CN2461965Y - Dredging appts. - Google Patents

Dredging appts. Download PDF

Info

Publication number
CN2461965Y
CN2461965Y CN 00268792 CN00268792U CN2461965Y CN 2461965 Y CN2461965 Y CN 2461965Y CN 00268792 CN00268792 CN 00268792 CN 00268792 U CN00268792 U CN 00268792U CN 2461965 Y CN2461965 Y CN 2461965Y
Authority
CN
China
Prior art keywords
guide rail
platform
bucket
fixed
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00268792
Other languages
Chinese (zh)
Inventor
熊祖元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 00268792 priority Critical patent/CN2461965Y/en
Application granted granted Critical
Publication of CN2461965Y publication Critical patent/CN2461965Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model relates to a dredging apparatus, which comprises a stand, a guide rail, a power section and a dredging bucket. The stand is fixed on a bank side, and the middle part is provided with a funnel. The guide rail is welded by sectional steel. The lower end of the guide rail is placed in a mud pool, and the upper end is in lap joint with a platform. The power section is composed of a large hoisting machine and a small hoisting machine. A head rope and a tail rope are pulled, so that the dredging bucket is filled with sludge and moves upwards along the guide rail. Then the sludge is poured into the funnel on the platform, and the sludge are transported to the suburb through a dump truck. The utility model is suitable for removing the urban sludge with much foreign material, causes no pollution to the city environment in the process of dredging, and has high efficiency.

Description

A kind of Accrete clearing device
The utility model relates to urban construction machinery, the large-scale Accrete clearing device in promptly a kind of city.
In the park of big and medium-sized cities, river course, water conservancy projects, often need to remove the mud in the water body, contain foreign material such as a large amount of rubbish, plastics, tire, plank in the municipal sludge, and it is populous in the city, sanitation of environment is required height, and mud can not be stacked nearby, must transport suburbs.In the face of these difficulties, no matter choose to dig and carry on the shoulder, still all not all right with excavator, forklift, dredge boat because under excavator and the forklift not mire, the pipeline of dredge boat can't be carried the foreign material in the mud again.
The object of the present invention is to provide a kind of be used for the city desilting, the dump truck of mud directly can being packed into is transported to the Accrete clearing device in countryside.
The object of the present invention is achieved like this: this Accrete clearing device comprises stand, guide rail, power section and bucket, it is characterized in that: stand is fixed on the bank, it is made up of four root posts and platform, there is funnel at the platform middle part, platform top is fixed with top block, there is angle pulley at the rear portion, one side has operating desk, guide rail is welded by shaped steel, and both sides are equipped with roller and backplate, and the guide rail lower end is placed in the mire, the upper end is overlapped on the platform, the guide rail lower end is welded with leading truck, and power section is big hoist engine and little hoist engine, all is fixed on the platform, there is head rope in the anterior system of bucket, through leading truck, top block, angle pulley enters big hoist engine, and there is tail rope in bucket rear portion system, and the fixed block through the opposite bank enters little hoist engine.
Bucket is a shoe-shaped, and anterior point is and short, and the rear portion is wide and high; it is wide identical with the guide rail inner width to struggle against; start little hoist engine, tail rope drags bucket backward through fixed block; because bucket is shoe-shaped; bucket floats on the mud and retreats, and behind the mire middle part, little hoist engine is shut down; start big hoist engine; head rope is through angle pulley; top block passes in leading truck, ties up to the bucket front portion, and the pulling bucket moves ahead; and the bucket front portion is goed deep in the mud; when bucket moved ahead, mud had also been filled bucket, behind the bucket upper rail; moving ahead between the backplate of guide rail both sides He on the roller of bottom; after rising on the platen, because action of gravity, bucket is poured mud into funnel automatically; mud falls in the dump truck below platform, as far as the countryside.
The utility model has the advantages that: 1, the suitable removing in the city contains a lot of mud of foreign material; 2, the mud automobile of directly packing into as far as the countryside, can not pollute urban environment; 3, bucket is dredged and is toppled over all and finish automatically, the efficient height, and cost is low, and labour intensity is little; 4, but long 100 meters of once desilting, wide 40 meters area are installed, and installation, convenient disassembly.
Fig. 1 is a front view of the present utility model.
Fig. 2 is a vertical view of the present utility model.
Fig. 3 is an A-A profile of the present utility model.
Details are as follows below in conjunction with accompanying drawing; Platform 2 is welded into by shaped steel and thick iron plate, be supported and fixed on the bank by 4 root posts 1, there is funnel 3 at the middle part, the brandreth that platform 2 tops are welded into 4 pillars is fixed with top block 10, the rear portion is fixed with angle pulley 11 by brandreth, one side has operating desk 14, guide rail 4 is welded by shaped steel, both sides are equipped with roller 16 and backplate 15, guide rail 4 lower ends are placed in the mire, and the upper end is overlapped on the platform 2, and the lower end of guide rail 4 is welded with leading truck 6, the top of leading truck 6 is equipped with 3 column roller bearings, to reduce the friction of head rope 9 and leading truck 6.Power section is Da Yang machine 12 and little hoist engine 13, all be fixed on the platform 2, there is head rope 9 in bucket 5 anterior systems, enter big hoist engine 12 through leading truck 6, top block 10, angle pulley 11, and there is tail rope 8 in bucket 5 rear portions system, fixed block 7 through the opposite bank enters little hoist engine 13, because two hoist engines are opened in turn, bucket 5 is moved back and forth, mud 17 and foreign material are wherein poured in the funnel 3 by guide rail 4, the tipping lorry that the platen of packing into waits for 2 times is pulled to the countryside.

