CN2502937Y - Double-rail-cavity transistion switching device - Google Patents

Double-rail-cavity transistion switching device Download PDF

Info

Publication number
CN2502937Y
CN2502937Y CN 01263582 CN01263582U CN2502937Y CN 2502937 Y CN2502937 Y CN 2502937Y CN 01263582 CN01263582 CN 01263582 CN 01263582 U CN01263582 U CN 01263582U CN 2502937 Y CN2502937 Y CN 2502937Y
Authority
CN
China
Prior art keywords
track
utility
model
cavities
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 01263582
Other languages
Chinese (zh)
Inventor
王树生
郑勇
田建川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu speed up logistics coating Engineering Co., Ltd.
Original Assignee
王树生
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王树生 filed Critical 王树生
Priority to CN 01263582 priority Critical patent/CN2502937Y/en
Application granted granted Critical
Publication of CN2502937Y publication Critical patent/CN2502937Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a double track cavity transition device for primary hanger track link and secondary hanger and workpiece rotate-hang and storage of the automobile engine to run in. Two track cavities are hung on a beam and both ends of the two track cavities are separately provided with self-locking devices; small automobiles depending on power units to drive are stored in the two track cavities; two locating holes are provided in the two track cavities; the hole is installed with an alignment device corresponding to the track cavity on another conveyor. The utility model has the advantages that the utility model occupies small space to arrange running-in platforms as many as possible in the limited space and improves the utilization rate of the space over 30 per cent, has reasonable structure and reliable running as well as high degree of automation under the control of PLC and has dual functions of storage and transport and rotate-hang and high density of integration.

Description

Double track chamber transition and conversion device
Technical field
The utility model relates to the double track chamber transition and conversion device that an a kind of suspender orbital docking, secondary suspender and workpiece that is used for the automotive engine break-in turns linked to and store.Belong to logistics conveying technology field.
Background technology
Prior art, be to adopt track switch shunting, interflow to finish the transition and conversion of workpiece, also having a kind of is the transition and conversion of finishing workpiece by artificial ground Lifting bench, and the former major defect is that the space of occupying is big, and also can't finish the up-and-down movement of workpiece and the inverse motion of logistics.It is big that the latter's defective is to occupy the space, and automatization level is low.
Summary of the invention
The purpose of this utility model is to overcome the defective of above-mentioned existence, a kind of double track chamber transition and conversion device is proposed, technical solution of the present utility model: on crossbeam, hang with two track chambeies, a self-locking device is respectively arranged on two ends in two track chambeies, respectively have in two track chambeies and deposit the dolly that relies on engine installation to promote, respectively establish two knock holees in two track chambeies, install in this hole one with another conveyer on the corresponding alignment device in track chamber.Advantage of the present utility model: occupy little space, be convenient in limited space, arrange the break-in platform as much as possible, improve space availability ratio more than 30%.Rational in infrastructure, reliable, under PLC control, the degree of automation height.Have accumulating, turn linked to dual-use function, the integrated level height.
Accompanying drawing is of the present utility model to the structure scheme drawing
Among the figure 1 is crossbeam, the 2, the 3rd, and ante-chamber 2, back cavity 3,4th are called for short, self-locking device in track chamber, front and back.
Provide working process of the present utility model below in conjunction with accompanying drawing:
A suspender of aerial conveyer has forward and backward track chamber 2,3, and ante-chamber 2 is used to hold the lorry formula secondary suspender of hanging workpiece, the driving engine for the treatment of break-in is provided for the break-in platform; Back cavity 3 is used to hold empty lorry formula secondary suspender, hangs workpiece that break-in finishes driving engine one by one.All there is self-locking device 4 at 2,3 two ends, track chamber of a suspender, only accurately just removing self-locking after the butt joint, but just the secondary suspender are moved in push-and-pull, shift workpiece.The break-in conveyer that moves above break-in platform in groups can parallel motion and hang the workpiece up-and-down movement.Its suspender has only a track chamber, is used to admit lorry formula secondary suspender, hangs the automotive engine of break-in platform up and down.Two ends, track chamber also are provided with self-locking device, accurately just remove self-locking after the butt joint, but just the secondary suspender is moved in push-and-pull, shift workpiece.The ante-chamber 2 of aerial conveyer arrives the position of docking with break-in conveyor rail chamber, if sky (no secondary suspender etc.) is treated in break-in conveyor rail chamber, then ante-chamber 2 is good with track chamber automatic butt, push away to hang remaining the secondary suspender of motoring engine by the transition power system, go out ante-chamber 2 and go into break-in conveyor rail chamber; The back cavity 3 of aerial conveyer arrives the position of docking with break-in conveyor rail chamber, if the finish secondary suspender of driving engine of the break-in of hanging is arranged in the break-in conveyor rail chamber, then back cavity 3 is good with track chamber automatic butt, the transition power system draws and hangs the finish secondary suspender of driving engine of break-in, goes out break-in conveyor rail chamber and goes into back cavity.Thereby finish turning linked to and exchanging of workpiece between break-in conveyer and aerial conveyer, and corresponding storing hung empty secondary suspender in ante-chamber 2 or back cavity 3.Realize automatic butt, turn linked to and the accumulating function.

