CN2479459Y CN 01220883 CN01220883U CN2479459Y CN 2479459 Y CN2479459 Y CN 2479459Y CN 01220883 CN01220883 CN 01220883 CN 01220883 U CN01220883 U CN 01220883U CN 2479459 Y CN2479459 Y CN 2479459Y
Authority
CN
China
Prior art keywords
storage bin
smelting furnace
batcher
proportioner
silicon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01220883
Other languages
Chinese (zh)
Inventor
贾玉东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01220883 priority Critical patent/CN2479459Y/en
Application granted granted Critical
Publication of CN2479459Y publication Critical patent/CN2479459Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Carbon And Carbon Compounds (AREA)

Abstract

The utility model relates to a batching device of a carbofrax smelting furnace, wherein storage bins are ranked in parallel, the quantity is no less than two, the lower end of each storage bin is equipped with a feeder, and a common used electric weighing hopper is equipped under the feeder. Compared with the prior device the batching device simplifies the device, and has small accommodation area, small power consumption, and decreased staff preparation, thereby decreasing the device investment and lowering the production cost.

Description

The proportioner of sic smelting furnace
The utility model relates to a kind of mechanical device, especially relates to a kind of proportioner of sic smelting furnace.
In the production process of carborundum, carborundum is smelted needed raw material will mix the back shove charge according to a certain percentage.Existing mixing arrangement has two kinds: a kind of more original, be about to go in the mixer to mix after used carbon material of silicon carbide smelting and silica material are weighed respectively, and this method labour intensity is big, inefficiency; Another kind method is more advanced, a plurality of storage bins are promptly arranged, be respectively arranged with batcher, electronic scale hopper below each storage bin, though a kind of defective of method before the method has solved, but, the investment of this proportioner is very big, again because of this equipment link is many, has place's equipment to make mistakes, just be easy to influence the operation conditions of entire equipment, influence the shove charge time, heat is smelted in influence simultaneously, reduces the annual production of smelting furnace.
The purpose of this utility model provides the proportioner of the sic smelting furnace that a kind of equipment investment is few, equipment is simple, floor space is few.
The technical solution of the utility model is:
A kind of proportioner of sic smelting furnace, storage bin is arranged side by side, and quantity is no less than two, and each storage bin lower end is provided with batcher, and batcher is divided into the shared electron bucket.
Described storage bin has two, and the lower end of each storage bin is provided with two batchers, and per two batchers are divided into an electronic scale hopper.
Described storage bin has three, and middle storage bin lower end is provided with two batchers.
The proportioner of sic smelting furnace described in the utility model because the shared electronic scale hopper of plurality of raw materials, with the current device simplified in comparison equipment, and its floor space is few, used power is few, and personnel's preparation also reduces, thereby has reduced equipment investment and production cost.
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of the proportioner of the utility model sic smelting furnace.
Fig. 2 has the structural representation of proportioner of two sic smelting furnace for the utility model storage bin.
Fig. 3 has the structural representation of proportioner of three sic smelting furnace for the utility model storage bin.
Embodiment 1:
All storage bins 1 support by pillar 8 among Fig. 1, be separately installed with batcher 2 under it, be provided with electronic scale hopper 3 below the batcher 2, electronic inductor 4 is installed on it, electronic inductor 4 connects computer, electronic inductor 4 and electronic scale hopper 3 are fixed on the storage bin 1 by fixture 7, and electronic scale hopper 3 bottoms are provided with emptying door 5, and batch mixer elevator bucket 6 is positioned at electronic scale hopper 3 belows.During use, earlier used material is deposited in respectively in the storage bin hopper 1, opened a certain batcher 2, wherein a certain component raw material is sent in the electronic scale hopper 3, when feeding coal reached predetermined weight, computer sent signal to batcher 2, and this batcher 2 quits work immediately.Then, open another batcher 2, when feeding coal reached scheduled volume, this batcher also quit work, carry out the weighing of a plurality of raw materials according to this after, promptly finish once batching.Open emptying door 5, confected materials is put into batch mixer elevator bucket 6, rise in the batch mixer and mix.After having put material emptying door 5 is closed, beginning is batching for the second time, so recycles.When foundry returns need stir, also can be with after the storehouse emptying in the storage bin 1, the foundry returns of packing into, foundry returns enters mixer by batcher 2, electronic scale hopper 3, batch mixer elevator bucket 6.
Embodiment 2:
This proportioning machine is basic identical with embodiment 1 structure, and its difference is that storage bin 1 has two, is equipped with two batchers 2 below each storage bin 1, transmits an electronic scale hopper 3 to be set below the batcher 2 of different material, and its advantage is to accelerate batching speed.
Embodiment 3:
This proportioning machine is basic identical with embodiment 1 structure, and its difference is that storage bin 1 has three, middle storage bin 1 is put a kind of raw material, the storage bin on both sides is put another kind of raw material, and middle storage bin 1 lower end is provided with two batchers 2, is transported to different local requirements to satisfy after two kinds of raw materials mix.When two kinds of raw materials are weighed, public two the electronic scale hoppers 3 of difference.