Claims (2)

1, a kind of Accrete clearing device, comprise stand, guide rail, power section and bucket, it is characterized in that: stand is fixed on the bank, it is made up of four root posts and platform, there is funnel at the platform middle part, platform top is fixed with top block, there is angle pulley at the rear portion, and a side has operating desk, and guide rail is welded by shaped steel, both sides are equipped with roller and backplate, the guide rail lower end is placed in the mire, and the upper end is overlapped on the platform, and the guide rail lower end is welded with leading truck, power section is big hoist engine and little hoist engine, all be fixed on the platform, there is head rope in the anterior system of bucket, through leading truck, top block, angle pulley enters big hoist engine, there is tail rope in bucket rear portion system, and the fixed block through the opposite bank enters little elevator.
2, a kind of Accrete clearing device according to claim 1 is characterized in that bucket is a shoe-shaped, and anterior point is and short, and the rear portion is wide and high, and it is wide identical with the guide rail inner width to struggle against.
CN 00268792 2000-12-30 2000-12-30 Dredging appts. Expired - Fee Related CN2461965Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00268792 CN2461965Y (en) 2000-12-30 2000-12-30 Dredging appts.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00268792 CN2461965Y (en) 2000-12-30 2000-12-30 Dredging appts.

Publications (1)

Publication Number Publication Date
CN2461965Y true CN2461965Y (en) 2001-11-28

Family

ID=33622294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00268792 Expired - Fee Related CN2461965Y (en) 2000-12-30 2000-12-30 Dredging appts.

Country Status (1)

Country Link
CN (1) CN2461965Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708287A (en) * 2018-06-04 2018-10-26 中交四公局第六工程有限公司 A kind of translating device of cable saddle installation
CN113323060A (en) * 2021-06-09 2021-08-31 中国水利水电第一工程局有限公司 Floating dock type dredging platform and dredging method for narrow space

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708287A (en) * 2018-06-04 2018-10-26 中交四公局第六工程有限公司 A kind of translating device of cable saddle installation
CN113323060A (en) * 2021-06-09 2021-08-31 中国水利水电第一工程局有限公司 Floating dock type dredging platform and dredging method for narrow space

Similar Documents

Publication Publication Date Title
CN102776910B (en) Engineering machine for dredging and cleaning river course
CN103615010A (en) Construction method of digging and conveying earth of deep foundation pit through current scour
CN211571341U (en) Road damaged surface cleaning device
CN111392583B (en) Grab bucket type underwater dredging device and construction method thereof
CN204822015U (en) On -water garbage collection ship
CN213323589U (en) Portable rubbish cleaning boat for small-area water area
CN202899194U (en) Main buoyancy tanks of riverway dredging engineering machinery
CN2461965Y (en) Dredging appts.
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN202899195U (en) Hydraulic propeller thruster for riverway dredging engineering machinery
CN202899184U (en) Bucket special for sludge
CN205369300U (en) Piping lane box culvert transportation installation device
CN202706091U (en) On-water locating and stabilizing mechanism of riverway dredging engineering machinery
CN217470721U (en) Device for closed-warehouse reclamation of large pit-type tailing warehouse
CN202990001U (en) Amphibious river channel working platform
CN110080321A (en) A kind of underwater intelligent bull-dozer
CN206267127U (en) Reservoir of Hydropower Station floater cleaning system
CN206625274U (en) A kind of riverway sludge clears up ship
CN201614655U (en) Drainage box culvert dredging device
CN114622643A (en) Pipeline dried sludge cleaning and dredging robot
CN208949951U (en) A kind of riverway sludge cleaning plant
CN206815418U (en) A kind of pipeline synthesis cleaning plant and its system
KR100997373B1 (en) Dredging plant equipment
CN214363733U (en) Channel dredging device for water conservancy and hydropower
CN218785018U (en) Automatic flushing system for boulders

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Xiong Zuyuan

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee