole of claim 1 wherein: the top section (11), the standard section (12), the bottom section (13), the shaft (2) and the well chamber cover plate (3) are all factory prefabricated parts.
CN201920466441.9U 2019-04-08 2019-04-08 Assembled inspection shaft Expired - Fee Related CN210031914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920466441.9U CN210031914U (en) 2019-04-08 2019-04-08 Assembled inspection shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920466441.9U CN210031914U (en) 2019-04-08 2019-04-08 Assembled inspection shaft

Publications (1)

Publication Number Publication Date
CN210031914U true CN210031914U (en) 2020-02-07

Family

ID=69358257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920466441.9U Expired - Fee Related CN210031914U (en) 2019-04-08 2019-04-08 Assembled inspection shaft

Country Status (1)

Country Link
CN (1) CN210031914U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535363A (en) * 2020-05-15 2020-08-14 中铁四局集团第三建设有限公司 Non-excavation pipeline middle section inspection well construction system and construction method thereof
CN111764435A (en) * 2020-06-24 2020-10-13 安徽华路畅安建材有限公司 A concrete prefabricated grouting sealed assembly inspection well
CN112095747A (en) * 2020-09-03 2020-12-18 北京建工土木工程有限公司 Safe construction method for non-stop butt joint of newly-built sewage pipeline and operation pipeline
CN112095748A (en) * 2020-09-03 2020-12-18 北京建工土木工程有限公司 Rapid construction method for non-stop butt joint of newly-built sewage pipeline and operation pipeline
CN112112249A (en) * 2020-09-15 2020-12-22 北京建工土木工程有限公司 Rapid construction method for non-stop water touch connection of newly-built sewage pipeline and main pipeline
CN112302051A (en) * 2020-11-06 2021-02-02 中铁工程装备集团有限公司 A mechanical shaft structure and its construction method
CN112663675A (en) * 2020-12-21 2021-04-16 福建鑫远建工有限公司 Anti-settling inspection well chamber structure and construction method thereof
CN114319433A (en) * 2021-12-22 2022-04-12 深圳市市政工程总公司 Work well reverse method prefabricated construction method
CN115045379A (en) * 2022-07-20 2022-09-13 无锡市政设计研究院有限公司 Assembled rectangular rainwater inspection well and construction method thereof
CN115075365A (en) * 2022-07-20 2022-09-20 无锡地铁集团有限公司 Assembly type circular rainwater inspection well with shallow pipeline burial depth and construction method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535363A (en) * 2020-05-15 2020-08-14 中铁四局集团第三建设有限公司 Non-excavation pipeline middle section inspection well construction system and construction method thereof
CN111764435A (en) * 2020-06-24 2020-10-13 安徽华路畅安建材有限公司 A concrete prefabricated grouting sealed assembly inspection well
CN112095747A (en) * 2020-09-03 2020-12-18 北京建工土木工程有限公司 Safe construction method for non-stop butt joint of newly-built sewage pipeline and operation pipeline
CN112095748A (en) * 2020-09-03 2020-12-18 北京建工土木工程有限公司 Rapid construction method for non-stop butt joint of newly-built sewage pipeline and operation pipeline
CN112112249A (en) * 2020-09-15 2020-12-22 北京建工土木工程有限公司 Rapid construction method for non-stop water touch connection of newly-built sewage pipeline and main pipeline
CN112112249B (en) * 2020-09-15 2022-03-11 北京建工土木工程有限公司 Rapid construction method for non-stop water touch connection of newly-built sewage pipeline and main pipeline
CN112302051A (en) * 2020-11-06 2021-02-02 中铁工程装备集团有限公司 A mechanical shaft structure and its construction method
CN112663675A (en) * 2020-12-21 2021-04-16 福建鑫远建工有限公司 Anti-settling inspection well chamber structure and construction method thereof
CN114319433A (en) * 2021-12-22 2022-04-12 深圳市市政工程总公司 Work well reverse method prefabricated construction method
CN115045379A (en) * 2022-07-20 2022-09-13 无锡市政设计研究院有限公司 Assembled rectangular rainwater inspection well and construction method thereof
CN115075365A (en) * 2022-07-20 2022-09-20 无锡地铁集团有限公司 Assembly type circular rainwater inspection well with shallow pipeline burial depth and construction method thereof

Similar Documents

Publication Publication Date Title
US10030792B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN104404983B (en) A kind of ride well device and construction method thereof for jacking construction
CN102162253B (en) Precipitation construction method employing pipe embedded in deep foundation pits
CN104674847A (en) Novel assembling type precast concrete urban comprehensive pipe gallery and construction method thereof
CN205530280U (en) Novel prefabricated two walls unification foundation ditch enclosure system
CN107023061B (en) Assembled plastic municipal drainage inspection well and construction method
CN214143998U (en) A layout structure of household sewage collection pipe network along the river
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body
Macaulay Underground
CN112726784A (en) Fully-prefabricated PC sewer inspection well component assembly type structure and construction method
CN110924438A (en) Prefabricated member of assembled rectangular inspection well
JP2001207515A (en) Underground communal space
CN204401756U (en) The drop well that reverse construction is set up on original gutter
CN106592635A (en) Integrated inspection shaft and installation method thereof
CN115075365A (en) Assembly type circular rainwater inspection well with shallow pipeline burial depth and construction method thereof
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN108777470A (en) A kind of cable duct bank and its construction method
CN217399865U (en) Assembled precast concrete inspection shaft
CN107152034A (en) A kind of pipe gallery and its construction method
CN218933931U (en) A reinforcement structure for deep foundation pit adjacent to existing buildings
CN206090623U (en) Prefabricated inspection shaft of construction efficient
CN116446514A (en) Multifunctional drainage inspection well and construction method
CN204532379U (en) The pre-buried gutter structure of subway sectional tunnel waste water pump house
CN204163178U (en) Push pipe interval combinations manhole
CN211312560U (en) A Simple Core Tube Staged Diversion and Drainage Structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200207

CF01 Termination of patent right due to non-payment of annual fee