CN206267127U - Reservoir of Hydropower Station floater cleaning system - Google Patents
Reservoir of Hydropower Station floater cleaning system Download PDFInfo
- Publication number
- CN206267127U CN206267127U CN201621394485.8U CN201621394485U CN206267127U CN 206267127 U CN206267127 U CN 206267127U CN 201621394485 U CN201621394485 U CN 201621394485U CN 206267127 U CN206267127 U CN 206267127U
- Authority
- CN
- China
- Prior art keywords
- dam
- water tank
- sliding machine
- reservoir
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
Abstract
The utility model provides a kind of Reservoir of Hydropower Station floater cleaning system, and it includes the salvaging system on front side of dam and the drive mechanism on rear side of dam;Salvaging system includes the sliding machine being installed on track, and the grid bucket that can be overturn is provided with sliding machine, and grid bucket lower end is also associated with balancing weight;Drive mechanism includes water tank, and water tank inlet is connected to the underwater on front side of dam by siphon piping, and siphon trigger mechanism is additionally provided with siphon piping, and water outlet of water tank position is additionally provided with T-shaped block, and T-shaped block lower section is provided with backstop;Water tank is connected by connecting rope with sliding machine;The one end of dam crest portion on front side of dam is provided with slope, and slope end is provided with for carrying out spacing limited block to sliding machine, and slope lower section is provided with the lorry of delivery floating object;The utility model solves current power station and removes contamination inefficiency, and energy consumption is big, input is big, need a large amount of manpowers and be absolutely unsafe, and floating object the difficult problem of secondary transhipment.
Description
Technical field
The utility model is related to Reservoir of Hydropower Station Removal Technology field, in particular to a kind of Reservoir of Hydropower Station floater cleaning
System.
Background technology
Power station generates electricity by waterpower, and its power station reservoir area is often to build by the mountain, can be by mountain after exposing to the weather
The dirts such as branch wood are accumulated to by the dykes and dams of reservoir area, to prevent that its blade is smashed and destroys water power the debris introducing hydraulic turbine
Unit, power station is substantially all by the way of traditional trash rack plus human assistance are removed contamination.Workman when inefficiency, blowdown operation
Labour intensity is big, energy-consuming is serious and extremely hazardous, and manual cleaning durations are long, gap periods are also long, and reservoir area is toward in the past
Substantial amounts of floating object is often built up, this also brings hidden trouble to the safe operation of unit.
The cleaning of current power station floating object has following several manner of cleaning up:1 trash, the motion dependency line of trash
The operation hung, in some special environment, the installation that row hangs is restricted, and also limits the use of trash.2 at me
The mountain area small hydropower station of state, mainly still clears up the water surface, inefficiency by human assistance crane, and energy consumption is huge, peace
Completely without guarantee.The pick-up boat of 3 movable types, this salvaging mode haves the shortcomings that energy consumption is big, input is big, need to build harbour etc., and
And limited by the water surface, it is difficult with the place of water depth deficiency, and floater is often the edge that there is waters,
Into the salvaging dead angle of pick-up boat;4 floating objects are salvaged after debarking, and transhipment upset is difficult, are easily caused secondary accumulation and are polluted.
The content of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, there is provided a kind of Reservoir of Hydropower Station floater cleaning system, solution
Certainly current power station is removed contamination inefficiency, and energy consumption is big, input is big, need a large amount of manpowers and be absolutely unsafe, and floating object
The difficult problem of secondary transhipment.
The utility model is in order to solve the above technical problems, the technical scheme for being used is:A kind of Reservoir of Hydropower Station floating object
Cleaning system, it includes the salvaging system on front side of dam and the drive mechanism on rear side of dam;
The salvaging system includes the sliding machine being installed on track, is provided with what can be overturn on the sliding machine
Grid bucket, the grid bucket lower end is also associated with balancing weight;
The drive mechanism includes water tank, and the water tank inlet is connected to the underwater on front side of dam by siphon piping,
Siphon trigger mechanism is additionally provided with the siphon piping, the water outlet of water tank position is additionally provided with T-shaped block, the T-shaped block
Lower section is provided with backstop;
The water tank is connected by connecting rope with sliding machine;The one end of dam crest portion on front side of dam is provided with slope, described
Slope end is provided with for carrying out spacing limited block to sliding machine, and the slope lower section is provided with the lorry of delivery floating object.
