CN215715540U - Simple prefabricated inspection well - Google Patents

Simple prefabricated inspection well Download PDF

Info

Publication number
CN215715540U
CN215715540U CN202121805428.5U CN202121805428U CN215715540U CN 215715540 U CN215715540 U CN 215715540U CN 202121805428 U CN202121805428 U CN 202121805428U CN 215715540 U CN215715540 U CN 215715540U
Authority
CN
China
Prior art keywords
prefabricated
pit shaft
well
shaft
well chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121805428.5U
Other languages
Chinese (zh)
Inventor
侯雷
姚子文
万海峰
吴江华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202121805428.5U priority Critical patent/CN215715540U/en
Application granted granted Critical
Publication of CN215715540U publication Critical patent/CN215715540U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a simple prefabricated inspection well. The utility model is suitable for prefabricating the rain and sewage inspection well in municipal pipe network engineering. The technical scheme of the utility model is to adopt a simple prefabricated inspection well, which is characterized in that: the prefabricated well chamber, the prefabricated cover plate and the prefabricated shaft are provided. The prefabricated well chamber top fixed mounting has prefabricated apron, there is the pit shaft bead in prefabricated pit shaft bottom, be equipped with on the prefabricated apron with pit shaft bead complex reserve concave pit shaft hole, prefabricated pit shaft lower extreme and prefabricated apron realize the socket joint through the cooperation of pit shaft bead and reservation concave pit shaft hole and are connected. When the construction conditions are complex and the difficulty is high, the prefabricated inspection well can be installed in the foundation pit when the soil reaches certain strength. The prefabricated pit shaft, the prefabricated cover plate and the prefabricated well chamber which are connected in a socket joint mode greatly reduce the prefabrication difficulty of the inspection well.