Claims (1)

1, double track chamber transition and conversion device, it is characterized in that on crossbeam (1), hanging with two track chambeies (2), (3), a self-locking device (4) is respectively arranged on two ends of two track chambeies (2), (3), respectively have in two track chambeies (2), (3) and deposit the dolly that relies on engine installation to promote, respectively establish two knock holees in two track chambeies (2), (3), install in this hole one with another conveyer on the corresponding alignment device in track chamber.
CN 01263582 2001-11-05 2001-11-05 Double-rail-cavity transistion switching device Expired - Lifetime CN2502937Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01263582 CN2502937Y (en) 2001-11-05 2001-11-05 Double-rail-cavity transistion switching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01263582 CN2502937Y (en) 2001-11-05 2001-11-05 Double-rail-cavity transistion switching device

Publications (1)

Publication Number Publication Date
CN2502937Y true CN2502937Y (en) 2002-07-31

Family

ID=33671143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01263582 Expired - Lifetime CN2502937Y (en) 2001-11-05 2001-11-05 Double-rail-cavity transistion switching device

Country Status (1)

Country Link
CN (1) CN2502937Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075171A (en) * 2012-12-14 2013-05-01 三一重型装备有限公司 Thrust mechanism and hydraulic bracket comprising thrust mechanism
CN109466906A (en) * 2017-09-07 2019-03-15 株式会社大福 Conveying equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075171A (en) * 2012-12-14 2013-05-01 三一重型装备有限公司 Thrust mechanism and hydraulic bracket comprising thrust mechanism
CN109466906A (en) * 2017-09-07 2019-03-15 株式会社大福 Conveying equipment
CN109466906B (en) * 2017-09-07 2020-10-23 株式会社大福 Conveying equipment

Similar Documents

Publication Publication Date Title
CN102019975B (en) Trolley flexible transport system and application method thereof
CN106378557B (en) Flexible Production line suitable for vehicle side production
CN2502937Y (en) Double-rail-cavity transistion switching device
CN202657003U (en) Electric car battery box replacement device
CN101761258B (en) Lifting type automobile access device
CN214689109U (en) Automatic quick-change robot for vehicle-mounted power battery
CN101330159B (en) Forwarding system for charging battery module
CN100441820C (en) Full-automatic multi-layer garage
CN201317419Y (en) Welding skid used for transmitting various car bodies
CN209064068U (en) A kind of battery cache mechanism of automobile electrical changing station
CN207790926U (en) Gusset tail portion positioning flexible substep switching mechanism
CN106449880A (en) Transfer device for solar photovoltaic panels
CN207761367U (en) One kind can pass through formula vertical circulation stereo garage
CN2515167Y (en) Cross transitional switching device
CN210858171U (en) Road underground garage
CN201722958U (en) Three-dimensional garage two-way car parking and picking-up device
CN209938564U (en) Automatic quick battery replacing device
CN208391303U (en) The fixture storage system of the main spelling system of automobile flexible
CN2251596Y (en) Mechanized stereoscopic rotary arm type garage
CN208586959U (en) Carry movable trailer and translation ascending and descending parking access apparatus
CN207705222U (en) A kind of battery core enters housing apparatus
CN110695553A (en) Laser welding transplanting and copper nozzle plugging mechanism for lithium battery
CN201163643Y (en) Battery module charging and transmission system
CN110670506A (en) Road cone recycling and placing system
CN101392398B (en) Anti-floating device for automobile body during pre-processing and electrophoresis process

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JIANGSU SUSHENG LOGISTICAL COATING AND LOADING ENG

Free format text: FORMER NAME OR ADDRESS: WANG SHUSHENG

CP03 Change of name, title or address

Address after: New South Park District in Jiangsu province Wuxi City Meicun town 214100

Patentee after: Jiangsu speed up logistics coating Engineering Co., Ltd.

Address before: 214087 Jiangsu province or a-6 Wuxi Liyuan Development Zone

Patentee before: Wang Shusheng

C17 Cessation of patent right
CX01 Expiry of patent term

Expiration termination date: 20111105

Granted publication date: 20020731