Claims (3)

1. the proportioner of a sic smelting furnace is characterized in that: storage bin (1) is arranged side by side, and quantity is no less than two, and each storage bin (1) lower end is provided with batcher (2), and batcher (2) is divided into shared electron bucket (3).
2, the proportioner of sic smelting furnace as claimed in claim 1 is characterized in that: described storage bin (1) has two, and the lower end of each storage bin (1) is provided with two batchers (2), and per two batchers (2) are divided into an electronic scale hopper (3).
3, the proportioner of sic smelting furnace as claimed in claim 1 is characterized in that: described storage bin (1) has three, and middle storage bin (1) lower end is provided with two batchers (2).
CN 01220883 2001-04-12 2001-04-12 Burdening device for silicon-carbide smelting furnace Expired - Fee Related CN2479459Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01220883 CN2479459Y (en) 2001-04-12 2001-04-12 Burdening device for silicon-carbide smelting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01220883 CN2479459Y (en) 2001-04-12 2001-04-12 Burdening device for silicon-carbide smelting furnace

Publications (1)

Publication Number Publication Date
CN2479459Y true CN2479459Y (en) 2002-02-27

Family

ID=33638316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01220883 Expired - Fee Related CN2479459Y (en) 2001-04-12 2001-04-12 Burdening device for silicon-carbide smelting furnace

Country Status (1)

Country Link
CN (1) CN2479459Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975605A (en) * 2010-08-30 2011-02-16 杭州高新绝缘材料有限公司 Plasticizer automatically weighing and dispensing system for PVC cable material production
CN103253673A (en) * 2013-05-24 2013-08-21 宁夏天净冶金有限公司 Charging equipment and charging method of large-scale silicon carbide smelting furnace
CN103423990A (en) * 2012-05-18 2013-12-04 中国有色(沈阳)冶金机械有限公司 Lifting type filling bin
CN117287975A (en) * 2023-11-24 2023-12-26 天祝鑫澳源碳材科技有限公司 Silicon carbide smelting furnace

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975605A (en) * 2010-08-30 2011-02-16 杭州高新绝缘材料有限公司 Plasticizer automatically weighing and dispensing system for PVC cable material production
CN101975605B (en) * 2010-08-30 2013-08-07 杭州高新橡塑材料股份有限公司 Plasticizer automatically weighing and dispensing system for PVC cable material production
CN103423990A (en) * 2012-05-18 2013-12-04 中国有色(沈阳)冶金机械有限公司 Lifting type filling bin
CN103423990B (en) * 2012-05-18 2014-12-17 中国有色(沈阳)冶金机械有限公司 Lifting type filling bin
CN103253673A (en) * 2013-05-24 2013-08-21 宁夏天净冶金有限公司 Charging equipment and charging method of large-scale silicon carbide smelting furnace
CN117287975A (en) * 2023-11-24 2023-12-26 天祝鑫澳源碳材科技有限公司 Silicon carbide smelting furnace
CN117287975B (en) * 2023-11-24 2024-02-09 天祝鑫澳源碳材科技有限公司 Silicon carbide smelting furnace

Similar Documents

Publication Publication Date Title
CN205461887U (en) Full -automatic high accuracy compounding device
CN105329678A (en) Combined feeding quantitative scale
CN206034248U (en) Formula of pressure asphalt mixture stirring device
CN2479459Y (en) Burdening device for silicon-carbide smelting furnace
CN101352892A (en) Rolling type technique and production line for molding assembly large plate
CN201250191Y (en) Automatic production device for organic fertilizer
CN211541793U (en) Production facility of building terminal production field with premixed mortar stirring
CN213290798U (en) Aggregate weighing device
CN102514091A (en) Closed automatic production device for refractory castable
CN214088310U (en) Dosing unit for cement manufacture
CN212441088U (en) Automatic batching system for silicon carbide production
CN101352891A (en) Technique and production line for integrally molding and assembling large plate
CN2346557Y (en) Gravity feeding mechanism
CN2098357U (en) Concrete mixer with proportioning and metering device
CN1788964A (en) Concrete decrement electronic automatic machine for gauging, feeding and stirring
CN112078011A (en) Concrete batching and stirring integrated device for construction site
CN201769285U (en) Concrete mixing plant
CN205974533U (en) Fermentation automatic batching system
CN213376468U (en) Automatic refractory material batching production line
CN218618795U (en) Batching ration blanking structure
CN211306939U (en) Efficient, environment-friendly and energy-saving dry powder mortar production equipment
CN208140239U (en) It is a kind of for weighing the burden balance of material
CN211261781U (en) Material distributing and charging system of large silicon carbide smelting furnace
CN218231002U (en) Automatic quantitative device that adds of iron and steel enterprise steel scrap
CN202428539U (en) Closed automatic production equipment for castable refractory

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20020227