Description

Simple prefabricated inspection well
Technical Field
The utility model relates to a simple prefabricated inspection well. The method is suitable for prefabricating the rain and sewage inspection well in municipal pipe network engineering.
Background
At present, the conventional municipal engineering rainwater and sewage inspection well construction adopts a mode of excavating a back brick or cast-in-place concrete inspection well, the quality cannot be guaranteed under complex geology, and meanwhile, the construction period is long.
The municipal engineering inspection well construction comprises brick laying and concrete cast-in-situ, and the process comprises the following steps: excavation of foundation pit → tamping of foundation pit → masonry of brick well chamber/concrete pouring well chamber → installation of well chamber cover plate → shaft masonry/concrete pouring. The conventional construction method of the rain and sewage inspection well comprises the steps of firstly excavating a foundation pit and constructing the inspection well; when the construction geological condition is poor, the sequence of firstly supporting, then excavating and then constructing is adopted, namely, firstly, steel sheet piles or log piles are supported, after the supporting is finished, foundation pit excavation and foundation tamping are carried out, and after the working procedures are finished, the steel sheet piles or the log piles are manually put into the foundation pit for inspection well building or template installation; when the construction geological conditions are relatively good, the foundation pit is excavated by adopting the first slope, and the inspection well is built or the template is installed in the foundation pit by manpower. In the process of carrying out the inspection well operation, the manual work is required to operate in the foundation pit for a long time, the potential safety hazard is very large, the quality of the bricklayed inspection well cannot be guaranteed, the maintenance time of the concrete cast-in-situ inspection well is too long, the work efficiency is very low, and the cost is also very high.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved by the utility model is as follows: aiming at the technical problems, the simple prefabricated inspection well is provided, when the construction geological conditions are complex and the difficulty is high, the inspection well is prefabricated near the point position, and when the maintenance age reaches or the concrete strength reaches more than 95%, the prefabricated concrete inspection well is hoisted into the excavated foundation pit by adopting hoisting equipment to be installed, namely, the prefabricated concrete inspection well is manufactured immediately, and is not influenced by the geological conditions. The method has the advantages of high operation efficiency, high progress, high quality, high safety, easy guarantee and the like.
The technical scheme adopted by the utility model is as follows: adopt a simple and easy prefabricated inspection shaft, its characterized in that: the prefabricated well chamber, the prefabricated cover plate and the prefabricated shaft are provided. The prefabricated well chamber top fixed mounting has prefabricated apron, there is the pit shaft bead in prefabricated pit shaft bottom, be equipped with on the prefabricated apron with pit shaft bead complex reserve concave pit shaft hole, prefabricated pit shaft lower extreme and prefabricated apron realize the socket joint through the cooperation of pit shaft bead and reservation concave pit shaft hole and are connected.
Preferably, waterproof materials are arranged at the joints of the prefabricated well chamber, the prefabricated cover plate and the prefabricated shaft for sealing.
Preferably, the bottom of the prefabricated well chamber is provided with a bottom foundation, the bottom foundation is provided with a flow groove, and the prefabricated well chamber, the bottom foundation and the flow groove are of an integrated structure.
Preferably, pipeline mounting holes for mounting pipelines are formed in two sides of the prefabricated well chamber, and the size of each pipeline mounting hole is larger than the outer diameter of each reserved pipeline.
Preferably, a well cover is arranged on the top of the prefabricated shaft.
Preferably, the prefabricated well chamber, the prefabricated shaft, the prefabricated cover plate and the bottom base material are all made of reinforced concrete.
Preferably, the prefabricated well chamber is a square prefabricated well chamber, and the prefabricated well shaft is a round prefabricated well shaft.
The utility model has the beneficial effects that: when the construction conditions are complex and the difficulty is high, the prefabricated inspection well can be installed in the foundation pit when the soil reaches certain strength. The prefabricated pit shaft, the prefabricated cover plate and the prefabricated well chamber which are connected in a socket joint mode greatly reduce the prefabrication difficulty of the inspection well.
Drawings
FIG. 1 is an elevation view of an inspection well.
FIG. 2 is a schematic illustration of a wellbore coupled to a well cover plate.
Fig. 3 is a schematic diagram of a reserved pipe hole in a well chamber.
In the figure: 1. the well cover comprises a well cover body, 2 prefabricated well shafts, 3 bearing slots, 4 prefabricated cover plates, 5 prefabricated well chambers, 6 pipeline mounting holes, 7 flow grooves, 8 bottom foundations, 10 reserved concave well shaft holes and 11 well shaft convex openings.
Detailed Description
The utility model relates to a simple prefabricated inspection well which comprises a prefabricated well chamber, a prefabricated cover plate and a prefabricated shaft. And the prefabricated well chamber, the prefabricated cover plate and the prefabricated shaft are independently prefabricated. And the prefabricated well chamber, the prefabricated shaft and the prefabricated cover plate are all made of reinforced concrete materials. And when the foundation pit reaches the installation condition, installing the prefabricated well chamber in the foundation pit, installing the prefabricated cover plate on the prefabricated well chamber, and installing the prefabricated shaft on the prefabricated cover plate.
In this embodiment, prefabricated apron is fixedly mounted at prefabricated well room top, there is the pit shaft bead in prefabricated pit shaft bottom, be equipped with on the prefabricated apron with pit shaft bead complex reserve concave pit shaft hole, the socket joint is realized through the cooperation of pit shaft bead and reservation concave pit shaft hole to prefabricated pit shaft lower extreme and prefabricated apron. So, alright in order to be in the same place prefabricated well room and prefabricated pit shaft fixed mounting in the foundation ditch, the cost of prefabricating significantly reduces.
In this embodiment, waterproof materials are arranged at the joints of the prefabricated well chamber, the prefabricated cover plate and the prefabricated shaft for sealing. Therefore, the waterproof capability of the prefabricated inspection well is greatly enhanced, and good sealing capability is achieved.
In this embodiment, a bottom foundation is arranged at the bottom of the prefabricated well chamber, a flow groove is arranged on the bottom foundation, and the prefabricated well chamber, the bottom foundation and the flow groove are of an integrated structure. The flow groove is arranged, so that accumulated water cannot be accumulated in the prefabricated inspection well, and the corrosion to the prefabricated inspection well is reduced.
In this embodiment, pipe installation holes are formed in two sides of the prefabricated well chamber, and the size of each pipe installation hole is larger than the outer diameter of each reserved pipe.
In this embodiment, a well lid is installed at the top of prefabricated inspection well.
In this embodiment, the prefabricated well chamber is a square prefabricated well chamber, and the prefabricated shaft is a round prefabricated shaft.
The using method of the utility model is as follows: in the construction of a road section with complex geological conditions and high difficulty, firstly, steel sheet piles or log piles are used for supporting, foundation pit excavation is carried out after supporting is finished, the foundation pit is tamped, when the maintenance age reaches or the concrete strength reaches over 90%, the prefabricated well chamber is hoisted to the foundation pit and installed, and the reserved pipeline hole of the prefabricated well chamber is matched with the reserved pipeline. And after the prefabricated well chamber is fixedly arranged in the foundation pit, the prefabricated cover plate is arranged at the top of the prefabricated well chamber, and the prefabricated shaft is matched with the reserved concave shaft hole on the prefabricated cover plate through the shaft convex opening at the bottom of the prefabricated shaft to install the prefabricated shaft on the prefabricated cover plate. And after the prefabricated shaft and the prefabricated cover plate are installed, sealing the prefabricated well chamber, the prefabricated cover plate and the connection part of the prefabricated shaft by using a waterproof material. And finally, covering a well cover on the top of the prefabricated shaft.