Preferably, the bellows that the siphon piping delivery port position passes through to stretch is connected with water tank inlet.
Preferably, siphon trigger mechanism is installed on dam trailing flank by fixed block.
Preferably, the grid bucket is hingedly connected on sliding machine.
Preferably, the water outlet of water tank position inner side is additionally provided with for carrying out spacing position-limited rack to T-shaped block.
The beneficial effects of the utility model:
1., again without additional power mechanism in addition to startup needs power, input is small, and maintenance operation expense is small for overall process.The system
Salvaging and lifting to floating object is completed by the gravity of Water in Water Tanks amount, grid bucket completes to topple over work after reaching slope.Together
When system operation power all from the water in dam, and the water of the system work will not produce any shadow to dam water level
Ring.Due to power station water turbine set it is desirable that the height of water, this small amount of current will not be on any influence of generation of unit generation amount.
2. institute is completed functional, to geographical position by system is by the attachment rail on dykes and dams front and back panel and auxiliary facility
Put without too big limitation, need to only select floating object to build up ground.The course of work is intervened without personnel simultaneously, someone guard,
Substantially reduce cost of labor.
3. the system can disposably complete to salvage and transport work, it is to avoid rehandling.
Brief description of the drawings
Fig. 1 is a kind of structural representation of Reservoir of Hydropower Station floater cleaning system;
Fig. 2 is local state schematic diagram when sliding machine rises to dam crest in Fig. 1;
Fig. 3 is local state schematic diagram when water tank drops to backstop in Fig. 1;
In figure, system 1, track 1.1, sliding machine 1.2, grid bucket 1.3, balancing weight 1.4, drive mechanism 2, water tank are salvaged
2.1st, siphon piping 2.2, bellows 2.2.1, siphon trigger mechanism 2.3, T-shaped block 2.4, position-limited rack 2.4.1, backstop 2.5,
Slope 3, limited block 3.1, connecting rope 4, lorry 5.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, a kind of Reservoir of Hydropower Station floater cleaning system, it includes the salvaging system on front side of dam
System 1 and the drive mechanism 2 on rear side of dam;
The salvaging system 1 includes the sliding machine 1.2 being installed on track 1.1, is provided with the sliding machine 1.2
The grid bucket 1.3 that can be overturn, the lower end of grid bucket 1.3 is also associated with balancing weight 1.4;
The drive mechanism 2 includes water tank 2.1, and the water inlet of the water tank 2.1 is connected to dam front side by siphon piping 2.2
Underwater, siphon trigger mechanism 2.3 is additionally provided with the siphon piping 2.2, the delivery port position of the water tank 2.1 is additionally provided with T
Type block 2.4, the lower section of the T-shaped block 2.4 is provided with backstop 2.5;Backstop 2.5 in the present embodiment is designed for screen cloth, Ke Yirang
Water passes through, and ponding will not occur.
The water tank 2.1 is connected by connecting rope 4 with sliding machine 1.2;The one end of dam crest portion on front side of dam is provided with tiltedly
Slope 3, the end of the slope 3 is provided with for carrying out spacing limited block 3.1 to sliding machine 1.2, and the lower section of the slope 3 is provided with fortune
Carry the lorry 5 of floating object.
Preferably, the delivery port position of the siphon piping 2.2 passes through the bellows 2.2.1 that can be stretched and water tank 2.1
Water inlet is connected.Bellows 2.2.1 in the present embodiment can free collapsing length, it is ensured that it on water tank 2.1 with moving down
Phenomenon will not be fallen off when dynamic.
Preferably, siphon trigger mechanism 2.3 is installed on dam trailing flank by fixed block 2.3.1.Preferably, siphon triggering
Mechanism 2.3 is a kind of suction pump, it is only necessary to which operation a period of time short time, just can draw water initiation siphonage.
Preferably, the grid bucket 1.3 is hingedly connected on sliding machine 1.2.
Preferably, the delivery port position of the water tank 2.1 inner side is additionally provided with spacing spacing for being carried out to T-shaped block 2.4
Frame 2.4.1.As described in Figure 3, when sliding machine 1.2 reaches 3.1 position of limited block, T-shaped block 2.4 is blocked by backstop 2.5, water
The delivery port of case 2.1 can relatively move generation gap with T-shaped block 2.4, and position-limited rack 2.4.1 is prevented from T-shaped block 2.4 and all enters
Enter to water tank 2.1.
The present embodiment operation principle is as follows:
Original state:Sliding machine 1.2 and grid bucket 1.3 are located at dam front side water surface lower section, and T-shaped block 2.4 blocks water tank
2.1 delivery port positions so that water tank 2.1 is water-tight;
Rise salvaging state:Start siphon trigger mechanism 2.3, trigger and siphonage, Ran Houguan occur in siphon piping 2.2
Siphon trigger mechanism 2.3 is closed, at this moment the water in water tank 2.1 is on the increase, when the weight of water tank 2.1 and its internal water is more than salvaging
During the weight of system 1, then water tank 2.1 pulls sliding machine 1.2 to be moved upwards along dam front side track 1.1 by connecting rope 4, enters
And driving grid bucket 1.3 to move upwards, grid bucket 1.3 can come into contact with floater during moving upwards, and will
Floating object basket thereon enters in grid bucket 1.3;Sliding machine 1.2 constantly rises, and slope 3 is moved to always and block 3.1 is limited
Block, because grid bucket 1.3 is now in heeling condition, can be overturn due to self gravitation, and then floating object is also poured into
In lorry 5;
Decline playback state:In the present embodiment, when sliding machine 1.2 reaches 3.1 position of limited block, water tank 2.1
Reach exactly at backstop 2.5, T-shaped block 2.4 is blocked by backstop 2.5, the delivery port of water tank 2.1 can be relatively moved with T-shaped block 2.4
Gap is produced so that the water in water tank 2.1 is continuously outflowed, when the weight of the weight less than salvaging system 1 of water tank 2.1 and its internal water
During amount, then salvaging system 1 can pull shifting on water tank 2.1 by the weight of itself, and at this moment T-shaped block 2.4 blocks the water outlet of water tank 2.1 again
In mouthful position, water tank 2.1 and continuous ponding, when water tank 2.1 and its internal water weight more than salvaging system 1 weight when, can
Repeat said process.
Claims (5)
1. a kind of Reservoir of Hydropower Station floater cleaning system, it is characterised in that:It includes the salvaging system on front side of dam(1)With
Drive mechanism on rear side of dam(2);
The salvaging system(1)Including being installed on track(1.1)On sliding machine(1.2), the sliding machine(1.2)Upper peace
Equipped with the grid bucket that can be overturn(1.3), the grid bucket(1.3)Lower end is also associated with balancing weight(1.4);
The drive mechanism(2)Including water tank(2.1), the water tank(2.1)Water inlet passes through siphon piping(2.2)It is connected to dam
The underwater of front side, the siphon piping(2.2)On be additionally provided with siphon trigger mechanism(2.3), the water tank(2.1)Delivery port position
Put and be additionally provided with T-shaped block(2.4), the T-shaped block(2.4)Lower section is provided with backstop(2.5);
The water tank(2.1)By connecting rope(4)With sliding machine(1.2)Connection;The one end of dam crest portion on front side of dam is provided with
Slope(3), the slope(3)End is provided with for sliding machine(1.2)Carry out spacing limited block(3.1), the slope
(3)Lower section is provided with the lorry of delivery floating object(5).
2. floater cleaning system in Reservoir of Hydropower Station according to claim 1, it is characterised in that:The siphon piping
(2.2)Delivery port position passes through the bellows that can be stretched(2.2.1)With water tank(2.1)Water inlet is connected.
3. floater cleaning system in Reservoir of Hydropower Station according to claim 1, it is characterised in that:Siphon trigger mechanism
(2.3)By fixed block(2.3.1)It is installed on dam trailing flank.
4. floater cleaning system in Reservoir of Hydropower Station according to claim 1, it is characterised in that:The grid bucket(1.3)
It is hingedly connected to sliding machine(1.2)On.
5. floater cleaning system in Reservoir of Hydropower Station according to claim 1, it is characterised in that:The water tank(2.1)Go out
Mouth of a river position inner side is additionally provided with for T-shaped block(2.4)Carry out spacing position-limited rack(2.4.1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621394485.8U CN206267127U (en) | 2016-12-19 | 2016-12-19 | Reservoir of Hydropower Station floater cleaning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621394485.8U CN206267127U (en) | 2016-12-19 | 2016-12-19 | Reservoir of Hydropower Station floater cleaning system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206267127U true CN206267127U (en) | 2017-06-20 |
Family
ID=59045871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621394485.8U Expired - Fee Related CN206267127U (en) | 2016-12-19 | 2016-12-19 | Reservoir of Hydropower Station floater cleaning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206267127U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110237590A (en) * | 2019-06-26 | 2019-09-17 | 钟治飞 | A kind of outlet pipe screen surface sundries cleaning equipment |
CN112267428A (en) * | 2020-10-15 | 2021-01-26 | 唐琪林 | Seepage-proofing reinforcing construction method for dam foundation of hydraulic engineering dam |
-
2016
- 2016-12-19 CN CN201621394485.8U patent/CN206267127U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110237590A (en) * | 2019-06-26 | 2019-09-17 | 钟治飞 | A kind of outlet pipe screen surface sundries cleaning equipment |
CN110237590B (en) * | 2019-06-26 | 2021-12-28 | 西藏瑞华资本管理有限公司 | Water outlet pipe filter screen surface sundries cleaning equipment |
CN112267428A (en) * | 2020-10-15 | 2021-01-26 | 唐琪林 | Seepage-proofing reinforcing construction method for dam foundation of hydraulic engineering dam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104986300A (en) | Cleaning boat for garbage on water surface | |
CN103072674B (en) | A kind of water rubbish clean-up vessel | |
CN104554642A (en) | Floating object cleaning ship | |
CN101353887B (en) | Full automatic pollution removing ice discharge apparatus | |
CN204236744U (en) | Floater cleaning boat | |
CN204822015U (en) | On -water garbage collection ship | |
CN109469029B (en) | Fish gathering and transporting system | |
CN206267127U (en) | Reservoir of Hydropower Station floater cleaning system | |
CN212534019U (en) | Water surface garbage cleaning device | |
CN213323589U (en) | Portable rubbish cleaning boat for small-area water area | |
CN112593534B (en) | Hydraulic engineering is with floating rubbish intercepting device | |
CN106697679A (en) | Water garbage bin | |
CN203111457U (en) | Water surface garbage collection ship | |
CN201027319Y (en) | Movable working table for sucking sand on water | |
CN210562071U (en) | Submerged floating type floating garbage collecting barge | |
CN202899195U (en) | Hydraulic propeller thruster for riverway dredging engineering machinery | |
CN108861185A (en) | Dustbin waterborne | |
CN203222771U (en) | Sand and sludge discharge disturbance device | |
CN112027003A (en) | Portable rubbish cleaning boat suitable for water course is transferred north to south water | |
CN202706091U (en) | On-water locating and stabilizing mechanism of riverway dredging engineering machinery | |
CN206581236U (en) | A kind of drainage arrangement of storage station | |
CN204662391U (en) | A kind of river floater automatic intercepting device of hoist engine lifting | |
CN211621489U (en) | River sluice for hydraulic engineering | |
CN212026184U (en) | River course floater collection ship | |
CN1928247B (en) | Method for treating sewage of water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||