Claims (7)

1. The utility model provides a simple and easy prefabricated inspection shaft which characterized in that: the prefabricated well chamber, prefabricated apron and prefabricated pit shaft have, prefabricated well chamber top fixed mounting has prefabricated apron, there is the pit shaft bead, be equipped with on the prefabricated apron with pit shaft bead complex reserve concave pit shaft hole, the socket joint is realized through the cooperation of pit shaft bead and reservation concave pit shaft hole to prefabricated pit shaft lower extreme and prefabricated apron.
2. The simple prefabricated manhole of claim 1 wherein: and waterproof materials are arranged at the joints of the prefabricated well chamber, the prefabricated cover plate and the prefabricated shaft for sealing.
3. The simple prefabricated manhole of claim 1 wherein: the prefabricated well chamber bottom is equipped with the bottom basis, is equipped with the chute on the bottom basis, and prefabricated well chamber, bottom basis and chute structure as an organic whole.
4. The simple prefabricated manhole of claim 1 wherein: and pipeline mounting holes for mounting pipelines are formed in two sides of the prefabricated well chamber, and the size of each pipeline mounting hole is larger than the outer diameter of each reserved pipeline.
5. The simple prefabricated manhole of claim 1 wherein: and a well cover is arranged at the top of the prefabricated shaft.
6. A simple prefabricated manhole according to claim 3, wherein: and the prefabricated well chamber, the prefabricated shaft, the prefabricated cover plate and the bottom base material are all made of reinforced concrete.
7. The simple prefabricated manhole of claim 1 wherein: the prefabricated well chamber is a square prefabricated well chamber, and the prefabricated well shaft is a round prefabricated well shaft.
CN202121805428.5U 2021-08-04 2021-08-04 Simple prefabricated inspection well Active CN215715540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121805428.5U CN215715540U (en) 2021-08-04 2021-08-04 Simple prefabricated inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121805428.5U CN215715540U (en) 2021-08-04 2021-08-04 Simple prefabricated inspection well

Publications (1)

Publication Number Publication Date
CN215715540U true CN215715540U (en) 2022-02-01

Family

ID=79992973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121805428.5U Active CN215715540U (en) 2021-08-04 2021-08-04 Simple prefabricated inspection well

Country Status (1)

Country Link
CN (1) CN215715540U (en)

Similar Documents

Publication Publication Date Title
CN212896422U (en) Deep foundation pit water intercepting and draining device
CN111997088A (en) Groove type prefabricated assembly type cable duct bank and working well installation and construction method
CN111535335A (en) Railway near-edge deep foundation pit supporting method
CN209873873U (en) Prefabricated assembled power pipeline working well
CN215105880U (en) Concrete inverted well suitable for connecting new and old water supply and drainage pipelines
CN112943256B (en) Construction method of prefabricated pipe-jacking working well
CN117449423A (en) Construction process for newly-built inspection well under state of maintaining water flowing state of existing pipeline
CN215715540U (en) Simple prefabricated inspection well
CN215406172U (en) Sinking type prefabricated inspection well
CN1078282A (en) Pile shoe pouring process and special reinforcing steel cage thereof
CN217399744U (en) Basement side wall sluicing decompression structure
CN214143998U (en) Sewage collecting pipe network arrangement structure for households along river
CN112726784B (en) Full-prefabricated PC sewer inspection well component assembly structure and construction method
CN214695953U (en) Domestic sewage drainage pipe that municipal works were used
CN201883453U (en) Combined pipe jacking working well
CN211646644U (en) Leachate collecting system of refuse landfill
CN110056012B (en) Waterproof and drainage system of prefabricated open caisson structure
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN220247075U (en) Prefabricated large-mouth well
CN220035505U (en) Circular water supply and drainage engineering top pipe well structure
CN221663848U (en) Assembled rain sewage well
CN221142829U (en) Drainage channel for soft soil stratum
CN221276802U (en) Sump pit structure
CN221919717U (en) Prefabricated flushing valve overflow well
CN221072929U (en) Non-excavation assembly caisson type inspection well for rural sewage pipe network

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant